DELIVERY RECORD. Location: Ibaraki, Japan

Similar documents
PRESENT STATUS OF J-PARC

OPERATIONAL EXPERIENCE AT J-PARC

Upgrading LHC Luminosity

3 cerl. 3-1 cerl Overview. 3-2 High-brightness DC Photocathode Gun and Gun Test Beamline

COMMISSIONING SCENARIOS FOR THE J-PARC ACCELERATOR COMPLEX

Linac upgrade plan using a C-band system for SuperKEKB

The ESS Accelerator. For Norwegian Industry and Research. Oslo, 24 Sept Håkan Danared Deputy Head Accelerator Division Group Leader Beam Physics

The PEFP 20-MeV Proton Linear Accelerator

TOWARDS THE COMMISSIONING OF J-PARC

Detailed Design Report

The Construction Status of CSNS Linac

Progress of Beam Instrumentation in J-PARC Linac

Commissioning of Accelerators. Dr. Marc Munoz (with the help of R. Miyamoto, C. Plostinar and M. Eshraqi)

STATUS OF THE SWISSFEL C-BAND LINEAR ACCELERATOR

Spear3 RF System Sam Park 11/06/2003. Spear3 RF System. High Power Components Operation and Control. RF Requirement.

Present Status and Future Upgrade of KEKB Injector Linac

ESS: The Machine. Bucharest, 24 April Håkan Danared Deputy Head Accelerator Division. H. Danared Industry & Partner Days Bucharest Page 1

Particle Beam Production - A Synchrotron-Based System - Prof. Dr. Thomas Haberer Scientific-technical Director Heidelberg Iontherapy Center

INFN School on Electron Accelerators. RF Power Sources and Distribution

CERN S PROTON SYNCHROTRON COMPLEX OPERATION TEAMS AND DIAGNOSTICS APPLICATIONS

Proton Engineering Frontier Project

Linac 4 Instrumentation K.Hanke CERN

STATUS OF THE SwissFEL C-BAND LINAC

III. Proton-therapytherapy. Rome SB - 3/5 1

Oak Ridge Spallation Neutron Source Proton Power Upgrade Project and Second Target Station Project

Towards an X-Band Power Source at CERN and a European Structure Test Facility

Diamond RF Status (RF Activities at Daresbury) Mike Dykes

PEP II Design Outline

Experience with the Cornell ERL Injector SRF Cryomodule during High Beam Current Operation

Status of RF Power and Acceleration of the MAX IV - LINAC

Workshop on Accelerator Operations August 6-10, 2012 Glen D. Johns Accelerator Operations Manager

The European Spallation Source

45 MW, 22.8 GHz Second-Harmonic Multiplier for High-Gradient Tests*

Current status of XFEL/SPring-8 project and SCSS test accelerator

KEKB INJECTOR LINAC AND UPGRADE FOR SUPERKEKB

High Brightness Injector Development and ERL Planning at Cornell. Charlie Sinclair Cornell University Laboratory for Elementary-Particle Physics

9th ESLS RF Meeting September ALBA RF System. F. Perez. RF System 1/20

NSLS-II RF Systems James Rose, Radio Frequency Group Leader PAC 2011

Production of quasi-monochromatic MeV photon in a synchrotron radiation facility

CLIC Feasibility Demonstration at CTF3

LENS Operating Experience

2 Work Package and Work Unit descriptions. 2.8 WP8: RF Systems (R. Ruber, Uppsala)

Status of BESSY II and berlinpro. Wolfgang Anders. Helmholtz-Zentrum Berlin for Materials and Energy (HZB) 20th ESLS-RF Meeting

RF considerations for SwissFEL

EPJ Web of Conferences 95,

30 GHz Power Production / Beam Line

The FAIR plinac RF Systems

PROTON DRIVER CHAPTER IV

4.4 Injector Linear Accelerator

DESIGN OF 1.2-GEV SCL AS NEW INJECTOR FOR THE BNL AGS*

RF plans for ESS. Morten Jensen. ESLS-RF 2013 Berlin

ILC-LNF TECHNICAL NOTE

THE OPERATION EXPERIENCE AT KOMAC*

Tutorial: Trak design of an electron injector for a coupled-cavity linear accelerator

THE NEXT LINEAR COLLIDER TEST ACCELERATOR: STATUS AND RESULTS * Abstract

Report from the 3 rd Meeting of the Accelerator Technical Advisory Committee for the Japan Proton Accelerator Research Complex (J-PARC)

Status of SOLARIS. Paweł Borowiec On behalf of Solaris Team

A Fifteen Year Perspective on the Design and Performance of the SNS Accelerator

Energy Upgrade Options for the LCLS-I Linac

reported by T. Shintake KEK / RIKEN Japan Summary of C-band R&D for Linear Collider at KEK New soft-x-ray FEL Project at RIKEN/SPring-8

Status of CTF3. G.Geschonke CERN, AB

Pulsed Klystrons for Next Generation Neutron Sources Edward L. Eisen - CPI, Inc. Palo Alto, CA, USA

HIGH-INTENSITY PROTON BEAMS AT CERN AND THE SPL STUDY

TECHNICAL SPECIFICATION Multi-beam S-band Klystron type BT267

FIRST SIMULTANEOUS TOP-UP OPERATION OF THREE DIFFERENT RINGS IN KEK INJECTOR LINAC

Activities on FEL Development and Application at Kyoto University

News from HZB / BESSY Wolfgang Anders at ESLS-RF Meeting September 2010 Trieste

RF Power Generation II

Thoughts on Project Standard in Japan

RUNNING EXPERIENCE OF FZD SRF PHOTOINJECTOR

RF Power Klystrons & 20 Year Look. R. Nelson 7/15/15

A HIGH-POWER SUPERCONDUCTING H - LINAC (SPL) AT CERN

SUMMARY OF THE ILC R&D AND DESIGN

North Damping Ring RF

Status of KEK X-band Test Facility and its future plans

ESS Linac WP8 Radio Frequency Systems and Test Facilities

Preparations for Installation, Testing and Commissioning based on Experience at CERN, SNS and Siemens

The basic parameters of the pre-injector are listed in the Table below. 100 MeV

The Elettra Storage Ring and Top-Up Operation

Recent developments in cyclotrons for proton therapy at IBA

Photo cathode RF gun -

Next Linear Collider. The 8-Pack Project. 8-Pack Project. Four 50 MW XL4 X-band klystrons installed on the 8-Pack

Final Report. U.S. Department of Energy Grant Number DE-FG02-04ER83916

The SPL at CERN. slhc. 1. Introduction 2. Description. 3. Status of the SPL study. - Stage 1: Linac4 - Stage 2: LP-SPL - Potential further stages

PEP-II Overview & Ramp Down Plan. J. Seeman DOE PEP-II Ramp Down-D&D Review August 6-7, 2007

Jae-Young Choi On behalf of PLS-II Linac team

First Simultaneous Top-up Operation of Three Different Rings in KEK Injector Linac

The Beam Test Facility at the SNS

SRS and ERLP developments. Andrew moss

Status of the FAIR Project. Jürgen Henschel FAIR Project Leader / Technical Director GSI & FAIR

5 Project Costs and Schedule

Status of SOLARIS Arkadiusz Kisiel

DEVELOPMENT OF A 10 MW SHEET BEAM KLYSTRON FOR THE ILC*

Operational Status of PF-Ring and PF-AR after the Earthquake

Development, construction and testing of a room temperature CH-DTL

Dark current and multipacting trajectories simulations for the RF Photo Gun at PITZ

BBU threshold current study for 6 GeV beam in 12 GeV beamline setup

Introduction: CW SRF linac types, requirements and challenges High power RF system architecture

Linac strategies for the lower beam energies. U. Ratzinger

PEP II STATUS AND PLANS *

Transcription:

DELIVERY RECORD Client: Japan Atomic Energy Agency (JAEA) High Energy Accelerator Research Organization (KEK) Facility: J-PARC (Japan Proton Accelerator Research Complex) Location: Ibaraki, Japan 1 October 2015 Machinery Systems Business Department 2015 MITSUBISHI HEAVY INDUSTRIES MECHATRONICS SYSTEMS, LTD. All Rights Reserved. 0

OUTLINE 1. OVERVIEW 2. MEDIUM-ENERGY BEAM TRANSPORT LINE (MEBT) 3. DRIFT TUBE LINAC (DTL) 4. SEPARATED-TYPE DRIFT TUBE LINAC (SDTL) 5. ANNULAR-RING COUPLED STRUCTURE (ACS) 6. CERAMICS CHAMBER 7. BEAM MATCHING SYSTEM 8. MAGNETIC ALLOY LOADED RF CAVITY 9. INPUT COUPLER (DTL / SDTL) 10. RF WINDOW (ACS) 2015 MITSUBISHI HEAVY INDUSTRIES MECHATRONICS SYSTEMS, LTD. All Rights Reserved. 1

1. OVERVIEW Courtesy of JAEA/KEK/J-PARC CERAMICS CHAMBER MAGNETIC ALLOY LOADED RF CAVITY BEAM MATCHING SYSTEM ANNULAR-RING COUPLED STRUCTURE (ACS) SEPARATED-TYPE DRIFT TUBE LINAC (SDTL) DRIFT TUBE LINAC (DTL) MEDIUM-ENERGY BEAM TRANSPORT LINE (MEBT) 2015 MITSUBISHI HEAVY INDUSTRIES MECHATRONICS SYSTEMS, LTD. All Rights Reserved. 2

2. MEDIUM-ENERGY BEAM TRANSPORT LINE (MEBT) Beam H - Beam Energy RF Frequency 3MeV 324MHz Length 2.8m Structures Buncher: 2 RF Chopper: 1 Beam Scraper: 1 Quadrupole Magnet: 7 Bending Magnet: 1 New RF Chopper 2015 MITSUBISHI HEAVY INDUSTRIES MECHATRONICS SYSTEMS, LTD. All Rights Reserved. 3

3. DRIFT TUBE LINAC (DTL) Frequency Structure Accelerating Type Accelerating Field Input Power 324 MHz Drift Tube Linac (DTL) Standing Wave (TM010) 0 mode 2.5 ~ 2.9 MV/m (design value) ~ 1.2 MW, 600 μsec, 50 Hz Q-value 48000 ~ 52000 Total Length Tank Length Delivery Number 27.1 m 9.9, 9.4, 7.3 m 3 Tanks Photo courtesy of JAEA/KEK/J-PARC 2015 MITSUBISHI HEAVY INDUSTRIES MECHATRONICS SYSTEMS, LTD. All Rights Reserved. 4

4. SEPARATED-TYPE DRIFT TUBE LINAC (SDTL) Frequency Structure Accelerating Type Accelerating Field Input Power 324 MHz Separated-Type Drift Tube Linac (SDTL) Standing Wave (TM010) 0 mode 2.5 ~ 3.7 MV/m (Design Value) ~ 1.0 MW, 600 μsec, 50 Hz Q-value 40000 ~ 42000 Photo courtesy of JAEA/KEK/J-PARC Total Length Tank Length Delivery Number 91.2 m 1.5 ~ 2.6 m 32 Tanks 2015 MITSUBISHI HEAVY INDUSTRIES MECHATRONICS SYSTEMS, LTD. All Rights Reserved. 5

5. ANNULAR-RING COUPLED STRUCTURE (ACS) Frequency Structure Accelerating Type Accelerating Field Input Power 972 MHz Annular-Ring Coupled Structure Standing Wave (TM010) π/2 mode 4.1 ~ 4.5 MV/m 2.7 MW, 600 μsec, 50 Hz Q-value 18000 ~ 20000 Total Length Module Length Delivery Number 108.3 m 3.9 ~ 5.0 m 21 Modules Photo courtesy of JAEA/KEK/J-PARC 2015 MITSUBISHI HEAVY INDUSTRIES MECHATRONICS SYSTEMS, LTD. All Rights Reserved. 6

6.1 CERAMICS CHAMBER Courtesy of JAEA/KEK/J-PARC Capacitor Capacitance : 330nF Every stripes are jumped over the joint area. Brazing joint TiN coating Thickness: 15nm Ti flange RF Shield 3540mm Ti sleeve 2015 MITSUBISHI HEAVY INDUSTRIES MECHATRONICS SYSTEMS, LTD. All Rights Reserved. 7

6.2 CERAMICS CHAMBER Courtesy of JAEA/KEK/J-PARC 2015 MITSUBISHI HEAVY INDUSTRIES MECHATRONICS SYSTEMS, LTD. All Rights Reserved. 8

7. BEAM MATCHING SYSTEM 4a-Beam dump (A) Beam (A) 4b-Beam dump (B) Analyzer (C) (B) To 3GeV Synchrotron Beam H - Beam Energy Structures 400MeV Magnet System: 54 sets Vacuum System: 4 sets Ti Vacuum Duct: 80m Power Supply (C) 2015 MITSUBISHI HEAVY INDUSTRIES MECHATRONICS SYSTEMS, LTD. All Rights Reserved. 9

8. MAGNETIC ALLOY LOADED RF CAVITY Frequency 1.6 ~ 3.4 MHz Accelerating Voltage 20 kv/gap Input Power 1 MW(peak) Q-value 10 ~ 30 Length 2.3 m Weight 7 ton (dry) Delivery Number 9 Modules Photo courtesy of JAEA/KEK/J-PARC Photo courtesy of JAEA/KEK/J-PARC 2015 MITSUBISHI HEAVY INDUSTRIES MECHATRONICS SYSTEMS, LTD. All Rights Reserved. 10

9.1 INPUT COUPLER (DTL) Frequency Input Power Coupling Window Type Waveguide Cooling Length 324MHz 1MW, 600μsec, 50pps Variable (Movable Loop) Disk Alumina (99.7%) Input / WX-203D Cavity side / WX-152D Water ~1.0 m Input Coupler Photo courtesy of JAEA/KEK/J-PARC 2015 MITSUBISHI HEAVY INDUSTRIES MECHATRONICS SYSTEMS, LTD. All Rights Reserved. 11

9.2 INPUT COUPLER (SDTL) Frequency Input Power Coupling Window Type Waveguide Cooling Length 324MHz 1MW, 600μsec, 50pps Variable (Rotation) Coaxial Disk Alumina (95%) Input / WX-203D Cavity Side / WX-152D Water ~1.0 m Input Coupler 2015 MITSUBISHI HEAVY INDUSTRIES MECHATRONICS SYSTEMS, LTD. All Rights Reserved. 12

10. RF WINDOW (ACS) Frequency Input Power 972MHz 2MW, 600μsec, 50pps VSWR <1.2 Window type Waveguide Cooling Length Disk Alumina (95%) WR975 Water 35cm TiN coating RF Window 2015 MITSUBISHI HEAVY INDUSTRIES MECHATRONICS SYSTEMS, LTD. All Rights Reserved. 13

2015 MITSUBISHI HEAVY INDUSTRIES MECHATRONICS SYSTEMS, LTD. All Rights Reserved.