SECTION O FIBER OPTICS

Similar documents
SECTION 7 -- CROSS-CONNECT SYSTEMS

Section Communications Optical Fiber Backbone Cabling

LGX Compatible (LSX) Connector Module) User Manual)

SECTION 8 -- CABLE RACK, AUXILIARY FRAMING AND LIGHTING SYSTEMS

SECTION J -- CABLING

UNIVERSITY of NORTH DAKOTA LOW VOLTAGE COMMUNICATIONS STANDARDS FOR CABLING, PATHWAYS, AND SPACE

ATT-TP Common Systems Cable and Wire Installation and Removal Requirements Cable Racks and Raceways

HCS - HES Cabling Systems

WaveTrax. Fiber Cable Management System

SECTION FIBER OPTIC STATION CABLES

STRUCTURED CABLE SYSTEM (SCS)

Public Works Division Lighting District Fiber Optic Specifications April 2009

Mediacom Upgrade/Splicing Procedures (based on original document from Corporate dated 4/16/98)

UNSIGNED HARDCOPY NOT CONTROLLED

SECTION Q -- EQUIPMENT REMOVAL AND CABLE MINING

UNIFIED FACILITIES GUIDE SPECIFICATIONS

SECTION T -- SYNCHRONIZATION

ACADEMIC SUCCESS CENTER THE COLLEGE AT BROCKPORT STATE UNIVERSITY OF NEW YORK PROJECT NO

California Polytechnic State University ITS Telecommunications PART 1 GENERAL SECTION AUDIO VISUAL STATION CABLES 1.

FIBER OPTIC CABLE PULLING

NGF optical distribution frame

2178 Fiber Optic Splice Case and 2181 Cable Addition Kit

Follow The Leader In Shielded Technology

Target Interface / Construction Compliance Inspection Checklist

3M Fiber Optic Wall Mount Enclosure 8430 Series

INSTALLATION INSTRUCTIONS

OCC Installation Conduit Guidelines Excerpt from Optical Cable Corporation s INSTALLATION GUIDE

AT&T January, 2012 Revised December, 2018 TABLE OF CONTENTS SECTION 1--INTRODUCTION...1-1

NC-1000 INSTALLATION MANUAL NC-1000 FIBRE OPTIC CROSS-CONNECTION SYSTEM

SPECIAL SPECIFICATION 6559 Telecommunication Cable

Michigan State University Construction Standards EXTERIOR FIBER OPTIC CABLE SYSTEM PAGE

TITLE: FIBER OPTIC SHOCK FIXTURES

REQUEST FOR QUOTE: TELECOMMUNICATIONS CABLING Library/Classroom Building, Beltline Campus

CABLE MANAGEMENT PRODUCTS Cable Managers & Accessories

Next Generation Frame (NGF) Fiber Combination Block (FCB) User Manual)

CHAPTER 14 WIRING SIGNALS AND LIGHTING FIELD GUIDE Wiring Requirements WIRING

SPECIAL SPECIFICATION 8540 Telecommunication Cable

3M Fiber Optic Splice Closure 2178-XL & 2178-XL/FR

DS1 Cross-Aisle Panel

3M Fiber Optic Splice Closure 2178-XL & 2178-XL/FR 3M Cable Addition Kit 2181-XL and 2181-XL/FR

3M Fiber Optic Splice Closure 2178-XSB/XSB-FR & 2178-XLB/XLB-FR 3M Cable Addition Kit 2181-XB/XB-FR

SECTION COMMUNICATIONS HORIZONTAL CABLING

Minimum qualifications for the Telecommunications Engineer are: A. Texas Licensed Profession Engineer (PE)

Medium Box for Cable Termination

WCH Slack Storage Housing (WCH-SSH-2 & WCH-SSH-4-12)

Cable installation guidelines

Cambria County Association for the Blind and Handicapped 175 Industrial Park Road Ebensburg, PA Prepared for: Prepared by:

2178-L/S Series Fiber Optic Splice Case with Gasket

FOSC 450 C6 and D6 Closures

SLiC Fiber Aerial Closure System

Optical Distribution Box 300 Installation Guide. Version : R0.0

SJOF-BS604B. Fiber Optic Splice Closure User Manual Rev.1

Cable Installation Tips

COMMON WORK RESULTS FOR INTEGRATED AUTOMATION DESIGN AND CONSTRUCTION STANDARD

Pre-bid Supplement #01 Communications Specifications and Additional Scope Project Bid: CM Date: 05/26/2017

HD Flex Patch Panel. ASSEMBLY VIEW (FLEX1UPN** shown) FS128B. CONTENTS: (#) indicates FLEX4UPN** quantity

FOSC-600 C and D I N S T A L L A T I O N I N S T R U C T I O N

FIST-MB2-S. FIST Medium Box for Cable Splicing Only. 4 Cable installation. 1 Introduction. Contents. 2 General. 5. Fiber routing to individual trays

FREEDM Loose Tube Interlocking Armored Cables

OCC Installation Figure 8 Guidelines Excerpt from Optical Cable Corporation s INSTALLATION GUIDE

3M Distribution Box (DDB)

BILOXI PUBLIC SCHOOL DISTRICT. Biloxi Junior High School

Cable Installation Tips

SECTION SYNCHRONIZATION

Customer-Owned Outside Plant

Cable and Power Management Open-Frame Rack Cable Managers

Aerial Cable Installation Best Practices

GF-KSW-48 Series of Fiber Optic Distribution Box. Instruction Manual

SPECIAL SPECIFICATION 6191 Fiber Optic Cable

CONNECTING THE FUTURE 19" LINXS LIGHTWAVE INTEGRATED CROSS-CONNECT SYSTEM USER MANUAL

SPECIAL SPECIFICATION 2284 Fiber Optic Cable (Self-Supporting)

SECTION 5900 TRAFFIC SIGNALS CITY OF LEE S SUMMIT, MISSOURI DESIGN CRITERIA

3M SLiC 530/533/733-2 Port 0.61 Cable Entry Bracket 3M SLiC 530/533/733-2 Port-MSM 0.61 Cable Entry Bracket

IP-LINX. Installation Guide

DIGITAL DISTRIBUTING FRAME (DDF) INSTALLATION PROCEDURES FOR PANELS AND MODULES

SUMITOMO PRODUCT SPECIFICATION. FutureFLEX. TCxxMSOS DIELECTRIC HIGH PERFORMANCE OSP TUBE CABLE SERIES

COYOTE CLOSURE FOR UNDERGROUND, AERIAL, AND BURIED SPLICES 6.0" x 22" 8.5" x 22" (15.24 cm x cm cm x cm)

Triax TechInfo. Installing and pulling Fibre Optic cables

IP-LINX Fiber :: X-XXXX

Installing a Wire Mesh Pulling Grip on All-Dielectric DX Armored Fiber Optic Cables

Student Services & Classroom Addition

OCC Installation Round Messenger Guidelines Excerpt from Optical Cable Corporation s INSTALLATION GUIDE

Coastal Carolina University RE-BID WILLIAMS BRICE RENOVATION AND REPAIR October 19, 2018 Construction Documents

CABLING STANDARDS FOR

Selecting the correct cable type for Outside Plant Application

2178 L/S Series Fiber Optic Splice Cases and Accessories

SUMITOMO PRODUCT SPECIFICATION. FutureFLEX. TCxxTP2-1 PLENUM RATED TUBE CABLE SERIES (NFPA 262) WITH GALVANIZED STEEL INTERLOCKED ARMORING

HI-DEX PRODUCT SET DATASHEET

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 804 FIBER OPTIC CABLE AND COMPONENTS. July 19, 2013

24-Fiber LANLINXS (Model # ) 48-Fiber LANLINXS (Model # ) User Manual

Aerial Installation Guidelines for Fiber Optic Cable

OPTICAL FIBRE CABLE NETWORK 2004/1

FOSC 400. Ordering Guide For Closures and Accessories. Section I 3. Section II 5. Section III 9. Section IV 11. Section V 15

Special Specification 6242 Special Fiber Optic Cable

Splice Closure Fiber (SCF) Family

SPECIAL SPECIFICATION 1438 Fiber Optic Cable (Single mode and Multimode)

LTX Optical Distribution Panels. Ordering Guide

Underground Installation of Optical Fiber Cable by Pulling

SUMITOMO PRODUCT SPECIFICATION. FutureFLEX. TCxxTOX / TOD DIELECTRIC OSP TUBE CABLE SERIES

SUMITOMO PRODUCT SPECIFICATION. FutureFLEX TC01TPX (NFPA 262) PLENUM RATED TUBE

Transcription:

SECTION O FIBER OPTICS CONTENTS PAGE 1. GENERAL...O-2 1.1 Introduction...O-2 1.2 Definitions...O-2 1.3 Requirements...O-2 2. RUNNING, SECURING AND FIRESTOPPING FIBER OPTIC CABLE...O-3 2.1 Running Fiber Optic Cable...O-3 2.2 OFNR Cabling - Raised Floor Environments...O-5 3. FIBER OPTIC CABLING FROM VAULT TO FDF...O-5 4. FIBER OPTIC PATCHCORDS AND JUMPERS...O-6 4.1 Requirements...O-6 TABLE O-1 SUMMARY OF CHANGES IN SECTION O Revision Date Item Action Requirements Change Notification 03/11/2016 Entire Document Modification N/A; March 2016 TP76300 Rewrite 06/01/2016 4.1.11 Addition ATT-TP-76300-348 06/01/2016 2.1.4 Modification ATT-TP-76300-349 07/01/2016 2.1.4 Modification ATT-TP-76300-351 08/01/2016 2.1.4 Modification ATT-TP-76300-356 09/01/2016 4.1.2 f) Addition ATT-TP-76300-361 10/05/2016 2.1.4 & 2.1.14 Modification ATT-TP-76300-363 7/28/2017 2.1.10 Modification ATT-TP-76300-378 7/28/2017 4.1.5 Deletion ATT-TP-76300-379 O-1

INSTALLATION REQUIREMENTS Revised July, 2017 AT&T March, 2016 1. GENERAL 1.1 Introduction 1.1.1 The Installation Supplier shall ensure, as part of the evaluation of the installation, that all equipment added, rearranged or modified is properly installed and in conformance with AT&T installation specifications. 1.1.2 The Installation Supplier shall ensure, as part of the evaluation of the installation, that all work has been done in accordance with the detail specifications or approved changes to the detail specifications. 1.1.3 This section covers AT&T requirements for running and terminating fiber optic cables and jumpers. 1.1.4 Changes in this issue of Section O are summarized in Table O-1. 1.2 Definitions 1.2.1 Fiber Optic Cable Premise Fiber Optic Cable is intended for indoor use within an environmental structure (i.e. home, commercial, or industrial building) to carry optical signals from place to place within the structure. There are two types of Premise cable and they are as follows: 1. Trunk Cable: Trunk cable is a stiff jacketed multi-stranded cable consisting of two or more fibers, typically used in a horizontal and distribution configuration, i.e. Optical Fiber Non-conductive Riser (OFNR) or Optical Fiber Non-conductive Plenum (OFNP). 2. Equipment Cord Cable: Equipment Cord cable is either one or two fibers often referred to as Simplex (a single fiber internal to one sheath) or Duplex (two individually sheathed fibers bonded together in a "zip cord" style), and is commonly refer to as either a jumper or a patch cord. The functional difference between a jumper and a patch cord is defined as follows: Patch Cord A connection between the rear of an FOT panel and a Network Element. Jumper A connection within the FDF complex between panels i.e. FOT to FOT, FOT to OSP, etc. 1.3 Requirements 1.3.1 The entire length of a polyethylene sheathed fiber optic cable run shall be placed on ladder type cable rack. 1.3.2 The Installation Supplier shall not install innerduct for use with polyethylene sheathed fiber optic cable in AT&T Equipment areas. 1.3.3 The AT&T approved Fiber Protection System (FPS) shall not be run through floor penetrations or fire rated walls. O-2

1.3.4 All fiber optic connections shall be made in a manner that provides proper operation and functionality of the equipment. 2. RUNNING, SECURING AND FIRESTOPPING FIBER OPTIC CABLE 2.1 Running Fiber Optic Cable 2.1.1 When the fiber optic cable enters the building in conduit, any slack shall be stored in the cable vault or cable entrance facility area, so that the cable can be pulled back and reterminated or spliced. 2.1.2 Whenever the building has no cable vault, any fiber optic cable slack shall be stored at the entrance facility. The stored length shall not exceed 50 feet. If the fiber optic cable has metallic strength members or a metallic shield, no more than fifty (50) feet of cable shall be pulled into the AT&T Equipment areas. 2.1.3 When the fiber optic cable is direct buried and does not enter the AT&T Equipment areas in conduit and, it cannot be pulled back into the first manhole, slack shall not be stored in the cable vault or cable entrance facility. 2.1.4 Fiber optic cable shall be run on either cable rack, basket rack or in metallic/terra cotta conduit throughout the AT&T facility. All horizontal cable rack shall be panned and horned which will allow the fiber to no longer be tied down on all new installations of cable racking and there is no need to upgrade any pre-existing racking with panning unless directed to do so by the IE. When cables are run on a vertical cable rack, cables shall be secured every strap (rung) and to the rungs only. The use of Y / U horns and L brackets is no longer permitted except under the following conditions and when securing the fibers it should be done on every third horn: a) In smaller offices like Huts the use of compartment horns is permitted where installing cable racking is cost prohibitive b) In those locations such as Legacy-T offices that don t have any dedicated fiber cable racking and use the compartment horn exclusively for their routing needs. c) In those locations where there are pre-existing cable runs on compartment horns it is permitted to use these runs until they become exhausted. 2.1.5 Polyethylene sheathed fiber optic cable (not to be confused with fiber optic patch cords or jumpers) shall not be placed in any fiber raceway/duct work of the fiber protection system. Note: Where cables have been run from the LGX to either the splice box or vault and the run is using a dedicated Fiber Protection System (FPS) it is permitted to follow the existing method and mark the FPS as (FIBER CABLES ONLY NO JUMPERS OR PATCH CORDS) AND NO WAIVER IS REQUIRED. The FPS should be inspected to insure that it has been supported properly to handle any additional weight of the cable. These cables are also subject to all bending radius standard requirements and to the capacity rules for an FPS. O-3

INSTALLATION REQUIREMENTS Revised July, 2017 AT&T March, 2016 2.1.6 All OSP cable entering a building, for more than 50 feet, that is not riser rated shall transition to an approved riser rated cable at the CEF or be placed in a fire stopped metallic or terra cotta conduit or approved fire rated inner duct prior to leaving the CEF. 2.1.7 Fiber cable shall not be run on dedicated primary power cable racks. 2.1.8 The cable shall be run straight on the cable rack and shall not hang off the side or run across an open area. 2.1.9 Fiber optic cable connectors shall be covered and protected with the manufacturer s dust caps during installation. 2.1.10 Fiber optic cables shall be installed and/or secured in a manner that protects them from damage. 2.1.11 The Installation Supplier shall utilize cable clamps and grommets to secure all fiber optic cables terminating between Fiber Distributing Frames (FDF) or between FDFs and Network Elements. Clamps and grommets shall be attached to the terminating shelf if there is a designated place on the shelf itself to do so. If there is no designated place on the terminating shelf, then the clamp and grommet shall be placed on the bay upright. Multiple clamps and grommets may be used if necessary to facilitate proper cable slack management. When the bay/cabinet will not accept a clamp and grommet method it is permissible to use the wax cord and the fiber paper method of securing the cables. Note the first choice is always the use of clamps and there is no waiver required when using the wax cord method. Note-1: Multiple cables of like size counts can be placed under one clamp only if there is sufficient space for the two or more cables and the bending radius is not compromised, the cables are not crushed or pinched. Note-2: When using/running small count cables such as 2 & 4 count and a clamp cannot be obtained to secure such a cable then it is permitted to secure such cables using wax cord method. 2.1.12 Optical Fiber Non-conductive Riser (OFNR) cable leaving cable racks and entering frames, racks or other equipment shall be supported at least every 3 feet. 2.1.13 On vertical runs, the cable shall be secured at every strap. 2.1.14 Horizontal runs of cable on non-panned/non-horned cable racks shall be secured at every 4th strap to maintain a straight run, and flow of the bends. 2.1.15 The cable shall be secured at points of break off from the cable rack. 2.1.16 The maximum amount of fiber cables allowed to be secured i.e. stitched/strapped together are as follows: a) Fiber counts of 2 to 6 per cable are allowed to have up to 10 cables. b) Fiber counts of 8 to 36 per cable are allowed to have up to 5 cables. c) Fiber counts above 36 fibers per cable are allowed to have no more than 2 cables. d) The "micro" cables used with the T.E. connectivity Rapid Panel can have up to 12 cables. O-4

2.1.17 Plastic tie wraps shall not be used to secure fiber optic cable inside the building. 2.1.18 No more than 10ft of slack is permitted for fiber cable runs over 100ft with the exception that the next rounded up 5ft increment is allowed to be added to the overall jumper length, (for example a 153ft or 154ft cable run is acceptable with an overall jumper length of up to 165ft). On fiber cable runs of less than 100ft, allowable slack shall be no more than 10% of the overall length of the run or rounded up to the next 5ft increment. This is especially true on cables of less than 50ft. 2.1.19 When securing OFNR cable, a minimum of two wraps of sheet fiber shall be placed around the fiber cable at each securing point. 2.2 OFNR Cabling - Raised Floor Environments 2.2.1 OFNR cable shall not be laid directly on a slab floor. 2.2.2 OFNR cable shall be run on or in its own dedicated medium. Acceptable mediums for OFNR cable in raised floor environments shall include but are not limited to cable racking, troughing, raceway, wire baskets or some other acceptable facsimile thereof which AT&T has approved. Note: In those locations where the OFNR cables were previously tied to the floor stanchion and there is no physical way to install a cable support medium then it is permitted to install the cables in the same manner, securing to the stanchions, without a waiver. 2.2.3 OFNR cable mediums shall be mounted to the floor stanchion or directly/indirectly to the slab floor. a) When mounting to floor stanchions, the medium shall be located 6 to 8 below the floor tile. 2.2.4 Fiber optic cabling paths shall be in 90 degree angle configurations and parallel to the floor stanchions and floor tiles. 3. FIBER OPTIC CABLING FROM VAULT TO FDF The following procedures apply to fiber cable run between the cable entrance facility and FDF: a) Traditional OSP Cable This cable shall be run in flexible, plastic, fire retardant innerduct, unless local fire or building codes dictate differently. Innerduct can be corrugated or smoothed walled. It is an NEC code requirement to install OSP cable in fire retardant inner duct when the cable enters a building. Note: when inner duct is used, it shall be properly fire stopped at the open ends and where it penetrates any fire rated wall, floor or cable penetration. b) OFNR Cable OFNR/OFNP Cable OFNR/OFNP cable shall not be run in innerduct. If OFNR/OFNP cable is installed in such a manner which causes the cable to free fall three or more floors, then a Kellum grip type of strain relief shall be used to support the cable. c) Indoor/outdoor cable shall follow the same guidelines outlined for OFNR/OFNP cable. Note: when securing this type of cable a fiber paper wrap is NOT required. O-5

INSTALLATION REQUIREMENTS Revised July, 2017 AT&T March, 2016 d) FDF PANEL DIVERSITY When cabling from the vault into a location and the cables are routed diversely to the FDF, it is an acceptable practice to terminate these cables within the same bay as long as these cables are terminated in separate FDF shelves. These cables shall be routed on opposite sides of the bay. In the event a pre-terminated shelf is being used then there could be a situation where both cables will be running on the same side of bay. This is ok as long as the cables take diverse routes after leaving the bay. 4. FIBER OPTIC PATCHCORDS AND JUMPERS 4.1 Requirements 4.1.1 Fiber optic patch cords shall not be run on cable racks. 4.1.2 Fiber optic patch cords shall be run in AT&T approved fiber protection system (FPS). The following requirements apply to the installation of fiber protection systems: a) Solid-walled FPS shall be used for horizontal runs. Covers on horizontal sections of FPS are not required. All non-horizontal FPS shall have covers. End Caps shall be required at the ends of all FPS. b) Framework mounted vertical FPS shall be placed with covers facing the aisle. c) Drop options from an FPS to a N.E. frame shall only be accomplished via the use of a rigid arrangement or a corrugated split tube arrangement. d) Installation supplier shall maintain proper bend radius and cable management within the bay footprint. e) Split flex tube shall not extend more than 3 inches into any fiber management system. f) An FPS shall be considered at capacity when equipment fiber cords come within ½ (one half) inch of the top of the FPS. Fiber equipment cords shall not be placed within the FPS with excessive slack. 4.1.3 Fiber optic equipment cords shall be ordered in the near correct lengths in order to interconnect between FDF panels or FDF panels and network elements. Fiber jumper slack shall be conditional as follows: a) No more than 10ft of slack is permitted for fiber runs over 100ft with the exception that the next rounded up 5ft increment is allowed to be added to the overall jumper length when necessary to account for adequate service loop slack (for example a 153ft or 154ft jumper run is acceptable with an overall jumper length of up to 165ft). b) On fiber runs of less than100ft, allowable slack shall be no more than 10% of the overall length of the run or rounded up to the next 5ft increment. This is especially true on jumpers/patch cords of less than 50ft. c) Excess fiber patch cord slack shall NOT be stored in the FPS. d) Under no condition, unless for testing or trouble shooting purposes, shall fibers be left UNTERMINATED at any Fiber Optic Termination Panel (FTP). O-6

Temporary patches or loop backs setup for testing or trouble shooting purposes shall remain in place at the discretion of GNFO. In these cases, a tag must be applied with the OTV name, order number and date. When any fiber is removed (unterminated) for testing or trouble shooting purposes, a dust cap shall be placed over the end of the fiber as well as in the vacated jack/port position. Spare fibers requested by the telco order are permitted and shall be left in place as appropriate. e) The following applies to spare fibers: 1. Spare fibers shall only be at the request of the IE via the TEO and shall be tagged, protected and secured as appropriate. OTV shall size the fiber cable to be as close to the desired number of fibers as possible. 2. The OTV shall never cut off spare fibers in a cable. 4.1.4 Protective/dust caps shall be placed on all unterminated fiber cables and fiber termination points. 4.1.5 Vertical sections of FPS placed on frame upright shall have support brackets at the top, middle and bottom. 4.1.6 In the event a previously installed FPS that contains fibers must be cut, the section(s) involved shall be removed from their previously installed position and ALL fibers shall be supported and protected before any cutting can be done. 4.1.7 The cutting of installed FPS is to be considered Volatile Work Activity and shall be performed during the Maintenance Window. 4.1.8 There are no drop length requirements for unsupported patch cords transitioning from the FPS to the network element. 4.1.9 Mining of fiber from an FPS shall not be permitted unless the fibers can be readily identifiable with no risk to network service. A minimum of two individuals shall perform that removal operation. The utmost care and discretion shall be observed as any Fiber Protection System will always be carrying live service. At no time shall a jumper/patch cord be pulled through an FPS system with the connector still on it. 1. If it becomes necessary to remove jumpers or patch cords from the vertical of a bay or Fiber Distribution Bay (FDB) the following procedure shall be used. 2. The fiber shall be fully identified at both ends. 3. The fiber shall be removed from the vertical fiber manager and traced up and into the horizontal FPS. O-7

INSTALLATION REQUIREMENTS Revised July, 2017 AT&T March, 2016 4. While still holding onto the fiber, it shall be traced into the horizontal a minimum of 6 inches and then cut at that point. 5. The remaining end of the jumper or patch cord shall be left as flat as possible within the FPS, horizontal to the remaining fibers. 6. The remaining end of the jumper or patch cord shall not be looped back into the FPS. 7. The other end of the fiber shall be treated the same way as defined in steps 1 5. 4.1.10 Fiber optic patch cords shall be run in dedicated troughs of fiber protection systems. New fiber raceways shall be installed using the AT&T approved fiber protection system. The following requirements apply to the installation of fiber protection systems: a) Each vertical drop from the rigid downspout going to the bay shall be placed within two inches of the top of the bay. If the distance from the overhead FPS down to the bay level, either to a vertical FPS attached to the bay or to some other type of fiber management system, i.e. Glide or IMP, is greater than 2 inches, the installation supplier may utilize the methods out lined in the Section B. Note: The first choice is always a RIGID VERTICAL FPS. b) When utilizing corrugated split tubing as a drop option from the overhead FPS down to the bay level, either to a vertical FPS attached to the bay or to some other type of fiber management system, i.e. Glide or IMP, it shall be secured at both the entrance and exit points of the split tube. Where the corrugated split tube meets the vertical FPS on the side of the bay or at some other type of fiber management system, i.e. Glide or IMP, at the bay level, the split tube may be secured with pop rivets, nuts and bolts or waxed cord. When utilizing waxed cord, holes shall be drilled through the split tube and FPS and the wax cord shall be sewn on the inside of the split tube to secure the split tube. All of the above methods will allow the split tube to be used for ongoing growth (see Figure below for wax cord placement). Bolts shall be installed with the head of the bolt on the inside of the tubing and the nut on the outside of the FPS duct. Enough of the tubing must penetrate the FPS duct to eliminate any sharp bends; however, the tubing shall never be allowed to block any of the cable runs. When utilizing corrugated tubing (i.e. Split tube) as a drop option from the overhead FPS down to the bay level, either to a vertical FPS attached to the bay or to some other type of fiber management system, i.e. Glide or IMP, the overall length of split tube shall not exceed 36 inches. Split tube shall not be used with a trumpet flare. O-8

[ END OF SECTION ] O-9