Dick Loveless. 20 November 2008 SLHC Workshop. Dick Loveless SLHC Workshop 20 Nov

Similar documents
Test Beam Wrap-Up. Darin Acosta

Status Radial Services and cable tray. 1) Holes, Flexrails, WireMesh Ctray.

Synchronization of the CMS Cathode Strip Chambers

Trigger Report. Wesley H. Smith CMS Trigger Project Manager Report to Steering Committee February 23, 2004

WBS Trigger. Wesley Smith, U. Wisconsin CMS Trigger Project Manager. DOE/NSF Review April 11, 2000

CSC Muon Trigger. Jay Hauser. Director s Review Fermilab, Apr 30, Outline

US CMS Endcap Muon. Regional CSC Trigger System WBS 3.1.1

Status of the CSC Track-Finder

Cable Installation Tips

The Cornell/Purdue TPC

CSC Data Rates, Formats and Calibration Methods

Cable Installation Tips

CMS Upgrade Activities

Review of the CMS muon detector system

Cryostat Instrumentation Cabling Grounding and Shielding. Eric Hazen Boston University 12/15/08 1

Outline. GEM R&D and assembly facilities at UVa. Cosmic test results. Update on the cm 2 GEM prototype

R&D on high performance RPC for the ATLAS Phase-II upgrade

Rome group activity since last meeting (4)

The field cage for a large TPC prototype

Cabling and Completing Assembly of the Cisco TelePresence System 1000

Muon Forward Tracker. MFT Collaboration

NC-1000 INSTALLATION MANUAL NC-1000 FIBRE OPTIC CROSS-CONNECTION SYSTEM

SuperB- DCH. Servizio Ele<ronico Laboratori FrascaA

Electrical Services. The MCCA offers a variety of electrical services through our experienced in-house team of electricians.

Minutes of the ALICE Technical Board, November 14 th, The draft minutes of the October 2013 TF meeting were approved without any changes.

CGEM-IT project update

CME500 SERVICE PARTS

Status of the Timing Detector Plastic+SiPM Readout Option

Trigger Cost & Schedule

Tracking Detector R&D at Cornell University and Purdue University

li, o p a f th ed lv o v ti, N sca reb g s In tio, F, Z stitu e tests o e O v o d a eters sin u i P r th e d est sezio tefa ectro lity stem l su

Small System Packages. Strand Dimming Systems

ELECTRICAL SERVICE ORDER FORM

Fixed Audio Output for the K2 Don Wilhelm (W3FPR) & Tom Hammond (NØSS) v August 2009

Atlas Pixel Replacement/Upgrade. Measurements on 3D sensors

Front End Electronics

Prospect and Plan for IRS3B Readout

GF-KSW-48 Series of Fiber Optic Distribution Box. Instruction Manual

Small System Packages. Strand Dimming Systems

IP-LINX Fiber :: X-XXXX

BILOXI PUBLIC SCHOOL DISTRICT. Biloxi Junior High School

ALICE Muon Trigger upgrade

The Silicon Pixel Detector (SPD) for the ALICE Experiment

UNIVERSITY of NORTH DAKOTA LOW VOLTAGE COMMUNICATIONS STANDARDS FOR CABLING, PATHWAYS, AND SPACE

AREAL- Phase 1. B. Grigoryan on behalf of AREAL team

Sprite TL Quick Start Guide

BMOA Component Systems. Miniature Optical Sensors. c Features. Technical Description

AT&T January, 2012 Revised December, 2018 TABLE OF CONTENTS SECTION 1--INTRODUCTION...1-1

MAXX BOX. MX102/202 Series. MAXX Box

CONNECTING THE FUTURE 19" LINXS LIGHTWAVE INTEGRATED CROSS-CONNECT SYSTEM USER MANUAL

J R Sky, Inc. tel: fax:

DAQ Systems in Hall A

ATLAS muon spectrometer varia, status, and upgrades. Gerjan Bobbink Steenwijk 16-june-2017

12 Cathode Strip Chamber Track-Finder

CMS Conference Report

Status of the Front Tracker GEM and INFN Electronics

Product Manual MNX10015 / REV C MODEL SB142, SB242. Dual Output Series Switch Boxes

Coastal Carolina University RE-BID WILLIAMS BRICE RENOVATION AND REPAIR October 19, 2018 Construction Documents

ELECTRICAL LEGEND NOTES AND FIXTURE SCHEDULE

Status of GEM-based Digital Hadron Calorimetry

TG 3 Status Report. C. Cattadori on behalf of TG3

FOSC-600 C and D I N S T A L L A T I O N I N S T R U C T I O N

FOSC-450D. Fiber Optic Splice Closure. 1 Introduction. Content. 5 Cable termination. 6 Fiber routing. 2 General. 7 Installation of the gel block

SUBCARRIER TRANSFER FILTER INSTRUCTION BOOK IB622702

Oak Ridge Spallation Neutron Source Proton Power Upgrade Project and Second Target Station Project

Traditional RF Splitter/Combiner and Directional Coupler User Manual

Optical Link Evaluation Board for the CSC Muon Trigger at CMS

Telecommunications Service Technician

Traditional RF Splitter/Combiner and Directional Coupler User Manual

Electronics procurements

Electronics for the CMS Muon Drift Tube Chambers: the Read-Out Minicrate.

FOSC 400. Ordering Guide For Closures and Accessories. Section I 3. Section II 5. Section III 9. Section IV 11. Section V 15

PEP-II Disassembly Technical Systems

GE Digital Solutions. PACE1000 High Precision Pressure Indicator Series. Spares Catalogue 120M3420 ALL USERS

The Alice Silicon Pixel Detector (SPD) Peter Chochula for the Alice Pixel Collaboration

Gel-sealed in-line fiber optic closure

Prodigy Eclipse ECC and EH222 Service Parts EH222 Cabinet - C Series

INSTALLATION INSTRUCTIONS

ANKA RF System - Upgrade Strategies

Service Call: Fiber Optic Installation and Repair

CHAPTER 14 WIRING SIGNALS AND LIGHTING FIELD GUIDE Wiring Requirements WIRING

OFDC-B8-72. Outdoor fiber distribution closure. 6 Closing. Content 1 Introduction. 7 Re-entry. 2 Kit content. 3 Closure preparation

10-Channel 16-Bit Analog Board Set User s Manual And Troubleshooting Guide

ILC Detector Work. Dan Peterson

ECS COMBINED CUT-OUT AND CT CHAMBER INSTALLATION

USER MANUAL. Kramer Electronics, Ltd. Models:

itop (barrel PID) and endcap KLM G. Varner Jan-2011 Trigger/DAQ in Beijing

BooBox Flex. OPERATING MANUAL V1.1 (Feb 24, 2010) 6 Oakside Court Barrie, Ontario L4N 5V5 Tel: Fax:

Emerging Subsea Networks

A Serializer ASIC at 5 Gbps for Detector Front-end Electronics Readout

Assembling and Mounting the Presentation Display, Speakers, Speaker Screens, and Table Door

Cascadable 4-Bit Comparator

Upgrading LHC Luminosity

STUDY OF ANODE SELF-TRIGGER ABILITY OF ME1/1 CMS ENDCAP CATHODE STRIP CHAMBER

Pre-bid Supplement #01 Communications Specifications and Additional Scope Project Bid: CM Date: 05/26/2017

GPON installation in high rise buildings via Fiber Tree system

GLAST Large Area Telescope:

FIST-GCOG2-Dx6. Follow all local safety regulations related to optical fiber plant elements.

Ex td A21 IP66 T58 C. max. 3 x 4 mm 2 or 1 x 10 mm 2 with pin cable lug + 1 x 2.5 mm 2 fine wire. max. 4 x M20 metal thread

WBS Calorimeter Trigger. Wesley Smith, U. Wisconsin CMS Trigger Project Manager. DOE/NSF Review April 12, 2000

Transcription:

ME4/2 Integration Dick Loveless 20 November 2008 SLHC Workshop Dick Loveless SLHC Workshop 20 Nov 2008 1

CMS Endcap Dick Loveless SLHC Workshop 20 Nov 2008 2

ME4/2 Upgrade Dick Loveless SLHC Workshop 20 Nov 2008 3

Installation ME4/2 Installation (per disk) 72 mounting posts into dowel holes 36 CSC chambers on YE3 (away from IP) 36 RPC chambers on YE3 (away from IP) Design features Install CSCs closest to iron disk (must go first) CSCs overlapped - - back first, then front Cable back CSCs before installing front ME4/2s Originally RE4 went on YE4 difficult for services Now mount RPC frame on end of posts (M24 hole) Install RPC chambers (overlapped) and cables RPC will wait if the ME4/2s are delayed RE group agrees with the plans shown Dick Loveless SLHC Workshop 20 Nov 2008 4

Mounting Post Dick Loveless SLHC Workshop 20 Nov 2008 5

Posts mounted on disks Dick Loveless SLHC Workshop 20 Nov 2008 6

Integration Services I Most integration issues already implemented for CSCs -- many also for RPCs Now operating 18 ME4/1 chambers per disk Cooling Manifolds installed (with threaded half-couplings) CSC and RPC add valves, flow restrictors, & hoses Gas Gas rack & piping completed to patch panels on outer edge of YE3 Add laterals to chambers (3 CSCs per loop,? RPCs per loop) Dick Loveless SLHC Workshop 20 Nov 2008 7

YE3 Cooling Schematic YE3 PERIPHERY MANIFOLD ME4/2 120W EACH SUPPLY RETURN CSC CIRCUIT QTY 12 ME4/1 145W 20º RPC CIRCUIT QTY 18 RE 4/1,RE 4/2,RE 4/3 80W VME RACK (2 CRATES) 213W+187W VME CIRCUIT QTY 4 RACK CIRCUIT QTY 5 CSC CIRCUIT QTY 6 2000 W DISK CIRCUIT QTY 12 Dick Loveless SLHC Workshop 20 Nov 2008 8

Cooling Connections Dick Loveless SLHC Workshop 20 Nov 2008 9

High Voltage Integration Services II Add crates and cabling as needed d Low voltage (CSC) Power cables in main cable chain & mini-cable chain Add CSC junction boxes (9 CSC per box) & cabling Add 2 Maraton power supplies Readout Add 12 skewclear cables per chamber Optical Fibers (peripheral crates to USC) CSC fibers in place need patch cords RPC fibers? Dick Loveless SLHC Workshop 20 Nov 2008 10

Junction boxes Inputs: Digital power Analog power Outputs: 9 CSC chambers Dick Loveless SLHC Workshop 20 Nov 2008 11

Skewclear cabling g( (ME4/1) Dick Loveless SLHC Workshop 20 Nov 2008 12

CSC cabling Dick Loveless SLHC Workshop 20 Nov 2008 13

On-chamber ME4/2 Integration No design work needed Use recovered ME1/1 CFEBs (strips) Need to plan installation carefully, start ME4/2 installation using spare CFEB boards Need new ALCTs (wires) and LVDBs (LV dist.) Integration design (covers, brackets, etc.) of CSC electronics identical to existing CSCs Off-chamber Peripheral crates, MPC, CCB exist and now work Recover TMB (trigger) and DMB (readout) boards from ME1/1 Dick Loveless SLHC Workshop 20 Nov 2008 14

Timing Integration issues with RPC RPC group plans to wait until CSCs installed Ok as long as we have a reasonable schedule for CSCs YE3 rack space YE3 space = YE2 space CSCs need ½ space used on YE2 Ok if RPCs can fit into remaining ½ YE3 space Dick Loveless SLHC Workshop 20 Nov 2008 15

Electronics ME1/1 Upgrade Issues Use new digital CFEB boards Need new LVDB (LV dist.) boards 7 CFEBs instead of 5 Need new TMB and DMB boards Optical cable connections Integration New electronics board layout on chambers Develop new routing for cables (optical & copper) Need ME1/1 prototype before t 0 +24 months Dick Loveless SLHC Workshop 20 Nov 2008 16

ME4/2 Installation Access For one endcap: Clean disk holes and mount posts 4 days Mount back chambers (6/day+cont.) 4 days Cable back chambers (3/day) 6 days Mount front chambers (6/day+cont.) 4 days Cable front chambers (3/day) 6 days Attach cooling, gas, HV, LV, test 10 days 34 days Posts can easily be mounted early Dick Loveless SLHC Workshop 20 Nov 2008 17

For one endcap: ME1/1 Installation Access Remove chambers (3/day) 12 days Mount new CFEB boards & test (4/day) 9 days Recover old CFEBs for ME4/2 chambers Install cables 9 days Replace chambers (3/day) 12 days Attach cooling, gas, HV, LV, test 10 days 52 days May save some time by mounting CFEB boards and testing at the same time as the cables are installed Dick Loveless SLHC Workshop 20 Nov 2008 18

ME4/2 Upgrade Schedule t 0 -- CD2 approval, money flows, begin work on Bldg 904 t 0 +3 months -- orders sent out for all parts t 0 +6 months -- production tooling shipped to CERN and assembled in Bldg 904 t 0 +9 months -- chamber parts delivered, shipped to CERN t 0 +12 months -- production begins at Bldg 904 at 2 CSCs/month t 0 +15 months -- production ramps to 4 CSCs/month t 0 + 18 months -- FAST site begins assembly & testing at CERN (Bldg 904?), spare CFEB boards installed on ME4/2s t 0 +24 months -- 42 CSCs finished and tested -- ready for installation of 1st endcap, recover 200 CFEB boards from ME1/1s t 0 +33 months -- all 76 CSCs finished t 0 +36 months -- final 36 chambers ready for installation on 2nd endcap Dick Loveless SLHC Workshop 20 Nov 2008 19

Electronics Upgrade Issues - Electronics Use spare CFEBs for 1 st 36 ME4/2 chambers Need 180 CFEBs -- have ~200 spares Recover CFEBs from ME1/1 during shutdown Get 180 enough for 2 nd set of 36 ME4/2 chambers Also recover TMBs and DMBs from ME1/1 ME4/2 -- Need new ALCT, LVDB, LVMB, HV dist. No design changes ME1/1 -- Need new LVDB, LVMB, CFEB, TMB, DMB New designs for all boards Dick Loveless SLHC Workshop 20 Nov 2008 20

Upgrade Issues -- Cables ME4/2 chambers New skewclear cables for ME4/2 12 per chamber LVMB cable 1 per ME4/2 chamber LV, HV lateral cables for ME4/2 Main power cables in place in cable chains Optical patch cords Optical cables complete through terminal box ME1/1 chambers Optical readout cables ME1/1 to peripheral crate Copper reference level cable New cable layout for ME1/1 patch panel (on nose) Dick Loveless SLHC Workshop 20 Nov 2008 21

Summary Major integration issues not serious Mechanics & Services in good shape Agreement with RPCs on services, need to work on rack layout RPCs will install RE4 AFTER CSCs Installation 36 ME1/1 upgraded and 36 ME4/2 installed at t 0 + 24 months Recover CFEBs from ME1/1s for 2 nd set of ME4/2s Final 36 ME1/1 upgraded and final 36 ME4/2 installed at t 0 + 36 months Dick Loveless SLHC Workshop 20 Nov 2008 22