Installation Device Instruction Guide. Page 1

Similar documents
HQ Electromagnetic Channel Locks

Installation Guide OvalSox TM Cable

Formulate Designer Series 30 Backwall - Kit 05

Formulate Designer Series 30 Backwall - Kit 05

FIST-MB2-S. FIST Medium Box for Cable Splicing Only. 4 Cable installation. 1 Introduction. Contents. 2 General. 5. Fiber routing to individual trays

B.2.CHRONO PLUS SIDE HUNG OPEN IN WINDOWS

Medium Box for Cable Termination

Adapter Selection. Entry Size (Continued) Table E. Multiplication. factors for wire bundles. with Equal Size Wires. This table provides multiplication

Check what you have received against the component checklist and hardware above.

FIST-GCOG2-Dx6. Follow all local safety regulations related to optical fiber plant elements.

Installation instructions Roxtec RM PE

Fiber Optic Splice Closure GPJ Instruction Manual

DLMP Installation Instructions

Installation instructions Roxtec RM ES

Support Frame STB Technical Instruction Manual

DLMP-45/45R Installation Instructions

Installation instructions Roxtec RM ES systems

KEL 183 Cable entry frames

Installation instructions Roxtec RM PE B

Product catalogue 2010

Cable installation guidelines

Check what you have received against the component checklist and hardware above.

SP02 Series Tape Feeder. Operator Guide. All rights reserved Revision 1 29 Feb D-E36

Installation instructions Roxtec RM ES B

DL-AR2 Technical Specifications Universal HDMI Adapter Ring Rev

Cold Shrink Straight Joint

Nava Buffet Assembly Instructions

F.A.Q. Frequently Asked Questions. Technical Questions

HQ Electromagnetic Channel Locks. For the HQ Infinity

Step 1. 1x NXT Ultrasonic Sensor

S020 fluorescent tube luminary

INSTRUCTION MANUAL [J] [E] [C] [G] [B] [I] [H] [D] [F] [A] 0 INTRODUCTION 1 RECOMMENDATIONS 2 ACCESSORIES INCLUDED

Formulate Designer Series 20 Backwall - Kit 07

INSTALLATION INSTRUCTIONS

Installation instructions Roxtec RM BG systems

The Mambo Twist LED Screen System

Automatic Connector MHV Connectors MHV Introduction MHV series connectors Contents Polarized mating interfaces Anti-Rock mating interfaces

Litile34 INSTALLATION MANUAL

Installation instructions Roxtec RM BG B systems

Nava Entertainment Unit Assembly Instructions

Tripod-1 Manual Rev B

KVT Split cable glands

Documentation on all Paxton products can be found on our web site -

Flat. Compact. Cost-effective. FWS Flat Change System

MAGNETIC CARD READER DESIGN KIT TECHNICAL SPECIFICATION

Caution. Hanging the Screen:

Cable System Installation Guide

Guía del usuario Español ( 7 10 ) Guide d utilisation Français ( ) Guida per l uso Italiano ( ) Benutzerhandbuch Deutsch ( )

Bionic Elephant Trunk. Assembly Instructions

Product information. Front-door station series with video for surface-mount

18mm ECAM Cable Entry Port

Formulate Designer Series 10 Backwall - Kit 05

2178-L/S Series Fiber Optic Splice Case with Gasket

Structural Plate Design Guide. 5 th Edition MULTI-PLATE. Aluminum Structural Plate. Aluminum Box Culvert SUPER-SPAN SUPER-PLATE.

Bookcheck Model 966. Site Planning Guide

3M Locator Plate N

RetractaNet XS. Extractable Solutions for OSP. October 2012

Support Frame STB Assembly and Operating Instructions

KIT INSTRUCTIONS. Checkstand Display Mount K039 Issue C

imac Intel 27" EMC 2546 isight Camera and Microphone Cable Replacement

PKK PKK CHARACTERISTICS. Dimensions. Travel. Travel speed. Acceleration. Temperature. Special versions APPLICATION AREAS. PLE max.

imac Intel 27" EMC 2639 Display Replacement

Growmaster Assembly Instructions

3M Distribution Box (DDB)

INSTALLATION INSTRUCTIONS MO023A

414 P 1. DESCRIPTION AND TECHNICAL SPECIFICATIONS 2. LAY-OUT OF STANDARD SYSTEM INSTALLATION DIMENSIONS. Fig. 1. Fig. A

INSTALLATION INSTRUCTIONS

Additional Information for Using Sony Wall-Mount Bracket (SU-WL500)

INSTALLATION INSTRUCTIONS

PRODUCT DESCRIPTION N3S

PSC300 Operation Manual

Identification - electrical services

TSUBAKI SEAMLESS LIGHT TYPE V

MY-HITE ADJUSTABLE TABLE

Operating instructions Retro-reflective sensor. OJ50xx laser / / 2010

The Two Assemblies. Standard Assembly For signs up to 11" wide. Pull flexible lens directly outward with Sucton Cup Tool for lens removal

THE CABLE TRAY SYSTEM

imac Intel 20" EMC 2133 and 2210 LCD Backlights (CCFL) Replacement

1.8 METER SERIES 1183 Az/El MOUNT ANTENNA SYSTEM

7 Day Digital Time Switch

KUZMA 4POINT TONEARM

MP Maker Pro Mk.1. Quick Start Guide

IndyGo Facility Upgrades Project 35671EE

Sliding Door System Bohle SlideTec optima 60

SCREEN WINCH SYSTEM INSTALLATION MANUAL FOR SCREENS FROM 300 cm. UP TO 450 cm. of width

3M Scotchcast Reenterable Signal and Control Cable Splicing Kits 78-R Series

Tips for Perfect Binding FlexBind Hinged Photo Pages

Aluminum spun system one piece reflector Parabolik Prime Focus AZ/EL or Polar Mount Easy Installation

HN Connectors. Automatic Connector. Introduction. Contents. 631/ FAX 631/

OWNER'S MANUAL SIGNAL COMMANDER

INSTALATION PROCEDURE

Satellite Dish Installation Manual (Ver. 2) 1

DREAMOC DIAMOND 4K - ASSEMBLY GUIDE VERSION ORIGINAL ASSEMBLY GUIDE

TECHNICAL INFORMATION

Obtained from Omarshauntedtrail.com

FOSC-600 C and D I N S T A L L A T I O N I N S T R U C T I O N

Distributed Design Series

Installation and handling of. elevator flat cable system and Compensation weight CW. Cabling Solutions

Notice technique de montage voûte série 260 Technical instructions for the installation of the vault series 260

Digital Time Switch. Installation & Operating Instructions

Transcription:

Installation Device Instruction Guide Page 1

Page 2 Tools required 2 x String lines & pegs. Hammer. Spirit level. 16mm diameter. Lengths to be determined by installer. Bar lengths will vary depending on soil type and height of channel above the trench depth. Number of required 2 per channel + 2 additional for the end channel. 12mm ring spanner. 1.1m length of timber to assist with levelling. Installations device. 1 per channel + 1 additional for the end channel. Read all steps below before starting installation. 2 people minimum are required for the installation of the channels.

Page 3 Installation device use Loosen both screws to allow the device to be positioned over the. Fixed side of device Push the adjustable clamp to the outside to allow the channels to be installed. Wedge is fitted during final stage of installation. Step 1 Create the required width template using timber sheet or similarly suitable rigid material. Diagrams can be printed from the ACO website. For ACO s KlassikDrain and PowerDrain System. http://www.acodrain.com.au/resources/site-installation.htm For ACO s KerbDrain QK200SF and QK200B System. http://www.acoaus.com.au/infrastructure/kerbdrain.htm

Page 4 Step 2 Set out the top string line for the top edge of the channel run and lay the required channels in sequence along the string line. Also lay out 2 and 1 installation device at the location of each channel joint. Step 3 Set the first channel without using the template to allow for flexibility. Note: The first channel to be set out must be at the outlet/deep end of the run. The fixed side of the installation device must be on the same side of the channel as the string line. Ensure the are adequately pushed into the ground so they do not fall over once the channel is removed and do not sit higher than the top of the channel. Fixed side of device Direction of installation Outlet end of channel

Page 5 Step 4 Once the first channel is set, levelled and straightness is achieved, remove the channel and leave the first installation device in place. Remove the second device, but leave the in place. Remove the second installation device from the second row of First installation device on first row of Direction of installation Step 5 Position the template over the second row of. Step 6 Set up the second string line up against the template edge ensuring that both string lines are parallel. The second string line should be just above the ground level to keep the template straight when moving from one channel to the next. The string line should also be on the same side of the channel as the top string line. First stringline for top of channel Second stringline for template edge Second row of

Page 6 Step 7 Hammer in the next/third row of reo-bars through the empty template holes. Drive the reinforcing bars into a sufficient depth - not too low to stop the use of the Installation Device. Third row of Second row of Step 8 Remove the template and reposition the template again on the last two that were just installed. Location for fourth row of Third row of Step 9 Re-attach the second installation device to the second row of. Re attach second installation device First installation device

Page 7 Step 10 Replace the first channel and ensure the channel is level with the top string line and is level across the width of the channel. If it s too high, tap down the. If it s too low, undo the screws and lift the installation device up. Step 11 Once the first channel has been replaced, DO NOT lock the adjustable side of the clamp with the wedge yet. This allows some movement of the channel when placing the next channel in line. Do not place the channel all the way to the fixed side of the clamp where it will sit in the locked position. This allows for easier installation of channels. Note: Always allow two sets of to be installed before placing channels. This allows the template to be removed and placed into the next position for setting the. Wedge Fixed side Adjustable sliding clamp Step 12 Continue to install devices and repeat process of setting the channels.

Page 8 Step 13 After next/fourth channel is set, the first channel can be locked into position using the wedges for the install device. Note, ensure the are installed at least 2 rows ahead prior to installing channels. 7 th row 6 th row 5 th row 4 th row 3 rd row 2 nd row 1 st row Wedge

Step 14 Continue to follow steps 7 to 13 until the trench run is complete and ensure all the wedges are in place. Channels are now set up for a single concrete pour operation. The installation device clamps the channels together to brace the channels in place and prevent movement during the concrete pour. Page 9