Trigger Report. Wesley H. Smith CMS Trigger Project Manager Report to Steering Committee February 23, 2004

Similar documents
Trigger Cost & Schedule

WBS Trigger. Wesley Smith, U. Wisconsin CMS Trigger Project Manager. DOE/NSF Review April 11, 2000

US CMS Endcap Muon. Regional CSC Trigger System WBS 3.1.1

WBS Calorimeter Trigger. Wesley Smith, U. Wisconsin CMS Trigger Project Manager. DOE/NSF Review April 12, 2000

Test Beam Wrap-Up. Darin Acosta

Local Trigger Electronics for the CMS Drift Tubes Muon Detector

Status of the CSC Track-Finder

Global Trigger Trigger meeting 27.Sept 00 A.Taurok

CSC Muon Trigger. Jay Hauser. Director s Review Fermilab, Apr 30, Outline

WBS Trigger. Wesley Smith, U. Wisconsin CMS Trigger Project Manager. DOE/NSF Review February 17, 1999

Design of the Level-1 Global Calorimeter Trigger

CMS Note Mailing address: CMS CERN, CH-1211 GENEVA 23, Switzerland

The CMS Drift Tube Trigger Track Finder

Dick Loveless. 20 November 2008 SLHC Workshop. Dick Loveless SLHC Workshop 20 Nov

12 Cathode Strip Chamber Track-Finder

TTC Interface Module for ATLAS Read-Out Electronics: Final production version based on Xilinx FPGA devices

Electronics procurements

Synchronization of the CMS Cathode Strip Chambers

IPRD06 October 2nd, G. Cerminara on behalf of the CMS collaboration University and INFN Torino

CMS Conference Report

LHCb and its electronics. J. Christiansen On behalf of the LHCb collaboration

li, o p a f th ed lv o v ti, N sca reb g s In tio, F, Z stitu e tests o e O v o d a eters sin u i P r th e d est sezio tefa ectro lity stem l su

Tests of the boards generating the CMS ECAL Trigger Primitives: from the On-Detector electronics to the Off-Detector electronics system

The CMS Detector Status and Prospects

Racks, Cabling and Latency

ADF-2 Production Readiness Review

arxiv:hep-ex/ v1 27 Nov 2003

Upgrades of the Tracker and Trigger of the CMS experiment at the CERN LHC

Review of the CMS muon detector system

Paul Dauncey For the CALICE-UK electronics group. A. Baird, D. Bowerman, P. Dauncey, R. Halsall, M. Postranecky, M.Warren, O.

Status Radial Services and cable tray. 1) Holes, Flexrails, WireMesh Ctray.

THE UPGRADE PATH FROM LEGACY VME TO VXS DUAL STAR CONNECTIVITY FOR LARGE SCALE DATA ACQUISITION AND TRIGGER SYSTEMS

Design, Realization and Test of a DAQ chain for ALICE ITS Experiment. S. Antinori, D. Falchieri, A. Gabrielli, E. Gandolfi

LHCb and its electronics.

Hardware Verification after Installation. D0 Run IIB L1Cal Technical Readiness Review. Presented by Dan Edmunds August 2005

Upgrades of the Tracker and Trigger of the CMS experiment at the CERN LHC

KEK. Belle2Link. Belle2Link 1. S. Nishida. S. Nishida (KEK) Nov.. 26, Aerogel RICH Readout

Electronics Status and Upgrade Opportunities for Flash ADC and 12GeV Trigger Hardware

Risk Risk Title Severity (1-10) Probability (0-100%) I FPGA Area II Timing III Input Distortion IV Synchronization 9 60

Electronics for the CMS Muon Drift Tube Chambers: the Read-Out Minicrate.

Update on DAQ for 12 GeV Hall C

The Pixel Trigger System for the ALICE experiment

The ATLAS Tile Calorimeter, its performance with pp collisions and its upgrades for high luminosity LHC

S.Cenk Yıldız on behalf of ATLAS Muon Collaboration. Topical Workshop on Electronics for Particle Physics, 28 September - 2 October 2015

An RPC-Based Technical Trigger for the CMS Experiment

CSC Data Rates, Formats and Calibration Methods

DT Trigger Server: Milestone D324 : Sep99 TSM (ASIC) 1st prototype

An FPGA based Topological Processor Prototype for the ATLAS Level-1 Trigger Upgrade

Lecture #4: Clocking in Synchronous Circuits

CERN-RRB April 2005 Status of the LHCb Experiment Report to April 2005 RRB By the LHCb Collaboration

CMS Tracker Synchronization

Scintillation Tile Hodoscope for the PANDA Barrel Time-Of-Flight Detector

THE WaveDAQ SYSTEM FOR THE MEG II UPGRADE

Beam Test Results and ORCA validation for CMS EMU CSC front-end electronics N. Terentiev

Status of GEM-based Digital Hadron Calorimetry

SuperB- DCH. Servizio Ele<ronico Laboratori FrascaA

Sensors for the CMS High Granularity Calorimeter

The Status of the ATLAS Inner Detector

A TARGET-based camera for CTA

Status of CMS and preparations for first physics

Update on DAQ for 12 GeV Hall C. Brad Sawatzky

HARDROC, Readout chip of the Digital Hadronic Calorimeter of ILC

AIDA Update. presented by Tom Davinson on behalf of the AIDA collaboration (Edinburgh Liverpool STFC DL & RAL)

Front End Electronics

Jean-Claude Brient Laboratoire Leprince-Ringuet

BABAR IFR TDC Board (ITB): requirements and system description

Paul Rubinov Fermilab Front End Electronics. May 2006 Perugia, Italy

Description of the Synchronization and Link Board

The TRIGGER/CLOCK/SYNC Distribution for TJNAF 12 GeV Upgrade Experiments

SVT DAQ. Per Hansson Adrian HPS Collaboration Meeting 10/27/2015

Conceptual Design of the Readout System for the Linear Collider Digital HCAL Prototype Detector

LHC Physics GRS PY 898 B8. Trigger Menus, Detector Commissioning

SPS BPM system renovation. Roadmap & Milestones

LUT Optimization for Memory Based Computation using Modified OMS Technique

PIXEL2000, June 5-8, FRANCO MEDDI CERN-ALICE / University of Rome & INFN, Italy. For the ALICE Collaboration

Faculty of Electrical & Electronics Engineering BEE3233 Electronics System Design. Laboratory 3: Finite State Machine (FSM)

Advanced Training Course on FPGA Design and VHDL for Hardware Simulation and Synthesis. 26 October - 20 November, 2009

itop (barrel PID) and endcap KLM G. Varner Jan-2011 Trigger/DAQ in Beijing

A pixel chip for tracking in ALICE and particle identification in LHCb

FPGA Design. Part I - Hardware Components. Thomas Lenzi

Testing Results for a Video Poker System on a Chip

Atlas Pixel Replacement/Upgrade. Measurements on 3D sensors

Advanced Implantation Detector Array (AIDA) Second BRIKEN Workshop RIKEN July 2013

Field Programmable Gate Array (FPGA) Based Trigger System for the Klystron Department. Darius Gray

Commissioning and Performance of the ATLAS Transition Radiation Tracker with High Energy Collisions at LHC

CMS Upgrade Activities

Note on the preliminary organisation for the design, fabrication and test of a prototype double-sided ladder equipped with MAPS

Commissioning and Initial Performance of the Belle II itop PID Subdetector

Optical Link Evaluation Board for the CSC Muon Trigger at CMS

EECS150 - Digital Design Lecture 3 Synchronous Digital Systems Review. Announcements

with Low Cost and Low Material Budget

Design of VGA Controller using VHDL for LCD Display using FPGA

Performance of a double-metal n-on-n and a Czochralski silicon strip detector read out at LHC speeds

A flexible FPGA based QDC and TDC for the HADES and the CBM calorimeters TWEPP 2016, Karlsruhe HADES CBM

ATLAS Pixel Subsystem and Simulation

An extreme high resolution Timing Counter for the MEG Upgrade

GERDA GeDDAQ. Status, operation, integration. INFN Padova INFN & University Milano. Calin A. Ur

CGEM-IT project update

bug, although this was still not quite clear. The problem seems to occur when there is an interrupt during a read cycle. Changing interrupt vectors an

The ATLAS Level-1 Central Trigger

Transcription:

Trigger Report Wesley H. Smith CMS Trigger Project Manager Report to Steering Committee February 23, 2004 Outline: Calorimeter Triggers Muon Triggers Global Triggers The pdf file of this talk is available at: http://cmsdoc.cern.ch/cms/tridas/tr/0402/smith_sc51_feb04.pdf W. Smith, U. Wisconsin, Steering Committee, February 23, 2004 CMS Trigger Electronics review - 1

Drift Tube Trigger Front End (Padova) Sector Collector (60 Boards on Balconies): Prototype used successfully in the structured beam test Production now scheduled for Sep 04 - Mar 05 Control Boards: After QPLL delivery (just now): CAEN needs 3 months to deliver the first 40 prototypes W. Smith, U. Wisconsin, Steering Committee, February 23, 2004 CMS Trigger Electronics review - 2

Drift Tube Track Finder Phi Track Finder: Prototype tested (Vienna) Production planned for Jul 04 Eta Track Finder: Prototype under test (Vienna) Production planned for Jul 04 Wedge Sorter (12 Boards in USC55): Prototype under test (Bologna) Production now planned for completion Dec 04 Barrel Sorter (1 Board in USC55): Design underway (Bologna) Plan for 1st proto Nov 04 Production now planned for Mar 05 W. Smith, U. Wisconsin, Steering Committee, February 23, 2004 CMS Trigger Electronics review - 3

CSC Trigger Trigger Mother Board (UCLA): PPP in fabrication, test next month Clock & Control Board (Rice): PCB done, pre-production prototype in 2 months Muon Port Cards (Rice): PPP fully tested stand-alone Holding production for final tests with SP, CCB Sector Processor (Florida): PPP: all individual functions tested Full Trackfinder Firmware now being incorporated Muon Sorter (Rice): PPP: all inputs fully tested, integration w/sp next W. Smith, U. Wisconsin, Steering Committee, February 23, 2004 CMS Trigger Electronics review - 4

RPC Trigger Trigger Board (Warsaw): Prototypes done & Tested Work on Pre-Production Boards started Readout Board (Warsaw): Prototypes done & Tested Work on Pre-Production Boards started Link Board (Helsinki/Lappeeranta) : Prototypes done & Tested Work on Pre-Production Boards started Splitter Board (Lappeeranta): Prototypes done & Tested Work on Pre-Production Boards started Pattern VHDL code underway Ready for 25 ns beam tests in 2004: Pre-production Splitter, Trigger, DCC Boards W. Smith, U. Wisconsin, Steering Committee, February 23, 2004 CMS Trigger Electronics review - 5

Calorimeter Trigger Primitives ECAL (CERN/Lisbon/LLR): Serial Link Board being prepared for tests with Regional Calorimeter Trigger this spring HCAL(Boston/FNAL/Maryland/Princeton): TPG implemented in firmware for HTR Rev 4 Scheduled for production in early 04 Tests with RCT planned for later this spring Latency: 6 crossings over budget for both. Investigating improved cable routings W. Smith, U. Wisconsin, Steering Committee, February 23, 2004 CMS Trigger Electronics review - 6

Regional Calorimeter Trigger (Wisconsin) Pre-Production full-function full-crate prototype tests All cards validated Production Underway All Receiver Mezzanine Cards in hand (1422) and tested All ASICs made Production Begun for RC, EIC, CCC, Backplane, Crate Activities Full production tests underway Full production Electron Isolation assembly now Clock and Control Card Production finished, cards being tested Production samples of Backplane, Receiver being checked Plans for Integration and surface test beginning 2004 Serial Link Test cards at CERN and Princeton/Maryland Integrated JSC output with GCT last August Ship full crate to CERN for HCAL surface test W. Smith, U. Wisconsin, Steering Committee, February 23, 2004 CMS Trigger Electronics review - 7

Global Input Triggers Global Calorimeter Trigger (Bristol): Trigger Processor Module Prototypes under test Running Data Links and TPM algorithms on real hardware Prototype Input Module in operation for 9 months Used for Integration with Regional Calorimeter Trigger and Global Trigger. Prototype Clock/Control Module under test Global Muon Trigger (Vienna): FPGA firmware close to completion MIP & ISO assignment, GMT Logic done & verified FPGA choices made New Mezzanine Card for larger Xilinx chips (Spartan-3) at input ORCA simulation available: bit-wise compatible W. Smith, U. Wisconsin, Steering Committee, February 23, 2004 CMS Trigger Electronics review - 8

Global Trigger (Vienna) Backplane: 6U prototype tested, 9U version being assembled Pipeline Synchronization Board: 6-ch prototype tested, 12-ch is conceptual design Global Trigger Logic Board: 20-ch prototype tested, 32-ch is conceptual design Timing Board: 6U version tested Final Decision Board: 9U version under design Trigger Control Board: 9U version board received W. Smith, U. Wisconsin, Steering Committee, February 23, 2004 CMS Trigger Electronics review - 9

Trigger Concerns - Time! Latency: Endcaps: HE, EE, RE Working on improved cable routings on detector Examining layout in USC55 Little improvement possible -already very optimized & very constrained Schedule: Further Slippage of Underground Schedule Solidifying plans for integration tests of trigger core in Prevessin 904 Allows people to wheel crates out of testing labs into an integration testing facility in same building for dedicated tests and then back into the labs with as little disruption as possible. W. Smith, U. Wisconsin, Steering Committee, February 23, 2004 CMS Trigger Electronics review - 10

Trigger Installation Preparation Individual Testing Labs & Integration Test Area Assemble one each of critical racks in central trigger core in underground counting room Contingency in case of further delays in occupancy W. Smith, U. Wisconsin, Steering Committee, February 23, 2004 CMS Trigger Electronics review - 11

News: Trigger Conclusions Moving from Prototypes to production Confidence from successful integration and structured beam tests Concerns: Latency -- hope for relief from shorter cable paths Installation time -- risks for further delays? Software & Planning needed for production/integration Actions: Trigger Software Review March 17 Electronics Systems Review May 5 Plans for Trigger Core Rack Test in Prevessin 904 W. Smith, U. Wisconsin, Steering Committee, February 23, 2004 CMS Trigger Electronics review - 12