Operational experience with the SOLEIL LINAC and Status of the ThomX LINAC project

Similar documents
RF considerations for SwissFEL

Detailed Design Report

Current status of XFEL/SPring-8 project and SCSS test accelerator

The basic parameters of the pre-injector are listed in the Table below. 100 MeV

CLIC Feasibility Demonstration at CTF3

The Elettra Storage Ring and Top-Up Operation

4.4 Injector Linear Accelerator

Status of CTF3. G.Geschonke CERN, AB

Status of RF Power and Acceleration of the MAX IV - LINAC

IOT OPERATIONAL EXPERIENCE ON ALICE AND EMMA AT DARESBURY LABORATORY

STATUS OF THE SWISSFEL C-BAND LINEAR ACCELERATOR

Experience with the Cornell ERL Injector SRF Cryomodule during High Beam Current Operation

3 cerl. 3-1 cerl Overview. 3-2 High-brightness DC Photocathode Gun and Gun Test Beamline

Diamond RF Status (RF Activities at Daresbury) Mike Dykes

Status of BESSY II and berlinpro. Wolfgang Anders. Helmholtz-Zentrum Berlin for Materials and Energy (HZB) 20th ESLS-RF Meeting

Design Studies For The LCLS 120 Hz RF Gun Injector

KARA and FLUTE RF Overview/status

30 GHz Power Production / Beam Line

INFN School on Electron Accelerators. RF Power Sources and Distribution

CBF500 High resolution Streak camera

LCLS RF Reference and Control R. Akre Last Update Sector 0 RF and Timing Systems

THE NEXT LINEAR COLLIDER TEST ACCELERATOR: STATUS AND RESULTS * Abstract

Towards an X-Band Power Source at CERN and a European Structure Test Facility

The Construction Status of CSNS Linac

Jae-Young Choi On behalf of PLS-II Linac team

PEP II Design Outline

Status of SOLARIS. Paweł Borowiec On behalf of Solaris Team

XFEL High Power RF System Recent Developments

Evaluation of Performance, Reliability, and Risk for High Peak Power RF Sources from S-band through X-band for Advanced Accelerator Applications

Status of the X-ray FEL control system at SPring-8

Present Status and Future Upgrade of KEKB Injector Linac

Status of Elettra, top-up and other upgrades

The PEFP 20-MeV Proton Linear Accelerator

News from HZB / BESSY Wolfgang Anders at ESLS-RF Meeting September 2010 Trieste

SRS and ERLP developments. Andrew moss

Activities on FEL Development and Application at Kyoto University

The FAIR plinac RF Systems

Pulsed Klystrons for Next Generation Neutron Sources Edward L. Eisen - CPI, Inc. Palo Alto, CA, USA

Next Linear Collider. The 8-Pack Project. 8-Pack Project. Four 50 MW XL4 X-band klystrons installed on the 8-Pack

TECHNICAL SPECIFICATION Multi-beam S-band Klystron type BT267

Features of the 745T-20C: Applications of the 745T-20C: Model 745T-20C 20 Channel Digital Delay Generator

Commissioning the TAMUTRAP RFQ cooler/buncher. E. Bennett, R. Burch, B. Fenker, M. Mehlman, D. Melconian, and P.D. Shidling

CLIC Feasibility Demonstration at CTF3

STATUS OF THE SwissFEL C-BAND LINAC

LLRF at SSRF. Yubin Zhao

KEKB INJECTOR LINAC AND UPGRADE FOR SUPERKEKB

EPJ Web of Conferences 95,

Introduction to CTF3. G.Geschonke CERN / PS

Summary of the 1 st Beam Line Review Meeting Injector ( )

Photo cathode RF gun -

GFT Channel Digital Delay Generator

SPEAR 3: Operations Update and Impact of Top-Off Injection

The FLASH objective: SASE between 60 and 13 nm

P. Emma, et al. LCLS Operations Lectures

Linac 4 Instrumentation K.Hanke CERN

TWO BUNCHES WITH NS-SEPARATION WITH LCLS*

Digital BPMs and Orbit Feedback Systems

Low Level RF for PIP-II. Jonathan Edelen LLRF 2017 Workshop (Barcelona) 16 Oct 2017

Upgrading LHC Luminosity

Photoinjector Laser Operation and Cathode Performance

Spear3 RF System Sam Park 11/06/2003. Spear3 RF System. High Power Components Operation and Control. RF Requirement.

Future Performance of the LCLS

Linac upgrade plan using a C-band system for SuperKEKB

High Brightness Injector Development and ERL Planning at Cornell. Charlie Sinclair Cornell University Laboratory for Elementary-Particle Physics

Status of the Jefferson Lab Polarized Beam Physics Program and Preparations for Upcoming Parity Experiments

RUNNING EXPERIENCE OF FZD SRF PHOTOINJECTOR

TESLA FEL-Report

Status of KEK X-band Test Facility and its future plans

RF plans for ESS. Morten Jensen. ESLS-RF 2013 Berlin

Solid State Modulators for X-Band Accelerators

CLIC FEASIBILITY DEMONSTRATION AT CTF3

The ESS Accelerator. For Norwegian Industry and Research. Oslo, 24 Sept Håkan Danared Deputy Head Accelerator Division Group Leader Beam Physics

Commissioning of Accelerators. Dr. Marc Munoz (with the help of R. Miyamoto, C. Plostinar and M. Eshraqi)

Status of SOLARIS Arkadiusz Kisiel

Pulses inside the pulse mode of operation at RF Gun

North Damping Ring RF

ANKA RF System - Upgrade Strategies

Tutorial: Trak design of an electron injector for a coupled-cavity linear accelerator

reported by T. Shintake KEK / RIKEN Japan Summary of C-band R&D for Linear Collider at KEK New soft-x-ray FEL Project at RIKEN/SPring-8

18 GHz, 2.2 kw KLYSTRON GENERATOR GKP 24KP 18GHz WR62 3x400V

High Rep Rate Guns: FZD Superconducting RF Photogun

SLS RF operation report 2003

14 GHz, 2.2 kw KLYSTRON GENERATOR GKP 22KP 14GHz WR62 3x400V

RF Upgrades & Experience At JLab. Rick Nelson

A HIGH POWER LONG PULSE HIGH EFFICIENCY MULTI BEAM KLYSTRON

Introduction: CW SRF linac types, requirements and challenges High power RF system architecture

AREAL- Phase 1. B. Grigoryan on behalf of AREAL team

Report on the LCLS Injector Technical Review

Trigger-timing signal distribution system for the KEK electron/positron injector linac

Oak Ridge Spallation Neutron Source Proton Power Upgrade Project and Second Target Station Project

RF Power Klystrons & 20 Year Look. R. Nelson 7/15/15

NSLS-II RF Systems James Rose, Radio Frequency Group Leader PAC 2011

An Overview of Beam Diagnostic and Control Systems for AREAL Linac

G0 Laser Status Parity Controls Injector Diagnostics

DESIGN AND PERFORMANCE OF L-BAND AND S-BAND MULTI BEAM KLYSTRONS

Design, Fabrication and Testing of Gun-Collector Test Module for 6 MW Peak, 24 kw Average Power, S-Band Klystron

A HIGH-POWER SUPERCONDUCTING H - LINAC (SPL) AT CERN

The ESRF Radio-frequency Data Logging System for Failure Analysis

CERN EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH. A 50 Hz LOW-POWER SOLID-STATE KLYSTRON-MODULATOR

POLARIZED LIGHT SOURCES FOR PHOTOCATHODE ELECTRON GUNS AT SLAC?

Transcription:

Operational experience with the SOLEIL LINAC and Status of the ThomX LINAC project 16/11/2016 20th ELS-RF Workshop Pollina JP 1

and Status of the ThomX LINAC project Operational experience with the SOLEIL LINAC 16/11/2016 20th ELS-RF Workshop Pollina JP 2

LINAC description SOLEIL, the French SR facility, has a the 110MeV 3GHz pre-injector, which is designed to work in two operation modes : a Short Pulse Mode (2ns 0.5nC) and a Long Pulse Mode (300ns 0,3nC to 8nC), both at 3Hz (10Hz max) repetition rate e- Gun Triode 90kV dc Prebuncher "Cleaner" Buncher Accelerating Section 1 Accelerating Section 2 15MeV 66MeV 110MeV 16/11/2016 20th ELS-RF Workshop Pollina JP 3

The Cleaner Cleaner (beam filter in short pulse mode) Fast electric deflector: to avoid parasitic beam current from the gun Allows a window of 2 ns eliminating the dark current and cutting the beam pulse head and tail Dark current of 90keV is deflected in front of a circular collimator by 700 V DC, this voltage droops to zero to 2 ns Its functionnality Collimator aperture = 7 mm New Generator Previous Generator Pulse Générator 1,01kV <2,6ns> 750V <3ns> 7 mm inner diameter Diaphragm Deflected beam with 700V DC Transverse distribution at collimator for 0.1 to 1 ma of dark current with focus for a beam pulse of 450 ma Deflector plate (strip line) Electrons beam Stripline Deflected by permanent coil 2Amps = 116,4mrad 1,6Amps = 93,1mrad Beam result 16/11/2016 20th ELS-RF Workshop Pollina JP 4

3 GHz bunching section 1 cell-cavity Prebuncher ΔE = ± 10keV @ 200W RFin Buncher: standing wave ΔE = 15MeV @ 5,5MW RFin vertical section of the buncher (43 cells) Half Cavity before brazing Copper cell alignment, 1m long, 15Mev Solenoid focusing 2000Gauss Four short shielded lenses provide the focusing between the gun and the buncher 16/11/2016 20th ELS-RF Workshop Pollina JP 5

Accelerating sections LIL type accelerating section, 2π/3 mode, travelling-wave Length: 4.5m Energy gain: 60MeV @ 15MW RFin Vertical section of the structure : 135 cells Temperature frequency tuning : 31,1 C@2998,41MHz, precision +/- 0,1 C The accelerating structures have no solenoid. The focusing is made by a triplet of Q-poles between them and a Glazer lens between the buncher and the first accelerating structure 16/11/2016 20th ELS-RF Workshop Pollina JP 6

3 GHz pulsed power source PFN Thyratron 7 2 x 35MW TH2100 Klystrons & HV modulators (300kV, 280A, 6µs pulse at 3Hz) 1 st klystron feeds buncher + accelerating section1 & 2 nd klystron accelerating section2 16/11/2016 20th ELS-RF Workshop Pollina JP 7

Backup-up mode with a single power source In case of a failure of one or the other klystron, two waveguide switches (SW1, SW2) allow to maintain the power in the buncher and section1. The objective is to reach 69MeV, which is still sufficient to insure a correct injection into the Booster. This mode is re-validated at each machine restart, after a shutdown. K1 K2 SW1 SW2 110MeV 69Mev Gr S1 S2 Normal Mode Back-UP Mode e- 16/11/2016 20th ELS-RF Workshop Pollina JP 8

Diagnostics Diagnostics : - Along the linac, 5 FCT (Fast Current Transformers) and 3 fluorescent screens - Along the transfer line, with two bending magnets : 1 FCT, (blue ellipse) 2 fluorescent screens, (in grey) 2 charge monitors, (in blue) an energy analysing slit, (in purple) and an emittance monitor, (in yellow) 16/11/2016 20th ELS-RF Workshop Pollina JP 9

Control system The control system consists in 6 Window embedded PC s with LabVIEW application Locally, 4 Industrial PC s ( Mod1, Mod2, Gun, Aux) with NI acquisition cards In the Linac Control Room (PDCL), 1 PC In the SOLEIL Main Control Room (SDCS), 1 Labview application, compatible with Tango The control-command system of the Linac is accessible via the TANGO DataSocket Device Server (5 DS) SDCS PDCL General Linac supervisor Local Linac supervisor PDCL PC: local Supervisor (expert access) SDCS PC: général Supervisor (user access)) Mod1 PC: local modulateur 1 control Mod2 PC: local modulateur 2 control Gun PC: local gun control Aux PC: local Aux control (cooling, vacuum ) Gun Local gun control Aux HUB Mod1 Local modulator1 control Mod2 Local other elements control Local modulator2 control 16/11/2016 20th ELS-RF Workshop Pollina JP 10

Local control racks Aux. rack Modulator racks (2) Gun rack 16/11/2016 20th ELS-RF Workshop Pollina JP 11

The 2 injection modes Two injection modes are available to fill the synchrotron ring LPM mode (Pulse length of 300ns) 500 ma multibunch in SR hybrid modes in SR SPM mode (1 to 4 Pulses) inside 300ns Min Delay between 2 pulses: 50ns Single and 8-bunch mode in SR 16/11/2016 20th ELS-RF Workshop Pollina JP 12

Top-up injection Since 2009, SOLEIL has adopted the TOP-UP mode of injection with the following features : Linac is always ready to inject Preheating sequence for temperature stabilization : Pre-trigger to start the High Voltage power supply of the modulator klystron 10s before injection, a 3Hz trigger to apply HF power in several equipments : Klystron pre-amplifier, Klystron, accelerating sections and buncher, during 21 cycles, each 2-5 minutes Automatic Reset by software, when a reverse current fault is detected in the modulator In the transfer line between Linac to Booster (LT1), a Bean Position Monitor, measures the pulse-to-pulse energy deviation and a Labview application (below) shows the injection efficiency vs beam position for the two modes of injection, SPM and LPM 16/11/2016 20th ELS-RF Workshop Pollina JP 13

Regular follow up Before each machine restart : a high voltage reconditioning of the Klystron and gun is performed to ensure good operating conditions during the whole run (Klystron : 300kV/300A/3Hz ; Gun :100kV & vacuum : 1e-8.mbar.l/s) Preventive maintenance : turnover of the modulator PS (every 6 months), check of the thyratron stability, To each mode of operation in the storage ring (single bunch, 8 bunches, 500 ma uniform, 450 ma hybrid, lowalpha, slicing, ) corresponds a dedicated file of injection parameters. The group is in charge of verifying and updating all these files. Each week, during the period of 1or 2 hours, dedicated to the machine maintenance, they are revalidated by a measurement of the energy spread Each day, the LINAC performance is checked (beam charge, position, pulse-to-pulse stability, ) 16/11/2016 20th ELS-RF Workshop Pollina JP 14

Achieved upgrades - Updating of the Industrial PCs : motherboard change, migration to Labview 2012, improved CPU load and reduced system iteration times - Additional temperature diagnostics along the LINAC - Replacement of the klystron heating power supplies improved control and stability (0.1%) - Optimization of the RF structure temperature working point - Replacement of the optical device driving the gun, which was based on an OPC server, by an optical transmission module, based on a Siemens PLC; the communication has been validated with Labview - Hardware linac load limitation procedure for the 500mA uniform of the ring for safety reasons - Optimization of the injection parameters for the very low charge in the Low-Alpha mode Implementation of a specific file (LPM, 0.3nC & 0,6nC, 280ns and SPM-30pC & 10pC ). The LINAC is able to meet this low charge requirement but the diagnostics of the LT1 transfer line are at the limit of the noise level LPM 0.6nC & 0.3nC SPM 30pC & 10pC 16/11/2016 20th ELS-RF Workshop Pollina JP 15

Cleaner efficiency upgrade SPM, Single Pulse Mode ; Beam Charge : 0,5nC/1,4ns by bunch Our choice, the FID GmbH s solution, with the increase of the output voltage from 700V(previous generator) to 1010V (new generator) This has improved the quality of the SPM beam (bunch purity) in the storage ring by in an order magnitude. SPECIFICATIONS Maximum amplitude into 50 Ohm - 1,5 kv Amplitude adjustment range - 0,6-1,5 kv Polarity - positive Rise time - 1-1,1 ns Previous Generator Pulse duration at 50% - 2-4 ns, adjustable Fall time - 1,2-1,3 ns Maximum PRF - 10 Hz Burst operation - max 4 output pulses with delay 50-300 ns between them Triggering - Internal and External 5 V, 100 ns External triggering to output delay - not more than 100 ns Jitter - better than 30 ps RMS Variation of trigger/output delay - +/- 500 ps between 20-30 C Remote control - amplituse and pulse duration by 0-10V DC Previous Generator New Generator 16/11/2016 20th ELS-RF Workshop Pollina JP 16

Incoming upgrades - Reprogramming all local PC s using a new «shared variables» protocol, in place of the datasockets server, which will not be supported by NI anymore, first semester 2017 - Improve the communication between the localpc s (error and logging management) - Reduce the number of variables circulating on the network and centralization of the data on the «local Aux. PC» - Test and commissionning of the Cleaner spare generator (new version), January 2017 - Implement phase measurements - For low charge mode : Improve gun charge dynamic range and transfer line diagnostics - Replacement of the klystron focusing power supplies to anticipate their obsolescence modulator 1, 1 st semester 2017 16/11/2016 20th ELS-RF Workshop Pollina JP 17

During the Linac life (in operation since 2005, 66 000 running hours) - the Same Triode, with unchanged performance - Failure of the optical fiber connection in the gun cabinet - one klystron was changed following a faulty ionic pump cable operation in back-up mode with a single klystron during five days for repairing 16/11/2016 20th ELS-RF Workshop Pollina JP 18

and Status of the ThomX LINAC project Status of the ThomX LINAC project 16/11/2016 20th ELS-RF Workshop Pollina JP 19

Status of the ThomX LINAC project The ThomX project ThomX is a new ultra-compact source of X-rays, based on the Compton back-scattering effect. This project was launched in 2012; the machine will produce its first photons in 2017. The ThomX French consortium includes different leading laboratories in the Compton associated technology. ThomX is being built on the Campus of the University Paris XI, Orsay. The accelerator complex consists in a 5 MeV photo-injector, a conventional S-band Linac injecting at full energy into a 50-70MeV storage ring of 16.8m circumference Laser and FP cavity Rep. rate = 20 msec RF pulse length : 3 ms Energy : 50-70 MeV 16/11/2016 20th ELS-RF Workshop Pollina JP 20

Status of the ThomX LINAC project Specifications and performances Specifications and Performances Energy (MeV) 50-70 Number of bunches Bunch Charge (nc) Repetition rate (Hz) 1 0.1 to 1 50 max Transverse size, RMS (mm) 1,4 Emittance (p.mm.mrad) 5 Energy Spread (%) < 1 Bunch Length, RMS (ps) 4 16/11/2016 20th ELS-RF Workshop Pollina JP 21

Status of the ThomX LINAC project Gun and accelerating sections Two sections with S-band RF Structures : Gun section : CTF3 Probe beam photo-injector + diagnostics + steerers Accelerating section : start with the spare SOLEIL accelerating section, lent to ThomX and to be later replaced by a new one ; a prototype is presently under fabrication (R&D LAL-PMB) 16/11/2016 20th ELS-RF Workshop Pollina JP 22

Status of the ThomX LINAC project Photo-cathode RF gun Manufactured by LAL RF Frequency (MHz) 2998,55@30 C E-Field at cathode plane (MV/m) 80 (100 max) Number of cells 2,5 RF power (MW) 5 (10 max) RF pulse length (µs) 3 Repetition rate (Hz) 50 Output electron beam energy (MeV) 5 Laser wavelength (nm) 260 Mg cathode efficiency 5 10-5 16/11/2016 20th ELS-RF Workshop Pollina JP 23

Status of the ThomX LINAC project Mg cathode Pumping chamber Coils Steerer Short stripline BPM From JC Denard Valve LASER insertion chamber YAG/OTR Sreen station Steerer Valve e- Thales accelerating structure in flange ICT LIL Section 16/11/2016 20th ELS-RF Workshop Pollina JP 24

Status of the ThomX LINAC project LIL accelerating section RF Frequency (MHz), mode 2998,55@30 C, 2Π/3 Field E (MV/m), Q 12 (18max), 14800 Number of cells 135 RF power (MW), phase stability 18 (25 max), Δφ < 1 RF pulse length (µs), filling time (µs) 3, 1.35 length (m), distance from the cathode (m) 4.5, 1,3 Repetition rate of (Hz) 50 Output electron beam energy (MeV) 50-70 Gain Energy 45MeV@9MW (gradient=12,5) 65MeV@18MW (gradient=18) 16/11/2016 20th ELS-RF Workshop Pollina JP 25

Status of the ThomX LINAC project Klystron - Modulator Modulator and Klystron Following the call for tender, Scandinova was selected for supplying a modulator, based on the solid state technology, with a Toshiba Klystron This is a very compact «turn key» solution The factory acceptance tests of the modulator + klystron are scheduled for Dec. 2016 at Uppsala (Sweden) RF Frequency (MHz) 2998,5 RF Peak Power (MW), RF average Power (kw) 35-37, 10 Modulator Peak Power (MW), Average (kw) 90, 28,5 Operational Voltage range (kv), Current range (A) 0-300, 0-300 Repetition rate range (Hz) 0-50 Pulse length (µs) 1-4,5 Flat top stability (dv) 1% during 4,5µs 0,1% during 1µs Rate of fall (kv/µs), amplitude stability (%) 200-250, <+/- 0,1 Trig delay, pulse to pulse jitter, pulse width jitter 1,2µs, <+/-4ns, <+/-8ns 16/11/2016 20th ELS-RF Workshop Pollina JP 26

Status of the ThomX LINAC project 3GHz RF power source Main components Klystron - Modulator 1 RF Klystron peak power (MW) 35 RF pulse length (µs) 3 Repetition rate (Hz) 50 RF wave guide network WR284@SF6 2 Variable attenuators 0-20dB 1 phase shifter in acc. section branch Power splitter 5 0-400 2 RF Windows Near the acc. section 16/11/2016 20th ELS-RF Workshop Pollina JP 27

Status of the ThomX LINAC project RF network layout and status Main components are delivered RF power attenuators and phase shifter are waiting for repair (leaks) 16/11/2016 20th ELS-RF Workshop Pollina JP 28

Status of the ThomX LINAC project The IGLEX facility 16/11/2016 20th ELS-RF Workshop Pollina JP 29

Status of the ThomX LINAC project ThomX in IGLEX Located in two areas Modulator and its klystron Electron beam line Hall D1 Casemate 16/11/2016 20th ELS-RF Workshop Pollina JP 30

Status of the ThomX LINAC project Further milestones Building availability is expected end of December 2016 The LINAC installation will begin in January 2017 The first beam is expected in the first semester 2017 16/11/2016 20th ELS-RF Workshop Pollina JP 31

Status of the ThomX LINAC project Thanks for your attention 16/11/2016 20th ELS-RF Workshop Pollina JP 32