Water blocking tape. Locator ridge HPA-0486

Similar documents
ALTOS LITE Loose Tube, Gel-Free Cables with FastAccess Technology, Fibers

MiniXtend Cable with Binderless* FastAccess Technology Jacket and Buffer Tube Removal Procedures. 1. General. 2. Precautions

WCH Slack Storage Housing (WCH-SSH-2 & WCH-SSH-4-12)

Installing a Wire Mesh Pulling Grip on All-Dielectric DX Armored Fiber Optic Cables

Loose Tube Cable Mid-Span Access for Splicing For Series 11D, 1GD, 12D, 1AD, 1DD, 1CD, 11, 1G, 12, 12L, 1A, 1D, 1C, 1NY, 13, 1H, HZD and HZA

Mid-Span Access of Loose-Tube Ribbon Fiber Optic Cable

FusionLink Central Tube Ribbon Preparation & handling procedure

INSTALLATION INSTRUCTIONS

2178 Fiber Optic Splice Case and 2181 Cable Addition Kit

SUMITOMO RECOMMENDED PROCEDURE SRP SP-F Ribbon Indoor/Outdoor Riser Cable Preparation

2179-CD Series Fiber Optic Splice Closure. Installation Instructions

2178-L/S Series Fiber Optic Splice Case with Gasket

TECHNICAL GUIDELINE. Universal/Toneable FTTP Cable Applications Guideline. Materials Required

Buffer Tube Midspan Access Tool Accessing fibers in buffer tube procedure

Furcation of a Central Tube Ribbon, Gel-Free, Non-Armored, 96- to 192-Fiber Cable into an OSE-UD

Instructions. Cable with Armor F CAUTION. October Rev A

SJOF-BS604B. Fiber Optic Splice Closure User Manual Rev.1

FREEDM Loose Tube Interlocking Armored Cables

Crimp & Cleave Termination Instructions for SEL ST Connectors

24-Fiber LANLINXS (Model # ) 48-Fiber LANLINXS (Model # ) User Manual

CONNECTING THE FUTURE 19" LINXS LIGHTWAVE INTEGRATED CROSS-CONNECT SYSTEM USER MANUAL

SLiC Fiber Aerial Closure System

VITALink Taped Splice Straight Through Crimp

FIST-GCOG2-Dx6. Follow all local safety regulations related to optical fiber plant elements.

3M Cold Shrink QS-III Silicone Rubber Splice Kit 5488A-TOW/WOT

Aerial Cable Installation Best Practices

IP-LINX Fiber :: X-XXXX

3M Distribution Box (DDB)

HCS - HES Cabling Systems

3M Fiber Optic Splice Closure 2178-L/S Series with Gasket

3M Better Buried Compound Compression Closure System

Cold Shrink Three-Conductor Splice Kit QS-III for use on Armor and Non-Armor Cables Instructions IEEE Std kv Class 250 kv BIL

Gel-sealed in-line fiber optic closure

OmniReach FTTX Solutions RealFlex DLX Universal Drop Cable Instruction Sheet

COYOTE CLOSURE FOR UNDERGROUND, AERIAL, AND BURIED SPLICES 6.0" x 22" 8.5" x 22" (15.24 cm x cm cm x cm)

3M Fiber Optic Wall Mount Enclosure 8430 Series

FOSC-600 C and D I N S T A L L A T I O N I N S T R U C T I O N

D1.6 Audio Cassette Special Processing Guide

IP-LINX. Installation Guide

NC-1000 INSTALLATION MANUAL NC-1000 FIBRE OPTIC CROSS-CONNECTION SYSTEM

Replacing the PanelMate epro PS, PanelMate epro PS EE, and PanelMate epro PS OD 7685x-12 Series Backlight Assembly

27mm ECAM Double Cable Entry Port

Table 4-1: Rating Levels

Multi-Media Installation Guide

GENUINE PARTS. SIRIUS Under Glass Antenna Kit

SPECIFICATION. Spec No : VSS-1402-CS603B

Splice Closure Fiber (SCF) Family

Optical Distribution Box 300 Installation Guide. Version : R0.0

3 Foam Sealed Closure 2" (50 mm) with Compound Compression

18mm ECAM Cable Entry Port

2.1 Kit Contents 2.2 Elements needed from the FIST installation kit 2.3 Tools 2.4 Cable preparation table

FOSC 450 C6 and D6 Closures

Panduit Recommended Best Case Practice Split Fibre

Public Works Division Lighting District Fiber Optic Specifications April 2009

3 SLiC Aerial Closure with Rubber End Seal

GENUINE PARTS SATELLITE RADIO INSTALLATION INSTRUCTIONS. 1. DESCRIPTION: Satellite Radio System 2. APPLICATION: Frontier (2006~)

SPECIFICATION FIBER OPTIC SPLICE CLOSURE. Spec No : VSS-1007-BS403A-04A/SD. VSS-0107-BS403A-04A/SD R & D Center Manufacturing Division

3M Fiber Optic Splice Closure 2178-XSB/XSB-FR & 2178-XLB/XLB-FR 3M Cable Addition Kit 2181-XB/XB-FR

SOLO ADSS Short-Span Cables, Fibers

HD Flex Patch Panel. ASSEMBLY VIEW (FLEX1UPN** shown) FS128B. CONTENTS: (#) indicates FLEX4UPN** quantity

OCC Installation Round Messenger Guidelines Excerpt from Optical Cable Corporation s INSTALLATION GUIDE

Telecommunications Service Technician

GENUINE PARTS CAUTION

FOSC 400 A4 Fiber Optic Splice Closure

3M Fiber Optic Splice Closure 2178-XL & 2178-XL/FR

ENGINEERING COMMITTEE Interface Practices Subcommittee SCTE Test Method for Cable Weld Integrity

3M Fiber Optic Splice Closure 2178-XL & 2178-XL/FR 3M Cable Addition Kit 2181-XL and 2181-XL/FR

TECHNICAL SPECIFICATION

All Dielectric Self Supporting (ADSS) Fiber Optic Cable Installation

Non-metallic Aerial Distribution Optical Cables for FTTH Networks

3M Better Buried Closure (with 3M Scotchlok Shield Bond Connector 4462-FN and 3M High Gel Re-enterable Encapsulant 8882)

Instrukcja montażu. FLEX LED Neon Instalacja

FOSC-450D. Fiber Optic Splice Closure. 1 Introduction. Content. 5 Cable termination. 6 Fiber routing. 2 General. 7 Installation of the gel block

Mediacom Upgrade/Splicing Procedures (based on original document from Corporate dated 4/16/98)

3M Cold Shrink Splice Kit QS-III 5416A

Installation of Optical Fiber

3M Cold Shrink Splice Kit QS-III 5515A

3. Electronics and MMU2 unit assembly

3M Better Buried Closures

FIBER OPTIC CABLE PULLING

Installation Overview

3M Cold Shrink Foldback Splice Jacket Kit

The FiberMark1 offers an ideal solution for

E2O6CMRXP-1T9 drop fiber leg preparation

Medium Box for Cable Termination

Part Number (used with PRO-CRIMPER Tool Frame ) for 50 Ohm BNC Dual Crimp MIL Type Connectors

3M Cold Shrink Splice Kit QS-III 5514A

Section Communications Optical Fiber Backbone Cabling

Service Call: Fiber Optic Installation and Repair

GF-KSW-48 Series of Fiber Optic Distribution Box. Instruction Manual

FOSC 400 C5 & D5 Fiber Optic Splice Closures

Underground Installation of Optical Fiber Cable by Pulling

Installation of Solo ADSS All-Dielectric Self-Supporting Fiber Optic Cables

3 Closure preparation 3.1 Work-stand 3.2. Opening FIST-GCOG2-Dx Preparing drop cable with micro-tubes

FOSC 400 B2/B4. Fiber Optic Splice Closures. Table of Contents. Page 1

3M Scotchcast Flexible Power Cable Splice Kits 82-F Series

DOME OPTIC SPLICE CLOSURE

DIAS power supply and DIC 221 fibre optic cable coupling module

UNSIGNED HARDCOPY NOT CONTROLLED

1.2 GHz GS7000 Node RF Split Upgrade Application Note

Transcription:

Table of Contents STANDARD RECOMMENDED PROCEDURE 004-138 ISSUE 1 MARCH 2012 PAGE 1 OF 12 Sheath Removal and Mid-Span Access of Dielectric ALTOS Cable with FastAccess Technology p/n 004-138, Issue 1 1. General...1 2. Precautions...1 3. Tools and Materials...3 4. Cable-end Sheath Removal and Fiber Access...3 5. Mid-span Sheath Removal and Fiber Access...7 1. GENERAL 1.1 This procedure describes cable-end and mid-span sheath removal and fiber access of ALTOS cables which feature Corning Cable Systems FastAccess Technology (Figure 1). 1.2 If this procedure is reissued, a summary of changes will appear in this paragraph. 2. PRECAUTIONS Chemical Precautions Locator ridge HPA-0486 WARNING: Fiber-Clean Wipes contain hydrocarbons. Apply in rooms having normal room ventilation. For prolonged and/or repeated use, gloves are recommended. Avoid eye contact. Keep away from open flames and ignition sources. If ingested, do not induce vomiting. Consult a physician. In case of eye contact, flush eyes with water for 15 minutes. Personal Protection Equipment (PPE) Precautions Water blocking tape Sheath Locator ridge Buffer tubes Binders CAUTION: Corning Cable Systems recommends the use of safety glasses (spectacles) conforming to ANSI Z87, for eye protection from accidental injury when handling chemicals, cables, or working with fiber. Pieces of glass fiber are very sharp and have the potential to damage the eye. Fibers Central member Figure 1 PRETERMINATED SYSTEMS CABLES CONNECTORS CABLE ASSEMBLIES HARDWARE TOOL KITS AND ACCESSORIES TEST EQUIPMENT SPLICE EQUIPMENT FAN-OUT KITS TRAINING

PRECAUTIONS -continued CAUTION: The wearing of cut-resistant safety gloves to protect your hands from accidental injury when using sharp-bladed tools is strongly recommended. To minimize the chance of injury from sharp-bladed tools, always cut away from yourself and others. Dispose of used blades and armor scrap properly. Laser Precautions CAUTION: Never look directly into the end of a fiber that may be carrying laser light. Laser light can be invisible and can damage your eyes. Viewing it directly does not cause pain. The iris of the eye will not close involuntarily as when viewing a bright light. Consequently, serious damage to the retina of the eye is possible. Should accidental eye exposure to laser light be suspected, arrange for an eye examination immediately. Cable and Fiber Handling Precautions CAUTION: Fiber optic cable is sensitive to excessive pulling, bending, and crushing forces. Consult the cable specification sheet for the cable you are installing. Do not bend the cable more sharply than the minimum recommended bend radius. Do not apply more pulling force to the cable than specified. Do not crush the cable or allow it to kink. Doing so may cause damage that can alter the transmission characteristics of the cable; the cable may have to be replaced. CAUTION: The typical filler rod color in the cable described in this procedure is black. Careful attention should be taken to avoid accidental cutting of live buffer tubes; particularly white and black tubes. In mid-span applications, Corning Cable Systems recommends coiling all tubes and filler rods in the slack storage area of the splice closure; especially for cables with fiber counts above 96 fibers. Avoid cutting any filler rods unless necessary for storage space considerations. When in doubt regarding the buffer tube color code and filler rod placement, contact Corning Cable Systems Engineering Services for assistance prior to cutting. WARNING: Care must be taken while handling fibers during mid-span access procedures to avoid causing large deviations in optical power throughput on fibers carrying communications traffic. INTERRUPTION OF SYSTEM TRAFFIC MAY RESULT FROM NEGLIGENT HANDLING OF FIBERS. CAUTION: Cleaved or broken glass fibers are very sharp and can pierce the skin easily. Do not let these pieces of fiber stick to your clothing or drop in the work area where they can cause injury later. Use tweezers to pick up cleaved or broken pieces of glass fibers and place them on a loop of tape kept for that purpose alone. Good housekeeping is very important. STANDARD RECOMMENDED PROCEDURE 004-138 ISSUE 1 MARCH 2012 PAGE 2 OF 12

3. TOOLS AND MATERIALS 3.1 The following tools and materials are required to complete this procedure: Tape measure (Corning p/n 100305-01) Permanent marker Vinyl tape (100278-01 Utility knife with hook blade (100299-01) Diagonal cutting pliers (side cutters) (100300-01) or Scissors (100294-01) Seam ripper (100304-01 ) Coaxial Cable stripper (100107-01) and its instructions, SRP-005-007, Scoring Fiber Optic Tubes with a Coaxial Cable Stripper (100107-01, 3204002-01) Small slotted screwdriver (100332-01) Needle nose pliers and for Mid-span applications: Optical Fiber Access Tool (OFAT) (OFT-000) and its instructions, SRP-004-014, Corning Cable Systems Optical Fiber Access Tool (OFT-000). Splice closure and any tools / materials necessary for its installation. Splice tray(s) and any tools / materials necessary for its installation. 4. CABLE-END SHEATH REMOVAL AND FIBER ACCESS 4.1 Refer to the documentation for the hardware in which you are installing the cable for the required sheath removal strip length. 4.2 Mark the cable at the appropriate distance, plus 1 inch (2.5 cm), from the cable end with at least three wraps of tape (Figure 2). These wraps will permanently remain on the cable. Strip length + 1 in (2.5 cm) 3 wraps of tape (minimum) HPA-0487 Figure 2 Locater ridges 4.3 At the end of the cable, locate the locator ridges which indicate the cable sheath s FastAccess Technology features. These features appear as small longitudinal ridges on the cable sheath and are located 180 from each other (Figure 3). Sheath HPA-0488 Figure 3 STANDARD RECOMMENDED PROCEDURE 004-138 ISSUE 1 MARCH 2012 PAGE 3 OF 12

Cable-end Sheath Removal Note: Use one of the following two methods to access the cable core with FastAccess Technology: Using FastAccess Technology - Method A - Cutting the Outer Sheath 4.4 For small fiber-count cables, use side cutters or scissors to make a 1-inch (2.5cm) longitudinal cut through the cable end along the FastAccess Technology locator ridges (Figure 4). HPA-0489 1 in (2.5 cm) Figure 4 For large fiber-count cables, use side cutters to make 1-inch (2.5cm) longitudinal cuts through the cable end along each FastAccess Technology locator ridge (Figure 5). 1 in (2.5 cm) HPA-0513 1 in (2.5 cm) Figure 5 NOTE: The resulting cuts in the outer sheath need to be long enough to allow you to grip each side of the split sheath with a gloved hand. If the cut is too short for you to do so, use needle nose pliers to begin the split along the locator ridges. Cable core 4.5 Grip each side of the split sheath and pull the sides 90 from the cable core. Continue to pull the sheath until it is split to the tape wraps (Figure 6). Skip to Step 4.7 on page 5 HPA-0490 Tape wraps Figure 6 STANDARD RECOMMENDED PROCEDURE 004-138 ISSUE 1 MARCH 2012 PAGE 4 OF 12

Using FastAccess Technology - Method B - Needle Nose Pliers Locator ridges 4.6 To use needle nose pliers and FastAccess Technology to split the end of the cable sheath: Step 1: Use needle nose pliers to firmly pinch the outer sheath on one side of the FastAccess Technology locator ridges (Figure 8). Try to direct the pressure on the sheath rather than the cable core. HPA-0514 Needle nose pliers Figure 8 Step 2: Continuing to apply firm pressure on the cable sheath, twist the pliers to apply a tearing-force on the sheath until it splits at the ridges (Figure 9). HPA-0515 Figure 9 Step 3: Reposition the pliers on the split sheath perpendicular to the cable s long axis. Roll the end of the split sheath with the pliers for a secure grip and then pull the pliers and end of the sheath 90 away from the cable core (Figure 10). Continue the split down to the tape wraps. HPA-0518 Figure 10 Cable core Step 4: Peel the remaining cable sheath half away from the cable core (Figure 11). HPA-0517 Figure 11 The next step is for both A and B Methods... 4.7 Using care to avoid damaging the cable core, use side cutters or scissors to trim off the split sheath sections at the tape wraps (Figure 12). HPA-0491 Figure 12 CAUTION: USE CARE IN THE NEXT SIX STEP TO AVOID DAMAGING THE BUFFER TUBES. STANDARD RECOMMENDED PROCEDURE 004-138 ISSUE 1 MARCH 2012 PAGE 5 OF 12

Cable-end Sheath Removal- 4.8 Use a seam ripper every 2 in (5 cm) to cut the single binding tape that secures the water blocking tape to the cable core (Figure 13). HPA-0492 Figure 13 4.9 Starting at the tape wraps, slide the binder tape down to and off the end of the cable core. 4.10 Separate the water blocking tape from the cable core to expose the buffer tubes (Figure 14). Use scissors to cut the water blocking tape flush with the end of the cable sheath. HPA-0493 Water blocking tape Figure 14 4.11 Use a seam ripper every 2 in (5 cm) to cut the binding tapes that secures the buffer tubes around the dielectric central member (Figure 15). HPA-0494 Figure 15 4.12 Starting at the tape wraps, slide the binder tape off the end of the cable. Separate the buffer tubes as follows: a. Working from the end of the cable back to the tape wraps, carefully unwind the buffer tubes from around the central member of the cable (Figure 16). Be careful not to bend or kink any of the buffer tubes. b. Examine each buffer tube for damage. If you find any damaged tubes, report the damage to your supervisor. Do not cut out a damaged tube or continue the installation with damaged fibers. Central member HPA-0495 Figure 16 NOTE: The central member length called for in this procedure should be adequate for most hardware - most closures will require additional trimming of the central member. Always verify the central member length your installation requires before cutting. 4.13 Use side cutters to cut the dielectric central member to a length of 6 in (15 cm) (Figure 17). 6 in (15 cm) HPA-0496 Figure 17 STANDARD RECOMMENDED PROCEDURE 004-138 ISSUE 1 MARCH 2012 PAGE 6 OF 12

Cable-end Fiber Access NOTES: Only access the fibers when you are ready to terminate or splice them. Before using the coaxial cable stripper, follow the adjustment and test procedures in SRP-005-007, Scoring Fiber Optic Tubes with a Coaxial Cable Stripper. to make sure that the stripper is properly adjusted and that it has a sharp blade. 4.14 Consult the instructions of the hardware in which the fibers will be installed for the required buffer tube length. Measure and mark this length on the buffer tubes with a permanent marker. 4.15 To score the first tube: a. Position the stripper s blade on the scoring mark. b. Hold the tube steady with one hand to prevent it from twisting. c. Use your other hand to rotate the tool around the tube two to three complete turns to score it (Figure 18). d. Remove the tool from the tube. HPA-0497 Score the tubedo not ring cut it Figure 10 4.16 Carefully flex the tube to break it at the score point (Figure 19). HPA-0498 Figure 19 4.17 Slide the scored section of tube off of the fibers (Figure 20). HPA-0499 Figure 20 4.18 Use scissors to trim 1 inch (2.5 cm) from the end of the fibers. The fibers are now ready to be cleaned and terminated (Figure 21). 4.18 Repeat steps 4.15-4.18 on the remaining buffer tubes/fibers. HPA-0500 1 in (2.5 cm) Figure 21 STANDARD RECOMMENDED PROCEDURE 004-138 ISSUE 1 MARCH 2012 PAGE 7 OF 12

5. MID-SPAN SHEATH REMOVAL AND FIBER ACCESS 5.1 This procedure is dependent upon sufficient slack cable for access and uses the OFT-000 Optical Fiber Access Tool. The minimum amount of cable slack is determined as follows: Slack needed= 60 x cable diameter + 42 in (105 cm): for example, for a 0.5 in (1.25 cm) OD cable, 60 X 1.25 =75cm plus 105 cm = 72 in (180 cm) of slack Add any necessary additional slack needed to reach the splicing workstation from a pole or manhole. 5.2 Prepare the tie-in (drop) cable according to the appropriate cable stripping procedure. If the tie-in cable is armored and grounding is required, install a grounding clip or connector at this time. Set the tie-in cable aside in a secure place. 5.3 Determine the center of the slack loop of the cable being accessed and mark it with a permanent marker. 5.4 Measure half of the total length to be accessed in each cable direction from the loop mid-point. Wrap each of these points with at least 3 wraps of vinyl tape. The total length from tape wrap to tape wrap should equal the full desired strip length (Figure 22).These wraps will permanently remain on the cable. HPA-0501 3-layer minimum tape wraps Half-distance (center) mark Figure 22 WARNING: Care must be taken while handling fibers during mid-span access procedures to avoid causing large deviations in optical power throughput on fibers carrying communications traffic. INTERRUPTION OF SYSTEM TRAFFIC MAY RESULT FROM NEGLIGENT HANDLING OF FIBERS. Mid-span Sheath Removal 5.5 At one tape wrap, on the inside of the slack loop, use a hook-blade knife to make a ring cut through the outer sheath (Figure 23). USE CARE TO AVOID CUTTING THE CABLE CORE AND BUFFER TUBES BENEATH THE SHEATH. Ring cut HPA-0502 Figure 23 5.5 At the ring cut, find the locator ridges which indicate the cable sheath s FastAccess Technology features. These features appear as small longitudinal ridges on the cable sheath and are located 180 from each other. See Figure 1 for a cross-section view of the cable. STANDARD RECOMMENDED PROCEDURE 004-138 ISSUE 1 MARCH 2012 PAGE 8 OF 12

Mid-span Sheath Removal-continued 5.6 To mid-span access the cable core: Tape wraps Ring cut Locator ridge Step 1: Use needle nose pliers to firmly pinch the outer sheath on one side of the FastAccess Technology locator ridges (Figure 24). Direct the pressure on the sheath rather than the cable core. HPA-0504 Needle nose pliers Locator ridge Figure 24 Step 2: Continuing to apply firm pressure on the cable sheath, twist the pliers to apply a tearing-force on the sheath until it splits at the ridges (Figure 25). HPA-0515 Figure 25 Step 3: Reposition the pliers on the split sheath perpendicular to the cable s long axis. Roll the end of the split sheath with the pliers for a secure grip and then pull the pliers and end of the sheath 90 away from the cable core (Figure 26). Continue the split down to the opposite tape wraps. HPA-0503 Figure 26 5.7 Grip the remaining side of the split sheath and pull it 90 from the cable core until it is also separated to the opposite tape wraps (Figure 27). Cable core HPA-0505 Figure 27 STANDARD RECOMMENDED PROCEDURE 004-138 ISSUE 1 MARCH 2012 PAGE 9 OF 12

Mid-span Sheath Removal-continued 5.8 Using care to avoid damaging the cable core, use side cutters or scissors to trim off the split sheath sections at the tape wrap (Figure 28). HPA-0506 Figure 28 USE CARE TO PREVENT ANY DAMAGE TO THE BUFFER TUBES DURING THE NEXT SIX STEPS. 5.9 Use a seam ripper every 2 in (5 cm) to cut the single binding tape that secures the water blocking tape to the cable core (Figure 29). HPA-0492 Figure 29 5.10 Remove the binder tape from the cable core. 5.11 Separate the water blocking tape from the cable core to expose the buffer tubes (Figure 30). Use scissors to cut the water blocking tape flush with the ends of the cable sheath. HPA-0493 Water blocking tape Figure 30 5.12 Use a seam ripper every 6 in (15 cm) to cut the binding tapes where the two overlap (Figure 31). HPA-0494 Figure 31 STANDARD RECOMMENDED PROCEDURE 004-138 ISSUE 1 MARCH 2012 PAGE 10 OF 12

Mid-span Sheath Removal-continued 5.13 Gently remove the cut binding tapes from the buffer tubes (Figure 32). You may need to cut the resulting bundles of binding tape with scissors to remove them from the cable core. HPA-0507 Figure 32 5.14 Locate the switch back center where the direction of the buffer tube s wrap around the central member switches to the opposite direction (Figure 33). HPA-0508 Switch back center Figure 33 5.15 Working from the switch back center back to the tape wraps, carefully unwind the buffer tubes from around the central member of the cable (Figure 34). Be careful not to bend or kink any of the buffer tubes. HPA-0509 Figure 34 NOTE: The central member length called for in this procedure should be adequate for most hardware - most closures will require additional trimming of the central member. Always verify the central member length your installation requires before cutting. 5.16 Use side cutters to cut the dielectric central member to a length of 2.6 in (6.6cm) from each end of the cable sheath (Figure 35). HPA-0510 Central member 2.6 in (6.6cm) Figure 35 5.17 Mount the ALTOS cable into the closure or hardware along with the drop cable according to the closure/ hardware instructions (see Figure 37. Depending upon the type of closure or hardware being used, install any cable mounting hardware and sealants at this time. STANDARD RECOMMENDED PROCEDURE 004-138 ISSUE 1 MARCH 2012 PAGE 11 OF 12

Mid-span Fiber Access 5.18 Read and completely understand SRP-004-014, Corning Cable Systems OFT-000 Optical Fiber Access Tool (OFAT) (Figure 36). This procedure describes how to access fibers in a buffer tube with the OFAT. HPA-0511 Figure 36 Slack loop of ALTOS cable with TM FastAccess Technology Drop cable buffer tubes Buffer tube to be accessed Continuous tubes Not to scale Drop cable OFAT Direction of cut HPA-0512 Figure 37 5.19 Access the appropriate buffer tube(s) as described in the OFAT tool s instructions (Figure 37). 5.20 Determine which end of the fiber should be cut and do so with a pair of scissors. The fibers are now ready to be cleaned and terminated. Corning Cable Systems LLC PO Box 489 Hickory, NC 28603-0489 USA 1-800-743-2671 FAX +1-828-325-5060 International +1-828-901-5000 http://www.corning.com/cablesystems Corning Cable Systems reserves the right to improve, enhance, and modify the features and specifications of Corning Cable Systems products without prior notification. ALTOS is a registered trademark of Corning Incorporated. All trademarks are the properties of their respective owners. Corning Cable Systems is ISO 9001 certified. 2012 Corning Cable Systems. All rights reserved. Published in the USA. STANDARD RECOMMENDED PROCEDURE 004-138 ISSUE 1 MARCH 2012 PAGE 12 OF 12