Supply Connection Plans of the PANDA Cluster- Jet Target, Beam Dump and its Interface with other Modules

Similar documents
HPS Slow Controls Overview

Cryostat Instrumentation Cabling Grounding and Shielding. Eric Hazen Boston University 12/15/08 1

A SQUID-BASED BEAM CURRENT MONITOR FOR FAIR / CRYRING

The FAIR plinac RF Systems

Setting up your Roland V-Drums with Melodics.

A New 4MW LHCD System for EAST

Operation of CEBAF photoguns at average beam current > 1 ma

An Overview of Beam Diagnostic and Control Systems for AREAL Linac

P. Emma, et al. LCLS Operations Lectures

Drift Tubes as Muon Detectors for ILC

A new Scintillating Fibre Tracker for LHCb experiment

Muon Forward Tracker. MFT Collaboration

HICUBE. The modular pumping stations for all applications in high and ultra-high vacuum

Screen investigations for low energetic electron beams at PITZ

HIGH VACUUM PUMPS. Hybrid Turbomolecular Pumps. ATH series. Adixen by Alcatel Vacuum Technology

TORCH a large-area detector for high resolution time-of-flight

Focus of efforts. ILC 2010, Mar/27/10 A. Seryi, BDS: 2

A fast and precise COME & KISS* QDC and TDC for diamond detectors and further applications

Vertical Electropolishing at Marui & KEK

GENCOA Key Company Facts. GENCOA is a private limited company (Ltd) Founded 1995 by Dr Dermot Monaghan. Located in Liverpool, UK

HD Review March 30, 2011 Franz Klein

40-Meter Subsystems: As LIGO-Like as Possible

Commissioning the TAMUTRAP RFQ cooler/buncher. E. Bennett, R. Burch, B. Fenker, M. Mehlman, D. Melconian, and P.D. Shidling

Lensed Fibers & Tapered Ends Description:

CHA EVAPORATOR. User guidelines. p.1. by Carlos Manzanedo. Last revised: 10/05/2000

Hall-B Beamline Commissioning Plan for CLAS12

Status of the FAIR Project. Jürgen Henschel FAIR Project Leader / Technical Director GSI & FAIR

Status and Plans for PEP-II

li, o p a f th ed lv o v ti, N sca reb g s In tio, F, Z stitu e tests o e O v o d a eters sin u i P r th e d est sezio tefa ectro lity stem l su

SPECIFICATION NO Model 207 Automatic GTAW Welding System

Performance of a double-metal n-on-n and a Czochralski silicon strip detector read out at LHC speeds

Peerless Forming Die Test Press Hydraulic Motion Control System

CREATE. CONTROL. CONNECT.

3 cerl. 3-1 cerl Overview. 3-2 High-brightness DC Photocathode Gun and Gun Test Beamline

A new Interlock Design for the TESLA RF System

CMS Note Mailing address: CMS CERN, CH-1211 GENEVA 23, Switzerland

HiPace 300 with TC 110 and power supply OPS 100, DN 100 ISO-F

Digital audio is superior to its analog audio counterpart in a number of ways:

CONTROL VISIO 0033 (0) ASSISTANCE ACCESSORIES SUPERVISION WALL UNIT INTEGRATION. Direct line

EPJ Web of Conferences 95,

WAVES Cobalt Saphira. User Guide

SuperFRS GEM-TPC Development Status Report

CLEX (CLIC Experimental Area)

Status of SOLARIS. Paweł Borowiec On behalf of Solaris Team

Present Status and Future Upgrade of KEKB Injector Linac

Digital Video Engineering Professional Certification Competencies

with Low Cost and Low Material Budget

FTS84/85 Feature Application Field. Temperature & Humidity / Flow Measuring Specialist. Monitor gas and flow for industrial process

Experience with the Cornell ERL Injector SRF Cryomodule during High Beam Current Operation

PEP-II longitudinal feedback and the low groupdelay. Dmitry Teytelman

Oak Ridge Spallation Neutron Source Proton Power Upgrade Project and Second Target Station Project

Grounding-type plugs and sockets K Product information

INSTALATION AND OPERATION MANUAL ABYSSAL OS Overlay Module Version 1.0.1

PROPORTIONAL VALVES Sentronic plus

The basic parameters of the pre-injector are listed in the Table below. 100 MeV

Scintillation Tile Hodoscope for the PANDA Barrel Time-Of-Flight Detector

INSTALATION AND OPERATION MANUAL ABYSSAL OS Overlay Module Version 1.3

Dick Loveless. 20 November 2008 SLHC Workshop. Dick Loveless SLHC Workshop 20 Nov

Size B INDUSTRIAL STANDARD

Westrex RA1713B Auxiliary Record Electronics

Upgrading LHC Luminosity

Prototyping and construction

SRS and ERLP developments. Andrew moss

Click Here To Start Demo

Linac 4 Instrumentation K.Hanke CERN

HIGH CURRENT IMPLANTER 200KeV - SERIES 1090 TECHNICAL DESCRIPTION

PEP-II Disassembly Technical Systems

PITZ Introduction to the Video System

DAQ Systems in Hall A

A flexible FPGA based QDC and TDC for the HADES and the CBM calorimeters TWEPP 2016, Karlsruhe HADES CBM

Requirements for the Beam Abort Magnet and Dump

Preliminary Conclusions from Recent Q weak Target Density Fluctuation Studies Mark Pitt, Virginia Tech

IQOTXS Dual-Channel Single-Mode Fibre Optic Transmitter for SDI

BUS UNITRONIC BUS CAN

ANKA RF System - Upgrade Strategies

Detailed Design Report

MICROFOCUS X-RAY SOURCE PROJECT*

Full IEFC workshop Feb.

KEL 24 Cable entry frames

VGA AUDIO SWITCHER S MANUAL

CGEM-IT project update

Status of BESSY II and berlinpro. Wolfgang Anders. Helmholtz-Zentrum Berlin for Materials and Energy (HZB) 20th ESLS-RF Meeting

TWO BUNCHES WITH NS-SEPARATION WITH LCLS*

Beamline improvement during g2p experiment. Pengjia Zhu

SciFi A Large Scintillating Fibre Tracker for LHCb

ADVANCED OPTICAL FIBER SOLUTIONS

Installation & Operation Manual. BEC PM1 Controller Time/Flow/Volume Controller. Water Control Solutions

University of Minnesota Minnesota Nano Center Standard Operating Procedure

Hitachi Kokusai Electric Comark LLC

PUBLICATION. Measurement setup at light source operational: Milestone M4.3

Compact Muon Solenoid Detector (CMS) & The Token Bit Manager (TBM) Alex Armstrong & Wyatt Behn Mentor: Dr. Andrew Ivanov

6MSD Weekly Scheduling Meeting. 1:30, MCC Conference Room

Status Radial Services and cable tray. 1) Holes, Flexrails, WireMesh Ctray.

FTS84/85 Feature Application Field. Temperature & Humidity / Flow Measuring Specialist. Monitor gas and flow for industrial process

4.4 Injector Linear Accelerator

Review of Diamond SR RF Operation and Upgrades

LLRF at SSRF. Yubin Zhao

SLAC ILC Accelerator R&D Program

Keyed LC Connector Solution A LANscape Solutions Product

InkZoneLoop & InkZonePerfect. Pre Installation Check List

Transcription:

Supply Connection Plans of the PANDA Cluster- Jet Target, Beam Dump and its Interface with other Modules MEC session 14.12.2017 GSI Darmstadt Benjamin Hetz WWU Münster Institut für Kernphysik WWU Münster

Content of this talk Two main topics: PANDA target supply connections and later on spectrometer platform wiring Beam dump backing pump pipe ideas Target status information interface Benjamin Hetz WWU Münster 2017/12/14 2

Status of the PANDA Target @ WWU Münster Setup in very close to PANDA geometry with final Beam Dump Daily Cluster-Jet production and optimizations studies running Current activities: Investigation/optimization of vacuum conditions at interaction point distance Beam dump backflow rates Target density optimization using PANDA Prototype target Last electronic/software improvements for COSY in summer 2018 Benjamin Hetz WWU Münster 2017/12/14 3

Sketch of the needed electrical, gas supply, coolant, etc. of the PANDA cluster-jet target. 4

Components placed upon the target spectrometer platform Benjamin Hetz WWU Münster 2017/12/14 5

Antiproton Beamline 6

Components placed upon the beam dump platform 7

Our idea is to have two separate located distribution patch panels (provided by FAIR) offering us power, gas, coolant etc. with the desired connectors at each platform. 8

From the distribution patch panels the connection is made to the target devices, e.g. the CEE power connectors. 9

Target modules connected internally (cables and pipes bundled in cable ducts). 10

PANDA Hydrogen Gas/Purifier System can be located anywhere but somewhere near the solenoid. More details will come from the responsible Vienna group about sizes connections etc. Benjamin Hetz WWU Münster 2017/12/14 11

Location of the Cluster-Jet Target Rack We bring our own rack for the cluster-jet source Already completely filled and set into operation at Münster Concrete location and size already shown in the latest PANDA step files Connections, power lines, etc. shown in the previous slides Benjamin Hetz WWU Münster 2017/12/14 12

Location of the Beam Dump Rack The rack 42U-T1009 on platform TW East can be claimed (talked with Jost Luehning) So we d like to claim the whole rack for the beam dump electronics About 1/2 is filled with the turbopump supply units The other half can be used for the final BD slow control system by the Warsaw group No concrete plans how much space is needed, yet Benjamin Hetz WWU Münster 2017/12/14 13

Cable Duct Ø 40 mm 19" Rack CJ- Source MEC session @ GSI A (very) rough sketch of the target/pumping station location View onto the target spectrometer platform Cable Duct Ø 160 mm Compressor Cluster-Jet Source Frame Cable Duct Ø 51 mm Pumping Station Indicated is the routing of our cable ducts for internal target communication only, these wires do not need communication with something else but our slow control system More or less to treat as one big cable External communication given by WAN connection point from the 19 rack (see prev. slides) Benjamin Hetz WWU Münster 2017/12/14 14

Backing Pumping Pipe Ø 70 mm MEC session @ GSI A (very) rough sketch of the needed beam dump backing pump line Pumping Station Beam dump located beneath the detector Beam dump needs a backing pumping pipe to the pumping station at the target spectrometer platform Additionally a backup backing pump near the beam dump would be worthwhile No concrete plans do exist about pumping line routing, yet Beam Dump Benjamin Hetz WWU Münster 2017/12/14 15

Information for and from the other detector modules Which concrete target parameter are wished to be directly accessible by others? (cf. Excel Tables of PANDA controls requirements) Pressures? Valve states? etc How to supply this information? Hard wired? EPICS? We need: Information about target cross shutters (FZ Jülich), best hard wired Luminosity Monitor information E.g. some feedback loop for instant thickness adjustments Benjamin Hetz WWU Münster 2017/12/14 16

Summary Target supply connection and wiring wishes shown Concretization of backing pump system for beam dump needed Separate backing pump/long backing pipe/both? Which target status information should be shared in which manner? DSS/Interlock, etc. wishes? Benjamin Hetz WWU Münster 2017/12/14 17