KMA Report on DBNet Operation : Current status and Future plan

Similar documents
BRAZIL-SPECIFIC TECHNICAL SOLUTIONS FOR DATA ACCESS, EXCHANGE, AND ARCHIVING GOES-R and JPSS

OUTCOME OF WMO MEETINGS OF RELEVANCE TO ET-SAT. Outline of a Strategy for Improved Availability and Accessibility of Satellite Data and Products

Working Group I: Global Issues on Satellite Systems and Telecommunication Coordination

WORLD CLASS through people, technology and dedication

EUMETCast and the Future

GEO-Netcast White Paper Final Draft 9 December Improving access to data, products and services through GEOSS

GSICS MW SubGroup 21 April UTC

Documentation of Site Preparation for Installation of SeaSpace Ground Stations at ECSU

Datasheet. 720P HD IR IP Camera

AsiaSat Satellite Fleet Operations using EPOCH IPS

FY-4A satellite commissioning latest outcome

IKONOS Ground Segment Interoperability & Experiences after 6+ Years of Operations

New Services. VP, Business Development and Regulatory Affairs

!! 1.0 Technology Brief

TVW750USBD ATSC Tuner Quick install manual

Case Study. AWI: The Alfred Wegener Institute IP-Based Videoconferencing from Antarctica

R&D for NGTB in JPN. Kenichi Murayama. Senior Research Engineer STRL, NHK. Toward UHD broadcasting

North America, Inc. AFFICHER. a true cloud digital signage system. Copyright PDC Co.,Ltd. All Rights Reserved.

Progress Report: APII IPv6 R&D Testbed Project

TVWS Devices and their Applications

A Geostationary Weather Satellite Station. A New. by Douglas Deans

VN-Matrix 325. High Quality, Low Delay Video Streaming. Sdi, hd-sdi & 3g-sdi

Social Infrastructure Systems

3D D HDTV over ATM. Ahn, Chieteuk Radio & Broadcasting Research Laboratory ETRI

LABWORK: SATELLITE ORBITS AND LINK BUDGETS

Presented by: David J. Crain, GeoMetWatch ITSC-18, Meteo France, Toulouse, March 21,

INSTALLATION MANUAL. CTMS-516RKPS Rack Mount Satellite Multiswitch

THE PROJECT MOMS/ PRIRODA MAIN RESULTS IN H.-D. Bettac*, K.-D. Missling*, V. Panchenko**, T. Tyan**, V. Voroncov**

Contact Information ( to be completed by all Users, please write in capitals)

Pg. 2 4: NavNet TZtouch MFD Network Installation (w/o: NN3D) Pg. 5: MIXED NavNet TZtouch MFD and NavNet 3D MFD Network Installation Pg.

IPS 2400 SMAVIA Appliance for up to 24 IP Channels, 8 3.5" HDD, 3 HU

Grid. Grid. Next-Gen Broadband Wireless CPE Technology. Datasheet. 4Gon Tel: +44 (0) Fax: +44 (0)

SATELLITE RELATED SERVICES

(12) Publication of Unexamined Patent Application (A)

Technology Advances. Ashaad Rambharos CSE Intelsat Africa

PCIe HDMI Video Capture Card - HDMI, VGA, DVI, or Component Video at 1080p60

Striking Clarity, Unparalleled Flexibility, Precision Control

Update of the CERSER TeraScan Cataloguing System and the TeraScan Image Processing Scripts

Distributed by Pycom Ltd. Copyright 2016 by Pycom Ltd. All rights reserved. No part of this document may be reproduced, distributed, or transmitted

Open loop tracking of radio occultation signals in the lower troposphere

Zero-Variable Wireless Infrastrucure Deployment. Datasheet. Models: BM2HP, BM5HP. Completely integrated Radio

Reconfigurable Communication Experiment using a small Japanese Test Satellite

Analysis of Capacity vs Orbital Spacing for military purpose Ka-band satellites

DVB-T2 T220 User Manual

ESA Ground Segment Technology Workshop 5-June-08. Ka band for Broadband and IPTV

rocket rocket Powerful 2x2 MIMO AirMax BaseStation Platforms Datasheet

MX/HD-SDI-3G. Transmit HD-SDI-3G signals over Fiber

Extending the Usable Range of Error Vector Magnitude Testing

Satellite Related Services

Receiving Envisat DDS and EUMETCast using 1 antenna, 1 cable and 1 PC

rocket rocket Powerful 2x2 MIMO AirMax BaseStation Platforms Datasheet Models: M2, M2GPS, M3, M365, M365GPS, M5, M5GPS, M900

Low cost 60GHz solutions by MikroTik

Telecommunication Development Sector

For high performance video recording and visual alarm verification solution, TeleEye RX is your right choice!

ESA STUDY CONTRACT REPORT SUBJECT : CONTRACTOR ESA CONTRACT N

C-band Use and Challenges in the Americas Region. January 2013

Day 1 (Tuesday 21 st October, Registration 08:30)

SERVICE DESCRIPTION VIDENS SD-WAN SERVICE MANAGEMENT

Digitalization Process in Japan

Milestone Leverages Intel Processors with Intel Quick Sync Video to Create Breakthrough Capabilities for Video Surveillance and Monitoring

THEOS available for European Users

E-BOOK - HD OVER THE AIR

DVB-T Hybrid X8000T. PCI Card

Content. Solutions. DLB series. LigoDLB PRO. LigoDLB ac. LigoPTP series. LigoPTMP. NFT series. Enterprise 2. Operators 2. Industrial 3.

Intelligent Monitoring Software IMZ-RS300. Series IMZ-RS301 IMZ-RS304 IMZ-RS309 IMZ-RS316 IMZ-RS332 IMZ-RS300C

A STUDY ON THE DEVELOPMENT OF THE DEDICATED OBU 1 FOR THE HANDICAPPED PERSONS USING HI-PASS 2 SYSTEM

Satellite Communications Training System

PSEUDO NO-DELAY HDTV TRANSMISSION SYSTEM USING A 60GHZ BAND FOR THE TORINO OLYMPIC GAMES

VBOX 3i. 100Hz GPS Data Logger. Features

Spec Sheet. InterReach Fusion Wideband 2.5 GHz WiMAX. In-Building Wireless Networking System. Product Highlights

ETR mm. 31mm. 91mm. Wireless-N 3G Router & Client Bridge PRODUCT DESCRIPTION

As novidades do Laboratório de Pesquisas de Ciências e de Técnicas (STRL) da NHK. Sep 2003 SET2003 9:00-11:00 Auditório B Hiroo Arata

Huawei AT815SN Brochure-Detailed

Adtec Product Line Overview and Applications

R&S WMS32 Wireless Measurement System Software Specifications

OMVC Non-Real Time Mobile DTV Use Cases

Datasheet. Powerful 2x2 MIMO airmax BaseStation. Models: M5, RM5-Ti, M3, M365, M2, RM2-Ti, M900. Advanced Software Technology to Maximize Performance

Datasheet. Powerful 2x2 MIMO airmax BaseStation. Models: M5, RM5-Ti, M3, M365, M2, RM2-Ti, M900. Advanced Software Technology to Maximize Performance

TELEPORT USINGEN DATA, VOICE, VIDEO AND AUDIO TRANSMISSION TO THE WHOLE WORLD

Wireless Cloud Camera TV-IP751WC (v1.0r)

2 Work Package and Work Unit descriptions. 2.8 WP8: RF Systems (R. Ruber, Uppsala)

NanoStation NanoStation. NanoStation. Compact, Hi-Power, 2x2 MIMO AirMax TDMA Station. *Respaldo y Garantía. Datasheet

Cisco Aironet 1850 Series Access Points

A9910 OMNISAT-ADAS (Advanced Data Acquisition System) for Earth Observation & Scientific Satellites

Datasheet. High-Performance airmax Bridge. Models: NBE M5-19, NBE-M5-16. Uniform Beamwidth Maximizes Noise Immunity. Innovative Mechanical Design

User Requirements for Terrestrial Digital Broadcasting Services

Sid Roberts Microsoft Corporation Technology Policy Group March

-1GUIDE FOR THE PRACTICAL USE OF NUBES

BBC Response to Glasgow 2014 Commonwealth Games Draft Spectrum Plan

Processor time 9 Used memory 9. Lost video frames 11 Storage buffer 11 Received rate 11

ATSC TELEVISION IN TRANSITION. Sep 20, Harmonic Inc. All rights reserved worldwide.

Cisco Aironet 1850 Series Access Points

Satellite Services and Interference: The current situation. ITU International Satellite Communication Symposium Geneva, June 2016

Session 1. Digital Terrestrial Television Broadcasting Implementation in Asia and the Pacific

Digital Terrestrial HDTV Broadcasting in Europe

ESP-LXD Controller Programming Guide

Fabien Jordan Electrical System Engineer Space Center EPFL Muriel Noca SwissCube Project Manager.

EasyFLYSAT. communications

Risk. Sedco Express DGPS Operations Five Years of Lessons Learned

VR5 HD Spatial Channel Emulator

Transcription:

KMA Report on DBNet Operation : Current status and Future plan Hyunjong Oh (hyunjong.oh@korea.kr) Satellite Operation Division, NMSC/KMA KMA

Contents I. AAPP/CSPP Operation Status of KMA II. Action Items related with KMA III. Future Plans including LEO development project IV. Announcement

The status of satellite data reception of NMSC COMS (MI) Himawari-8 COMS(GOCI) DMSP(SSM/I) TRMM FY-2E Windsat S-NPP GCOM-W1 Terra/Aqua GPM NOAA-15/18/19 National Meteorological Satellite Center ACE Direct Receiving FTP GOES Metop-A/B Direct Reception : 10 Satellites Land-Line : 11 Satellites STEREO SOHO Space Weather GEO COMS, HIMAWARI-8, FY-2E LEO NOAA-15/18/19, Terra/Aqua, Metop-A/B, S-NPP DMSP(SSM/I), CORIOLIS, GPM, GCOM-W1 etc.

The coverage of data reception Jincheon Site http://nmsc.kma.go.kr/html/homepage/en/rars/rarsinformation.do

Status of AAPP / CSPP Operation DBNet products(atovs, IASI) of KMA have been showing good performance in terms of quality and timeliness (checked by the daily report of MetOffice) Current Version (Date of Installation) - (AAPP) V7.13 (08/02/16) - (CSPP) SDR V2.2, (06/28/16) EDR V2.0, (05/27/15) MIRS V2.0, (10/20/15) NUCAPS V1.1, (06/20/16) Relay Scheme of NMSC for Direct Readout ATOVS and IASI Data NMSC AVHRR AMSU MHS HIRS IASI KMA HQ AVHRR AMSU MHS HIRS GTS Network (Tokyo) Raw -> Level 1C 200Mbps => 10GB (2016)

Status of AAPP / CSPP Operation Hardware Configuration Processing Software and Facilities AAPP CSPP model 23 44 Computer Hardware CPUs Model name Intel(R) Xeon(R) CPU E5430 @ Intel(R) Xeon(R) CPU 2.66GHz E5640 @ 2.67GHz RAM 8G 32G Hard drive 400G 1.8T Operating System Red Hat Enterprise Linux Server release 5.2 (Tikanga) CentOS release 6.5 (final) Network Connection teaming(1+1) teaming(1+1) Bandwidth 1Gbps(Total : 2Gbps) 1Gbps(Total : 2Gbps) * Currently, ATMS & CrIS SDR processing time delay(raw -> level 1C BUFR) is about 30 min., respectively. The time delay needs to be shorten for future DBNet operation

Action Item related to KMA Adaptability of receiving station to LHCP/RHCP a) the type of receiving stations operated under your responsibility => NMSC has only RHCP receiving facilities now b) the feasibility of adapting the station(s) to make the polarization configurable (LHCP/RHCP) At this point we re not sure that technically one antenna-based facility can receive the both polarization signal, therefore information and studies related to this issue are needed. If an additional facility is inevitably needed for receiving LHCP signal data, we have to figure out the necessity level of the data and the budget issue.

Action Item related to KMA TLE update 12. All station operators should update the TLE at least once per day knowing that significant changes can appear after a satellite manoeuvre. => KMA is updating the TLE information daily Exemplary case for NOAA-18 TLE on 11 th Sep. 2011

Action Item related to KMA Priority of receiving NOAA satellites 14. Station operators are encouraged to give higher priority to NOAA-18 than NOAA-15 in reception scheduling. => KMA has set the configuration to give higher priority to NOAA-18 than NOAA-15 since 9 th Sep. 2016

Action Item related to KMA WIS registration of DBNet products 17. All DBNET products should be registered in WIS (directly with a GISC or through a DCPC) and in Vol.C1 as mentioned in the draft Guide. => KMA will register the DBNet products in DCPC-KMA based on the guidance.

Future Plans for DBNet Operation To make the IASI data be DBNet operational To collect and utilize the new station(syowa@antarctica) data provided by JMA To improve the CSPP processing timeliness of by upgrading the hardwares and software packages - BUFR data quality was validated for NWP utilization To prepare to receive the data of FY-3C and upcoming FY3D, JPSS etc.

Future Plan on LEO Program Development (plan) : ~ 2022 (TBD) Altitude/orbit : 500~900km / Sun-synchronous or dawn-dusk orbit (TBD) Satellite : ~500kg, instrument : ~150kg Possible type of Instrument - MW Sounder like ATMS, AMSU - Hyper-spectral sensors like CrIS (limited channels) - MW Imager like GMI * instrument type will be decided based on feasibility study International cooperation / joint development for payload and sensors

Announcements The Joint 7th Asia-Oceania / 2nd American Meteorological Society (AMS)-Asia / 2nd KMA International Meteorological Satellite Users' Conference to take place 21-28 October 2016, Songdo city, Incheon http://nmsc.kma.go.kr/aomsuc7/main.jsp Daily schedule 21~22 October Training on meteorological satellite data usage 24~27 October 28 October The Joint 7th AOMSUC / 2nd AMS-Asia / 2nd KIMSC International Meteorological Satellite Users Conference The 4th meeting of the Coordinating Group of the RA II WIGOS Project

THANK YOU!