Revised Procurement Plan for the project Rural Roads Project -II (PMGSY) For MEGHALAYA Effective 1 st February 2015

Similar documents
Measurement of Capacitances Based on a Flip-Flop Sensor

Lab 2 Position and Velocity

Updated Project Procurement Plan for

UPDATE FOR DESIGN OF STRUCTURAL STEEL HOLLOW SECTION CONNECTIONS VOLUME 1 DESIGN MODELS, First edition 1996 A.A. SYAM AND B.G.

G E T T I N G I N S T R U M E N T S, I N C.

2015 Communication Guide

-To become familiar with the input/output characteristics of several types of standard flip-flop devices and the conversion among them.

application software

Monitoring Technology

I (parent/guardian name) certify that, to the best of my knowledge, the

Overview ECE 553: TESTING AND TESTABLE DESIGN OF. Ad-Hoc DFT Methods Good design practices learned through experience are used as guidelines:

application software

Enabling Switch Devices

Adaptive Down-Sampling Video Coding

Physics 218: Exam 1. Sections: , , , 544, , 557,569, 572 September 28 th, 2016

SAFETY WITH A SYSTEM V EN

Besides our own analog sensors, it can serve as a controller performing variegated control functions for any type of analog device by any maker.

Advanced Handheld Tachometer FT Measure engine rotation speed via cigarette lighter socket sensor! Cigarette lighter socket sensor FT-0801

10. Water tank. Example I. Draw the graph of the amount z of water in the tank against time t.. Explain the shape of the graph.

Drivers Evaluation of Performance of LED Traffic Signal Modules

Personal Computer Embedded Type Servo System Controller. Simple Motion Board User's Manual (Advanced Synchronous Control) -MR-EM340GF

Computer Graphics Applications to Crew Displays

DO NOT COPY DO NOT COPY DO NOT COPY DO NOT COPY

LATCHES Implementation With Complex Gates

TWENTY-SEVENTH ANNUAL REPORT

CE 603 Photogrammetry II. Condition number = 2.7E+06

A Turbo Tutorial. by Jakob Dahl Andersen COM Center Technical University of Denmark

EX 5 DIGITAL ELECTRONICS (GROUP 1BT4) G

DIGITAL MOMENT LIMITTER. Instruction Manual EN B

SMD LED Product Data Sheet LTSA-G6SPVEKT Spec No.: DS Effective Date: 10/12/2016 LITE-ON DCC RELEASE

MULTI-VIEW VIDEO COMPRESSION USING DYNAMIC BACKGROUND FRAME AND 3D MOTION ESTIMATION

Digital Panel Controller

ZEP - 644SXWW 640SX - LED 150 W. Profile spot

4.1 Water tank. height z (mm) time t (s)

First Result of the SMA Holography Experirnent

TUBICOPTERS & MORE OBJECTIVE

Special Events Meetings Photography

Nonuniform sampling AN1

TEA2037A HORIZONTAL & VERTICAL DEFLECTION CIRCUIT

Trinitron Color TV KV-TG21 KV-PG21 KV-PG14. Operating Instructions M70 M61 M40 P70 P (1)

THE INCREASING demand to display video contents

AUTOCOMPENSATIVE SYSTEM FOR MEASUREMENT OF THE CAPACITANCES

R&D White Paper WHP 120. Digital on-channel repeater for DAB. Research & Development BRITISH BROADCASTING CORPORATION.

MELSEC iq-f FX5 Simple Motion Module User's Manual (Advanced Synchronous Control) -FX5-40SSC-S -FX5-80SSC-S

A Methodology for Evaluating Storage Systems in Distributed and Hierarchical Video Servers

(12) (10) Patent N0.: US 7,260,789 B2 Hunleth et a]. (45) Date of Patent: Aug. 21, 2007

Communication Systems, 5e

Signing Naturally, Teacher s Curriculum Guide, Units 7 12 Copyright 2014 Lentz, Mikos, Smith All Rights Reserved.

Workflow Overview. BD FACSDiva Software Quick Reference Guide for BD FACSAria Cell Sorters. Starting Up the System. Checking Cytometer Performance

The Impact of e-book Technology on Book Retailing

AN-605 APPLICATION NOTE

04/000 Control Relays, Contactor Relays, Electronic Timing Relays, Electronic Safety Relays, Measuring and Monitoring Relays s y la e r R cto

Course Schedule from Oct. 2, 2017 to Dec. 31, 2018

Source and Channel Coding Issues for ATM Networks y. ECSE Department, Rensselaer Polytechnic Institute, Troy, NY 12180, U.S.A

LCD Module Specification

Student worksheet: Spoken Grammar

MaxGard Interconnection Systems

Type: Source: PSU: Followspot Optics: Standard: Features Optical Fully closing iris cassette: Long lamp life (3000 h) Factory set optical train:

On Mopping: A Mathematical Model for Mopping a Dirty Floor

The Projection of DP (and DegP)

TLE7251V. 1 Overview. Features. Potential applications. Product validation. High Speed CAN-Transceiver with Bus Wake-up

SOME FUNCTIONAL PATTERNS ON THE NON-VERBAL LEVEL

LCD Module Specification

Corrigendum-II. Up to 30 th October 2018 till 17:00 Hrs. 31 st October 2018 till 17:00 Hrs. 2 nd November 2018 till 14:00 Hrs.

TLE7251V. Data Sheet. Automotive Power. High Speed CAN-Transceiver with Bus Wake-up TLE7251VLE TLE7251VSJ. Rev. 1.0,

Flo C. Compact W MSR. Followspot

f, I f, f, t t A Tale of Two Cities : A Study of Conference Room Videoconf erencing I ELEI{TE)ENLE 0nulo Telepresence Project

Removal of Order Domain Content in Rotating Equipment Signals by Double Resampling

Commissioning EN. Inverter. Inverter i510 Cabinet 0.25 to 2.2 kw

TLE Overview. High Speed CAN FD Transceiver. Qualified for Automotive Applications according to AEC-Q100

Coded Strobing Photography: Compressive Sensing of High-speed Periodic Events

Circuit Breaker Ratings A Primer for Protection Engineers

CHEATER CIRCUITS FOR THE TESTING OF THYRATRONS

Theatrical Feature Film Trade in the United States, Europe, and Japan since the 1950s: An Empirical Study of the Home Market Effect

THE THIRD & MISSION. Jones Lang LaSalle Brokerage, Inc. Real Estate License #:

Specialized High Schools Student Handbook

Kees Schoonenbeek Arranger, Composer, Director, Publisher, Teacher

Sartorius Cubis Series User Manual Precision and Analytical Scales MSA Models

Q = OCM Pro. Very Accurate Flow Measurement in partially and full filled Pipes and Channels

TLE6251D. Data Sheet. Automotive Power. High Speed CAN-Transceiver with Bus Wake-up. Rev. 1.0,

IDT70V05S/L 8K x 8 DUAL-PORT STATIC RAM

Telemetrie-Messtechnik Schnorrenberg

Lancelot TS. Grand W HTI. Followspot. Type: Followspot Source: 4000 W HTI PSU: Magnetic - hot restrike Optics: 2 to 5 zoom.

INSTRUCTION MANUAL SPA CONTROL SYSTEM NEO 2100 CONTROL PANEL NEO 1100 CONTROL PANEL

TLE8251V. 1 Overview. High Speed CAN Transceiver with Bus Wake-up

VECM and Variance Decomposition: An Application to the Consumption-Wealth Ratio

Region-based Temporally Consistent Video Post-processing

Senior Math Studies Lesson Planning Date Lesson Events

Hello! Target Language

Prospects of Digital Broadcasting and Convergence Services. - The Essential and Expanding Role of Broadcasting September 02, 2010

DETAIL SPECIFICATION SHEET CONNECTORS, ELECTRICAL, CIRCULAR, RECEPTACLE, THREADED, JAM-NUT MOUNTING, REMOVABLE CRIMP CONTACTS, SERIES III, METRIC

NATURAL EXPERIMENTS IN U.S. BROADBAND REGULATION

Procurement of IC TESTER & TRAINER KITS, OSCILLOSCOPES, FG S, DECADE BOXES AND ANALOG METERS

TLE9251V. 1 Overview. High Speed CAN Transceiver. Qualified for Automotive Applications according to AEC-Q100. Features

Sartorius EcoMix.COMPACT

KPI and SLA regime: August 2015 performance summary Ref Jun 15 Jul 15 Aug 15 Target Description KPI A 100% 100% 99.87% 99% green

Tarinaoopperabaletti

You can download Mozart s music. You can t download his genius!

SAFETY WARNING! DO NOT REMOVE THE MAINS EARTH CONNECTION!

RCOA Mandatory Contestability for Phase 1 Customers. 16 December 2016

Transcription:

re Auhorized Public Disclosure Auhorized Public Disclosure Auhorized Public Disclosure Auhorized Revised Procuremen Plan for he projec Rural Roads Projec -II (PMGSY) For MEGHALAYA Effecive 1 s February Page 1 of 33 This is an indicaive plan prepared by he Projec for he enire projec period. The Projec shall updae he Procuremen Plan annually or as needed hroughou he duraion of he projec in agreemen wih he Bank o reflec he acual projec implemenaion needs and improvemens in insiuional capaciy. The Projec shall implemen he Procuremen Plan in he manner in which i has been approved by he Bank. This plan has been reviewed during negoiaions I. General 1. Bank s approval he procuremen Plan Feb 2. General Procuremen Noice issued for Consulancies only: Sepember 14, 2010. Updaed GPN for he complee projec is o be issued. 3. Period covered by his procuremen plan: enire projec period II. Goods and Works 1. Procuremen Mehods and Prior Review Threshold: Procuremen Decisions shall be subjec o Prior Review by he Bank as saed in Appendix 1 o he Guidelines for Procuremen. Expendiure Caegory Procuremen Mehod Prior Review Threshold US$ GOODS, EQUIPMENT & MACHINERY 1. Goods and Equipmen esimaed o cos equivalen of US$ 3000,000 or more per conrac 2. Goods and Equipmen esimaed o cos less han US$ 3000,000 and greaer Commens ICB All conracs World Bank SBD will be used and he procuremen will be as per procedures described in World Bank Guidelines 95050 NCB All pos review The NCB bidding documen agreed wih GOI will be used and he procuremen will be as per procedures described in he

han US$ 100,000 equivalen per conrac 3. Goods and Equipmen esimaed o cos less han US$ 100,000 equivalen per conrac Shopping procedure wih a leas hree quoaions from qualified bidders in accordance wih he provisions of paragraph 3.5 of procuremen Guidelines. All pos review Procuremen and Managemen Manual. Procuremen hrough DGS&D rae conracs will be considered equivalen o shopping procedure. 4. Goods and Equipmen ha mee he requiremens of paragraph 3.6 and 3.7 of Procuremen Guidelines. Direc ing Upo US$ 100000 pos review and balance prior review c 5.. 6. Civil works conracs esimaed o cos more han US$ 40,000,000 equivalen per conrac Civil works conracs esimaed o cos up o US$ 40,000,000 equivalen per conrac CIVIL WORKS ICB * All conracs World Bank SBD will be used and he procuremen will be as per procedures described in World Bank Guidelines. NCB Firs conrac for works for each sae, irrespecive of value and all conracs esimaed o cos more han US$ 15,000,000 equivalen per conrac will be subjec o prior review by he Bank. All oher works conracs will be subjec o pos Page 2 of 33 The procuremen will be done as per procedures described in he Procuremen cum Managemen Manual and using he «Model Bidding Documen» cleared by he Bank

review. * As per curren planning, no ICB conracs are envisaged for civil works. 2. Pre-qualificaion. No Applicable 3. Proposed Procedures for CDD Componens (as per paragraph. 3.17 of he Guidelines): No Applicable 4. Reference o (if any) Projec Operaional/Procuremen Manual: A Procuremen cum conrac Managemen Manual is already circulaed by NRRDA afer aking WB ino confidence. All procuremen in he projec will be done as per procedures described in i.. 5. Any Oher Special Procuremen Arrangemens: The following provisions consiue addiional provisions applicable for purposes of Naional Compeiive Bidding (NCB). NCB will be conduced in accordance wih paragraph 3.3 and 3.4 of he Guidelines and he following provisions: Only he model bidding documens for procuremen of works hrough NCB agreed wih he Bank (and as amended for ime o ime), shall be used for bidding; No special preference will be accorded o any bidder eiher for price or for oher erms and condiions when compeing wih foreign bidders, sae-owned enerprises, small scale enerprises or enerprises from any given Sae; Excep wih he prior concurrence of he Bank, here shall be no negoiaion of price wih he bidders, even wih he lowes evaluaed bidder; The sysem of rejecing bids ouside a pre-deermined margin or "bracke" of prices shall no be used in he projec; Page 3 of 33

However, as an excepion in his projec, wo par bidding for NCB works (as described in he model bidding documen) has been agreed by he Bank subjec o appropriae fiduciary safeguards(eprocuremen sysem and complain handling mechanism accepable o he Bank) All procuremen of works hrough NCB in he seven paricipaing saes will be done hrough a sandardized e-procuremen sysem accepable o he Bank. As per paragraph 1.14(e) of he World Bank's Procuremen Guidelines, he Associaion's righ o inspec he accouns and records of bidders, suppliers and conracors will be included in he bidding documens. III. Selecion of Consulans 1. Selecion Mehods and Prior Review Threshold: Selecion decisions shall be subjec o Prior Review by Bank as saed in Appendix 1 o he Guidelines Selecion and Employmen of Consulans: Expendiure Caegory x Value hreshold per conrac Selecion Mehod Prior Review Threshold Consulancy conracs o be awarded o Consulan firms including selecion of raining insiues by NRRDA/SRRDAs Each conrac esimaed o cos US$ 1000,000 equivalen or more per conrac Each conrac esimaed o cos less han US$ 1000,000 equivalen per conrac -Qualiy and Cos Based (QCBS) mehod -REOI o be published in UNDB on line -Qualiy and Cos Based (QCBS) mehod -Qualiy Based (QBS) mehod of selecion in accordance wih he provisions of paragraph 3.1 o 3.4 of Consulan s Guidelines. -Consulan s Qualificaions (CQS) mehod. -Leas Cos Mehod (LCS). -Fixed BudgeMehod. All prior review. All single source selecion of consulans wih esimaed cos of more han US$ 100,000 equivalen per conrac will be subjec o prior review. All oher conracs will be subjec o pos review bu wih TORs subjec o prior review by he Page 4 of 33

All dividual Consulan conracs -Single Source Selecion -Through comparison of qualificaions of a leas hree candidaes. -Sole Source Selecion Bank All cases subjec o pos review bu wih TORs subjec o prior review by he Bank. All conracs for single source d\selecion of individual consulan wih esimaed value more han USD 100 000 will be subjec o prior review. 2. Shor lis comprising enirely of naional consulans: Shor lis of consulans for services, esimaed o cos less han $ 500,000 equivalen per conrac, may comprise enirely of naional consulans in accordance wih he provisions of paragraph 2.7 of he Consulan Guidelines. Any Oher Special Selecion Arrangemens: NIL PROCUREMENT PLAN WITH METHODS AND TIME SCHEDULE FOR 18 MONTHS PERIOD STARTING FEBRUARY Sae: Meghalaya CIVIL WORKS Procuremen Mehod : NCB SANCTION UNDER FIRST TRANCHE ON 16 AUGUST Review by Bank : PRIOR Page 5 of 33

16h Augus, 16h Augus, Disric 1 Ri-Bhoi 2 Wes Garo VI- MG/04/03 VI- MG/06/03 ed (Rs. 10.000 9.253 4.660 2.771 : 14.660 12.024 Descripion of works Consrucion i/c MB of a road from MMR Road (Umshru) o Nongrim Jirang Consrucion i/c MB of a road from 10h km of AMPT Road (Gnarugre) o Rongalgre issue of NIT 9h Sep. 9h Sep. submission of Bids 31s Oc. 31s Oc. accepance 21-Mar- 26-Mar- (Rs. 879.103 289.049 Compleed Review by Bank : POST Disric ed (Rs. Descripion of works issue of NIT submission of Bids accepance (Rs. 3 Eas Garo VI-MG/0103 5.000 4.332 Consrucion i/c MB of a road from T02 o Madalanggre o Bolpuma (Ch:0.00-1830m) Consrucion i/c MB of a road from T02 o Madalanggre o Bolpuma (Ch:1830-5000m) 11h Mar. 11h Mar. 6h May 6h May 10h July 10h July 227.87 254.751 Page 6 of 33

4 VI-MG/0106 2.045 1.603 5 6 7 8 9 10 11 Eas Khasi Jainia Ri-Bhoi VI- MG/02/01 VI- MG/02/02 VI- MG/02/03 VI- MG/03/03 VI- MG/03/04 VI- MG/04/01 VI- MG/04/02 4.354 4.57 10.190 8.38 7.475 6.62 3.330 2.266 6.200 4.494 7.400 6.438 4.620 3.972 Consrucion i/c MB of a road from L-32 o Mil Awe Consrucion i/c MB of a road from Mawpyrshong o Mdanlangning Consrucion i/c MB of a road from Jaroi o Nonghali & Mynriang Consrucion i/c MB of a road from Mawlong o Lumkseh Consrucion i/c MB of a road from Barao o Iongkwang Consrucion i/c MB of a road from Mulai o Mukhain Consrucion i/c MB of a road from UJ road o Pamrinai via Pamlaban Consrucion i/c MB of a road from Uma o Mawkangi. 11h Mar. 9h Sep. 9h Sep. 9h Sep. 9h Sep. 9h Sep. 9h Sep. 9h Sep. 30h April 31s Oc. 31s Oc. 31s Oc. 31s Oc. 31s Oc. 31s Oc. 31s Oc. 18h July 14-Mar- 07-Nov- 03-Apr- 26-Mar- 20-Mar- 26-Mar- 14-Mar- 169.665 425.938 Compleed 822.753 623.560 Compleed 211.707 Compleed 472.488 Compleed 650.341 369.681 Page 7 of 33

16h Augus, Disric 12 Ri-Bhoi 13 14 15 16 17 18 Wes Garo Wes Khasi VI- MG/04/04 VI- MG/06/01 VI- MG/06/02 VI- MG/06/04 VI- MG/06/05 VI- MG/07/02 VI- MG/07/04 ed (Rs. 4.000 2.911 1.998 1.048 3.323 2.065 2.557 1.58 3.227 2.181 5.500 6.644 20.000 23.682 Descripion of works Consrucion i/c MB of a road from Umsning- Mawrong road o Banbudai. Consrucion i/c MB of a road from 70h km of AMPT Road o Singwilgre Consrucion including MB of a road from Baljek Agal o Rongsep Adinggre Consrucion i/c MB of a road from Kalchenggre o Rongram-gre (Ph-II) Consrucion i/c MB of a road from 18h km of AP Road o Somonpara Consrucion of a road from Phojaud o Mawbidong Consrucion of a road from Nongjri o Jynruniangbrak issue of NIT 9h Sep. 9h Sep. 11h Mar. 9h Sep. 11h Mar. 9h Sep. 20h Feb. submission of Bids 31s Oc. 31s Oc. 30h April 31s Oc. 30h April 31s Oc. 3rd April accepance 26-Mar- 26-Mar- 14h Aug 21-Mar- 14h Aug 11-July- 27-Sep- (Rs. 287.424 100.916 Compleed 229.713 162.521 250.004 627.900 920.716 Page 8 of 33

8h May, (1s-10h Km) : 91.219 82.786 Consrucion of a road from Nongjri o Jynruniangbrak (11h-20h Km) 20h Feb. 3rd April 25-Sep- 1214.74 SANCTION UNDER SECOND TRANCHE ON 08 MAY 1 Disric ed (Rs. MG/01/05 1.537 0.937 5 Eas Garo MG/01/55 5.790 4.593 6 MG/01/57 2.953 2.338 Descripion of works T02 o New Kanolguri 2 MG/01/08 1.650 1.034 T05 o Darakhona 3 MG/01/47 3.161 2.49 4 MG/01/53 3.207 2.473 7 MG/01/77 2.000 1.357 8 MG/01/80 2.269 1.993 Disric ed Wagopgre o Rongdolgre Bolpuma o Dalbo Rongbok Akarok o Akarok Songgial T04 o Dagal Samiy Rongjeng Jambal o Baringgre Wadro Mangsang Makura o Mangsang Dosikgiim Descripion of works issue of NIT 30 h Oc. submission of Bids 25 h Oc. 16 h Sep. 26 h Sep. accepance (Rs. 8h Jan 110.09 21s Nov. 118.38 269.04 9 h Jan 29 h Jan 4 h March 293.61 30 h Oc. 30 h Oc. issue of NIT 16 h Sep. 25 h Nov. 25 h Nov. 16 h Sep. submission 8h Jan. 8h January accepance 510.04 277.91 158.66 220.64 Page 9 of 33

8h May, (Rs. of Bids (Rs. Baringgre Wadro 9 MG/01/82 4.719 4.22 30 h 25 h Nov. 8h Jan Oc. 499.00 o Bolkrek Eas 10 Garo MG/01/84 2.581 2.312 T03 o Gandual 30 h 25 h Nov. Oc. 8h Jan 268.15 Haslong o 16 h Sep. 11 MG/01/88 1.812 1.602 176.94 Nagimaram Mawryngkang o 12 MG/02/04 2.500 3.027 Nonghymmai 4 h Sep. (Mawshun) 330.89 including bridge 13 MG/02/05 3.000 3.028 14 15 Eas Khasi MG/02/06 MG/02/07 2.591 2.299 3.590 3.239 16 MG/02/08 2.105 1.852 17 MG/02/11 1.523 1.313 18 MG/02/12 4.880 3.953 Khrang o Khonghong Nongspung Laimawsiang road o Mawkynroh Sohiong Pariong road o Kharongai, Mawlynghoh and Wahnongbah Sohiong Nongspung road o Kyndong Wahlang L - 026 o Lailulong Sec - II T-01 o Nonglyngkien 19 MG/02/13 1.914 1.368 T-01 o Mawiong 28h Jan 13 h Sep. 6 h Sep 6 h Sep. 6 h Sep. 4 h Sep. 28 h Feb 5 h Sep. 21s November 309.62 233.44 318.99 182.74 129.22 26 h May 389.15 134.51 Page 10 of 33

8h May, 20 Disric ed (Rs. Descripion of works MG/02/14 1.573 1.236 T-01 o Jaud issue of NIT submission of Bids 5h Sep. accepance (Rs. 121.64 21 Eas MG/02/15 3.458 4.143 Khasi 22 MG/02/20 3.564 1.984 23 MG/02/26 3.001 2.7 24 MG/03/01 3.000 2.922 Jainia 25 MG/03/02 2.929 1.95 26 MG/03/05 13.500 15.684 27 MG/04/05 16.000 14.179 28 MG/04/01 5.230 4.699 29 MG/04/02 5.237 3.326 RiBhoi 30 MG/04/04 3.727 4.632 31 MG/04/06 3.739 3.328 32 MG/04/08 3.175 2.627 Rngibah o Thangbnai L-041 o Lumdiengsai Lyngkha Tmar o Nongsohphan 207h Km of NH40E o Iongnoh PWD road o Khliehmynriang Thruk o Moulhoi including bridge Umsiang o Amjong N.U.M.U. Road o Korsep Umran Diary o Rilong Mawskeihem o Mawskeilum 67h Km of U.J. Road o Mawker Nonglum o Umangling 6 h Sep. 6h Sep. 5 h Sep. 5 h Sep. 5 h Sep. 12 h Sep. 6 h Sep. 16 h Sep. 26 h Sep. 17 h Sep. 6 h Sep. 7 h Sep. 26 h Sep. 17 h Sep. 25h Oc. 25h Oc. 21s November 20h November 422.21 194.44 279.22 335.85 210.46 1475.99 1403.74 462.81 326.99 482.24 325.31 258.61 Page 11 of 33

8h May, No. Disric ed (Rs. Descripion of works issue of NIT submissi on of Bids accepance (Rs. 33 MG/04/10 1.998 1.017 B K.D Road o Nongpyrde 17 h Sep. 99.72 34 MG/04/14 8.600 7.831 35 MG/04/15 2.500 2.216 36 MG/04/16 1.780 1.246 37 MG/04/17 3.373 1.518 6h Km of BB road o Mawhei DT road o Sohliya UJ Road o Shilliang Umdoh DT Road o Madan Nonglakhia 6h Sep. 17 h Sep. 17 h Sep. 26 h Sep. 17 h Sep. 20h November 771.38 218.30 124.24 148.79 38 MG/04/19 2.000 1.795 Ribhoi 39 MG/04/20 1.550 1.083 40 MG/04/21 1.600 0.860 NUMU Road o Umshakai MMR road o Sohkyrbam Domphlang MMR Road o Gunpai 6h Sep. 6 h Sep. 17 h Sep. 26 h Sep. 26 h Sep. 21s November 20h November 176.78 106.73 84.75 41 MG/04/22 7.500 6.644 3rd Km of US road o Narap and Sohlairim 6 h Sep. 26 h Sep. 20h November 654.44 42 MG/04/23 2.500 1.531 17h km of UJ road o Mawkynrong 6 h Sep. 26 h Sep. 20h November 148.30 43 MG/04/24 2.320 1.884 M.M. road o Nongdom Mawpliang 6 h Sep. 26 h Sep. 20h Nov. 185.82 Page 12 of 33

8h May, No. Disric ed (Rs. Descripion of works issue of NIT submission of Bids accepance (Rs. 44 MG/04/25 4.800 4.214 Kyrdem o Mawlwai 17 h Sep. 411.67 Ribhoi 45 MG/04/26 5.000 3.628 UBU road o Umkakroh (Pamkroh) 1 17 h Sep. 356.96 46 MG/06/06 1.807 1.571 Rongchadenggre o Wakanagre Sec-I (upo Jamanggre) 30 h Oc. 25 h Nov. 7h Jan 175.89 47 MG/06/07 3.927 3.146 7h km of Ampai Boldamgre road o Kambakpara 23 rd Sep. 20h Nov. 319.88 48 MG/06/08 1.700 1.225 Joyfar o Kashra Sec-I (Upo Belbari) 23 rd Sep. 20h Nov. 129.10 49 Wes Garo MG/06/09 4.779 4.484 50 MG/06/11 2.935 2.651 4h km of KG road o Dinangpara Wakringonggre o Gondenggre 23 rd Sep. 20 h Sep. 20h Nov. 451.73 289.40 51 MG/06/12 3.714 2.918 52 MG/06/13 1.711 1.363 53 MG/06/14 6.750 5.005 54 MG/06/15 5.847 6.262 Kamaboldakgre o Somarenggre Haisil o Muji Agalgre Jamanggre o Wakanagre Damal Asim o Tebronggre (Ph-I) (upo Dipogre) 30 h Oc. 30 h Oc. 20 h Sep. 23 rd Sep. 25 h Nov. 25 h Nov. 20h Nov. 319.83 135.46 7h Jan 560.79 8h Jan 741.72 Page 13 of 33

8h May, No. 55 Disric ed (Rs. MG/06/16 5.284 4.868 56 MG/06/20 2.326 2.373 57 MG/06/40 2.730 2.38 58 MG/06/47 2.375 1.783 59 Wes MG/06/67 1.637 1.391 Garo 60 MG/06/70 1.678 1.498 61 MG/06/72 3.539 2.535 62 MG/06/87 2.023 2.016 63 MG/06/94 4.096 3.531 64 MG/06/100 2.500 2.264 65 MG/06/119 3.232 2.426 66 MG/06/130 2.617 2.217 Descripion of works Pedaldoba Rakasmgre road o Megapara i/c Box Culver Garobadha Rangsakona Road o Jaluagre Kalchenggre o Danang Songma 121s km of AMPT road o Rongbakgre 60h Km of N.H. 51 road o Rongdenggre NH-51 o Saminggre 8h Km of G.R. road o Bangre Lower Darenggre o Doldegre Oragiok o Dura Kalakge N.H. 51 o Ganol Songma Sanchonggre o Galwanggre Dollonggre o Diegre issue of NIT 30 h Oc. submission of Bids 20 h Sep. 20 h Sep 16 h Sep. 25 h Nov. 16 h Sep. 16 h Sep. 20 h Sep 20 h Sep 20 h Sep. 16 h Sep. 16 h Sep. 16 h Sep. accepance (Rs. 532.57 257.08 256.74 8h Jan 189.82 151.45 162.75 270.35 216.71 380.85 246.60 264.14 241.33 Page 14 of 33

4h February 8h May, No. 67 Disric e d (Rs. MG/07/01 3.000 2.702 68 MG/07/03 2.614 2.348 69 4.703 4.208 MG/07/05 70 4.607 4.128 71 Wes MG/07/02 2.550 1.527 Khasi 72 MG/07/04 3.420 2.984 73 MG/07/06 1.600 1.301 Descripion of works Nayapara o Kolapara Langor o Ksehkohmoi PWD Road o Mawlumkhri NH-51 road o Lawsiej (Par-I) Sohhylleng o Amarsang Shngimawlein o Sohma T-08 (Pamphyrnai) o Ksehkohlong Umjarain o Diwah Langja (Sec- II) o Tynghor issue of NIT 6 h Sep. submission of Bids 7 h Sep. 3 rd Sep. 5 h Sep. 5 h Sep. 26 h Sep. 26 h Sep. 4 h Sep. accepance 25h Oc. 25h Oc. 20h November (Rs. 74 MG/07/07 7.980 6.202 9 h Jan 29 h Jan 4 h March 604.34 75 MG/07/22 2.085 1.674 4 h Sep. 164.74 : 267.202 229.286 23675.96 SANCTION UNDER THIRD TRANCHE ON 4 h FEBRUARY Disric e d (Rs. Descripion of works issue of NIT submissio n of Bids accepanc e 264.95 230.51 411.84 406.41 157.97 294.37 128.23 (Rs. Gabil Songicham road o Gra 1 Eas MG/01/50 2.884 1.66 199.47 Songicham 17h April 13h May Garo 2 MG/01/52 3.330 1.99 T03 road o Jogogri 239.43 3 MG/01/56 2.326 1.61 T03 road o Rem Megapgre 194.00 Page 15 of 33

4h February 4 Disric e d (Rs. MG/01/48 2.630 1.50 5 MG/01/54 1.789 1.19 Descripion of works Rongap road o Rongap Songicham L36 road o Dalbo Noka (Songma) 6 MG/01/57 9.314 4.36 T01 o Gongrang L28 road o Kakwa Bonegre 7 MG/01/58 5.525 4.50 including Bridge MG/01/14 Rongchek Songgicham road o 8 5.737 3.56 9 Rongchek Songgial Tebil Bonegre o Chinaba 9 MG/01/19 9.314 4.80 (Barikgre) Bonegre road o Asil Songial 10 MG/01/49 9.342 5.80 Eas including 2 Nos bridge Garo 11 MG/01/51 4.949 3.53 Dagal Apal road o Redamgre 12 13 14 MG/01/79 A MG/01/62 A MG/01/10 0 5.359 3.01 3.674 2.20 5.108 2.66 15 MG/01/27 2.160 1.56 16 MG/01/28 8.631 6.45 Dobu Agalgre road o Dobu Achakpek Chiminmingre road o Kakwa Duragre Chekwebibra road o Rongbing Boldak Rongsak Songgial road o Suchilgre Meghagre Songgial road o Dilma Debragre (Tongbol Songicham) 17 MG/01/30 2.990 1.82 T03 road o Nengkra Waregre issue of NIT 5h Sep submissio n of Bids 15h Sep. accepanc e 26h Aug 26h Aug 26h Aug 23rd Sep 27h Augus 26h Aug 26h Aug 26h Aug (Rs. 163.36 129.86 523.23 480.30 423.99 523.09 687.98 419.19 328.74 240.73 315.40 170.84 773.78 198.68 Page 16 of 33

4h February 18 Disric e d (Rs. Descripion of works MG/01/43 8.131 4.28 Rongsak Bazar o Dinajekgre issue of NIT submissio n of Bids accepanc e 23rd Sep (Rs. 466.25 19 MG/01/54 7.969 5.34 Rongrenggre road o Akelgre (Gonggre) 5h Sep 15h Sep. 636.18 20 MG/01/13 2.584 1.63 L24 o Rongpechi Bolsadam 21 MG/01/14 3.114 1.57 Thapa Agichak To Chisimari 22 MG/01/17 3.122 1.32 Bakenang Songma o Chabildam 23 MG/01/64 2.503 1.58 L21 road o Nisangram Babupara 24 Eas Garo MG/01/65 2.910 1.82 Raksam Songma road o Raksimgre 25 MG/01/70 2.655 1.40 T05 road o Gondonggre 26 MG/01/74 6.844 4.80 T04 road o Dalmanggre 27 MG/01/62 3.127 2.31 T06 road o Dami Aga Machakol Page 17 of 33 5h Sep 15h Sep. 23rd Sep 23rd Sep 27h Augus 23rd Sep 28 MG/01/67 3.036 1.86 T06 road o Dangra (Dangra Songma) 17h April 13h May 218.93 29 MG/01/68 2.012 1.16 L21 road o Galwangsa 136.38 30 MG/01/69 8.214 5.46 T01 road o Gambil Apal 643.87 31 MG/01/74 1.484 0.70 L35 road o Chipakram 82.00 32 MG/01/90 7.045 2.33 33 MG/01/92 2.953 1.01 177.03 170.13 144.21 170.99 208.38 152.43 581.92 272.88 Gokolgre road o Achochonggre Sage-II Chisim Akanang road o Korepara - 17h April 13h May 275.68 Sage-II 120.18

4h February 34 Disric e d (Rs. MG/01/07 1.905 1.12 Tangba o Arauk Descripion of works 35 MG/01/35 6.555 5.04 Silkigre road o Jalkim 36 MG/01/36 3.752 1.57 T04 road o Tebrongpara 37 MG/01/37 1.561 0.63 Sakware Songgial o Gorok 38 MG/01/38 1.246 0.56 Chilpara road o Lower Bolmedam 39 Menadoba road o Mancheng MG/01/40 2.375 1.92 including Bridge Eas 40 Garo MG/01/44 3.842 1.82 Chima Aga road o Arai Apal 41 MG/01/13 T04 road o Tengaso (- 1.766 0.78 2 1.766 Km) 42 MG/01/14 6 3.640 2.32 Dochisoram road o Waramja 43 MG/01/41 6.242 4.62 Rajasimla Songma road o Rongdal Aimbo 44 MG/01/44 B 3.467 1.97 Mingkrak road o Dochisoram 45 MG/01/45 4.642 3.09 Upper Bolmedam road o Rongmachu including Bridge 46 MG/01/46 3.180 1.47 T04 road o Chilpara Reserve 47 MG/01/78 6.389 6.50 Gabil Bisa road o Mejolgre Mancho (Wancho) including Bridge issue of NIT 21s Aug. 21s Aug. 21s Aug 21s Aug 5h Sep submissio n of Bids 8h Sep. 8h Sep. 8h Sep. 8h Sep. 15h Sep. accepanc e 27h Augus 23rd Sep 23rd Sep 27h Augus 26h Aug 26h Aug 23rd Sep (Rs. 122.72 551.62 168.87 68.09 66.94 222.80 198.40 85.31 265.76 550.26 230.06 364.11 158.99 761.65 Page 18 of 33

4h February 48 Disric MG/01/79 B e d (Rs. 49 MG/01/81 1.682 1.79 50 MG/01/85 4.402 3.93 51 MG/01/87 4.950 4.94 52 MG/01/03 2.000 0.78 Eas 53 Garo MG/01/05 2.000 0.72 54 55 MG/01/29 A MG/01/29 B MG/01/18 9 Descripion of works 5.985 3.81 Imbanggi road o Chikal Songma 5.000 4.767 5.25 Mangsang Dosikgiim road o Rengkil Apal including Bridge L21 road o Dambo Rongjeng (Rongdeng) (4.402Km) including Bridge T03 road o Nengsil including Bridge Rongjeng Gangdopgiim o Silchangiim (Rongjeng To Silchanggiim) (L032) Sage-II. Mangsang o Haslong (Mangsang Bamil o Mangsang Makura) (L025) Sage-II. Jingnamgre o Dinaminggre (Ch: 0.00-5000.00 m) Jingnamgre o Dinaminggre (Ch: 5000.00-9767.00m) 3.602 1.94 L21 road o Rompa 56 MG/01/43 4.790 2.53 Agropaal road o Nengbak Wapil 57 Eas MG/02/18 1.018 0.54 T-02 o Diengkynhong Khasi 58 MG/02/25 1.000 1.59 Wahsherkhmu o Korblang issue of NIT 5h Sep 5h Sep 17h April Dec. Dec. Dec. Dec. 28h Feb, 28h Feb, submissio n of Bids 15h Sep. 15h Sep. 13h May 28h Jan 28h Jan 28h Jan 28h Jan 2nd April 2nd April accepanc e 13h Oc 23rd Sep 19h June (Rs. 412.86 190.08 447.43 582.78 85.74 79.01 53.08 161.50 Evaluaio Evaluaio Evaluaio Evaluaio Page 19 of 33

4h February 59 Disric e d (Rs. MG/02/16 1.813 1.74 T-03 o Kshaid 60 MG/02/62 3.000 0.66 61 MG/02/59 1.800 0.55 62 63 MG/02/50 B MG/02/50 A 1.674 0.40 1.895 0.45 66 Eas Khasi MG/02/44 6.975 6.46 67 MG/02/99 1.000 0.33 Descripion of works Lailyngko o Kyrdemkhla (12h mile NH - 40 o Umlympung) L044 o Laiiam (Ryngud o Lailiam Road) NH-44 o Laikor Nonglum (Laikor o Lumheh) NH-44 o Laikor Nonglum (Laikor o Nonglum) 64 MG/02/17 1.542 1.65 L-029 o Nonghymmai 65 MG/02/23 3.468 3.94 T-03 o Mawdon i/c bridge 68 69 70 MG/02/59 B MG/02/51 B MG/02/51 A 2.000 0.61 2.922 0.70 71 MG/02/53 5.000 1.39 72 MG/02/46 A (Laimynring 39h KM) ST Road (NH-40) o Mynrieng T02 o Lyngkien (16km of NH-40 o Lyngkein) L037 o Ryngud (MS Ryngud o Ryngud Road) L041 o Lyngkien Shyiap (Maweinai o Lyngkien) 1.500 0.37 T05 (Pomlakrai) o Mawnarain 1.000 0.36 73 MG/02/61 2.160 0.58 12h Km of SD Road o Mawpdang (Mawkhanu o Jaroi) Mawmihkrei o Nongsawing (12h Km NH - 40 (Mawrie) o Mawblah) 12h Km of ST Road o Mawpdang (Pomlahier Village o Iapsyndei Village) issue of NIT 28h Feb, 28h Feb, 28h Feb, 28h Feb, 28h Feb, 28h Feb, 28h Feb, 28h Feb, 28h Feb, 26h June 28h Feb, 28h Feb, 28h Feb, 28h Feb, 28h April submissio n of Bids 2nd April 3rd April 3rd April 4h April 4h April 2nd April 3rd April 3rd April 4h April 4h April 4h April 3rd April 4h April 14h May accepanc e 19h June (Rs. 171.01 69.07 64.27 39.89 44.62 163.12 445.48 656.84 37.61 72.88 68.82 36.21 137.16 35.30 69.86 Page 20 of 33

4h February 74 Disric MG/02/46 B e d (Rs. 1.000 0.33 75 MG/02/45 1.000 0.29 Descripion of works Mawmihkrei o Nongsawing (16km of NH-40 o Nongbe) Pynursla o Mylla (Pynursla To Nongmadan) - Sage-II 76 MG/02/48 5.000 1.68 L049- T01 o Jabar Sage-II issue of NIT 17h April submissio n of Bids 13h May accepanc e 27h Augus 19h June (Rs. 35.70 34.30 199.59 77 78 79 Eas Khasi MG/02/49 A MG/02/49 B MG/02/49 C 1.500 0.54 1.000 0.36 1.000 0.31 L021-Rangskhen o Lwai ( N N Road o Bangla, Sage-II Mawmihkrei o Nongsawing (Mawkhynai o Nongpahaw) - 2nd Sage Mawmihkrei o Nongsawing {3rd km of Mawngap o Mawreng (sohun)} 2nd sage 80 MG/02/52 2.000 0.50 T06 o Thynroid (TTM o Thynroid) 81 MG/02/54 5.740 1.60 82 L-024 o Nonghulew (Synung o Nonghulew) 2nd sage MG/03/01 6.094 3.73 Umladoh To Umma 83 MG/03/12 7.087 4.97 Lakasein (Semmasi Umkyrpong) o Kseh 84 Jainia MG/03/14 1.324 1.32 BS road o Lahalein 85 MG/03/17 8.199 9.48 Lakadong To Madanpohkseh 86 MG/03/02/ 7 4.000 1.78 Umshong Iapmala To Wahsarang Sage-II 17h April 17h April 17h April 17h April 28h April 28h Feb. 28h April 28h Feb. 17h April 13h May 13h May 13h May 13h May 14h May 3rd April 14h May 3rd April 13h May 19h June 19h June 19h June 19h June 19h June 63.53 41.47 37.12 49.30 193.60 446.30 516.41 151.53 934.84 204.91 Page 21 of 33

4h February 87 88 Disric MG/03/03 A MG/03/03 B e d (Rs. 1.700 0.54 3.000 1.09 89 MG/03/06 3.000 1.01 90 MG/03/07 4.000 1.41 91 MG/03/09 2.000 0.79 Descripion of works Borao Saba Road {T-02(JOWAI KHANDULI ROAD TO KPERMYNSNIEH} Sage-II Borao Saba Road (Shangpung- Sunga Road To Mynkrem) Sage-II Shilliang Mynang o Laymphu (Musiaw-Umsalang o Laymphu) Sage-II (Barao) Maidieng o Iongkynshor Sage-II. Borao Saba Road (Mynso- Shangpung o Mynhung) Sage-II. issue of NIT 17h April submissio n of Bids 13h May accepanc e 16h June (Rs. 92 MG/03/11 4.870 4.50 Jowai Khanduli o Mokairam 492.76 93 94 JNKK (Jowai Khanduli) road o MG/03/13 5.643 4.55 Jainia Riangsanphaw L048 o Myngkrem (L024 o MG/03/15 1.500 0.72 Chyrmang) 497.58 78.44 95 MG/03/16 6.000 2.72 L048 o Mynkrem (Mynsngad To Umladang) Sage-II. 295.04 96 MG/03/04/ Lumshken (Musniang o 17h April 13h May 5.000 2.25 6 Lumshken)Sage II 258.09 97 MG/03/05/ L045 o Remain (Nonglaem To 17h April 13h May 16h June 4.000 1.43 8 Remain) Sage-II 154.73 98 MG/03/08/ Thruk o Moulhoi (Lakasein o 3.000 1.26 9 Umkyrpong) - (Sage-II) 140.78 99 MG/03/10/ 17h April 13h May 6.000 1.90 Lura o Thlangpui - (Sage-II) 11 224.61 100 MG/03/15/ 5 4.000 1.69 L026 o Chyrmang (L024 o Chyrmang) Sage-II 14h Oc. 11h Nov. 58.11 118.39 109.54 152.24 85.54 Evaluaio Page 22 of 33

4h February 101 Disric e d (Rs. 106 MG/04/31 4.500 1.39 Ri Bhoi Descripion of works MG/04/09 4.032 3.40 Iewsohksang o Umiong 102 MG/04/07 16.124 16.14 U.J. Road o Lymphuid 103 MG/04/11 7.122 4.11 Syngku o Paiklong (U.J. Road o Tihwieh) 104 MG/04/18 8.000 6.43 UJ Road o Pamlahar 105 MG/04/30 10.000 3.30 107 MG/04/32 2.000 0.79 108 MG/04/34 5.000 1.57 109 MG/04/35 2.000 0.62 110 MG/04/36 5.000 1.84 111 MG/04/38 7.000 2.38 112 Souh Garo L144 - Sonidan - Mawari - STAGE II Approach Road To Sonidan Village (JAGI ROAD TO UMSHIAW) - STAGE II: Approach Road To Sonidan Village(CONSTRUCTION OF MAWDIENGNGAN - UMLAITENG.) STAGE II 3rd Km of MU road o Umkaduh Sage - II 5h Km of NUMU road o Sarikhushi Sage-II 10h Km of MM Road o Bakhlapara (10h Km of MM Road o Umsohbar) Sage-II Approach Road To Sonidan Village (LUMMIHWAR - INGSAW) STAGE II MG/05/06 2.5 3.67 L021-Rongara o Siju ic Bridge issue of NIT 28h Feb. 28h Feb. 28h Feb. 17h April Dec. 17h April 17h April 17h April 17h April 25h Sep submissio n of Bids 2nd April 2nd April 2nd April 13h May 28h Jan 13h May 13h May 13h May 13h May 11h Oc. accepanc e 16h June 19h June 19h June 26h Aug 19h June 19h June 21s Oc. (Rs. 371.54 1590.14 403.98 632.69 144.85 94.78 173.77 74.23 219.16 260.27 379.36 Evaluaio Page 23 of 33

4h February Disric e d (Rs. Descripion of works issue of NIT submissio n of Bids accepanc e (Rs. 113 MG/06/10 1.406 0.93 T-04 (58h km of AMPT Road) o Balujhora 28h Feb. 2nd April 101.88 114 MG/06/10 1.771 2.47 L-025 road o Belbari i/c Bridge 7 256.54 115 MG/06/10 26h Aug 1.445 0.78 Jurigaon o Balbalgre 9 84.52 116 MG/06/93 1.999 1.16 Jangrip o Wankolagre 23rd Sep 114.06 117 MG/06/89 3.993 2.61 Upper Waregre o Didapara 23rd Sep Songgicham 282.33 118 MG/06/92 3.601 3.40 Raksamgre o Laskorpara Garo 5h Sep 15h Sep. including Bridge 395.28 MG/06/11 119 5.524 4.29 Dolwakgre o Balsagre 509.10 1 Wes MG/06/12 Damal Asim o Aigre including 28h April 14h May 120 Garo 7.263 8.09 947.77 7 Bridge MG/06/13 Dadenggiri o Dallanggri cluding 121 6.127 4.26 524.42 7 Bridge 122 MG/06/73 2.500 2.68 Romjora road o Renigre 316.83 123 MG/06/91 6.617 4.36 Gimbil Agal o Dodanggre 28h April 14h May 514.50 124 MG/06/13 1.733 1.12 Cheran Songmagre o Chisikgre 3 132.05 125 MG/06/68 3.953 3.96 Dadenggiri osaegri 23rd Sep 429.32 126 MG/06/77 1.673 1.44 Rongram Phulbari Hill Road o 23rd Sep Dokramagre 157.00 127 MG/06/99 4.019 2.90 Rongsakgre o Rabonggre 13h Aug 23rd Sep 316.72 128 MG/06/11 0 2.206 2.35 Rongram Phulbari Hill road o Chigichakgre including Bridge 5h Sep 15h Sep. 269.55 Page 24 of 33

4h February Disric Wes Garo e d (Rs. Descripion of works Page 25 of 33 issue of NIT submissio n of Bids accepanc e (Rs. 150.12 129 MG/06/51 1.793 1.26 13h km of AP Road o Nachilpara 130 MG/06/36 2.437 1.07 17h Km (5h Km) of Ampai 17h April 13h May Purakhasia Road o Anangpara Songsarek 107.36 131 MG/06/80 1.185 1.06 8h km of A.P. Road o Dinapara 126.98 MG/06/14 132 3.661 1.91 Babadam o Balupara 17h April 13h May 6 133 MG/06/59 2.270 1.69 Babadam o Buripara 202.79 134 MG/06/12 14h Km of Ampai Purakhasia 23rd Sep 2.789 1.89 4 road o Sindilgre 206.78 135 MG/06/62 8.405 6.74 16h of AP Road o Kerupara 5h Sep 15h Sep. 811.23 136 MG/06/14 8h Km of Damalgre Melim road 3.472 1.63 4 o Alabagre III 193.38 137 MG/06/12 8 TH KM OF Ampai Mellim road o 1.992 2.52 1 Sanapara 303.27 138 MG/06/90 4.127 3.63 139 MG/06/66 4.900 7.04 10h km of Sengsengpara Kherapara road Basulpara o Akinpara 3rd KM of Bhaua Chengapara Rohanpara o Naronggre including 4Nos. Bridge 27h Augus 140 MG/06/01/ 17h April 13h May 19h June 3.000 1.32 Nagargaon o Sabang Sage-II 1 141.72 141 MG/06/05/ Dabakgre o Gonda Songgicham 17h April 13h May 6.160 2.46 2 Sage-II 281.85 142 MG/06/52 4.688 2.88 Rangsagre o Bolbokgre 339.51 MG/06/10 T 03 road o Dalangsa including 143 2.080 3.18 17h April 13h May 360.08 3 Bridge MG/06/11 144 1.192 0.82 L34 road o Nisinipara 97.65 5 228.75 397.17 774.47

4h February 145 Disric e d (Rs. Descripion of works MG/06/56 2.794 1.99 L-58 (Nengkalpara) o Okanggre 146 MG/06/86 4.795 2.96 Ujinggre o Rongsanggri 147 MG/06/01 4.000 1.88 148 MG/06/04 4.880 2.21 149 MG/06/05 4.000 1.94 NH-51 road o Aguragre (74h Km of NH-51 road o Aguragre) - (2nd Sage) 77h Km of NH-51 road o Ringgigre - (2nd Sage) Baljek Agal o Boegre (Baljek Agal o Rongsep Adinggre) - (2nd Sage) issue of NIT 13h Aug submissio n of Bids accepanc e 23rd Sep 27h Augus (Rs. 217.31 321.78 221.98 265.39 230.83 68h Km. of NH-51 Road o Warisepgre 26h Aug 150 Wes MG/06/25 1.875 1.47 155.48 Garo 151 Kalchenggre o Rongramgre (Sec-I) MG/06/02 3.993 2.12 254.75 - (2nd Sage ) 17h April 14h May Rongram Phulbari Hill Road o 152 MG/06/27 2.302 1.59 191.61 Ampanggre 153 MG/06/34 0.970 0.72 AMPT Road o Daldagre 86.00 9h Km of Kerapara Deku Bazar 154 MG/06/03 2.800 1.28 road o Rimrang Asimgre 5h Sep 15h Sep. (Kerapara Deku Bazar road o 145.05 Rimrang Asimgre) 2nd Sage 155 MG/06/43 1.712 1.42 Dalugaon o Dingkajora 156 MG/06/97 4.868 6.81 157 MG/06/10 4 3.627 2.46 128h km of NH-51 road o Surunanggre including Bridge 4h Km of Kherapara Chengapara road o Ganipara 26h Aug 154.99 806.87 280.94 Page 26 of 33

4h February 158 159 Disric Wes Garo MG/06/13 4 MG/06/03/ 21 e d (Rs. 2.000 1.32 1.616 0.61 160 MG/06/29 1.929 1.34 161 MG/06/79 1.635 1.95 162 163 164 165 166 MG/06/10 8 MG/06/14 1 MG/06/14 8 MG/06/14 9 MG/06/04 A Descripion of works 6 h km of Magupara Songjclpara o Thallanggre 5h Km of GM NEC road o Tangabari (4h Km of GM Road o Tangabari) Sage II 17h Km. of MM Road o Mekdual Adenggre 21s km of KG Road o Durapara including Bridge 1.891 1.67 6h Km of PM road o Bakdagre 2.998 3.05 5h Km. of Ampai Mellim road o Bangdapara 2.024 1.38 9h Km of MM road o Wanangre 1.840 1.66 12h km of Mankachar Mahendraganj Road o Marhalipara Upgradaion 1.500 0.61 T04 o Baghmara (2nd Sage) 167 MG/06/46 3.389 1.97 Haldibari o Dodoregre 168 169 170 MG/06/12 6 MG/06/12 8 MG/06/04/ 22 3.792 3.62 T03 o Dipogri including Bridge 6.830 3.59 T- 03 (GSB road) o Boldakgre 2.000 1.00 Rongkhon o Chibinang ( AMPT road o Gasbari) ( 2nd Sage ) issue of NIT 28h Feb submissio n of Bids 15h May accepanc e 23rd Sep 26h Aug 23rd Sep 23rd Sep 23rd Sep 27h Augus 27h Augus 19h June (Rs. 143.42 66.64 160.14 205.54 182.78 351.89 164.64 196.64 66.01 214.91 423.10 391.69 108.47 Page 27 of 33

4h February 171 Disric Wes Garo e d (Rs. MG/06/22 2.861 1.79 172 MG/06/38 1.190 0.78 Descripion of works 10h Km of GA Road o Chondonpara Murchapani Koch (Bandalkona) o Dalbopara 173 MG/06/42 0.989 0.75 Joyfar o Kashra (Sec II) 174 MG/06/44 2.668 1.66 175 MG/06/57 2.996 2.00 176 MG/06/98 2.500 1.08 177 178 179 MG/06/13 9 MG/06/14 7 MG/06/12 4B (i) MG/06/12 4B (ii) 1.513 1.30 2.916 1.82 2.000 2.078 5.15 180 MG/06/71 1.494 4.61 181 MG/06/11 4 3.138 3.25 3rd Km of Garobadha Rangsakona Road o Waregre Chigichakgre o Jelbongpara Songma Ampai Civil Sub-Division o Bangkapara 114h Km of AMPT road o Jewilgre 4h Km of Ampai Mahendraganj road o Simsang Bokmagre Jangrapara o Jengrigiri (0.00-2000.00m) including Bridge 25.58M span Jangrapara o Jengrigiri (2000.00-4078.00m) Rengigiri o Menggochigre including 3Nos Bridges Rom Bazar o Romsangsilgre including Bridge issue of NIT 5h Sep Dec. Dec. Dec. Dec. submissio n of Bids 15h Sep. 28h Jan 28h Jan 28h Jan 28h Jan accepanc e 27h Augus 23rd Sep 27h Augus 23rd Sep 27h Augus (Rs. 195.32 85.26 89.47 181.65 227.33 117.57 147.77 198.38 Evaluaio Evaluaio Evaluaio Evaluaio Page 28 of 33

4h February 182 183 184 185 186 Disric Wes Garo MG/06/12 2 MG/06/10 5 MG/06/14 3 MG/06/50 A MG/06/50 B MG/06/83 A MG/06/83 B e d (Rs. 2.616 3.60 3.544 4.36 3.331 3.36 6.000 6.195 5.000 5.553 8.07 5.81 187 MG/06/85 2.431 3.39 188 Wes Khasi MG/07/37 3.000 1.44 Descripion of works 24h Km of Ampai Purakhasia road o Rimrangpara including Bridge 24h km of Ampai Purakhasia road o Tochapara 26h Km of Adugiri Purakhasia road o Rakwapara including Bridge 3rd Km of Gambegre Darenggre via Amindagre road (NH-51 Darengre PHC) o Bolchugre Nengja Bolchu (Ch: 0.00-6000.00m) 3rd Km of Gambegre Darenggre via Amindagre road (NH-51 Darengre PHC) o Bolchugre Nengja Bolchu (Ch: 6000.00-12195.00m) Dokagre o Dabakgre (CH: 0.00 o 5000.00m) Dokagre o Dabakgre (Ch: 5000.00-10553.00m) 8km of P.M. road o Gujangpara including Bridge Myriaw o Nongria (Ramsiej) (Sage II) issue of NIT Dec. Dec. Dec. Dec. Dec. Dec. Dec. Dec. 28h Feb. submissio n of Bids 28h Jan 28h Jan 28h Jan 28h Jan 28h Jan 28h Jan 28h Jan 28h Jan 2nd April accepanc e (Rs. 142.83 Evaluaio Evaluaio Evaluaio Evaluaio Evaluaio Evaluaio Evaluaio Evaluaio Page 29 of 33

4h February 189 Disric e d (Rs. MG/07/44 6.000 2.63 190 MG/07/47 4.000 1.15 Descripion of works Laikseh o Marngor Village (Umdum o Umjakoid) (Sage II) 16h Km of Nongshillong Jakrem Road o Mawhong (Mawkyrwa o Marshillong) (Sage II) 191 MG/07/40 5.000 1.97 Shallang o Riangdim (Sage II) 192 Laikseh o Marngor (Kynshi o MG/07/39 3.000 1.30 Mawlangren) (Sage II) Wes 193 Khasi MG/07/08 1.156 0.67 Wahri To Phudbah 194 MG/07/20 2.125 1.53 16 Km of JT Road (T-02) o Lawblei 195 MG/07/09 5.935 4.16 PWD Road o Mawikhar 196 MG/07/07 1.921 1.16 MMR Road (Maroid) o Kynrui 197 MG/07/42 6.360 2.05 Nongsoin o Rambrai (Nongsoin- Sangriang road o Nongkhnum) (Sage II) issue of NIT 28h April 28h Feb. 28h Feb. 28h Feb. 28h Feb. 28h Feb. 28h Feb. submissio n of Bids 14h May 2nd April 2nd April 2nd April 2nd April 2nd April 3rd April accepanc e 19h June (Rs. 318.16 136.35 237.68 135.15 66.22 150.57 408.58 114.11 247.89 739.758 481.970 47612.989 Sl Nos/ses Descripion MEGHALAYA - GOODS ed amoun (Rs in Esimaed Cos (Rs in Procuremen Mehod Review by Bank Expeced Bid Opening dae Commens 1 Approved by NRRDA vide NRRDA 2 TOTAL STATION 12.00 Shopping Pos 15-Jan-14 Procured leer P-17029/1/2006/P-III AUTO LEVEL 86.50 2 3 Shopping Pos 15-Jan-14 d 25h Sep (COMPLETE SET) 6.25 Procured Page 30 of 33

3 7 4 5 5 5 Lab Equipmen se (Dynamic Cone Peneromeer, Sieves, Elecronic Balance, Elecric Oven, Sand Pouring Cylinder apparaus, Compacion Tes apparaus for Ligh compacion, Compacion Tes apparaus for Heavy compacion, CBR Tes Apparaus, Aggregae Impac eser, Compression Tesing Machine, Cas Iron Moulds) Modified Roughness dicaing Machine (MERLIN) Concree Tes Hammer 55.90 NCB Pos 28-07- 1.10 Shopping Pos 15-Mar-15 1.50 Shopping Pos 15-Mar-15 6 1 Bump egraor (CRRI Design) 7.75 Shopping Pos 15-Mar-15 wih ranspn, ec 7 Small field equipmen 2.00 Shopping Pos 15-Mar-15 8 TOTAL 86.50 Procuremen finalized. delivery schedule NOL received for procuring from he sole qualified bidder. finalizaion. finalizaion Page 31 of 33

ADDITIONAL EQUIPMENT MEGHALAYA-IT EQUIPMENTS 9 Approved by NRRDA vide NRRDA File 17029/1/2006/P-III d 12h Nov 10 5 15 11 13 Deskops wih all necessary accessories (el Core i5, 4GB RAM, 500GB HDD, TFT/LED 18 Monior wih Windows 8 OS Pre-Loaded, ec) Lapops (el Core i5, 4GB RAM, HDD 500GB, Windows 8 OS, ec) Priners (Laserje Monochrome, 24ppm,ec) 9.54 6.00 Shopping Pos 13.02. 2.50 Shopping Pos 13.02. 1.04 Shopping Pos 13.02. Procuremen o be compleed wihin February MEGHALAYA - CONSULTANCY Sl Reference Descripion of Assignmen Cos (Rs) Selecion Mehod Review by Bank Award Posiion Commens 1 1. PW/EO-SRRDA /PMGSY/ 52/ 2010/160 d 25 Sep 2. WBR 25 vide email daed 12 Oc 3. Bank NOC vide email d 31 Augus. Consulancy Services ofr Projec Managmen Consulan for PMGSY Rural Roads Projec in Meghalaya 94,445,478.00 QCBS (Time based) Prior Awarded o M/s MSV ernaional, c Kirkland, Washingon Bank NOC vide email d 31 Augus. Page 32 of 33

Shri MM Sun Empowered Officer, SRRDA, PMGSY Meghalaya, Shillong Page 33 of 33