For Review Only No Copying No Saving No Lending No Posting Online

Similar documents
SIGNALPERSON REFERENCE MANUAL

Signal Person Requirements in OSHA s New Crane Rule

INSTRUCTOR Signal Person Package

Fixed Signals - Rules 1 to 23

Connect with us:

Category 2 Crane Safety Refresher Instructor Guide Revisions

Manipulator-type industrial radio remote controls. UM serie. électronique. Description 1. Typical applications : CONTENTS

Preface 11 Key Concept 1: Know your machine from a programmer s viewpoint 17

Common Human Gestures

Category 3 Non-Cab Operated Crane Safety Rev-04 Instructor Guide Revisions

How to Videoconference (without being a technical geek)

VOH681/VOH681P. ion Manual

The Grey Nomad s Guide to Satellite Dish Setup Procedures.

THE EXECUTIVE INTERVIEW (EXIT 25)

Category 4 Crane Safety Instructor Guide Changes

Humorous Speech Contest Toastmaster Script [Club Name] or [Area ] or [ Division _ ] Fall Humorous Speech Contest [Day, Month, DD, YYYY]

This script serves as a guideline for the Contest Toastmaster. Please feel free to add your oomph to it.

Category 2 and Cab-Operated Category 3 Crane Safety Rev03 Instructor Guide Revisions

USER MANUAL. DE-1 Police-light. CAUTION! Keep this device away from rain and moisture! Unplug mains lead before opening the housing!

TV44. Owner s Manual. Amplified/Outdoor Satellite Dish Clip-on Antenna

Clarinet Assembling the Instrument

Instruction Manual. 2.4G Digital Wireless Four Channel Transmitter System RVS-554W. Reverse With Confidence 1

What's New in LMS Smart Scope 3?

SIGNALING PRACTICES ON PROTOTYPE AND MODEL RAILROADS

Warning and Safety Information. FCC Information

4125 system setup and deployment quick start guide

Safety Information. Camera System. If you back up while looking only at the monitor, you may cause damage or injury. Always back up slowly.

NETWORK COMPASS USER MANUAL CONTENTS

Publication No. W E. Load Moment Indicator AML-L E. Model PRINTED IN JAPAN 0606 E

Considerations for Specifying, Installing and Interfacing Rotary Incremental Optical Encoders

Piano Safari Repertoire Book 2

STEM Lab August 2017

PC-250. SMD Taped Parts Counter Operator s Manual. ISO 9001:2008 Certified. V-TEK, Incorporated 751 Summit Avenue Mankato, MN USA

SMART Height Adjustable Wall Mount (HAWM-UX/UF) Integration and Cabling Guide. For SMART Board 600 and 800 interactive whiteboard projector systems

Humorous Speech Contest Toastmaster Script for Combined Area Contests [Area and Area ] Fall Humorous Speech Contest [Day, Month, DD, YYYY]

Directions. Lesson One:

VIDEO JUDGE SYSTEM SETUP & CAPTURE

Kourou Media Guide. All accreditation requests from journalists, photographers or other media technicians must be made in the following manner:

120cm (4x36 Watt) incl. Splitter Instruction Manual

RADIO RECEIVER RGBW CONTROLLING LED STRIP COMMON ANODE

AUTO-LIT. vs advertisers. Catalogue of OLUMINESCENT COMMERCIAL PURPOSE.

APPLICATION NOTE. Practical Tips for Using Metalic Time Domain Reflectometers (The EZ Way) What is a Time Domain Reflectometer?

HC4900 Load Moment Indicator. User Manual. Edition 6 / Aug, 2014 For Zoomlion RT Crane With 5-section boom

Inspire Station. Programming Guide. Software Version 3.0. Rev A

Aerial Cable Installation Best Practices

Scales. The provided fingerings are suggestions, but you may choose to use alternate fingerings.

Transportation Engineering - II Dr. Rajat Rastogi Department of Civil Engineering Indian Institute of Technology - Roorkee

Phone (440) Fax Wireless Rear Observation System With Night Vision Camera

Table of Contents. Sticks Song: ABC's Jingle Bell Sticks Song: Jingle Bells. Holiday Songs

Introduction to Conducting Ready, Begin

Voice Remote. Using Otto TM Technology. Quick Start Guide

Filmair Cinema Services

Cable ISOBUS Active Termination

In-Line or 75 Ohm In-Line

Not Fade Away. The Ultimate Buddy Holly Experience. TECHNICAL RIDER Video Projection is Recommended

Winmate Communication INC.

Instruction Manual. Wireless Transmitters (Digital) RVS-550W. Reverse With Confidence 1

3B SCIENTIFIC PHYSICS

Toshiba TLP-B2 Training Module Introduction

The Grey Nomad s Guide to Satellite Dish Setup Procedures.

BURNLEY GROUP OPERATING PROCEDURES

Major Scale Crash Course

AN INTRODUCTION TO PERCUSSION ENSEMBLE DRUM TALK

All Dielectric Self Supporting (ADSS) Fiber Optic Cable Installation

Musician Transformation Training FUNDAMENTALS FLUENCY

Revision 1.2d

Connecting the Elecraft Power Combo to the Kenwood TS-2000 series Transceiver

SPX-5600 Series. Operations Manual. Suprex Reader Extender - RF Wireless Interface SPX-5600MAN. Page 1 of 20

Quick Start Bruker Dimension Icon AFM

Product Guide Verizon Pennsylvania Inc. Section 35D Verizon Pennsylvania Inc. Original Sheet 1 RESIDENCE TWO-POINT MESSAGE TOLL SERVICE

Coimisiún na Scrúduithe Stáit State Examinations Commission. Leaving Certificate Examination, Answer these questions in the answerbook provided.

QC Electromagnetic Overhead Crane Specifications

MAXIMUM REACH ENTERPRISES 1853 Wellington Court Henderson, NV Ph: cox.net 20 December 2018

Be sure to check the camera is properly functioning, is properly positioned and securely mounted, every time you operate your vehicle.

INSTRUCTION MANUAL. Made in the U.S.A. by USA Dance Floor. Copyright 2017 USA Dance Floor, LLC

MULTI-STATE VIDEO CODING WITH SIDE INFORMATION. Sila Ekmekci Flierl, Thomas Sikora

Everybody has seen Telechron clocks and even. US Navy Warren Telechron Clock System. by Robert Simon (CA)

Up to 85% higher Service Life due to efficient sealing method.

Lab experience 1: Introduction to LabView

9216e. Installation and User Guide

Transportation Engineering -II Dr. Rajat Rastogi Department of Civil Engineering Indian Institute of Technology - Roorkee

3.22 Finalize exact specifications of 3D printed parts.

Field Instruction. Any registered training organisation UETTDRCJ21A Lay ESI electrical cables. Before commencing work:

Figure 1. MFP-3D software tray

TIMECLOCK ENROLLMENT GUIDE (5000 SERIES)

User Manual. SWIT ELECTRONICS CO., LTD Model: S-4904P Wireless HD Transmission System(with Panel Receiver) Ver:A

PIANO SAFARI PATTERN PIECES BOOK 2 Teacher Guide by Dr. Julie Knerr Table of Contents

The Smart Port Vision

Finding a key detection method with TRIZ

OSU MARCHING BAND PERCUSSION A GUIDE TO TECHNIQUE

IMPORTANT! Special Instructions for the TracVision M3DX Conversion System ( )

Order Form SwingRiser (HRG 220) Single Gate Operator

ALEX COOPER S CHRISTMAS CHEER. Written by Alex Cooper

D1.6 Audio Cassette Special Processing Guide

Index. Index. 1.0 Introduction...2 This Manual Operation Finger Lift Cable Lift Pneumatic Operation...

MODEL... MXL012/55NZ MXL012/65NZ SIMPLICITY AT IT S BEST SET UP & USER MANUAL REGISTERED COMMUNITY DESIGN NO

Lynx Broadband Installation Manual for Residential Packages with a 35 db Amp Quick Start Guide (first 3 pages)

VBS Imagination Station. Training Manual South Hills. June 25 June 29, 2018

Design and Manufacture of Video Pipeline Inspection Systems A Full Service Company

Kansas State University

Transcription:

The following copyrighted samples are provided as a service for your review only. Copying, saving, lending, posting online or any general use of these files other than for the purpose provided is unlawful and fiscal compensation will be sought after. For Review Only No Copying No Saving No Lending No Posting Online Respect Copyright Laws. Respect our company. - Safety Provisions, Inc. info@safetyprovision.com Rigging/Signal Person Training

Crane communication: Signaling is an important part of crane operation, but is often not treated with the respect it deserves. Signalers must be used whenever: Operator cannot see the load Operator cannot see the load s landing area Operator cannot see the path of travel of the load or of the crane Operator is far enough away from the load to make the judgment of distance difficult The crane is working within a boom s length of the approach limits to powerlines or electrical equipment. Where loads are picked up at one point and lowered at another, two signalers may be required one to direct the lift and one to direct the descent. Hand signals should be used only when the distance between the operator and the signaler is not great and conditions allow for clear visibility. Telephone or radio communications between operator and signaler can be extremely effective. 1

Who can give the hand signals? A person who is qualified to give crane signals to the operator. This person must be trained and evaluated through a written and practical test. *There should be only one designated signaler at a time. Never start an operation without everyone who is involved in the pick knowing who the designated signal giver is. If signalers are changing between each other, the one in charge should wear a clearly visible badge of authority. This could be a colored hard hat; highly visible gloves; or a unique vest *Question on written test: How many signal persons should be designated to give hand signals to the operator for normal lifts? a. One primary and one backup b. Only one d. All those who are handling the load can give hand signals. e. Doesn t matter. (Note: This question is sometimes marked wrong because it is sometimes necessary to have a second signaler during blind picks.) 2

What should you do when in charge of signaling? The signaler must: Be in clear view of the crane operator. Have a clear view of the load and the equipment. Keep persons outside the crane's operating area. Never direct a load over a person. 3

Hand signal chart: There should be a hand signal chart posted in the area of operation 4

Wire Down, Hoist Down, Lower Load: The wire down signal is made by pointing your index finger down and moving it in a wide circular motion. Remember, the crane operator needs to be able to distinguish between all of the different hand signals. Often you will see a signal person point his hand down and rub his fingers together like he a chef seasoning some hot dish in the skillet. If he has a glove on and the lighting is not optimal it would be very difficult to know that he wanted you to wire down.

Wire Down, Hoist Down, Lower Load Slowly: The wire down slowly signal is made by pointing your index finger down and moving it in a wide circular motion above the palm of your other hand. Again, the signal is clear and can be seen from a distance.

Wire up, Hoist up, Raise load: The wire up signal is made by pointing your index finger up and moving it in a wide circular motion.

Wire up, Hoist up, Raise load, Slowly: The wire up slowly signal is made by pointing your index finger up and moving it in a wide circular motion below the palm of your other hand.

Boom up: The boom up sign is given by extending your arm with the fingers in and the thumb pointing up.

Boom down: The boom down sign is given by extending your arm with the fingers in and the thumb pointing down.

Boom up, wire down (float load in): This is a useful signal that tells the operator to float the load in by booming up and wiring down simultaneously.

Boom down, wire up (float load in): This is a useful signal that tells the operator to float the load out by booming down and wiring up simultaneously.

Swing, slew, rotate crane: The sign for swing is given be pointing with one or both arms in the direction you want the load to travel. Be sure to keep your thumb tucked so as not to look like you want the operator to boom up.

Telescope in, Retract boom, Knuckle in: The sign for telescope in is holding both hands out with thumbs pointing in. This sign can also be used on non-telescopic knuckle cranes for knuckle in. In essence it does the same thing. It moves the load toward the operator.

Telescope out, Extend boom, Knuckle out: The sign for telescope out is holding both hands out with thumbs pointing out. This sign can also be used on non-telescopic knuckle cranes for knuckle out. In essence it does the same thing. It moves the load away from the operator. *There are three ways the operator can increase the radius of the crane: Boom down; Telescope out; and on articulating cranes (knuckle cranes), knuckle out, or jib out. *Question on written test: Which of these signals could you give to have the operator increase the load radius? a. Boom down b. Telescope out d. Knuckle out e. All of the above

One handed load out: This is the sign for signaling riggers that only have one hand free because they are active in controlling the load with the other hand. The sign is made by pointing the thumb in the direction you want the boom to telescope or the load to move. Load out: point your thumb toward yourself.

One handed load in: Load in: point your thumb toward yourself. 17

Stop: The stop is given by extending your arm and bringing it across your body in one quick motion. (It is not recommended that your use the common stop signal of clinching your hand and raising it above your head. This is not an easy signal to see from far distances or in dim lighting.) Although, this is not the emergency stop signal, the operator should obey it no matter who gives it.

Emergency stop: The emergency stop signal is given by crossing your arms in front of your and bringing them out to your sides. This can be done several times in succession until the operator does indeed stop. *This signal is internationally know and can be given by anyone who might notice something amiss. *Question on written test: Who can give the crane operator an emergency stop signal? a. The designated signal person. b. The site supervisor. d. The site safety manager. e. Anyone on site.

Dog everything: This is a useful signal that tells the operator to take his hands off the controls and wait for further directions. This signal is a carry over from the friction crane days where they would use a pin (dog or pawl) to secure the rotation, boom and winch, holding everything as is till further notice.

Knuckle boom: On knuckle cranes, you may need to show which boom you want to have moved up.

Whip Line, Main Block: These two signals are to designate which hoist line you are giving signals for. *Whip Line: Make this signal by holding your right arm in a square and tapping the elbow with the left hand. Main Block: Make this signal by tapping the top of your hard hat. *Question on written test: What do you do to designate to the operator you want him to use the whip line rather than the main hoist line? a. Hold your left elbow out and tap on it with your right hand b. Tap on your hard hat c. Hold up 2 fingers d. Hold up 1 finger 22

Hand signals for crawler cranes: Travel left track: Hold your left arm to the square with your hand closed while turning your right arm in front of you in a circular motion in the direction you want the crane to travel (forward or backward) Travel right track: Hold your right arm to the square with your hand closed while turning your left arm in front of you in a circular motion in the direction you want the crane to travel (forward or backward) Travel both tracks: Turn both arms in front of you in a circular motion in the direction you want the crane to travel (forward or backward) 23

Overhead Crane Hand Signals: Magnet disconnected: Make this signal by holding both hands outstretched with palms up. 24

Overhead Crane Hand Signals: Travel bridge or tower: Stand behind the load and signal like your pushing in the direction of desired travel. Travel trolley: Point your thumb in the direction of desired travel. 25

Overhead Crane Hand Signals: For overhead bridge cranes that have multiple trolleys on the same bridge, the signal person needs to designate Trolley #1 or Trolley #2 before giving the hand signal for the function. 26

Voice Signals: 29 CFR 1926.1421 states: (a) Prior to beginning operations, the operator, signal person and lift director (if there is one), must contact each other and agree on the voice signals that will be used. Once the voice signals are agreed upon, these workers need not meet again to discuss voice signals unless another worker is added or substituted, there is confusion about the voice signals, or a voice signal is to be changed. (b) Each voice signal must contain the following three elements, given in the following order: function (such as hoist, boom, etc. ), direction; distance and/or speed; function, stop command. (c) The operator, signal person and lift director (if there is one), must be able to effectively communicate in the language used. 27

Voice Signals: For example, if you wanted the operator to boom down slowly, then you would say: * Boom.Down, slowly.boom stop *Question on written test: For verbal communication to have the operator boom down slowly and stop you say: a. Slowly Boom Down Boom Stop b. Boom Down Slowly Stop c. Boom down Slowly Boom Stop d. Boom Down Slowly Stop 28

Voice Signals: *29 CFR 1926.1420 Signals radio, telephone or other electronic transmission of signals. (a) The device(s) used to transmit signals must be fully charged and tested on site before beginning operations to ensure that the signal transmission is effective, clear, and reliable. (b) Signal transmission must be through a dedicated channel, except: (1) Multiple cranes/derricks and one or more signal persons may share a dedicated channel for the purpose of coordinating operations. (2) Where a crane is being operated on or adjacent to railroad tracks, and the actions of the crane operator need to be coordinated with the movement of other equipment or trains on the same or adjacent tracks. (c) The operator's reception of signals must be by a hands-free system. *(the signal person s does not) *Question on written test: If you are using radios to communicate, which of these do not apply: a. The signal person must use a hands-free radio b. The operator must use a hand-free radio c. It must be on a dedicated channel d. They should be fully charged 29

Audible vehicle travel signals: When moving the vehicle, the following signals shall be used: GO FORWARD: two short audible signals STOP: one short audible signal *BACK UP: three short audible signals *Question on written test: When traveling the crane, how many short audible signals designate you are going to back up? a. One b. Two c. Three d. Four 30