KPI and SLA regime: September 2014 performance summary Reference Outcome Result Target Description KPI A Green 100% 99% green

Similar documents
KPI and SLA regime: October 2014 performance summary Reference Outcome Result Target Description KPI A Green 100% 99% green

KPI and SLA regime: June 2015 performance summary Ref Apr 15 May 15 Jun 15 Target Description KPI A 100% 100% 100% 99% green

KPI and SLA regime: September 2015 performance summary

OB35 Paper 06 KPI Report

KPI and SLA regime: November 2016 performance summary

KPI and SLA regime: March 2017 performance summary

KPI and SLA regime: August 2015 performance summary Ref Jun 15 Jul 15 Aug 15 Target Description KPI A 100% 100% 99.87% 99% green

OB17 Paper 6 KPI Report

DIGITAL SWITCHOVER & THE BBC S ROLE

The Zendesk Benchmark. The ROI case for omnichannel support

TV COVERAGE FUN CUP CHAMPIONSHIP 2017

700 MHz clearance programme timescale review. Review of progress, risks and readiness

THE SVOD REPORT CHARTING THE GROWTH IN SVOD SERVICES ACROSS THE UK 1 TOTAL TV: AVERAGE DAILY MINUTES

The Communications Market: Digital Progress Report

RELIABILITY REASON FOR A COMMERCIAL INADVERTENT-INTERCHANGE SETTLEMENT STANDARD.

Library. Summary Report

Going Digital Strategic plan November 2011

Prospects of Digital Broadcasting and Convergence Services. - The Essential and Expanding Role of Broadcasting September 02, 2010

Delaware Division of Libraries Update A presentation at the joint Delaware Library Association/ Maryland Library Association Annual Conference 2013

AN302 Anconda 3BR 3BA

Introduction. Introductory remarks

ADAPTING IN A PERIOD OF IMMENSE CHANGE: Strategies you might consider

Digital TV Broadcasting in Japan. Tetsuo YAMAKAWA

Outsells. InStyle. Vogue, Harpers Bazaar, and Elle

Interim use of 600 MHz for DTT

A journey of many steps. Alma Integration with Libraries Australia

Joint submission by BBC, ITV, Channel 4, Channel 5, S4C, Arqiva 1 and SDN to Culture Media and Sport Committee inquiry into Spectrum

TMT Conference. London, 7 th June 2006

Outsells. InStyle. Vogue, Harpers Bazaar, and Elle

Happily ever after or not: E-book collection usage analysis and assessment at USC Library

RCOA Mandatory Contestability for Phase 1 Customers. 16 December 2016

FY 2012 Website Visits Up 19% over previous year

Session 1. Digital Terrestrial Television Broadcasting Implementation in Asia and the Pacific

Grid Code Modification Register. March 2018

ALA Webinar August 21, 2013

CITY OF ISSAQUAH CABLE COMMISSION

These restrictions, also called Network Constraints, are characterized by:

The Concept of Digital Transition. Korea s Current Status. Korea s Digital Transition Policy. Public Communications Program

As novidades do Laboratório de Pesquisas de Ciências e de Técnicas (STRL) da NHK. Sep 2003 SET2003 9:00-11:00 Auditório B Hiroo Arata

Slide 1. Fox Kids Europe NV

AGENDA Cable TV Commission

700MHz Clearance Programme Information for Freeview channel providers

Funny Factuals & Documentaries. Sponsorship Opportunity

SCOPUS : BEST PRACTICES. Presented by Ozge Sertdemir

The Future of Digital Terrestrial Television Enabling new services for viewers

Trigger Cost & Schedule

Blockbuster Advertising Campaign By Cara Smith, Chi Kalu, Bill Citro, Tomoka Aono

Syndication April 2006

Telecommunication Development Sector

700MHz Clearance Programme Information for Freeview channel providers

DTTB implementation in Thailand 23 May 2016, Incheon, Republic of Korea

M6 Group Lehman Brothers Meeting 4 July 2006

Code of Practice on Changes to Existing Transmission and Reception Arrangements

MCPS distribution policy rules Contents

House of Lords Select Committee on Communications Digital switchover of television and radio 20 January Digital UK Submission

GUIDELINES FOR THE PREPARATION AND SUBMISSION OF YOUR THESIS OR DISSERTATION

Start of DTV Transition 600 MHz repacking

Marc Segar Director of Technology NEP Australia

ITU-D Regional Development Forum for the Arab Region: Access to spectrum, including broadcasting services trends and technologies

Strategic innovation programme IoT Sweden Trend report:

reaching 407,000+ readers each issue (ROY MORGAN DECEMBER 2017) MEDIA KIT 2018

Welcome to our information pack for the post of: Festival and Venue Marketing Advisor

2. Television and audio visual

Beyond Broadcast Innovative models of content delivery

Methods, Evidence, Action? The Case of Digital Television. Dr Jeremy Klein, Head of Public Sector, Generics Group.

(12) Patent Application Publication (10) Pub. No.: US 2004/ A1

3. Green OA (self-archiving) needs to be mandated

PROJECTS FOR THE MONTH(S) OF AUGUST 2014 OCTOBER 2014

6.3 DRIVERS OF CONSUMER ADOPTION

Digital Switchover Management of Transition Coverage Issues Statement

The Digital Dividend: THE challenge for digital TV

2-2-1 Jinnan, Shibuya-ku, Tokyo , Japan TEL FAX

Response to Ofcom Consultation The future use of the 700MHz band. Response from Freesat. 29 August 2014

Questions we aim to answer through this Newsletter

Digital Television Update Q4 2004

avenue CITY LIFE STYLE 2014 Media Kit AvenueMagazine.ca AvenueMagazine.ca Edmonton:

Chapter 3 Answers. Problem of the Week p a)

Jersey Competition Regulatory Authority ( JCRA ) Decision M799/11 PUBLIC VERSION. Proposed Joint Venture. between. Scripps Networks Interactive Inc.

ENFORCEMENT DECREE OF THE BROADCASTING ACT

Village of Glenview Appearance Commission

2018 TELEVISION ANIMATION AGREEMENTS. Referendum Booklet

Deconstructing Social Media: An Analysis of Twitter and Facebook Use in the Publishing Industry

GUIDELINES AND APPLICATION FORM TO OBTAIN A DIGITAL TERESTERIAL TELEVISION BROADCASTING LICENSE AS SIGNAL DISTRIBUTOR

700MHz Clearance Programme Information for Freeview channel providers

TERMS AND CONDITIONS FOR KBC PHONE LINE COMPETITION

NATIONAL COMMUNICATIONS AUTHORITY

Let s Get Together. Reading. Exam Reminder. Exam Task

Coronado & Jacó Beach PRICE LIST

Half. Morgan Stanley. 7 th Annual TMT Conference

M6 Group. Merrill Lynch TMT Conference. 7 June 2006

A REPORT ON HIRING ACTIVITY IN INDIA by: Location, Industry and Experience

SKY NETWORK TELEVISION. John Fellet CEO Jason Hollingworth - CFO 27 February 2007

MultiSpec Tutorial: Visualizing Growing Degree Day (GDD) Images. In this tutorial, the MultiSpec image processing software will be used to:

Recent Topics on Digital Terrestrial TV Broadcasting in Japan

VIVO INDIAN PREMIER LEAGUE 2019 REGULATIONS FOR NEWS AND CURRENT AFFAIRS BROADCASTERS FOR AUDIO VISUAL BROADCASTING

How to Craft Sticky Messages*

Savona Free Library Annual Report to the Community for 2017

M24 Family Cluster. Brand extensions Michelle Fourie

Digital Television Reception Predictors

Deliverable 2.17 Periodic WP2 Progress Report 3

Transcription:

OB19 Paper 07 KPI Report KPI and SLA regime: September 2014 performance summary Reference Outcome Result Target Description KPI A Green 100% 99% green 98% amber Service Restoration within 10 working days where household is a primary DTT user KPI A1 Green 99.24% 97.5% green Installer visits completed as scheduled with viewer 95.0% amber KPI A2 Green 99.76% 90% green Installer visits completed within 3 working days 50% amber KPI A4 Green 99.25% 90% green Vulnerable visits completed within 3 working days 70% amber KPI A6 Communal installer visits completed as scheduled with landlord where access and liability is confirmed KPI A7 Green 100% 98% green Reactive filters issued within 3 working days 94% amber [KPI A10] 100% [SUSPENDED FOR REACTIVE-ONLY TRIAL] Addresses in very high pixels mailed filters SLA B1 Red 98.70% 100% green 99% amber Identifiable addresses within forecast medium, high and very high risk pixels (high and very high risk only for London) to be mailed at least once no more than 12 weeks ahead of scheduled mast activation SLA B2 Report on households mailed and not mailed within forecast pixels (i.e. number of low risk households) SLA B3 Report on households reporting interference within un-mailed forecast pixels SLA B4 Awareness to be maintained (reminder mailings) with those viewers at continued risk of experiencing interference from masts that were not activated as scheduled SLA B5 SLA B6 SLA B7 Qualitative and quantitative reports provided. No specific targets. Awareness to be maintained (reminder mailings) with those viewers at renewed risk of experiencing interference from infill masts where the addition of the mast increases the risk of interference in that pixel to very high Report on households mailed and not mailed reminders within forecast pixels (i.e. number of low risk households) Report on above the line comms and research outcomes, including awareness in rollout areas Complaints SLA C1 Green 0.30% <1% green <2% amber SLA C4 Report on total number and categories of complaints SLA C5 Report on vulnerable complaints SLA D1 Measure of the numbers of mailings per report of / SLA D2 case of interference Qualitative and quantitative reports Measure of the number of reported cases that occur provided. No specific targets. outside of mailed area SLA D3 Measure of number of cases of interference per mast remaining between 0.17 and 1.66 (5k to 50k cases of interference for rollout)

KPI A Service Restoration KPI A: Service Restoration within 10 working days where household is a primary DTT user (communal households and households where cable or satellite services are received are excluded). 99% (green); 98% (amber) Result: 100%; green All of the 320 confirmed 4G cases in September 2014 were resolved within 10 working days Green. KPI A1: Installer visits completed as scheduled with viewer. 97.5% (green); 95% (amber) Result: 99.24%; green Of the 918 installer visits originally scheduled for September 2014: o 842 were undertaken and closed on schedule o 7 visits were cancelled or missed by the installer o 69 visits were cancelled by the viewer Total scheduled visits not missed by installer / total visits scheduled (842 + 69) / (842 + 69 + 7) = 911 / 918 Result: 99.24% Green. KPI A2: Installer visits completed within 3 working days. 90% (green); 50% (amber) Result: 98.94%; green Of the 918 scheduled installer visits detailed above, there were 849 visits scheduled where the viewer did not cancel Of these 849 o 750 were completed within three working days o 90 were delayed beyond three working days at the viewer s request o Seven visits were cancelled by the installer o Two were delayed beyond three working days owing to operational constraints 840 / 849 Result: 98.94% Green. KPI A4: Vulnerable visits completed within 3 working days: 90% (green); 70% (amber) Result: 96.46%; green In September 2014, there were 266 scheduled installer visits to people marked as vulnerable where the viewer did not cancel Of the 266 visits to be measured o 247 were completed within three working days o 20 were delayed beyond the three-day window at the viewer s request o Two visits were cancelled by the installer Page 2 of 10

Result: 99.25% Green. KPI A6: Communal installer visits completed as scheduled with landlord where access and liability is confirmed. Reporting only. Result: 100% Of the 13 communal jobs in the month of September 2014: o 12 were completed as agreed with the customer o One was cancelled by the viewer Therefore all 13 were completed as scheduled with the viewer (or cancelled by the viewer) giving a success rate of 100%. KPI A7: Reactive filters issued in 3 working days. 98% (green); 94% (amber). Result: 100% There were 1,762 filter requests in September 2014 All of these were sent within one working day Green. KPI A10 [SUSPENDED]: 100% of identifiable addresses in very high pixels mailed proactive filter. Not applicable. Page 3 of 10

SLA B Awareness SLA B1: Identifiable addresses within forecast medium, high and very high risk pixels (high and very high risk only for London) to be mailed at least once no more than 12 weeks ahead of scheduled mast activation. 100% (green); 99% (amber). Result: 98.70%; red During September, DMSL sent a number of mailings to allow MNOs to activate masts earlier than their original schedule. In all of these cases where the MNO made a specific request, DMSL ensured postcards landed before mast activation was permitted Further, there were two special mailings undertaken to support masts that activated out of process without prior warning from the MNO. In relation to these masts, 4,642 households were identified and mailed on 24 September with 460 households mailed on 25 September. Postcards would have landed up to one week following mast activation Therefore, of all 391,257 households forecast to be affected by October masts; additional masts submitted for earlier activation; or masts activated prior to their scheduled activation month unknown to DMSL, 386,155 (98.70%) were mailed in advance of their potential or in the case of activated masts, their actual go-live date. Red. SLA B2: Report on households mailed and not mailed within forecast pixels (i.e. number of low risk households) The following table shows the breakdown of households by risk category and those confirmed as mailed. Mailing Date V_HIGH HIGH MED LON_MED LOW TOTAL 03-Sep-14 3,189 16,766 23,148 43,103 03-Sep-14 4,811 57,520 68,634 130,965 08-Sep-14 6,007 79,879 104,443 190,329 16-Sep-14 693 10,581 10,484 21,758 24-Sep-14 1,770 2,872 4,642 25-Sep-14 88 372 460 Not Mailed 17,195 614,830 632,025 TOTAL 14,700 166,604 209,953 17,195 614,830 1,023,282 SLA B3: Report on households reporting interference within un-mailed forecast pixels. More than 40% of total reports of interference DMSL to address through operational adjustments (e.g. mailing low risk pixels in a certain area or adjusting the risk score for pixels), however, a de minimis threshold to apply. In September 2014, DMSL was contacted by a total of 2,426 households reporting interference that DMSL believed could be caused by 4G. Installers visited 846 and filters to a further 1,562. Of the 846 viewers to whom we sent installers, 320 were confirmed as being impacted by 4G Of the 2,426 households, 33 (1%) were suppressed through the risk-based mailing. Page 4 of 10

Mailing Status 4G Filter Grand Not 4G confirmed sent Total Mailed 309 532 1426 2,267 Suppressed 4 3 26 33 Not picked up 7 9 110 126 Total 320 544 1562 2,426 SLA B4: Awareness to be maintained (reminder mailings) with those viewers at continued risk of experiencing interference from masts that were not activated as scheduled. Report on reminder mailing numbers to be provided. A reminder mailing was undertaken on 1 Oct 2014 to 3,344 households forecast to be affected by masts originally expected to activate in April 2014. The following table shows the breakdown of households by risk category and those confirmed as mailed. Mailing Date V_HIGH HIGH MED LON_MED LOW Grand Total 1 Oct 2014 1 1,656 1,687 3,344 Not mailed 25,988 18,373 44,361 Total 1 1,656 1,687 25,988 28,373 47,705 SLA B7: Report on above the line communications and research outcomes, including awareness in rollout areas The proactive PR work we carried out during September adopted an updated approach, using Twitter to identify local voices and amplifiers in the areas we targeted. These people were sent tweets from at800 and asked to re-tweet to their followers to create some local awareness before the news release was sold-in over the telephone to journalists. This approach was particularly effective, securing 26 individual pieces of media coverage that communicated DMSL s key messages, with a total potential reach of over 1.2 million people. Examples of coverage included: The Press York: More than 800 postcards are landing on doormats in Harrogate from today [ ] the plus side to all of this is that it is free. Evening Gazette Teesside: Funded by the leading UK operators, at800 will make sure that viewers can still watch Freeview or are offered a suitable alternative. Stirling News: If at800 believes disruption to Freeview is due to 4G at 800 MHz, it will arrange for an accredited installer to visit the viewer s home, check the cause and fit an approved filter to the TV system, at no cost to the viewer. In most cases, disruption will be fixed by an at800 filter. In September we ran adverts on Facebook to support the direct marketing and PR work during the Ryder Cup, when a number of new masts were activated. Page 5 of 10

The adverts targeted addresses registered in Kinross, Auchterarder and Perth. There are approximately 46,000 people in these areas on Facebook. The Facebook advertising took place between Tuesday 23 and Sunday 28 September. Below is a summary of the Facebook activity. Post Area Clicks Reach Post likes Post shares comments Perth 982 25,124 36 29 25 Auchterarder 372 1,866 7 8 14 Kinross 169 2,538 9 9 3 Total 1,284 29,450 52 46 42 Background: DMSL runs above-the-line, PR or digital advertising communication when masts are activated/the operators begin offering 4G services (at 800 MHz), and not necessarily in line with when DMSL mails viewers. Prior to mast activations/4g at 800 MHz launch, our primary means of communication with viewers is direct mail postcards. Page 6 of 10

SLA C Quality of Service SLA C1: Percentage of households interacting with DMSL that make a complaint. 1% (green); 2% (amber). Result: 0.30% We interacted with a total of 7,583 households in September 2014 Of these, 22 (0.30%) made a complaint Green. SLA C4: Report on total number and categories of complaints Below is a breakdown of the 22 complaints received in September 2014: Compensation: 13 Rollout in general: 3 Filter issuance criteria: 3 Non-4G issue that we cannot help with: 2 Installer-related: 1. [SLA C5:] Vulnerable viewer complaints Out of 833 viewers flagged as being vulnerable with which we interacted in September 2014, none made a complaint. Page 7 of 10

SLA D Scale SLA D1: Measure of the numbers of mailings per report of / case of interference The following table shows the number of mailings per reported case and confirmed case of interference to date for September 2014 rollout households that relate to masts planned to be activated up to September 2014. Month Installer, non-4g Installer, 4G Reactive filter Initial mailings Mailings per non- 4G Mailings per 4G Mailings per reactive filter Mailings per case Jul 2013 5,771 2,342 15,081 7,205,414 1,249 3,077 478 311 Aug 2013 198 209 460 153,875 777 736 335 177 Sep 2013 225 224 438 183,179 814 818 418 207 Oct 2013 96 64 191 117,425 1,223 1,835 615 335 Nov 2013 36 56 121 129,946 3,610 2,320 1,074 610 Dec 2013 39 16 63 103,043 2,642 6,440 1,636 873 Jan 2014 49 28 102 534,796 10,914 19,100 5,243 2,988 Feb 2014 81 71 187 128,943 1,592 1,816 690 380 Mar 2014 8 3 11 5,727 716 1,909 521 260 Apr 2014 4 1 13 4,133 1,033 4,133 318 230 May 2014 4 4 16 4,606 1,152 1,152 288 192 Jun 2014 16 25 43 94,100 5,881 3,764 2,188 1,120 Jul 2014 238 143 578 320,204 1,345 2,239 554 334 Aug 2014 16 16 38 64,130 4,008 4,008 1,688 916 Sep 2014 39 28 102 99,349 2,547 3,548 974 588 Oct 2014 2 3 386,155 N/A 193,078 128,718 77,231 Nov 2014 18 50 88 136,107 7,562 2,722 1,547 872 Dec 2014 2 460 N/A 230 N/A 230 Nothing within 2km 363 72 1,613 Total 7,201 3,356 19,148 9,671,592 1,343 2,882 505 326 Note: Data is included for November and December 2014 masts as some of these have been activated out of sequence. SLA D2: Measure of the number of reported cases that occur outside of mailed area Of the 320 households identified as experiencing 4G interference in September 2014: Cases not mailed due to risk profile or low pop in pixel 4 (1.25%) Cases never identified in modelling 7 (2.19%) Total cases outside mailed area 11 (3.44%) Total cases caught by mailing 309 (96.56%) SLA D3: Measure of number of cases of interference per mast remaining between 0.17 and 1.66 (5k to 50k cases of interference for rollout) exceeding or trending towards exceeding the range will be raised to the OB for review/action. Page 8 of 10

Note: The above thresholds are based on a total mast count of 50,000. Page 9 of 10

Appendix 1: Logic for SLA D1: Identifying the nearest mast Identifying an individual mast that is causing interference is an inexact science. Indeed two masts may individually not result in interference for a household, but when both are active at the same time, interference may result. A household that has interacted with us a number of times (either requesting multiple filters or receiving many installer visits) further complicates the identification of a single affecting mast, as masts may have activated between in between their interactions with us. For the purposes of SLA D1, the logic described below has been used to identify the dates against which households should be measured, and the logic for identifying the mast that is thought most likely to be causing the interference. In-scope households and their effective date The analysis looks separately at households that have received reactive filters and those that have had installer visits. The few households that have received both count in both analyses. For households to which DMSL has sent reactive filters, their analysis is based on the first date on which they made a request for a filter, a request that the triage process indicated warranted the dispatch of a filter. For installer visits, each household is counted once, but all visits are analysed to inform the record. For any households that had a single visit, the date on which that visit was requested is used as the basis for analysis, and the household is categorised as 4G or not based on the outcome of that visit. For any households that had multiple visits, if one or more visits resulted in a 4G diagnosis, it is categorises as 4G and the date on which the earliest of these visits was requested is used as the basis for analysis. If all visits resulted in a non-4g diagnosis, it is categorised such and the request date of the earliest visit is used as the basis for analysis. Identifying mast most likely to be causing interference For each of the above cases, the following process is undertaken: Determine all masts that were activated on or before the household s effective date (see above), but only include masts that are within a 900 metre radius of the property. From these masts, determine the mast that was activated the soonest before the call came in. This is deemed to be the mast most likely to be the cause of the interference If the above yields no masts, undertake the same process using a 1,500 metre radius If the above yields no masts, undertake the same process using a 2,000 metre radius In the event that the above yield no masts (i.e. there was no active mast within 2,000 metres at the point at which the call came in), then the case is not associated with any specific mast and is discounted from the analysis. This logic is used to tag each household with an affecting mast. The rollout month for which this mast was submitted is used as the basis for analysis. Page 10 of 10