LineLight Crosswalk Installation Manual: Solar Panel & Motion Radar

Similar documents
Single sensor setup with NIVEL210

SECTION 5900 TRAFFIC SIGNALS CITY OF LEE S SUMMIT, MISSOURI DESIGN CRITERIA

SUBCARRIER TRANSFER FILTER INSTRUCTION BOOK IB622702

What is SnoCam? SnoCam Installation Guide. SolarVu

JAMAR TRAX RD Detector Package Power Requirements Installation Setting Up The Unit

DLMP-45/45R Installation Instructions

I N S T R U C T I O N D A T A

Bionic Elephant Trunk. Assembly Instructions

General Wiring and Installation Guidelines. Typical Mounting Installations Electrical Connections General Guidelines Common Questions & Answers

Azatrax Model Railroad Track Signal Control - Single Track

Digital Economy Seven Programmer

SEEP SIGNAL INDICATOR

FOSC-450 Product Range Ordering Guide

Sentronic PLUS Electronic Pressure Regulator. Installation Manual

Sentronic PLUS. Electronic Pressure Regulator. Installation Manual

GWL/ Power Group Technology Solutions Stay Powered for the Future

Projector Lift. User Guide INSTALLATION OPERATION SETUP PROGRAM IR REMOTE FACTORY RESET

Luminaire installation box Surface-mounted box Ceiling installation box

Cyclo Series. user manual. MartinArchitectural

Installation. SAPTF33xx-1xx in the Network. Standard Configuration

NICHARGE UNIFIX 20. Le support universel (sol, mur, mât, ) 16/04/2018 CO00117

OCC Installation Round Messenger Guidelines Excerpt from Optical Cable Corporation s INSTALLATION GUIDE

Timer Modules. EL11 24 Hour Module EL17 7 Day Module. Installation & Operating Instructions

A.D. Engineering International Pty Ltd - Product Range

Camera Setup Instructions

Control cabinet interface and cable entry systems

Owners SW-LCD 2.0 Manual & Specifications

FOSC 450 C6 and D6 Closures

LD OEM/LD PDS/LD PeCo

Data Acquisition Networks. Installing and Configuring the DM01 Hardware

Optical Signal Devices. Free-standing Beacons

ALM-6813/6812 INSTALLATION AND PROGRAMMING MANUAL

1. General Information:

Power Injector 1520 Series

Assembling and Mounting the Presentation Display, Speakers, Speaker Screens, and Table Door

Entry Level Wind System. English Français Deutsch Nederlands Espagñol Italiano

Horn loudspeaker, Ex proof, short/long flare

SDI-MP1010-GM-60P-M-RA 3G/HD-SDI Output Video Transceiver. SDI-MP1010-GM-60P-M-RA Features. Block Diagram SDI-MP1010-GM-60P-M-RA.

OCC Installation Figure 8 Guidelines Excerpt from Optical Cable Corporation s INSTALLATION GUIDE

Kramer Electronics, Ltd. USER MANUAL. Model: VS x 1 Sequential Video Audio Switcher

S020 fluorescent tube luminary

K Service Source. Apple High-Res Monochrome Monitor

KING-METER USER GUIDE SW-LCD

2178 Fiber Optic Splice Case and 2181 Cable Addition Kit

AUDIO ROOF KIT P/N , , APPLICATION BEFORE YOU BEGIN KIT CONTENTS. Instr Rev Page 1 of 6

DREAMOC DIAMOND 4K - ASSEMBLY GUIDE VERSION ORIGINAL ASSEMBLY GUIDE

1-800-LOGGERS 2

Los Angeles Model Railroad Society. Assembling Fascia Plates

LEVEL CROSSING MODULE FOR LED SIGNALS LCS2

MONO AMPLIFIER KIT ESSENTIAL INFORMATION. Version 2.2 CREATE YOUR OWN SPEAKER DOCK WITH THIS

Snail Fence InteleCell Deployment Guide

OWNER'S MANUAL KIT INCLUDES. 3M VHB Mounting Pad Mounting Hardware PART # 40040

Splice Closure Fiber (SCF) Family

USER S MANUAL (1/2) (Functions and connections)

4830A Accelerometer simulator Instruction manual. IM4830A, Revision E1

Guide for installers. METTLER TOLEDO MultiRange Explosion proof weighing system with IND226x weighing terminal.

Building the BX24-AHT

TL8651 3G/HD-SDI Output Video Transceiver. TL8651 Features. Block Diagram TL8651 3G/HD-SDI. 1080p p50

PERIFON-M fence detection system Planning instructions

Cable Retainers UTILITY PRODUCTS. Cable Retainer Assy, For 4 Foundation Anchor, Galvanized Steel SP-6224-GLV

Extender w/ RS-232 and 2-way IR

Instruction Manual. Universal Flow Controller Model 261 / 261-EC-01

Sonesse. For Interior Window Coverings

WINEGARD INSTALLATION MANUAL. Model GM Carryout Ladder Mount for mounting pipes with outer diameters between 1 to 1-1/8

K Service Source. Apple High-Res Monochrome Monitor

Part names (continued) Remote control

nroads Fleet Full Size Lightbar Mid-Size Lightbar Mini Lightbar Beacons Accessories

TeamWork Installation Guide

DLMP Installation Instructions

HDMI Cross Converter

Building + Mounting Learn Rooftop Basics

Audio. 4K Ultra HD Extender. w/ RS-232 and 2-way IR GTB-UHD2IRS-ELRPOL-BLK. User Manual. Release A2

AP-40. AP-40 Series Features Industry s smallest-sensor head Ultra lightweight High-speed response Two-color LED digital pressure display

COLOUR CHANGING USB LAMP KIT

SBL /SBLG Series Wireless Clock

420 LED/Buzzer Combination

STSW1001T STSW1001R STSW1001 INSTALLATION / USER'S MANUAL

ENCODER. Incremental Angle Transducer. Series A36, A58. Key-Features:

User Manual V2.6. Omniksol WIFIKIT User Manual. Omnik New Energy Co., Ltd.

HCS - HES Cabling Systems

FIST-GCOG2-Dx6. Follow all local safety regulations related to optical fiber plant elements.

Instromet Weather Systems Ltd

Troubleshooting. 1. Symptom: Status indicator (Red LED) on SSR is constant on. 2. Symptom: Output indicator (Yellow LED) on SSR is flashing.

User Manual. for. Panel mounted instrument

(Cat. No IJ, -IK)

Installation Note. Agilent 89441A Option AYC Installation Kit

Optical Distribution Box 300 Installation Guide. Version : R0.0

Gazer VI700A-SYNC2 and VI700W- SYNC2 INSTALLATION MANUAL

Site Installation Model MP-8433

Manual. Simrad IS80 Heading Repeater HR80. English

Assembly Instructions Clearlight Infrared Sauna: CE-C

DATE QTY MODEL NO. LED COLOR LED QTY. POWER BEAM ANGLE SIZE WEIGHT LWW/LFL-W150A-36P LWW/LFL-W150A-72P LWW/LFL-W150A-144P

4-DIGIT & 6-DIGIT "U" SERIES TIME CODE READERS OPERATION AND MAINTENANCE MANUAL

Ocean Sensor Systems, Inc. Wave Staff III, OSSI With 0-5V & RS232 Output and A Self Grounding Coaxial Staff

MAGNETIC CARD READER DESIGN KIT TECHNICAL SPECIFICATION

Peak Atlas IT. RJ45 Network Cable Analyser Model UTP05. Designed and manufactured with pride in the UK. User Guide

TeamWork Kits Installation Guide

Kramer Electronics, Ltd. USER MANUAL VM-20HD. Dual 1:10 HD/SD SDI Distribution Amplifier

KEL 183 Cable entry frames

Video Server SED-2100R/S. Quick Installation Guide

Transcription:

LineLight Crosswalk Installation Manual: Solar Panel & Motion Radar (Crosswalk Application Example) The purpose of this document is to give step by step instructions to install a crosswalk with motion radar and road studs powered by solar energy. Major Components Parts List LineLight R1/2 road studs* Motion Radar Solar Kit: including: Battery solar panel solar panel pole (2 3/8 inches diameter x 13 feet in height) charge regulator battery housing box Please follow the below step-by-step installation instructions. If any questions arise during installation, please contact technical support at 888.333.SOLAR or contact@solarpathusa.com *For the instructions on the installation of the LineLight R1-R2 road studs, please see the LineLight R1/2 installation manual 1 / 12

Step 1 Centered 5 Feet Step 1 Install the pole approximately 5 feet from the curb and centered at the middle of the crosswalk. 2 / 12

Step 2 A Tube Step 2 (A) Take the solar panel with the structure and place it on the top of the pole. The pole must be inside of the small tube that is in the back of the structure. 3 / 12

Step 2 B Inclination Screws Orientation Screw Step 2 (B) When you have the pole inside of the tube, you next need to adjust the solar panel to the South with a 45º degrees inclination (more or less). Last, secure the panel in place with the 3 screws that are shown in the picture. 4 / 12

Clamps Step 3 Having attached the solar panel to the pole, you next need to attach the housing box to the pole as seen in the picture. Take the clamps out of the back of the box and fasten the box to the pole. For security purposes, make sure the box is at the maximum height on the pole. 5 / 12

Step 4 Controller Charge Regulator Battery Step 4 Place the battery inside of the box using caution due to its weight. It should look like the above picture. In the box you will have one charge regulator, one controller, the battery and several cables. Next, you must connect the 2 wires of the charge regulator to the battery. Connect the red wire to the positive terminal (+) and the black wire to the negative terminal (-). Now you should see 2 Green or yellow LEDs illuminate. 6 / 12

Step 5 A Glands Radar Step 5 A At the bottom of the box you have 4 glands to pass through the solar panel cable, the radar cable and the road studs cable. If you open the radar box you will find four holes to attach the radar with the 4 screws that were sent. Attachment Holes 7 / 12

Step 5 B Step 5 B For the radar cable, you need to first attach the radar to the pole, orienting the sensor to the crosswalk as seen in the picture. 8 / 12

Step 6 Connect the Solar Panel Cable Here Step 6 When you have all the cables inside the box, you need to start the connecting the cable. First, connect the solar panel cable to the charge regulator. Next, connect the brown wire of the solar panel into the positive terminal (+) of the charge regulator. Then, connect the blue wire of the solar panel into the negative terminal (-). 9 / 12

Step 7 Connect the R1 or R2 Units cable to these wires Step 7 Now you can connect the road studs cable into the output controller cable for the R1 or R2. Connect the blue wire of one cable with the other and the same for the brown wire 10 / 12

Step 8 Radar PC Configuration Cable Radar & RS232 Cable Step 8 Lastly, you need to connect the Radar cable to the RS232 communication cable that you can see in the above picture. The radar cable has 7 wires numbered from 1 to 6 and one green/yellow wire. Connect these wires to the cable that goes to controller and to the RS232 communication cable. When connecting the two cables, make sure to match them number with number and color with color. At this point, the radar PC configuration cable is only necessary to configure some internal parameters of the radar and is not essential for operation. 11 / 12

Step 9 Step 9 Finally, be sure to double check the radar system for proper orientation. The R1/R2 units should begin to flash anytime the radar detects a pedestrian on the crosswalk,. Congratulations! Your system is now fully functional and ready to operate. 12 / 12