Mediacom Upgrade/Splicing Procedures (based on original document from Corporate dated 4/16/98)

Similar documents
Aerial Cable Installation Best Practices

CHAPTER 14 WIRING SIGNALS AND LIGHTING FIELD GUIDE Wiring Requirements WIRING

FOSC-600 C and D I N S T A L L A T I O N I N S T R U C T I O N

HCS - HES Cabling Systems

SPECIAL SPECIFICATION 8540 Telecommunication Cable

SLiC Fiber Aerial Closure System

SPECIAL SPECIFICATION 6559 Telecommunication Cable

SJOF-BS604B. Fiber Optic Splice Closure User Manual Rev.1

VITALink Taped Splice Straight Through Crimp

FOSC 450 C6 and D6 Closures

Public Works Division Lighting District Fiber Optic Specifications April 2009

3M Distribution Box (DDB)

SECTION MEDIUM VOLTAGE CABLE INSTALLATION. 1. Section Underground Ducts and Manholes.

OCC Installation Round Messenger Guidelines Excerpt from Optical Cable Corporation s INSTALLATION GUIDE

INSTALLATION INSTRUCTIONS

All Dielectric Self Supporting (ADSS) Fiber Optic Cable Installation

3 SLiC Aerial Closure with Rubber End Seal

2178-L/S Series Fiber Optic Splice Case with Gasket

2178 Fiber Optic Splice Case and 2181 Cable Addition Kit

3M Fiber Optic Splice Closure 2178-XSB/XSB-FR & 2178-XLB/XLB-FR 3M Cable Addition Kit 2181-XB/XB-FR

Section 8 FIBERLIGN Hardware for Aerial FTTP Applications

FIBER OPTIC CABLE PULLING

NC-1000 INSTALLATION MANUAL NC-1000 FIBRE OPTIC CROSS-CONNECTION SYSTEM

Gel-sealed in-line fiber optic closure

OCC Installation Figure 8 Guidelines Excerpt from Optical Cable Corporation s INSTALLATION GUIDE

Water blocking tape. Locator ridge HPA-0486

SECTION TESTING, IDENTIFICATION AND ADMINISTRATION

UNM IT/Telecommunications Guide Specification Labeling 11/07/

SECTION 5900 TRAFFIC SIGNALS CITY OF LEE S SUMMIT, MISSOURI DESIGN CRITERIA

2179-CD Series Fiber Optic Splice Closure. Installation Instructions

Instructions. Cable with Armor F CAUTION. October Rev A

The FiberMark1 offers an ideal solution for

Loose Tube Cable Mid-Span Access for Splicing For Series 11D, 1GD, 12D, 1AD, 1DD, 1CD, 11, 1G, 12, 12L, 1A, 1D, 1C, 1NY, 13, 1H, HZD and HZA

IndyGo Facility Upgrades Project 35671EE

ALTOS LITE Loose Tube, Gel-Free Cables with FastAccess Technology, Fibers

Section Communications Optical Fiber Backbone Cabling

24-Fiber LANLINXS (Model # ) 48-Fiber LANLINXS (Model # ) User Manual

Telecommunciations Infrastructure Project September 20, A. Broadband radio frequency active and passive components

SECTION COMMUNICATIONS HORIZONTAL CABLING

2178 L/S Series Fiber Optic Splice Cases and Accessories

Preventing Fieldbus Physical Layer Problems

SECTION O FIBER OPTICS

3M Fiber Optic Splice Closure 2178-XL & 2178-XL/FR

FIST-GCOG2-Dx6. Follow all local safety regulations related to optical fiber plant elements.

3M Fiber Optic Splice Closure 2178-XL & 2178-XL/FR 3M Cable Addition Kit 2181-XL and 2181-XL/FR

Product Manual MNX10015 / REV C MODEL SB142, SB242. Dual Output Series Switch Boxes

TV55. Owner s Manual. Indoor/Outdoor Amplified TV Antenna

Coastal Carolina University RE-BID WILLIAMS BRICE RENOVATION AND REPAIR October 19, 2018 Construction Documents

A. The requirements of Section govern the work specified in this section.

ACADEMIC SUCCESS CENTER THE COLLEGE AT BROCKPORT STATE UNIVERSITY OF NEW YORK PROJECT NO

COYOTE CLOSURE FOR UNDERGROUND, AERIAL, AND BURIED SPLICES 6.0" x 22" 8.5" x 22" (15.24 cm x cm cm x cm)

3 Closure preparation 3.1 Work-stand 3.2. Opening FIST-GCOG2-Dx Preparing drop cable with micro-tubes

UNIVERSITY of NORTH DAKOTA LOW VOLTAGE COMMUNICATIONS STANDARDS FOR CABLING, PATHWAYS, AND SPACE

Optical Distribution Box 300 Installation Guide. Version : R0.0

GENUINE PARTS ! CAUTION

Preparing a home for TransACT fibre-to-the-premise (FTTP) services

CONSTRUCTION SPECIFICATION FOR TRAFFIC SIGNAL EQUIPMENT

Follow The Leader In Shielded Technology

Student Services & Classroom Addition

California Polytechnic State University ITS Telecommunications PART 1 GENERAL SECTION AUDIO VISUAL STATION CABLES 1.

Aerospace Fiber Optics

All Dielectric Self Supporting (ADSS) Fiber Optic Cable Installation

APPENDIX A Verify All Part Numbers (Partial List of Approved Products)

Multi-Media Installation Guide

OmniReach FTTX Solutions RealFlex DLX Universal Drop Cable Instruction Sheet

3M SLiC 530/533/733-2 Port 0.61 Cable Entry Bracket 3M SLiC 530/533/733-2 Port-MSM 0.61 Cable Entry Bracket

INSTALLATION GUIDE. LANmark-OF Zone Distribution Box

Aerial Installation Guidelines for Fiber Optic Cable

Service Call: Fiber Optic Installation and Repair

ENGINEER S REPORT. of the SAFETY OF MAW COMMUNICATIONS FIBER OPTIC CABLE INSTALLATION

INTRODUCTION INSTALLATION LIGHTNING RETARDING LOOPS. Figure 1. Relay Box Antenna Connections. Relay Box Cable Connections

INSTALLATION INSTRUCTIONS FOR. MODEL 2230LED

Cable Installation Tips

INSTALLATION INSTRUCTIONS FOR

SECTION FIBER OPTIC STATION CABLES

3M Cold Shrink QS-III Silicone Rubber Splice Kit 5488A-TOW/WOT

FOSC 400. Ordering Guide For Closures and Accessories. Section I 3. Section II 5. Section III 9. Section IV 11. Section V 15

18mm ECAM Cable Entry Port

TECHNICAL GUIDELINE. Universal/Toneable FTTP Cable Applications Guideline. Materials Required

Customer-Owned Outside Plant

Bravo AV s Structured or Whole-House Wiring Approach

WCH Slack Storage Housing (WCH-SSH-2 & WCH-SSH-4-12)

Mid-Span Access of Loose-Tube Ribbon Fiber Optic Cable

Pre-bid Supplement #01 Communications Specifications and Additional Scope Project Bid: CM Date: 05/26/2017

FusionLink Central Tube Ribbon Preparation & handling procedure

POET-1 P.O.E. TEST PORT MEASUREMENT TOOL INSTRUCTION BOOK

Michigan State University Construction Standards EXTERIOR FIBER OPTIC CABLE SYSTEM PAGE

Target Interface / Construction Compliance Inspection Checklist

STRUCTURED CABLE SYSTEM (SCS)

IP-LINX Fiber :: X-XXXX

Winch Adjustable Feed Level Tubes for the Adult Turkey Feeder Installation & Operator s Instruction Manual MF /99

Creative Suggestions & Billboard Installation

IP-LINX. Installation Guide

Cable Broadband Premises Installation and Service

FOSC-450 Product Range Ordering Guide

3M Better Buried Closures

BILOXI PUBLIC SCHOOL DISTRICT. Biloxi Junior High School

Cable Installation Tips

INSTALLATION INSTRUCTIONS MODEL VSBX-236 LED 3 X 8 INDOOR SCOREBOARD

UNIFIED FACILITIES GUIDE SPECIFICATIONS

Transcription:

Mediacom Upgrade/Splicing Procedures (based on original document from Corporate dated 4/16/98) 1. Splicing specifications are provided by Mediacom, but due to resplice conditions, many locations become a custom build. For example - field decisions regarding the use of extension connectors (3-inch or 6-inch) to maintain proper spacing from the pole and to provide a uniform and straight entry into the equipment on the input and output sides. Most locations will require the input loop to be straightened and reformed (with Jackson/Lemco mechanical benders only - no boards, forms or handformed loops) with the proper spacing (see attached drawings). 2. All strand-mounted equipment, including amplifiers, directional couplers, splitters and power inserters will have input and output loops. If a power inserter falls at a location with a piece of feeder equipment, the feeder equipment (tap, directional coupler or line extender) should be on brackets with the power inserter mounted above it on the strand, just offsetting the bracket. Don t force the input loop! Taps are the only devices that do not require an input loop, EXCEPT at terminating taps. The loops at a terminating pole may be deleted in certain situations where the pole is accessible ONLY by climbing. 3. Grounding and bonding: a. All active components require either a bond or their own ground rod and vertical groundwire at the pole or pedestal prior to and after the active. b. All junction poles can be share bonded with the power or telephone vertical, but a split-bolt connector must be connected below the CATV strand. c. If local utilities allow, strand may be bonded to power or telephone. If no telephone or power vertical exists, install a full vertical and ground rod. d. For underground plant no new grounds are required, and any existing grounds should be reconnected securely. 1. All rusted lashing wire clamps and straps are to be replaced. Tree guard shall be installed beneath the suspension clamp on all trunk or multiple cables. 2. On dual cable, two straps are placed in the bottom of each loop. Loops without two straps are to be brought up to Mediacom specifications where contractor work is being performed. Skip (no cut) poles do not have to be reworked, with the exception of straps, spacers, and lashing wire clamps. 3. Straight splices require an input loop, as well as the standard output loop. Page 1 4 of

4. Do not place taps on preformed strand splices, deadends, or other obstructions. 5. Self-support cable shall be treated with the same specifications as any other cables. Split the cable from the messenger with great care so as not to damage the jacket. Use straps and spacers (55 inches out from the suspension clamp), and Jackson/Lemco mechanical benders must be used to form the loops. Forming boards are not allowed. 6. Where possible, taps are to be placed 18 inches from the suspension clamp. When necessary, one may use a measurement of NO LESS THAN 12 INCHES to save a straight splice or extension connector. 7. When the combined length of multiple pieces of equipment would put the furthest connector beyond 4 feet from the suspension clamp, the equipment may be split into two separate pieces which may then be spliced on each side of the pole. All other applicable specifications shall be adhered to, including length of doglegs, loops, etc. 8. Long, straight doglegs into equipment shall be the standard. There must be a minimum of 6 inches of straight cable into any connector. There must be a minimum of 4 inches of straight cable into any strap and spacer. 9. Any active house drops must have new Snap-N-Seal F connectors installed, with proper tools used for preparation and installation. When moving span clamps, install them no closer than 18 inches from the pole. 10. Mediacom mandated working hours are to be coordinated with Project Managers. Although local requirements may vary, the following is recommended: Trunk: Off 12 midnight On 6AM Answering service is to be notified before and after (by person coordinating nighttime splicing) Feeder: Off 6AM On 3:30 PM Areas to be affected by work must be logged on street sheets the previous day, and faxed to the Regional dispatch center No active system work is to be performed on weekends or holidays unless specified in advance by Mediacom personnel. Page 2 4 of

1. Signal levels of amplifiers, and end-of-line levels are to be noted on amplifier log sheets, and the control maps, during upgrade. Balancing is to be performed using channels 4, 58 or 70 (or applicable pilot channels) and two additional channels to be designated. Log sheets will be collected daily. 2. Street sheets showing daily work locations are required to be turned in to the project supervisor, before 8:30AM each day. 3. Wall maps are to be marked up daily for Mediacom, with all end-of-line levels posted, noting any added equipment or other design changes. 4. Contractors for Mediacom are required to provide magnetic identification signs for all trucks. Contract personnel will carry photo ID cards identifying them as contractors for Mediacom. 5. Proper splicing techniques are to be used at all times: a. Coring tools are required that leave a smooth edge on the coax sheath (Cablematic or Lemco tools) b. Center conductor cleaner tools must not damage copper cladding. The Plexiglas Y-190 tool works well. No metal blades are allowed. Center conductors must be cut to length in accordance with the connector manufacturer s specifications. EXPECT MEDIACOM TO REGULARLY INSPECT SPLICING. 1. Bishop #10 3-3/4" x 10' Electro-Seal tape will be applied to all housing to housing connectors. Do not apply Bishop tape to 90_, 180_, or other connectors. The tape may be cut in half for easier application in small spaces, but in any case should be stretched tight as it is wrapped. 2. In underground areas, all equipment will be securely mounted to the pedestal or closure with the proper mounting bracket. Taps may be mounted directly to the pedestal, if a proper mounting point exists. No equipment is to be left floating, or mounted to ground rods. 3. Pedestals will be replaced only if they are the incorrect size, or damaged. Dull paint is not a reason to replace an otherwise functional metal pedestal. 4. Safety a. Hard hats are to be worn whenever doing any aerial work. b. Cones are to be set out at rear and front of truck. c. Men Working signs shall be used when mandated. d. Flares shall be used when conditions warrant. Page 3 4 of

e. Ladders must not be left unattended. f. Debris including staples, loose wire, pieces of shielding or center conductors, connectors, etc., must not be left unattended at the job site. General information 1. When applicable, use top feeder ports on amplifiers. 2. All splicing should conform to Mediacom s specifications regarding proper spacings, and uniform and straight entry. If done properly, no individual s splicing can be singled out from the rest (see attached drawings). 3. All equipment provided by Mediacom should be handled properly without abuse including keeping it dry, secure, etc. Organized trucks do help. FIBER OPTIC CABLE SPECIFICATIONS AND NOTES 1. Underground fiber: Depth will vary from region to region a 36 inch to 42 inch depth will be considered a minimum. One underground warning tape will be placed 12 inches above the cable. If alldielectric fiber cable is used, an additional tape with an integral metallic locating conductor will be placed directly on top of the cable. Use Budco Brady stakes for above grade warning markers. DO NOT place stakes directly above the fiber path, or within the trench/plow path. NOTES: Conduit being used for fiber will be of nothing less than a schedule 40. Long distance fiber locators may be required due to long runs. 1. Aerial fiber: The "bag loop" in the fiber at the pole, on the attached drawings, is exaggerated for clarity, and should not be built as drawn. The loop at the pole should be a shallow, smooth curve that maintains a slight separation between the fiber sheath and the suspension clamp. Use Vikimatic (TVC) fiber optic warning tag yellow or orange with black letters, to be attached to bottom of loop at pole, with tie wraps. Fiber lashing wire clamps will be placed on the pole side of the existing lashing wire clamps. Above existing coaxial cable loops, fiber will be attached using stainless steel cable straps. All fiber will be installed, no partial fiber reels will be brought back to the warehouse. Page 4 4 of

All fiber lashbacks will be installed 10 feet from the pole. Fiber loops will be teardrop-shaped, hanging vertically, with manufacturer s bending radius specifications observed. Snowshoes WILL NOT be used as a bending form and are not to be used AT ALL. Node service cables should be lashed or strapped out along the strand - not coiled. 1. Fiber backlashes: Regional preferences or local codes may apply. All storage fiber is to be lashed to the strand (see attached drawings). MULTIPLE DWELLING UNITS (MDUs) 1. The upgrade process will generally provide a minimum +20dBmV input signal to an active or a lockbox serving a MDU complex. This may be reflected on the design maps as individual tap ports for 12 units and under, or a terminated feeder leg with signal level shown. Adjustments to the design may be necessary to properly provide signal for each building in a complex. 2. Any lockbox work, splitter updating, indoor amplification, or rewiring is the responsibility of the local technical operations personnel. 3. Construction personnel and a representative from the local technical staff should meet well in advance of the upgrade start date, to review the work necessary and coordinate efforts. 4. All lockboxes should be grounded with #6 copper at the input. Local codes regarding grounding and bonding should be followed. 5. Interior distribution amplifiers should be avoided, if at all possible. Outdoor line extenders, powered from the outside plant, are preferred. Page 5 4 of