Connection requirements for generators to distribution grid C10/11 CENELEC. 26 Oct 2016 Elia WG Belgian Grid

Similar documents
CENELEC GUIDE 13 FAQ. Frequently Asked Questions on the Frankfurt Agreement. Edition 1,

CEN, CENELEC, ESMIG, Eurelectric and ORGALIME joint workshop. Electromagnetic Interference in the Cenelec-A band

Grid Code Modification Register. March 2018

Expert Workgroup on Fast Fault Current Injection stage 1 Terms of Reference

Technical Committee No. 2 (TC/2) Electrical Installations

CENELEC GUIDE 13. IEC - CENELEC Agreement on Common planning of new work and parallel voting. Edition 1,

English version. Identification of cores in cables and flexible cords

Code of Practice on Changes to Existing Transmission and Reception Arrangements

Applying to carry BBC content and services: a partners guide to process

The Future of Digital Terrestrial Television Enabling new services for viewers

Minutes of Meeting ENTSO-E Drafting Team on RfG DSO Technical Expert Group. Participants Name Affiliation present excused

BBC S RELEASE POLICY FOR SECONDARY TELEVISION AND COMMERCIAL VIDEO-ON-DEMAND PROGRAMMING IN THE UK

The transition to Digital Terrestrial TV and utilisation of the digital dividend in Europe

MCP Upgrade: Transmission Line and Pore Importance

1. EXPERT MEETING EXPERT MEETING EXPERT MEETING Feedback from the meeting attendees...

Conformity assessment procedures for Radio & Telecommunication Terminal Equipment Scheme

Reliability Guideline: Generating Unit Operations During Complete Loss of Communications

Digital Switchover Management of Transition Coverage Issues Statement

ENGINEERING COMMITTEE Interface Practices Subcommittee SCTE STANDARD SCTE

Frankfurt Agreement Day to Day Management Between IEC/CO and CCMC

AS/NZS :2011

These restrictions, also called Network Constraints, are characterized by:

Load Frequency Control Structure for Ireland and Northern Ireland

MEETING REPORT. Electro-Magnetic Compatibility (EMC) Directive 2004/108/EC 22 st Working Party in Brussels, 28 th of May :00 14:00

GUIDANCE DOCUMENT No 9 ON THE APPLICATION OF THE DIRECTIVE ON THE SAFETY OF TOYS BOOKS

NERC Reliability Standard PRC-024 Generator Frequency and Voltage Protective Relay Settings

Drop Passives: Splitters, Couplers and Power Inserters

AMERICAN NATIONAL STANDARD

NATIONAL MEDIA COMMISSION. A Report on Migration from Analogue to Digital Broadcasting in Ghana

Draft Framework for Digital Terrestrial Television Broadcasting in Trinidad and Tobago

DIRECTORATE-GENERAL III INDUSTRY Legislation and standardization and telematics networks Standardization

STATUS REPORT ON THE FOLLOW-UP OF EC MANDATE M/313 ON EMC OF TELECOM NETWORKS

SOUTH AFRICAN NATIONAL STANDARD

THE RESEARCH COMMITTEE FOR TOTAL ENERGY THE ENERGY CONSERVATION STANDARDS WORKING GROUP SUMMARY OF FINAL CRITERIA

AMERICAN NATIONAL STANDARD

INTERNATIONAL STANDARD

TECHNICAL SPECIFICATION

Broadcasting Authority of Ireland Rule 27 Guidelines General Election Coverage

American National Standard

This document is a preview generated by EVS

GC0100/101/102 Code Administrator Consultation Responses. Rob Wilson. Grid Code Panel 8 th Feb 2018

INTERNATIONAL STANDARD

Safety Codes Council Conference Banff C Panel Discussion

DIGITAL TELEVISION: MAINTENANCE OF ANALOGUE TRANSMISSION IN REMOTE AREAS PAPER E

Notes Generator Verification SDT Project

COMMISSION STAFF WORKING DOCUMENT. Accompanying document to the

Electronic display devices Part 2-3: Measurements of optical properties Multi-colour test patterns ICS ; ISBN

Stage 05: Draft Final Modification Report

AES standard for audio connectors - Modified XLR-3 Connector for Digital Audio. Preview only

OECD COMMUNICATIONS OUTLOOK 2001 Broadcasting Section

Table of Contents - 2 -

Specification. NGTS Issue 1 October 1993

American National Standard for Electric Lamps - Fluorescent Lamps - Guide for Electrical Measures

Journal of Japan Academy of Midwifery Instructions for Authors submitting English manuscripts

New Standards in Preventive Conservation Management. Irmhild Schäfer Bavarian State Library, Munich, Germany

Digital Terrestrial HDTV Broadcasting in Europe

Versatile EMS and EMI measurements for the automobile sector

Policy on the syndication of BBC on-demand content

AMERICAN NATIONAL STANDARD

ThinkRF D GHz RF Downconverter

ECC Decision of 30 October on harmonised conditions for mobile/fixed communications networks (MFCN) operating in the band MHz 1

SPECIALIST TASK FORCE 505 IOT STANDARDS LANDSCAPING & IOT LSP GAP ANALYSIS. Objectives and deliverables. ETSI All rights reserved

IoT Standardization. in ISO/IEC/JTC1/SC41. Wei Wei (IBM)

American National Standard for Lamp Ballasts High Frequency Fluorescent Lamp Ballasts

NOTICE. (Formulated under the cognizance of the CTA R4.8 DTV Interface Subcommittee.)

This document is a preview generated by EVS

21. OVERVIEW: ANCILLARY STUDY PROPOSALS, SECONDARY DATA ANALYSIS

REGULATIONS EDITION TO 21 APRIL 2018

AES standard for professional audio equipment Application of connectors, part 1, XLR-type polarity and gender

Standard IRO Reliability Coordination Responsibilities and Authorities

NOTICE. (Formulated under the cognizance of the CTA R4 Video Systems Committee.)

AMIGO- 8VSB (ATSC) digital Modulator

21. OVERVIEW: ANCILLARY STUDY PROPOSALS, SECONDARY DATA ANALYSIS

DTG Response to Ofcom Consultation: Licensing Local Television How Ofcom would exercise its new powers and duties being proposed by Government

CEA Standards Update

1C.5.1 Voltage Fluctuation and Flicker

Remote Voltage Detector - JET (RVD) Medium and High Voltage kV AC

SEMI F47 Compliance Certificate KEPCO Low-Power Power Supplies EPRI PEAC Corporation PQ Star sm Test Program. Certification Date: July 23, 2003

3WS(Cape Town/Secretariat)1

Audio & Music multiplatform compliance guidelines

Flicker Caused by Operation of Industrial Technology

Modernising the digital terrestrial television (DTT) platform. Work programme

This document is meant purely as a documentation tool and the institutions do not assume any liability for its contents

A. Introduction 1. Title: Automatic Underfrequency Load Shedding Requirements

Ground Frames and Shunters Releases

OPEN NETWORK PROVISION COMMITTEE

COMMISSION OF THE EUROPEAN COMMUNITIES

Health Professions Council Education & Training Panel 5 July 2007 NORDOFF ROBBINS MUSIC THERAPY CENTRE - MA MUSIC THERAPY

The BBC s Draft Distribution Policy. Consultation Document

Q&A OVERVIEW REPORT Q&A OVERVIEW HOLLANDSE KUST (ZUID) Date: 15 December V November 2017 V December 2017

Defining DTTB network specifications and ensuring Quality of Service

IEEE 1904 ANWG Opening Report

Physics Requirements for the CXI Ion Time-of-Flight

TO BE PUBLISHED IN THE GAZETTE OF INDIA, EXTRAORDINARY, PART III, SECTION 4 TELECOM REGULATORY AUTHORITY OF INDIA

SUMMARY OF PTS DECISIONS CONCERNING BROADCASTING TRANSMISSION SERVICES, TO DELIVER BROADCAST CONTENT TO END USERS

Form C: Type Test Verification Report

COMMISSION OF THE EUROPEAN COMMUNITIES COMMISSION STAFF WORKING DOCUMENT. Accompanying document to the

Joint submission by BBC, ITV, Channel 4, Channel 5, S4C, Arqiva 1 and SDN to Culture Media and Sport Committee inquiry into Spectrum

Form C: Type Test Verification Report

Australian Standard. Digital radio Terrestrial broadcasting. Part 1: Characteristics of terrestrial digital audio broadcasting (T-DAB+) transmissions

Transcription:

Connection requirements for generators to distribution grid C10/11 CENELEC 26 Oct 2016 Elia WG Belgian Grid

Context & Objective (1/2) Ongoing debates in Elia TF Network Code Implementation Focus on connection codes Topic wise discussion Significant grid user, reactive power, Active involvement for DSOs w.r.t. connection requirements for type A/B generators Existing Synergrid prescription C10/11 must be made compliant with network codes Also other evolutions to be integrated, eg scope: 36kV distribution systems, storage Scope C10/11: requirements for connection of generators to public distribution grid 2

Context & Objective (2/2) Stakeholder feedback on Network Code Implementation Process (Elia special workshop Genval, 6 sept 2016) ask for global overview of connection requirements where possible: harmonization with other European Member states Therefore, Synergrid will publish first consultation version of renewed C10/11, compliant with NC with European CENELEC document as most important reference Next slides: short introduction to C10/11 + process, and to CENELEC 3

C10/11 structure New structure: based on categorisation of generators instead of topics Three parts based on three CENELEC docs <= 10kVA ( CLC/EN 50438 1:2015) Low voltage distribution grid & > 10kVA ( CLC/TS 50549 1:2015) High voltage distribution grid & <=25 MVA ( CLC/TS 50549 2: 2015) Reminder Network code RfG is no exhaustive set of connection requirements only with relevant impact on transmission system C10/11 also deals with requirements related to local grid concerns e.g. one or three phase connection of small generators 4

C10/11 envisaged consultation process Public consultation expected end 2015 (depending on approval Synergrid Techn. Committee) Earlier, Synergrid engaged not to bypass ongoing work in TF NCI (TF NCI 26/4) but we see added value in publishing (informal) consultation version now to give global overview of all envisaged capabilities & to collect first feedback; because other topics than network code matters need revision/formalisation; Note: some specific articles in C10/11 will be marked as depending on final decision A B threshold We are open for suggestions w.r.t. further procedure & timing for formal consultation & regulatory approval process but we aim for final approval in 2017 ultimate deadline = 2 years after publication RfG (RfG Art 4.2 & 7.4) = April 2018 Note: meanwhile a formal consultation will be done, to integrate storage devices in scope C10/11 5

Relation C10/11 CENELEC documents Synergrid wants to refer as much as possible to European references: CENELEC Norms (EN) and Technical Specifications (TS), that are compliant to RfG subdivided in more logical technical categories (LV / MV) and enriched with standard requirements for local issues discussed on European level between experts from various organisations = the right platform for discussion on realistic technical capabilities aim to support competitive European manufacturer market Advantages for manufacturers, generator users and system operators competitive manufacturer market, especially for mass products (A/B generators) connection process & compliance testing: based on type tests & certificates 6

About CENELEC CENELEC = European Committee for Electrotechnical Standardization 33 members: national standardization bodies from EU MS&other www.cenelec.eu and www.cencenelec.eu 7

Technical specifications vs European Standard (extract from CENELEC website) EN (European Standard) carries with it the obligation to be implemented at national level by being given the status of a national standard and by withdrawal of any conflicting national standard A Technical specification (TS) is established and approved by a technical body by a weighted vote of CENELEC national members. Technical Specifications are established with a view to serving, for instance, the purpose of: publishing aspects of a subject which may support the development and progress of the European market, giving guidance to the market on or by specifications and related test methods, providing specifications in experimental circumstances and/or evolving technologies. 8

CENELEC references Involved CENELEC Technical body: CLC/TC8X See linkfor scope, structure, action plan Involved standards/specifications EN 50438: Requirements for the connection of micro generators in parallel with public low voltage distribution network, TS 50549 1 and 2 : Requirements for the connection of generators above 16 A per phase to the LV distribution system and to the MV distribution system Evolutions: ongoing revisions & upgrade of TS to EN will be taken into account in new C10/11 9

Conclusion Revision & restructuring of C10/11 is being prepared RfG compliant based on CENELEC references Early consultation is planned for ensuring stakeholder involvement Aim to conclude in 2017 Firm deadline: April 2018 Meanwhile: consultation to formally integrate storage devices in scope C10/11 follow up of CENELEC evolutions 10