Winter Wonderland Train Show

Similar documents
DelMarVa Chicken Festival Trackmaster s Report

02- Write (T) true of (F) false to the sentences below. CORRECT THE FALSE SENTENCES.

MODULAR RAILROAD SPECIFICATIONS FAQ

Unit Four Answer Keys

1-800-LOGGERS 2

Installing a Turntable and Operating it Under AI Control

Guru Kids Pro Reading Comprehension 1 (Level A)

Aerial Cable Installation Best Practices

Bill Harley: Solo Family Concert Technical and Concert Riders

Hall Hire Frequently Asked Questions

Frequently Asked Questions

$ + $ + $ = $ Booth Fee Corner Fee Electric Fee Total Fees Due. Exp. / Signature

Section 2: Known and Unknown

Attachment 7: 5/9/13 Neighborhood Meeting Summary

DL-AR2 Technical Specifications Universal HDMI Adapter Ring Rev

Installation Agreement

National Wire and Cable and National Cable Molding Headquarters Los Angeles California

It d be Great if I Could See it! A guide to evaluating LED wallboards and LCD displays for the call center

QUICK PATCH Coaxial Patch Panels

IndyGo Facility Upgrades Project 35671EE

Stephen Roy s. Black & White. On-Site Requirements Stage Setup. Ideal Performance Space Set-up Other Practical Considerations Load In Show Control

IL591 SECTION D Rev /2011. Tek-SAFE NC150R Area of Rescue Assistance System. Operation, Installation and Service Manual

INSTALATION PROCEDURE

TECHNICAL RIDER. If you have problems to fulfil some of our demands, please don t hesitate to contact us. We will find a solution!

ENGLISH FILE. Progress Test Files Complete the sentences with the correct form of the. 3 Underline the correct word or phrase.

The Joys of Life Model Railway Club OPERATING THE RAILWAY. Not To Be Taken Away

EZRA STEVENS: My father, after that flood, died. That was in He started--

UNIVERSITY of NORTH DAKOTA LOW VOLTAGE COMMUNICATIONS STANDARDS FOR CABLING, PATHWAYS, AND SPACE

ACADEMIC SUCCESS CENTER THE COLLEGE AT BROCKPORT STATE UNIVERSITY OF NEW YORK PROJECT NO

TruePlate Structural Plate

ELEVATOR INFORMATION DISPLAYS

MPO Technology Connectivity & Application

DS 200 P DS 200 P. Electronic Pressure Switch with Flush Process Connection

ENGR 40M Project 3a: Building an LED Cube

Screen ONE XL and Screen Classic

The Lights Technical Guide June 2017

Minimum qualifications for the Telecommunications Engineer are: A. Texas Licensed Profession Engineer (PE)

The theatre is located in Queen Mary s Gardens, right in the heart of Regent s Park.

Tripod-1 Manual Rev B

Failure Analysis Technology for Advanced Devices

Live From Nashville TECHNICAL RIDER

DS 400 P. Intelligent Electronic Pressure Switch in Hygienic Stainless Steel Ball Housing. on hygienic process connections

Telecommunications Service Technician

February 16-18, 2018

Don t let Potential Customers pass you by!

(1) These Regulations may be called PEMRA Standards for Cable Television Regulations 2003.

The Early Finisher Board

Display Dilemma. Display Dilemma. 1 of 12. Copyright 2008, Exemplars, Inc. All rights reserved.

The theatre is located in Queen Mary s Gardens, right in the heart of Regent s Park.

AUDIO/RADIO PRODUCTION

Vortex / VSX TM 8000 Integration

Theme Ideas EXCITEMENT. An exciting theme is a proven way to drive student traffic to the Fair. Other Ideas Schools Have Used

Bolt-A-Plate. We Support You.

DINNER GAME 20 Things I Love about

Access Statement for An Lanntair

1. Uses. 2. Power Supply. 1) Removal or Positioning of Weld Lines. 2) Regulation of the Injection Quantity by Gate Operation

ELECTRICAL SAFETY INSPECTION REPORT.

OWNERS MANUAL. Revision /01/ Lightronics Inc. 509 Central Drive Virginia Beach, VA Tel

THE NUTCRACKER, A CANADIAN TRADITION Technical and Hospitality Rider

This Errata Sheet contains corrections or changes made after the publication of this manual.

4320 SS-25 Self-Strip Terminating Block

Technical Rider. Page 1 of 5 10/18

Level 2 - Stage 2 Stage Test based on English in Mind Book 1

65 Mustang. A comedy in one act by Burton Bumgarner

Bill Lyons (803) Superintendent Booking: Itaska Walker (803)

Show Host Information Marching Band Season

Simple and highly effective technology to communicate your brand s distinctive character

Concert Hall Technical Specifications

Often Confused Words

When I turn on the Silverleaf, this is the first screen I see:

Seated Risers. Staging Canadell s Seated Risers use an Executive Stage foundation to create tiered seating for bands, choirs or audiences (see page 3)

Assembling and Mounting the Presentation Display, Speakers, Speaker Screens, and Table Door

TECHNICAL RIDER FOR THEATER (rev. 1/2/18)

VNS2210 Amplifier & Controller Installation Guide

Temposonics. Magnetostrictive Position Sensors. L Series (Model LH) to G-Series Linear-Position Sensor. Cross Reference A

VALCOM HANDSFREE TALKBACK PAGING SYSTEM DESIGN/INFORMATION

NMC Concert Band Members Manual Revised January, 2013

ISC202 Quick Start Guide

Postings, Decorations, Electronic Campus Display and Information Distribution Standards

Our Canvas, Your Cause

Theatre SPECIFICATIONS UPDATED: 13/08/13 21 KINGLAND ROAD, POOLE, DORSET, BH15 1UG TELEPHONE: FAX: ADDRESS: TECHNICAL MANAGER:

The Region s Largest and Best Attended Home Show! FEBRUARY , Rockland Community College Field House Arena, Suffern, New York

QRO Coaxial Tee Fitting by WA4NJP, Ray Rector

January 26-27, Welcome to the Virginia Home Show! Thank you for exhibiting with us. January 27-28, 2018

Social Recreation Program Heritage Homes, Inc.

THE CITY OF WINNIPEG BY-LAW NO. 36/2013

Capacity: 60 2 Roxburgh Place, EH8 9SU. Assembly Roxy - Downstairs

Main Products. Cable Assemblies Wire Harnesses Raw Cables. Connectors

,

Volunteer Coordinator and the scheduled Ambassador Captain

SOUND DESIGN DEFINITIONS

Historic meets HIP. Capacity GRAND HALL OVERLOOK

Arizona Pathfinder Fair

Information about Visiting The Customs House

SWISS TIMING Service catalogue FIS World Cup Ski Jumping / Ski Flying 2017/2018

Startle Response. Joyce Ma and Debbie Kim. September 2005

Project Identity Adjustable Art Table Week 1: Monday, January 23, 2006 Bruce Bassi

TECHNICAL RIDER FOR THEATER (rev. 11/30/17)

VNS2200 Amplifier & Controller Installation Guide

to believe all evening thing to see to switch on together possibly possibility around

Transcription:

Winter Wonderland Train Show Manassas Candy Factory 2013 The Manassas Candy Factory, aka the Center for the Arts at the Hopkins Candy Factory, proved a spectacular venue for our train show. As usual the show featured both O Gauge and Standard Gauge layouts. Being alongside the Norfolk Southern main line only added to the uniqueness of the show. The Virginia Railway Express (VRE) contributed to the attendance by scheduling Four Santa Express trains departing and returning from the Manassas station on Saturday the 14 th. All trains were sold out and we took advantage by advertising our train show at the station using sandwich boards, which proved very effective. Saturday s attendance was just under 900 people. The City along with the Candy Factory and local papers advertised the show several weeks in advance of the actual event. The weather played a factor this year causing some delays and cancellations during the set up process but the show opened on time as scheduled. The total attendance was 1870 folks as counted by the building guards. This year s layout was designed not only as a fun layout for the Candy Factory but as a Beta site for the layout being considered for the York show next April. The Up and Over concept was incorporated into the original design and proved very effective. The Up and Over idea requires the Over modules to be raised enough to allow adequate clearance for the under modules. The target was 7 1/2 inches from the top of the lower track to the bottom of the Over Module. HEIGHT:The height was achieved by using Lifters (Frank Hale). The lifters are comprised of PVC (2 ) pipe cut into 1

17 lengths. The module legs are placed inside the PVC pipe and once the module is raised to the desired height a C clamp is attached to the leg at the top of the PVC holding the module at the selected height. 1. All raised modules were double clamped to the adjacent module for support 2. Using 2 PVC pipes per module worked well but required at least three folks when attaching and measuring the height of the module. The advantage is less PVC pipe and clamps. 3. Using 4 PVC pipes per module made it easier to adjust and attach but requires double the PVC pipe and clamps. 4. Our goal was a grade of 1 per 4 feet ( 2%) The Under modules were lowered to 39 to help with the clearance of the Over module. This was achieved by adjusting the legs. 5. The Over module was actually a special Girder bridge built for the show. Instead of underneath support on the module it was on top for maximum clearance. 6. The actual clearance was just under 7 which proved adequate. The final height was a direct product of the limitations of the room and the total layout. Wiring: The layout was our typical two track configuration with a twist so to speak. Each loop (Inner and Outer) was completely separate but because of the Up and Over configuration one side of the layout was a mirror image of the other, this required a harness change in two distinct places. We used a male to male jumper harness with the red and white wires reversed and a female to female jumper harness with the red and white wires reversed. The male to male was inserted at the end of the Over module where the next modules were reversed and at the end of the Under module again as the modules were reversed. Fiber Pins were not required. These were the only wiring changes needed. Each loop was approximately 180 feet in length. The Power House was connected as usual. Assembly: The show is located on the third floor of the Candy Factory so it requires all modules and club assets to be moved via the buildings elevator which is quite adequate but time consuming. Once everything was on the third floor it required about 5-6 hours for assembly minus the inside skirting and some scenery. As mentioned earlier it takes multiple people to assemble the modules with lifters. Multiple measuring devices are needed 2

and at least a two foot level is also required. It is important to assure the tracks are level both across and along the length of the modules. Note: the Old VA Gezzer Gate (Bruce s) does not lend itself to lifters due to it s design. The overall stability of the raised modules was excellent. No less than our normal configuration. The five day period of operation did not effect the stability of the modules. New Virginia Corners: Two new corners were also used and tested at the show. Both corners were used next to each other spanning 12 feet. The corners went in flawlessly and also worked well with lifters attached as they were part of the grade. The track work is excellent and any engine overhang problems were non-existent. One end of the corners were adjacent to Justin s crossover module and the other was a standard module. The other end of the rectangle was composed of standard corners and a module totaling 12 feet also. Some extra cleaning of the track was needed (Weathered Track) as expected. Normal running cured any issue. 3

Operational Issues: As in any layout with separate areas Gezzer Gates are needed especially when all trains are assembled at the yard. A lot of trains were physically carried from one side to the other. Since one side of the layout was a mirror image all tracks were reversed. What was outer loop on the yard side was the inner loop on the mirror side. The same held true for the inner Loop. We used the yard primarily to avoid any confusion when placing trains on the track. With one yard servicing both loops run time should be separated by at least 15 minutes to avoid congestion. Since both sides of the layout incorporated a 2% grade we paid special attention to all trains looking for any difficulties but I am happy to say every train, including a 40 car consist, worked without incident. Skirting: Normal skirting is sufficient on the majority of modules. Where modules are raised 8 inches or so the PVC lifters show which isn t too bad but all the boxes stored under the modules are also viewable. Where this this impacts the overall image of our layout ( For example at entrances) we stapled a skirt to the legs so it just touched the floor and then applied the normal skirt over it. Scenery: Our members outdone themselves this year, Winter Wonderland scenes were evident on every module. The clubs Dept 56 collection was artfully displayed and attracted a lot of attention. I noticed a lot of pictures being taken. With our display on the 3 rd floor of the Candy Factory the majority of spectators use the elevator. Both elevator and stairwell open directly into the room so when either doors opened everyone had the same reaction. A loud WOW! The whole effect of our layout was being surrounded by trains and it was noticed. The first comments I heard were from the Manassas City folks and they especially liked the Up and Over idea. This comment was echoed may times over to several Trackers from our visitors. We also placed Santa s chair directly in front of the Up and Over so as Santa (Bear Bailey) sat in the chair with kids on his knee trains were crisscrossing behind him creating a very special effect, Outstanding. Once again a great photo op that wasn t missed by our visitors. Standard Gauge: A large rectangle (10x28) tabletop layout was put together by Clem and Dan with the scenery decorated by the Candy factory volunteers following the Winter Wonderland theme. Three loops were constantly in motion requiring special attention at all times. Clems collection of trains is amazing and unique. Besides the Standard gauge Clem 4

also featured a Gauge 1 loop running European trains. A half restored train caught everyone s attention as it went around the loop. One complete side finished while the other side was in its original condition. Clem also kept a running blog of the days events through his eyes, It is worth reading!. A pleasant unexpected photo op seemed to come out of nowhere. While standing in front of the Up and Over bridge looking directly towards the back of the room the Standard gauge layout with its white skirting was in view. It fit perfectly. Food: Thanks to everyone who provided a great selection for each days repast. Roast Beef, Sauerkraut and Sausage, Meatball Subs, Chili and a exceptional Pasta dish. Of course each day had a delicious selection of desserts including chocolate cake, apple pie, cookies and fruit. A very generous effort by all members that was truly appreciated by all. To say this year s show was a success is an understatement. We met all our goals as a Beta Site for York while providing an impressive display enjoyed by everyone who attended including all our members. Many thanks to all participants Regis Candy factory Trackmaster 5