Avant Garde Dance & The Place Fagin s Twist Tech Spec 2016

Similar documents
Presents. Dare To Sea

New Theatre Royal Lincoln Technical Information

PRELIMINARY TECHNICAL RIDER - LITTLE RED RIVER

Enormous Room Technical Rider & General Lighting Plan

The performance is about 100 minutes long, excluding intermission. ACT 1 is 75min, ACT 2 is 20min. Intermission 20-25min.

TECH SHEET AND INFORMATION (Updated )

Technical Specification Pavilion Dance

VENUE TECHNICAL REQUIREMENTS

"The Road Is Just A Surface" by Anja Garbarek and Jo Strømgren Kompani Technical Requirements

Irish Heartbeat TECHNICAL RIDER. Video Projection Requested

TOURING RIDER Where Magic & Motion Meet!

JANE RUTTER AUSTRALIA S FIRST LADY OF THE FLUTE

TECHNICAL SPECIFICATIONS

TECHNICAL SPECIFICATIONS (as at 29 April 2011)

TECHNICAL RIDER GENERAL INFORMATION

"A Dance Tribute to Ping Pong " by Jo Strømgren Kompani. Technical Requirements

HALFWAY TO DAWN TOUR

TECHNICAL SPECIFICATIONS: STICKS STONES BROKEN BONES Company: Bunk Puppets, contact :Jeff Achtem,

STUDENT PRODUCTION JOBS

Technical Rider. GöteborgsOperans Danskompani. Tour to xxx. Alaska. Table of Contents: 2. Stage. 3. Lighting. 4. Sound. 5. Medical. 6.

FASO DANCE COMPANY KALAKUTA REPUBLIK

Stephen Roy s. Black & White. On-Site Requirements Stage Setup. Ideal Performance Space Set-up Other Practical Considerations Load In Show Control

Muscle Memory Collusion Music and Dance Ensemble

SR Wing space = 2m SL Wing space = 1.1m There is an upstage cross over with pass doors onto stage USR & USL.

DEREHAM MEMORIAL HALL

TECHNICAL RIDER FOR THEATER (rev. 11/30/17)

JERWOOD VANBRUGH THEATRE

SHIVER. Technical rider update : 10th feb Premiere at Theater l Arsenic in Lausanne/Suisse the 4th of february 2014

Uprising & The Art of Not Looking Back

Technical Rider. GöteborgsOperans Danskompani. Untitled Black. Tour to.. Table of Contents: 2. Stage. 3. Lighting. 4. Sound. 5. Medical. 6.

Dr. Fred Speckeen Theatre. Information and Technical Specifications

THE ROUNDHOUSE THEATRE

TECHNICAL RIDER FOR THEATER (rev. 1/2/18)

Theatre Technical Specifications

COURTYARD!!!!! THEATRE

Little River Band Production Rider 2018

SIMON & GARFUNKEL THROUGH THE YEARS TECHNICAL INFORMATION PACK

Kenny Rogers Productions, Inc Production Requirements Indoor and Outdoor and Small Venue Performances

The Bapo (horn) Show

Technical Rider. GöteborgsOperans Danskompani. Spirit Tour to XX DATE to DATE. Table of Contents: 1. The Company

Technical Information Guide PLEASE FORWARD TO TECHNICAL DIRECTOR

HUECO / Technical Rider

Theatre SPECIFICATIONS UPDATED: 13/08/13 21 KINGLAND ROAD, POOLE, DORSET, BH15 1UG TELEPHONE: FAX: ADDRESS: TECHNICAL MANAGER:

Capacity: 60 2 Roxburgh Place, EH8 9SU. Assembly Roxy - Downstairs

CONTACTS Jani Lauzon Managing Artistic Director

Live From Nashville TECHNICAL RIDER

TECHNICAL RIDER. If you have problems to fulfil some of our demands, please don t hesitate to contact us. We will find a solution!

Technical Rider. Update: may 6th 2008

SHUT DOWN FILM INSTALLATION TECHNICAL SPECIFICATION

Rider Part1: Technical Requirements, A Cappella Show

Technical Specification

Waterfall. Air. Tour Ready

TECHNICAL RIDER March 30th 2015

PSYCHIC SALLY PRODUCTION RIDER & FOH REQUESTS (UPDATED 2016)

The Standard Bank Studio is a music venue made from the choir stalls and the stage of the Cape Town City Hall Auditorium. It

THE NUTCRACKER, A CANADIAN TRADITION Technical and Hospitality Rider

20 hemp bars, set at random intervals (SWL=150lbs) Fixed position situated Stage Right. Operated stage level, SL (counterweighted)

TOURING INFORMATION AND TECHNICAL REQUIREMENTS THE ADVENTURES OF ALVIN SPUTNIK: DEEP SEA EXPLORER BY TIM WATTS

The set is very simple. It consists of one small box, a small stool, and a small ping- pong table.

EbzB Productions Your World Is Our Stage!

Standard (with END ON seating) 8.75m Wide x 7.3m Deep (to US black) Open Floor (seating retracted) 8.75m Wide x 13m Deep (to US black)

Figurines by Lola Maury - touring technical rider

ETC Congo Desk 1024 channels in two universes ( Universe 1 House dimming, Universe 2 Toured dimming) Digital light processor dimmers

Studio 180. Electronic and Print versions of the venue ground plan are available from the Technical Director.

Tucker Theatre Policies and Procedures MTSU Department of Theatre 205 Boutwell Dramatic Arts Murfreesboro, TN 37132

2012 HSC Entertainment Industry Sample Answers

Notes for Lighting and Sound Technicians

ROSE THEATRE MAIN THEATRE

Marist Auditorium. Facility Guide

UNDER MILK WOOD - FULL Tek Specs - (updated 19/01/17)

Technical Specification for the Alley Theatre, Strabane

Please carefully read this entire form before completing any information.

Technical Specification

Technical Pack. Attenborough Arts Centre

The Mannie Manim Technical Specifications

James Clemens High School

Matt Dann Cultural Centre

JAMIE ADKINS. Circus INgognitus. Technical Rider Version: January, 2014

Notes for Lighting and Sound Technicians (A Supplement to Notes for Playing Companies)

Dr JOHN GALLAGHER CONCERT CHAMBER

O Donoghue Centre for Drama, Theatre and Performance National University of Ireland Galway

Summary. Access and Parking

Technical Rider Attached is a technical Rider covering schedule, technical and practical requirements, and contacts. Changes may occur.

PLEASE NOTE THAT DUE TO A VOIDED FLOOR PYROTECHNICS ARE NOT PERMITTED IN THE STUDIO.

Technical requirements & conditions for hirers

[ PRODUCERS PACK] 1 PRODUCERS PACK Union House Theatre

Technical Rider Vocal Point Season Performing Arts Management

Latrobe Performing Arts Centre

FULL BAND FOUR PIECE // HOSPITALITY & TECH RIDER. Should the purchaser have any questions regarding this rider please contact management.

[technical list] updated 27/09/2017. Groupe Emile Dubois My Ladies Rock Creation September Playing time : 1h15 without intermission

TECHNICAL SPECIFICATIONS AND INVENTORY RIALTO THEATER

Barney Simon Theatre Technical Specifications

Concert Hall Technical Specifications

Not Fade Away. The Ultimate Buddy Holly Experience. TECHNICAL RIDER Video Projection is Recommended

The Ultimate Musical Odyssey

ARTPARK MAINSTAGE THEATER TECHNICAL PACKET

SADNESS EXTENDED TECHNICAL RIDER

RHAPSODY & RHYTHM Technical Rider

Duties and Responsibilities Handbook

Hirers Technical Information Pack

Transcription:

Avant Garde Dance & The Place Fagin s Twist Tech Spec 2016 TOURING TECHNICAL TEAM Laura Hammond Production Manager 07545 181027 laura.hammond87@hotmail.com / Relighter Huw Williams Technical Stage 07793 610193 hdwilliams@btinternet.com Manager / Sound COMPANY Tony Adigun Lisa Hood Aaron Nuttall Dani Harris Walters Jemima Brown Joshua James Smith Muti Musafiri George Hodson Sia Gbamoi Choreographer Assistant Choreographer / The Performing Company consists of 5 males and 3 females Please ensure that the theatre and dressing rooms are adequately heated for dance and for rehearsal and performance sessions ABOUT THE SHOW Fagin s Twist is the untold story of a notorious and complex villain. It imagines Fagin's youth, driven by greed and ambition in the face of overwhelming poverty. The streets are a place of little comfort and fairy tale endings are hard to find in this poignant coming of age tale. See Dickens Oliver Twist in a new light. Tony Adigun s Avant Garde Dance flips your expectations of five familiar characters, with their unmatched contemporary hip hop style. Avant Garde Dance is at the forefront of new hip hop/contemporary dance theatre, led by artistic director Tony Adigun. The company's dynamic performances have musicality at their core and explore a myriad of styles, themes and media. Fagin's Twist is Co Produced by The Place. RUNNING TIME Act 1: 39mins Interval: 20mins Act 2: 47mins Total Running Time: 1hr 46mins 1

INFORMATION FOR BOX OFFICE This show contains Haze and flashing lighting effects The house will open no earlier than 10mins before Act 1 as we have a performer set on stage as the audience enter. If there is no safety curtain or tabs in your venue: the audience will need to clear the auditorium during the interval in order for us to reset the stage For the start of Act 2 we will open the house no earlier than 5 mins before. In this instance it is best to ask the audience to start to cue outside the doors so that we can get them in as quick as possible as we have all the performers set on stage ready to start the show TRANSPORT The show will tour in a 3.5t LWB Luton Van with tail lift Please provide a suitable parking space for the duration of our time at your venue STAGE Ideal stage area: 10m x 10m Minimum stage area: 8m x 8m We require a black box space including a black, crease free dance floor taped with 2 matt black PVC tape The set consists of three trucks on braking castors which the company move as part of the choreography. These are a simple flat pack style construction which bolt together. Please see attached drawing and method statement for assembly method. In addition to this there are 3 tables & 3 chairs and some small hand props, all company supplied. Venue to supply: Black box space Black Dance floor White Cyc Black Gauze where available (please advise if not) 2 x black serge legs to edge in cyc 1 x full black to create a cross over behind the white cyc, or if this is not possible due to US space restrictions and wings are not available, 2 x black serge legs to create exits 1 x tank trap style base to tie off the practical lighting fitting with metal lamp shade on a pulley system (lamp shade and pulley provided by the Company) VENUE STAFFING LX Rig, fit up and focus: We require a minimum of 2 house crew Performances: We require a minimum of 1 Duty Technician Get Out: We require a minimum of 3 house crew for 2 hours to start immediately after the final performance Please advise if charges will be incurred as a result of these staffing levels 2

LIGHTING Our Production Manager will re light the show and will operate for the shows. Lighting will be run through ETC NOMAD on the company laptop which will require your DMX input. LX plan and patch list will be sent to you separately. The lighting plan for each venue will be drawn up based on the supplied kit list. Please let the production manager know as soon as possible if there are any problems with the equipment or dimmers. Please advise if charges will be incurred as a result of use of equipment Lighting, where agreed, to be rigged, plugged and working before the company s technical team arrive The lighting equipment we will be touring with us: 3 x rechargeable battery operated LED battons which attach to the set using magnets 1 x practical light fitting with metal lamp shade flown on a simple pulley system 6 x birdies on wooden bases with 15amp plugs All lighting gel Haze fluid (for Unique 2) We will require backstage blues in the crossover (if applicable) or in the wings, the venue will need to supply these EFFECTS Haze will be used throughout this production. If you have any problems with this please inform our Production Manager as soon as possible We will require the use of the venue s haze machine SOUND Our TSM will lead the sound fit up and will operate for shows We will require the use of the venue s PA system. Sound playback for the show will run off Qlab in Stereo only. We will supply the mac with Qlab, but will expect the venue to supply mixing desk, PA and associated cabling etc. including Sub Bass. We require dedicated power exclusive for sound equipment for both the FOH position as well as on stage We will require a minimum of 2 x stage monitors, preferably 4 paired on 2 auxiliary sends. We will be touring 5 x Sennheiser wireless mic systems which will use Channel 38. If rehearsals or warm ups are taking place in an alternative space we will require the use of a portable playback system Comms We will require comms between the lighting and sound op positions 3

WARDROBE REQUIREMENTS We will require the use of a washing machine, tumble dryer, iron & ironing board to be used on a daily basis. We will need access to these during the day and evenings. Please notify us if there are specific times in which these facilities are not available DRESSING ROOMS Minimum 2 dressing rooms required with space for 8 cast members. (5 male, 3 female) Full shower/toilet facilities required close to the dressing rooms. All dressing rooms to be supplied with mirrors, costume rails, adequate lighting and heating. Clean towels should be supplied to dancers for each performance. A supply of clean drinking water required for all staff & company. GENERIC SCHEDULE Tour Crew Local Crew Fit up/technical Rehearsals Day 1 Time On Stage No. No. 09:00 10:00 Load in 2 2 10:00 12:00 Rig LX Hang Cloths 12:00 13:00 Lay dancefloor 13:00 14:00 Lunch 14:00 16:00 build set 16:00 18:00 Start Focus 18:00 19:00 Dinner 19:00 22:00 Continue Focus Set up sound (no noise whilst working at height) Day 2 09:00 13:00 Patch / Re plot 2 2 Set up dressing rooms 13:00 14:00 Lunch 14:00 17:00 Dancer spacing on stage 2 1 17:00 18:00 re set & stage checks Cast dinner break 18:00 19:00 Crew Dinner break Warm up on stage 19:20 19:30 House open 19:30 21:20 Performance 1 Day 3 16:00 17:30 re set & stage checks 2 1 17:30 19:00 Cast Warm up on stage Crew Dinner break 4

19:20 19:30 House open 19:30 21:20 Performance 2 21:25 00:00 Get out 2 3 5