Synergy Controller Application Note 74 February 2011, Revision P4 Tidal Engineering Corporation Synergy Controller LED Backlight Retrofit

Similar documents
Replacing the PanelMate epro PS, PanelMate epro PS EE, and PanelMate epro PS OD 7685x-12 Series Backlight Assembly

NewScope-7A Operating Manual

imac Intel 20" EMC 2133 and 2210 LCD Backlights (CCFL) Replacement

Replacing the PanelMate epro PS, PanelMate epro PS Classic, PanelMate epro PS EE, and PanelMate epro PS OD 7685x-15xx Series Backlight Assembly

HD Flex Patch Panel. ASSEMBLY VIEW (FLEX1UPN** shown) FS128B. CONTENTS: (#) indicates FLEX4UPN** quantity

iphone 7 Plus LCD Screen and Digitizer Replacement

OAI-80018AA-7602-B 5/22/2007. Optrex Part Numbering System Description

FOSC-600 C and D I N S T A L L A T I O N I N S T R U C T I O N

RMS 8424S Quick Start

3M Cold Shrink Splice Kit QS-III 5515A

MAGNETIC CARD READER DESIGN KIT TECHNICAL SPECIFICATION

Water blocking tape. Locator ridge HPA-0486

Technical Information Bulletin

3M Cold Shrink Splice Kit QS-III 5514A

Operating Instructions for Throttle Valves Using VRC Valve Positioner

Application Note [AN-007] LCD Backlighting Technologies and Configurations

Business Display Solutions - Institutional Television Mirror TV. Installation Guide for 32PM8822 ( BDL3221M) 42PM8822 (BDL4221M)

SLiC Fiber Aerial Closure System

Product General Specification

All-In-One. Connector System PODIUMS AUDITORIUMS FLY PACKS MOBILE - TRUCKS PANELS CORPORATE FLOOR POCKETS RENTAL & STAGING RACKS

C-net WIND. User s Guide

3M Cold Shrink QS-III Silicone Rubber Splice Kit 5488A-TOW/WOT

CN Remove the scanner assembly (X476 and X576 models) and all doors/covers.

Installing a Wire Mesh Pulling Grip on All-Dielectric DX Armored Fiber Optic Cables

3. Electronics and MMU2 unit assembly

SCdefault. 900 Installation instructions. Accessories Part No. Group Date Instruction Part No. Replaces :36-29 Sep

Medium Box for Cable Termination

Ainsworth Part # volt CUT TO FIT LED bar to replace cold cathode lamps in all LCD s from 10 to 22

PMCL300 Series TFT LCD Monitor 17-INCH, 19-INCH, OR 19-INCH WIDE, WITH MULTIMODE FUNCTIONALITY

3M Cold Shrink Splice Kit QS-III 5416A

General Description. SC Configurations

Magelis XBT ZG43 Backlight Replacement Kit Quick Reference Guide

ACUBRITE 23 SS. Manual. Stainless Steel Chassis 23" LCD Display. Content

HCS - HES Cabling Systems

Winmate Communication INC.

DL-AR2 Technical Specifications Universal HDMI Adapter Ring Rev

INSTALLATION MANUAL FOR THE TIMING LIGHT

Instructions. Cable with Armor F CAUTION. October Rev A

Panduit Recommended Best Case Practice Split Fibre

Cold Shrink Three-Conductor Splice Kit QS-III for use on Armor and Non-Armor Cables Instructions IEEE Std kv Class 250 kv BIL

1. General Description

Optical Distribution Box 300 Installation Guide. Version : R0.0

PLL1920M LED LCD Monitor

(E-UB) UPRIGHT BIKE INSTALLATION INSTRUCTIONS

TFT-150R-G. Tape Shield Cable (page 2) Suggested Installation Equipment (not supplied with kit) Wire Shield Cable (page 7)

IPad 3 (glass) REPAIR GUIDE. Version Edition

ipad Air 2 Wi-Fi Display Assembly Replacement

Total Chlorine Sensor

3 Closure preparation 3.1 Work-stand 3.2. Opening FIST-GCOG2-Dx Preparing drop cable with micro-tubes

Displays Open Frame Monitor Model Number: AND-TFT-150Bxx

SV-LCD50. Installation and User Guide. Thin-Film Transistor (TFT) Liquid Crystal Display (LCD) Color Rear Vision Monitor. Version 1.

Backlight Replacement

TMX-R1000 (USA and JAPAN) TMX-R1000P (EUROPE)

DIY. How to install a PL-259 connector. Parts list: Tools list: Worthwhile projects you can build on your own

DLMP-45/45R Installation Instructions

FIST-MB2-S. FIST Medium Box for Cable Splicing Only. 4 Cable installation. 1 Introduction. Contents. 2 General. 5. Fiber routing to individual trays

IP-LINX. Installation Guide

Industrial Monitor Update Kit

QuickSpecs. HP V19b 18.5-inch Monitor. Overview. 1. Menu 3. Plus ( + ) 5. Power 2. Minus ( - ) 4. OK. 1. Power connector 3. Security lock slot 2.

General. zoom ring. focus ring. Size of liquid. Color. foot adjust levers. Projection. Computer In. Mouse/Com. Power

Building a MidiBox LCD Cable

Prodigy Eclipse ECC and EH222 Service Parts EH222 Cabinet - C Series

VOH681/VOH681P. ion Manual

3M Coupling Tray FDTC-10S-COUPLINGTRAY

IP-LINX Fiber :: X-XXXX

Splice Closure Fiber (SCF) Family

P XGA TFT Monitor. User s Manual

OWNER S MANUAL MOTORIZED 7 WIDE TFT LCD COLOR MONITOR CNT-701

LA1500R USER S GUIDE.

3M Cold Shrink QS4 Integrated Splice Kit QS4-15JCN-4/0-500

3M Cold Shrink QS4 Integrated Splice Kit QS4-15JCN

UNSIGNED HARDCOPY NOT CONTROLLED

24-Fiber LANLINXS (Model # ) 48-Fiber LANLINXS (Model # ) User Manual

Operating Instructions

IPad 4 REPAIR GUIDE. Version Edition

HDS-42AVR HDMI Switcher INSTALLATION MANUAL

3M Motor Lead Inline Splice 5331, 5332, 5333 & 5334

6.4 Chassis Monitor Model Number: LCM0642xx. SPEC No.: SAS Version: 0.0 Issue Date: April 16, Introduction:

WCH Slack Storage Housing (WCH-SSH-2 & WCH-SSH-4-12)

LGX Compatible (LSX) Connector Module) User Manual)

ipad Air 2 Wi-Fi Display Assembly Replacement

INSTALLATION INSTRUCTIONS

Cable ISOBUS Active Termination

NHD YF-CTXI# TFT

PowerBook G4 Aluminum 12" GHz LCD panel upgrade

Dual extruder upgrade manual addendum to assembly manual

7 LCD Color Monitor 8 LCD Color Monitor OWNER S MANUAL

HQ Electromagnetic Channel Locks. For the HQ Infinity

Converting ccfl slot machine monitor to led

ASSEMBLY, INSTALLATION, AND REMOVAL OF CONTACTS AND MODULES

HR7012M / HR7012S. Custom Vehicle Headrests with 7 Slim Style LED LCD Satellite Monitors or Built-in DVD Player for Rear Entertainment HR7012M

FLAT DISPLAY TECHNOLOGY

USER MANUAL FOR THE PANEL VIEWER

MIL-C CLASS L COMPATIBILITY ORDERING INFORMATION

HQ Electromagnetic Channel Locks

LCM Assembly Techniques...

User Manual Color Video Door Phone

3M Cold Shrink QS4 Integrated Splice Kit QS4-15JCN-2-4/0

Color TFT LCD Monitor The Art of Surveillance

8753E, 8753ET, and 8753ES Network Analyzer Option 1D5 High Stability Frequency Reference Upgrade Kit. Applicable Upgrade Kit Model Number

Transcription:

Synergy Controller LED Backlight Retrofit Since their introduction in 2000, Synergy Controller and VersaTenn V 5.7 Liquid Crystal Displays (LCDs) utilize a CCFL (Cold Cathode Fluorescent Lamp) backlight. A Synergy LED Backlight Retrofit kit is now available that offers a lifetime guarantee. This kit, P/N TE2136, utilizes Hi Brightness (HB) white LEDs from CREE and is backward compatible with all current Synergy Controller and VersaTenn V configurations equipped with 5.7 LCDs. This application note details the installation of this LED Backlight kit. The Synergy LED Backlight kit ships in a protective shipping tube as shown below. To begin the installation, pull the cover off one end of the shipping tube and pull out the Application Note 74 and antistatic bag containing the kit contents. Page 1 of 14

6 2 3 1 5 4 The TE2136 kit contains one of each of the following items: (Identified in the figure above) 1. TE2113, Synergy Micro LED Backlight Lamp Assembly 2. TE2137, Synergy Micro LED Backlight Power Cable Assembly 3. TE2121, Synergy Micro LED Backlight Driver Assembly 4. S2B XH A, J17, Connector, 2 POS, Right/Angle Connector 5. Teflon Sleeving, 9 inches,.(040" ID, CLR 0.065 OD, P/N TFT20018 NA005 ). 6. Tyrap Cable Ty (Panduit Corp, P/N PLC2S S6 C0, CLAMP TIE STD #6SCR WR BK 7.9"). 7. Synergy_Controller_App_Note_74_Synergy_LED_Backlight_Retrofit_P4 (this document) Page 2 of 14

The installation steps are summarized as follows: 1. Remove controller from the system. See technical manual for detailed instructions. 2. Remove LCD from controller as described below. 3. Remove the CCFL Lamp and install the LED Backlight. For Sharp Displays (Appendix A) For other Styles (Appendix B). 4. Connect the TE2137 Power Cable Assembly to the TE2121 Driver and the 5 VDC Plug. If necessary, solder the supplied S2B XH A connector in place. 5. Re assemble system. Page 3 of 14

For VersaTenn V Controllers Once the controller is removed from the chamber remove the four screws securing the LCD Display to the controller. Remove the six screws, top and bottom, and flip the touch sensor frame to the left as shown below. Remove the four screws holding the LCD to the LCD panel. Remove the CCFL Lamp Assembly from the display and install the LED Lamp Assembly per Appendix A (for the Sharp Display) and Appendix B (for the FEMA display) as required. Page 4 of 14

Remove the four screws and lift the panel to access the CCFL inverter as shown below: Flip the panel down and unplug the 5 VDC power from the touch controller and the lamp from the CCFL lamp inverter. Then remove the screw holding the CCFL inverter to the panel as shown below: Lamp Power 5 VDC Power Touch Controller CCFL lamp inverter Secure the Ty Rap around the LED Driver and cut the excess portion as shown below: Page 5 of 14

Push the Lamp Power Cable thru the grommet and connect to the LED Driver as shown below: Secure the new (a) TE2121 LED Driver to the panel with the screw and plug the (b) TE2137 TE2137 power cable into the (c) 5 VDC plug on the (d) Touch Controller. Then connect the (e) Lamp Power cable to the LED Driver as shown below (d) Touch Controller (e) Lamp Power (a) LED Driver 5 VDC Power (b) TE2137 Lamp Driver Power Cable Page 6 of 14

For Synergy Micro, Micro II, and Micro V Models: Remove the controller from the chamber and remove the LCD Display hardware as follows. Unplug the ribbon cable and the three discrete wires from the controller as shown below. Remove the (10) screws and lift the LCD panel out of the case. Remove the (5) screws securing the touch screen support and unplug the flex cable for the touch sensor as shown below. Page 7 of 14

Remove the touch screen panel and the touch screen support as shown below. Remove the (4) Screws securing the LCD to the panel and the touch screen support as shown below. Remove the CCFL Lamp and install the LED Kit per Appendix A (for the Sharp Display) and Appendix B (for the FEMA display) as required. Connect the TE2137 LED Driver power cable and the TE2113 LED Lamp cable to the TE2121 LED Driver as shown in the figures below. J17 Note that the J17 site is not populated on all controllers and therefore the S2B XH A Connector is provided so it can be solder to the board. Page 8 of 14

Appendix A LED Lamp Installation in Sharp LM057 Display Push the lamp catch to the side and pull the lamp housing from the display using the cable as shown below. Cut the Teflon sleeving in half (4.5 ) as shown below. Place the sleeving in the lamp housing then place the TE2113 LED lamp in the display lamp housing on top of the sleeving as shown below. Cable Cable exits opposite this end Slide the lamp housing into the Display as shown below. Page 9 of 14

Secure the cable in the cable support as shown below. Page 10 of 14

Appendix B LED Lamp Installation in FEMA Display Remove the (5) screws on the back of the display and bend back the retaining tabs on the ends of the display as shown below Lift the back cover as shown below: Lift the lamp housing and remove it from the display and pull the white lead from the lamp housing as shown below. Page 11 of 14

Gently lift the lamp out of the housing, fold the Teflon sleeving in half and place it in the lamp housing as shown below. Note that the sleeving is not cut in half for the FEMA but is for the Sharp CAUTION: THE LAMP IS MADE OF GLASS AND IS VERY FRAGILE. BE CAREFULL. Seat the Teflon sleeving in the lamp housing then place the TE2113 LED Lamp assembly in the lamp housing as shown below: Note that the cable should exit the housing away from the end shown. Cable exits opposite this end Cable Place the lamp housing in the slot on the back of the display as shown below: Page 12 of 14

Place the back cover on the display and then replace the (5) screws on the back of the display as shown below. Bend the retaining tabs on the ends of the display back into position. Page 13 of 14

About Tidal Engineering Headquartered in Randolph, NJ, Tidal Engineering Corporation has been designing and building award winning embedded hardware and software for test and measurement and data acquisition applications since 1992. The company is recognized for technical expertise in such areas as Embedded IEEE 488, and turnkey SCADA (Supervisory Control and Data Acquisition) systems. Tidal s products are available exclusively through ADI American Distributors Inc., an ISO 9002 certified distributor of electronic and electromechanical components and assemblies. Tidal Engineering Corporation 2 Emery Avenue Randolph, NJ 07869 Tel: 973/328 1173 Fax: 973/328 2302 www.tidaleng.com info@tidaleng.com Page 14 of 14