FA Cup Final Wembley Stadium London HA9 0WS 27th May 2017

Similar documents
TRNSMT Festival Glasgow Green, Scotland. 29 th June 1 st July th July 8th July 2018

Ride London London and Surrey. 28 th 29 th July 2018

London Marathon London. 22 nd April 2018

Reading and Leeds 2018

Download Festival 2018

Licence for the transmission of digital terrestrial television multiplex service

BBC Response to Glasgow 2014 Commonwealth Games Draft Spectrum Plan

The long term future of UHF spectrum

SWISS TIMING Service catalogue FIS World Cup Cross Country 2017/18

700 MHz clearance programme timescale review. Review of progress, risks and readiness

A Short PWMS overview. DKE WG "Professional Wireless Microphone Systems of DIN and VDE (Germany)

Olympic Spectrum Planning. Mostafa Relmy & Nigel Gunn London 2012 Olympic Games & Paralympics 28 th November 2012

1 Current National Frequency bands and National Interfaces for Mobile use

In November, the Federal

Reply Comments from the Canadian Association of Broadcasters

Swiss Timing Service catalogue FIS World Cup Cross Country 2015/2016

Ofcom's proposed guidance on regional production and regional programming

VERIZON MARYLAND INC.

PSYCHIC SALLY PRODUCTION RIDER & FOH REQUESTS (UPDATED 2016)

Product Guide Verizon Pennsylvania Inc. Section 35D Verizon Pennsylvania Inc. Original Sheet 1 RESIDENCE TWO-POINT MESSAGE TOLL SERVICE

1. Information about the consultation participant 28/07/2017

Overview on the operation and usage principles of PWMS in Europe

GLASGOW 2014 LIMITED RESPONSE TO OFCOM CONSULTATION DOCUMENT Submitted 15 November 2012

MSTV Response to Ofcom s cognitive device proposals

CHIEF BROADCAST ENGINEER

Roadmap for the MHz frequency band in the Slovak Republic

SWISS TIMING Service catalogue FIS World Cup Ski Jumping / Ski Flying 2017/2018

Digital Television Transition in US

Managing the effects of 700 MHz clearance on PMSE and DTT viewers. Summary of progress and call for input

1.2 The NAB is the leading representative of South Africa s broadcasting industry representing:

ITU-D Regional Development Forum for the Arab Region: Access to spectrum, including broadcasting services trends and technologies

Before the Federal Communications Commission Washington, D.C ) ) ) ) ) REPLY COMMENTS OF PCIA THE WIRELESS INFRASTRUCTURE ASSOCIATION

1. Information about the consultation participant 05/04/2018

PMSE DTT spectrum sharing. Darko Ratkaj European Broadcasting Union

Planning for TV Spectrum Repacking and the Transition to ATSC 3.0

RESPONSE OF SHURE INCORPORATED. Securing Long Term Benefits from Scarce Spectrum Resources: A Strategy for UHF Bands IV and V. Submitted June 7, 2012

Orders received after July 1st will be charged 2x Standard Rate.

Code of Practice on Changes to Existing Transmission and Reception Arrangements

Demonstration of geolocation database and spectrum coordinator as specified in ETSI TS and TS

Purchasing and Property Services AOC East Fowler Avenue Tampa, Florida (813)

SWISS TIMING Service catalogue FIS World Cup Ski Jumping Ladies 2017/2018

UK 700MHz Strategy and Digital Terrestrial Television update. Chris Woolford, Director of International Affairs, Ofcom 3 rd October 2013

TERMS & CONDITIONS. Please read this policy carefully to avoid losing your deposit payment and any cancellation fees.

UNIVERSITY OF CAMBRIDGE INTERNATIONAL EXAMINATIONS International General Certificate of Secondary Education

ELIGIBLE INTERMITTENT RESOURCES PROTOCOL

Via

British Entertainment Industry Radio Group (BEIRG)

Start of DTV Transition 600 MHz repacking

Incorrect Temperature Measurements: The Importance of Transmissivity and IR Viewing Windows

Before the FEDERAL COMMUNICATIONS COMMISSION Washington DC ) ) ) ) ) ) ) ) COMMENTS OF

Tone Insertion To Indicate Timing Or Location Information

Cultural Arts Center Fall Choral &Theatre Festival 2016 Registration Form for Choral

REQUEST FOR PROPOSALS AND TERMS OF REFERENCE

6.3 DRIVERS OF CONSUMER ADOPTION

(12) Publication of Unexamined Patent Application (A)

TECHNICAL SPECIFICATIONS FOR THE DELIVERY OF CLOSE TO TRANSMISSION TELEVISION PROGRAMMES TO THE

In this document, the Office of Management and Budget (OMB) has approved, for a

AUDITION FOR TUTTI VIOLIN

Reconfiguration Along the U.S.-Mexico Border Meeting in NPSPAC Region 3: Arizona May 16, 2013

2010 NAB Show Call for Speakers

Questionnaire on cross-border coordination issues regarding 700 MHz spectrum clearance and migration of broadcasting service below 694 MHz

TERMS & CONDITIONS. Please read this policy carefully to avoid losing your deposit payment and any cancellation fees.

Digital Switchover Management of Transition Coverage Issues Statement

EMERSON SMART WIRELESS RADIO SILENCE REPORT

COLUMBIA COUNTY, WISCONSIN COURTROOM VIDEO CONFERENCE & AV SYSTEMS REQUEST FOR PROPOSALS

Wireless VGA Extender LR. GTV-WVGA-LR. User Manual

Notice Pursuant to Section 32H of the Telecommunications Ordinance (Chapter 106)

City of Winter Springs, FL

COP 23/CMP 13/CMA 1.2

The availability of UHF spectrum for SAB after television switch-over J.A. Green, P.L. Marsden and

GOVERNMENT GAZETTE OF THE REPUBLIC OF NAMIBIA. N$4.00 WINDHOEK - 11 July 2014 No. 5507

RETURN THIS AMENDMENT TO THE ISSUING OFFICE AT: AMENDMENT (1) ONE to RFP

The transition to Digital Terrestrial TV and utilisation of the digital dividend in Europe

Official Journal of the European Union L 117/95

Introduction. Introductory remarks

Council of the European Union Brussels, 11 January 2017 (OR. en)

Maximising the benefits of 700 MHz clearance. Enabling acceleration of 700 MHz clearance and use of the 700 MHz centre gap

(2) provide notice to the public about the availability of these features; and

Digital audio is superior to its analog audio counterpart in a number of ways:

DragonWave, Horizon and Avenue are registered trademarks of DragonWave Inc DragonWave Inc. All rights reserved

OECD COMMUNICATIONS OUTLOOK 2001 Broadcasting Section

Contract Details, and Delivery Requirements

PART FIVE (V): CONCERTS AND RECITALS UNDERGRADUATES AND GRADUATES WASHINGTON STATE UNIVERSITY SCHOOL OF MUSIC POLICIES AND PROCEDURES

LEXUS CLUB MEMBER HANDBOOK

Music Administrator, Temple Church

CROCODILE AUSTRIA VIDEOSYSTEM

Digital Audio Design Validation and Debugging Using PGY-I2C

British Entertainment Industry Radio Group (BEIRG) Response to consultation Implementing Geolocation

Draka Shipboard Cables

DRAFT UK Interface Requirement 2102

Quick Reference Guide

The Telecommunications Act Chap. 47:31

Administrator: TLC Marketing UK Ltd, 17a-19 Harcourt Street, London, W1H 4HF.

Tele-Conferencing Rooms

Meeting & Hospitality Space Request Form Spring 2019 Convention: February 22 24, 2019 Hyatt Regency Sacramento and Sacramento Convention Center

MAYHEM POETS CONTRACT RIDER

Impact on Providers. Page 1 of 11

Adaptrum and Microsoft NAB Show Demonstration

THEATER RENTAL AGREEMENT

RADIO SPECTRUM POLICY GROUP

Transcription:

Wembley Stadium London HA9 0WS 27th May 2017

Introduction The FA Cup Final 2017 is once again designated as a Major Event, where careful control of frequency assignments will need to be implemented in order to establish a successful working system. This year the Event will be coordinated by Gregory Smith Frequency Coordinator Greg Smith Our office contact details are: +44 (0) 207 981 3803 or email pmse@ofcom.org.uk During the event, we can be contacted on: +44 (0)7773 213 839 or email Gregory.smith@ofcom.org.uk 1

Contents Section Page 1 Application Process 3 2 Coordination and Licensing 4 3 Event Time 5 4 Useful Contacts 6 2

Section 1 1 Application Process 1.1 Talkback spectrum is always in high demand for the FA Cup Final so applicants are asked to submit their requests at the earliest possible opportunity. It is advisable to submit frequency applications by April 14 th 2017, as applications submitted later than this may not be accommodated as required. As the FA Cup Final is designated a Major Event, applications for frequencies will not be subject to Ofcom PMSE s usual three day turnaround rule. All frequency applications will be collated and worked on at the same time in order to achieve the best frequency plan. Applications can be submitted via the online Event application process, or by submitting an application form in the usual manner. All application forms are downloadable from our website www.ofcom.org.uk/pmse. On receipt of all frequency applications customers will be notified via email that their application has been received. Once applications have been reviewed, customers will be contacted if there are any immediate concerns regarding their requirements, or if any relevant information has been omitted. 3

Section 2 2 Coordination and Licensing 2.1 The two main areas of concentrated talkback use are the OB Compound and the Television Gantry. It is therefore vital from a coordination perspective that the locations of all talkback antennas made known. If the locations of talkback antennas are not made known, Ofcom PMSE will call to obtain this information, which may delay the process. Information key to the coordination process includes: The number of wireless microphones, in ear monitors and wireless talkback systems and wireless cameras required The frequency range that equipment will tune across (greater flexibility will aid the coordination process) The dates and times that frequencies are needed The location of wireless talkback antennas within the stadium Such information can be included on the application form or an accompanying email. When Licences have been processed, a secure payment link will be emailed to the applicant. Once confirmation of payment has been received, the Licence will be issued and emailed to the applicant. We aim to issue licences on or before May 12 th 2017 for applications received within the stated time periods, allowing sufficient time for equipment to be retuned or programmed. Payment can be made via the secure payment link, credit/debit card, BACS transfer or by carnet tokens. 4

Section 3 3 Event Time 3.1 During the Event it is imperative that all frequencies are used within the terms and conditions of the Licence held. This includes transmission of frequencies only during the times and date stated on the Licence, not exceeding the designated maximum power, transmitting frequencies only from the location specified on the Licence or as discussed with the Event Coordinator. If interference is experienced during the event the Event Coordinator will be available to assist during office hours by way of investigating the possible cause of the interference. If the cause is identified the necessary steps will be taken. If interference occurs outside of office hours, the Emergency Coordinator will be able to assist. 5

Section 4 4 Useful Contacts 4.1 Event Coordinator Details E-mail: gregory.smith@ofcom.org.uk Direct Dial: +44 (0) 20 7981 3753 Mobile: +44 (0)7773 213 839 4.2 Office Details Our office hours are 9:00 17:00 Monday to Friday Telephone: +44 (0) 207 981 3803 Email: pmse@ofcom.org.uk For help outside of these hours, please contact our out of hours Emergency Coordinator (Please note there is a 55 premium charge per schedule for our out of hours service) on emergency contact number: +44 (0) 7866 423619. 6