beam dump from P2 losses this morning

Similar documents
LHC Beam Instrumentation Further Discussion

LHC Nominal injection sequence

1. General principles for injection of beam into the LHC

The 2011 LHC Run - Lessons in Beam Diagnostics

Beam systems without failures what can be done?

LHC Machine check out

2008 JINST 3 S LHC Machine THE CERN LARGE HADRON COLLIDER: ACCELERATOR AND EXPERIMENTS. Lyndon Evans 1 and Philip Bryant (editors) 2

OPERATIONAL EXPERIENCE WITH CIRCULATING BEAM

LHC COMMISSIONING PLANS

LHC_MD292: TCDQ-TCT retraction and losses during asynchronous beam dump

New Filling Pattern for SLS-FEMTO

Development of an Abort Gap Monitor for High-Energy Proton Rings *

Session 07 - What did we learn with beam in 2008? LHC Performance Workshop Chamonix Rhodri Jones on behalf of BE/BI & all our collaborators

Friday 05/03/ :00 13:00 : Establishing reference orbit golden Jorg Wenninger. Problems Wrong polarity on MCBXH3.L8 Polarity flag changed in DB

REVIEW OF LHC OPERATION

RF PERFORMANCE AND OPERATIONAL ISSUES

PEP II Design Outline

WHAT WE WILL DO FOR BEAM PREPARATION IN 2009 : BEAM INTERLOCKS

INITIAL BEAM COMMISSIOMING OF INJECTION AND BEAM DUMP

CLIC Feasibility Demonstration at CTF3

First LHC Beams in ATLAS. Peter Krieger University of Toronto On behalf of the ATLAS Collaboration

Fast Orbit Feedback at the SLS. Outline

Precision measurements of beam current, position and phase for an e+e- linear collider

Bunch-by-bunch feedback and LLRF at ELSA

Libera Hadron: demonstration at SPS (CERN)

CERN S PROTON SYNCHROTRON COMPLEX OPERATION TEAMS AND DIAGNOSTICS APPLICATIONS

SPEAR 3: Operations Update and Impact of Top-Off Injection

Development of beam-collision feedback systems for future lepton colliders. John Adams Institute for Accelerator Science, Oxford University

Commissioning of the CNGS Extraction in SPS LSS4

PEP-II Status. U. Wienands, PEP-II Run Coordinator for the PEP-II team

Digital BPMs and Orbit Feedback Systems

PEP-I1 RF Feedback System Simulation

PICS IN THE INJECTOR COMPLEX WHAT ARE WE TALKING ABOUT?

Linac 4 Instrumentation K.Hanke CERN

TRANSVERSE DAMPING AND FAST INSTABILITIES

COMMISSIONING SCENARIOS FOR THE J-PARC ACCELERATOR COMPLEX

Equipment Installation, Planning, Layout, organisation and updates

FILLING SCHEMES AND E-CLOUD CONSTRAINTS FOR 2017

OPERATIONAL EXPERIENCE AT J-PARC

Characterizing Transverse Beam Dynamics at the APS Storage Ring Using a Dual-Sweep Streak Camera

LEP OPERATION AND PERFORMANCE WITH ELECTRON-POSITRON COLLISIONS AT 209 GEV

Status and Plans for PEP-II

Control of Intra-Bunch Vertical Motion in the SPS with GHz Bandwidth Feedback

An Overview of Beam Diagnostic and Control Systems for AREAL Linac

Status of SOLARIS. Paweł Borowiec On behalf of Solaris Team

Status of SOLARIS Arkadiusz Kisiel

THE ANTIPROTON DECELERATOR (AD)

Status of RF Power and Acceleration of the MAX IV - LINAC

P. Adamson, Fermi National Accelerator Laboratory, Batavia, IL 60510, USA. Abstract

Sérgio Rodrigo Marques

... A COMPUTER SYSTEM FOR MULTIPARAMETER PULSE HEIGHT ANALYSIS AND CONTROL*

TWO BUNCHES WITH NS-SEPARATION WITH LCLS*

Requirements for the Beam Abort Magnet and Dump

30 GHz Power Production / Beam Line

Information here generates the timing configuration and is hence the definitive source. The situation is quite volatile, new events and telegram

The Elettra Storage Ring and Top-Up Operation

LEP Status and Performance in 2000

LESSONS LEARNT FROM BEAM COMMISSIONING AND EARLY BEAM OPERATION OF THE BEAM LOSS MONITORS (INCLUDING OUTLOOK TO 5 TEV)

Photoinjector Laser Operation and Cathode Performance

arxiv: v1 [physics.acc-ph] 9 Aug 2016

LHC TRANSVERSE DAMPER OBSERVATIONS VERSUS EXPECTATIONS

CLIC Feasibility Demonstration at CTF3

LCLS RF Reference and Control R. Akre Last Update Sector 0 RF and Timing Systems

SUMMARY OF SESSION 4 - UPGRADE SCENARIO 2

Challenges in Accelerator Beam Instrumentation

Full IEFC workshop Feb.

What can be learned from HERA Experience for ILC Availability

Study of the performances of the ALICE muon spectrometer

FIRST SIMULTANEOUS TOP-UP OPERATION OF THREE DIFFERENT RINGS IN KEK INJECTOR LINAC

Beam Diagnostics for the BNL Energy Recovery Linac Test Facility

ABORT DIAGNOSTICS AND ANALYSIS DURING KEKB OPERATION

Hall-B Beamline Commissioning Plan for CLAS12

Linac3 experience for LHC ion runs

Precise Digital Integration of Fast Analogue Signals using a 12-bit Oscilloscope

North Damping Ring RF

Screen investigations for low energetic electron beams at PITZ

EPJ Web of Conferences 95,

P. Emma, et al. LCLS Operations Lectures

Experience with the Cornell ERL Injector SRF Cryomodule during High Beam Current Operation

THE NEXT LINEAR COLLIDER TEST ACCELERATOR: STATUS AND RESULTS * Abstract

A Facility for Accelerator Physics and Test Beam Experiments

CONSTRUCTION AND COMMISSIONING OF BEPCII

Feedback Control of SPS E-Cloud/TMCI Instabilities

STATUS AND FUTURE PROSPECTS OF CLIC

BEAM DIAGNOSTICS IN THE CNAO INJECTION LINES COMMISSIONING

Phase (deg) Phase (deg) Positive feedback, 317 ma. Negative feedback, 330 ma. jan2898/1638: beam pseudospectrum around 770*frev.

Accelerator Instrumentation RD. Monday, July 14, 2003 Marc Ross

Suggested ILC Beam Parameter Range Rev. 2/28/05 Tor Raubenheimer

PoS(EPS-HEP2015)525. The RF system for FCC-ee. A. Butterworth CERN 1211 Geneva 23, Switzerland

A Fast Magnet Current Change Monitor for Machine Protection in HERA and the LHC

Troubleshooting EMI in Embedded Designs White Paper

PEP-II longitudinal feedback and the low groupdelay. Dmitry Teytelman

4.4 Injector Linear Accelerator

RF2TTC and QPLL behavior during interruption or switch of the RF-BC source

Injectors. Injectors ready

SUMMARY OF THE ILC R&D AND DESIGN

Andrei Seryi, Toshiaki Tauchi. December 15-18, 2008

HIGH-INTENSITY PROTON BEAMS AT CERN AND THE SPL STUDY

Procedures for the Commissioning of the Beam Interlock System for the CNGS and SPS-LHC Transfer Lines

Present Status and Future Upgrade of KEKB Injector Linac

Transcription:

beam dump from P2 losses this morning Some observations on the beam dump from P2 losses this morning 29.10.10 at 01:26:39: - single bunch intensity (average) was ~1.3e11 - significantly higher than previous fills - as a result vacuum in MKI from beam related effects was higher than previously, but stable - no sign of a vacuum spike in any of the B1 MKI at the moment of the beam loss; we are very sensitive to vacuum changes and did not see anything. - beam losses started in MKI - factor 100 smaller signal in upstream Q5, which is probably cross-talk to BLMs - loss evolution as function of turn number in MKI (and TCTH downstream which catches a lot of the scattered beam) is perfect Gaussian which would have peaked after about 13-14 turns at 2.6 Gy/s (or 14 Gy/s on the TCTH). - sigma of loss profile is about 3.4 turns, and beam size at MKI.D is 0.14 mm vertically, 0.33 mm horizontally (assuming 2.5 um in both planes). - velocity of alleged UFO would therefore be between 0.15e-3/(3.4*89e-6) m/s and 0.33e-3/(3.4*89e-6) m/s, i.e. 0.46-1.08 m/s. Brennan Goddard

Brennan Goddard 2

EOF onwards Alice length scale measurement only partially successful 10:35 ADJUST quick test of parallel optimization successful 11:00 beams dump 12:40 onwards Damper guys working on 50 ns setup leading into injection studies Some issues with extracting from SPS with LHC4 (50 ns. cycle) during the afternoon Stephen page in full debug mode

4 Parallel IR Optimization Panel Input Parameters: IP selection + usual inputs Scan Results: No new Optimum found was showing knob value Changed to fit results.

5 Test with Beam BRAN data: IP1 X IP1 X+Y IP1+5 X+Y IP5 BRAN IP1 BRAN No initial separation, scan around peak luminosity to test routine. Back to optimum in all cases. Power Converters data: Scan X / Y in serie. Automatic re-centering. Different IPs are driven simulaneoulsy.

Transverse damper progress we have already found and optimized the loop parameters (phase advance between the pickup and the kicker, gain etc.) earlier this year. Switching to a shorter bunch spacing needed to shorten the pulse stretching time constant (was 150ns, now 50ns) and re-adjust the one turn (kick) delay. So far (150ns operation) we were using only the "coarse" delay with a delay granularity of 25ns what was sufficient for the 150ns operation. However now, when the bunch spacing is more dense we needed to commision also the fine delay adjustment with a granularity of 100ps. The total one-turn delay needs to be fine adjusted within a nanosecond in order to avoid "crosstalk" between the bunches. The delay was pre-adjusted looking at the HOM (higher order mode) port of the ADT kicker plates where we can see the bunch induced signal and a derivative of the kick signal (see attached pictures). The settings should be later refined by a precise measurement of the loop/beam transfer function with multiple bunches circulating. All 8 units for both planes and both beams were set-up and tested with single, nominal bunch. The performance still needs to be checked with a full 50ns train. 6

7

50 ns injection studies First try of injection with 50 ns bunch separation - Injected 12 bunches per shot for the two beams (96 bunches injected) - Tried to steer trajectory in TL to improve losses at the TCDI and reduce injection oscillations ==> losses stay high (20-30 ugy), inection oscillations do not look bad (new trajectory saved in the catalog) - High cross talks at MQ8 for Beam 1, debunched beam losses for Beam 2 - Need to recheck centering of TCDI - Vacuum activity monitored during all injections: no activity recorded for B1, a big spike, slowly decaying, observed during first injection of B2. 8

21:15 Injecting for TOTEM run very small emittances (1.2 1.5) 00:04 Vertical primary to 4.5 sigma 01:15 after some discussion Final settings in unit sigma for the vertical pots: XRPV.A6R5.B1 7.66 XRPV.B6R5.B1 6.53 XRPV.B6L5.B2 6.46 XRPV.A6L5.B2 6.50 05:18 Roman pots out TCP back to normal, stable beams 9

Night shift continued 07:00 Alice length scale calibration successfully completed Start longitudinal scan 08:00 Abort gap cleaning study starting... 10

Today - provisional planning Finish abort gap cleaning studies at 3.5 TeV Dump, cycle, re-inject Damper studies phase 2 Injection studies continued with RF in closed attendance 100b 50 ns ramp/squeeze/collide/stable beams End-of-fill studies TFB off (gently), BBQ, separate in LHCb 11

Next few days 12

Today was 13 running 3-4 hours late

50 ns Start injection with 12 bunches (all fills will have the first injection with 12 bunches). The first physics fill will be done with 1 12 bunches and 4 24 bunches (from 2 PH injections), in total 108 bunches. This gives not yet the full beam-beam effect. Further fills will be done with 200 bunches, 300 bunches and 400 bunches if there is sufficient time. To be re-discussed if priority should be given to MD studies. The fill with 200 bunches will be done with batches of 24 bunches, from 2 booster rings. 14

ABT 15 test of injection gap cleaning - 4h at 450 GeV, high priority (potential limit for 2011 operation). This we are ready to do 'any day, any time' at relatively short notice. ü abort gap cleaning at 3.5 TeV - 1 ramp with low intensity beam, high priority - we assume this can be fitted into the final MD period.

RF 1. RF noise induced beam diffusion with nominal LHC beam: Beam conditions: End of fill study. Method: We reduce phase noise gain and let "natural" noise blow-up the bunches. We measure lengthening and noise PSD. Time needed: 1-2 hours at end of a physics fill. Preferably wk 43 2. RF noise induced beam diffusion with pilot LHC beam: continuation of measurements done last week (see below) Beam conditions: 4 bunches fat pilots ramped to 3.5 TeV (no blow-up, no squeeze) Time needed:a 4 hours block Preferably during wk 44 3. Ramping the klystron High Voltage on flat bottom, with beam: Beam conditions: ~100 bunches nominal at 450 GeV Goal: vary the HV with circulating beam and confirm no effect on beam. Motivation: Prepare for High Intensity 2011 operation Time needed: 1-2 hours, preferably second half wk 43 ü Philippe Baudrenghien 16

OP etc. 17 Orbit shift versus TCT check: collide 1 bunch and check the TCT center change as compared to predicted orbit change. Quench tests 450 GeV with injected beam 3.5 TeV with wire scanners Aperture in IRs at 450 GeV

BI studies list to be updated Check the linearity of the fast BCT s in the new configuration for nominal bunches Tune the High BW/Low Gain fast BCT calibration for the coming ion run Measure the High BW/Low Gain fast BCT sensitivity limit and linearity for low intensity bunches (ion run) Re-check BPM sensitivity limit Calibrate the abort gap over the whole ramp Check the abort gap acquisition gate timing resolution and stability Commission BGI in preparation to ions Check BSRT/BGI/BWS cross-calibration including corresponding emittance logging Test and compare bunch/bunch profile measurement via BWS and/or BSRT PLL studies during ramp continued For all this, we would need the 2 rings for a few hours at 450 GeV then a ramp and again a few hours at 3.5 TeV. This would be really difficult to fit in a 4 hour slot. 8 would be perfect but we could try with 6. LHC status 08/10/2010

TFB 1) multi-bunch acquisition of the damper pick-ups signals, update: Verena released her software, but some changes need to be still done for the drivers and the fesa class, see schedule below. We would like a slot on Wednesday (at the earliest) to reboot crates 2) gain in ramp: I have discussed with Delphine the specs to be seen if after she has implemented and tested the new scheme an LSA release should be done 3) abort gap cleaning @450 GeV: should be used from re-start onwards. Needs to be disabled for clean tune measurement. A beam based measurement is probably the best approach to identifying why we pollute the tune measurement; we have some ideas, could be done during the weekend during some of the test ramps. 4) injection cleaning: we suggest a manual test first, after that, implementation in sequencer Wolfgang Hofle 19

TFB 5) abort gap cleaning in ramp: following discussion with Elena, convinced we would NOT need this; time scales can be found in Elena's papers (EPAC 2004 for example), start of ramp: beam lost after ~ 20 s, at full ramp rate used now lost after < 2 s; for more accurate numbers one would need to take into account the actual voltage, ramp rates, start-of ramp function and function for the momentum collimation. 6) abort gap cleaning at 3.5 TeV, probably advised for higher intensity as there is little energy loss at 3.5 TeV (7 TeV -> synch. radiation!), in particular during a long fill we may accumulate beam in abort gap. We should allocate some time to study this and make the cleaning operational at 3.5 TeV. 7) some time needed for the 50 ns set-up (2x4 hours) Wolfgang Hofle 20

Experiments 40-50 pb -1 - done Alice fill without dipole Totem dedicated fill - done Totem 90m Longitudinal scan - done 21