My Kohler Generator Installation, Model 20RESD MIKE LIZOTTE MARION, MA.

Similar documents
DLP ANTENNA INSTRUCTION MANUAL. Dielectric LLC 22 Tower Road Raymond, Maine Phone:

Cambria County Association for the Blind and Handicapped 175 Industrial Park Road Ebensburg, PA Prepared for: Prepared by:

ELECTRICAL SAFETY INSPECTION REPORT

Tab 10 - The NESC and Underground Applications. Restricted Siemens Industry, Inc All rights reserved.

ASSEMBLING. the. ECEbot. Printed Circuit Board: Part Three. Due Date. The Part Three assembly steps must be completed prior to:

Cable installation guidelines

Public Works Division Lighting District Fiber Optic Specifications April 2009

HRSG FINNED TUBE STUDY USING THE LOW FREQUENCY ELECTROMAGNETIC TECHNIQUE TO EXAMINE TUBES FROM THE OUTSIDE DIAMETER TESTEX, INC.

Instrumentation Cables

IndyGo Facility Upgrades Project 35671EE

TruePlate Structural Plate

Medium Voltage 12/20 (24)kV NF C cable system. Xavier Brosse Luanda May 2009

ELECTRICAL SAFETY INSPECTION REPORT.

INSTRUCTION DE SÉCURITÉ SAFETY INSTRUCTION Mandatory as defined in SAPOCO/42 FIRE PREVENTION FOR CABLES, CABLE TRAYS AND CONDUITS

MJK 7030 Float Switch Installation Instructions. Applies to Part Numbers , , and ft.

TIC TFS12 Stereo Outdoor Rock Speakers Feature

Power and Control T YPE BY RAVI GANATR November/December IAEI NEWS

SAQCC FIRE D&GS TRAINING SUB COMMITTEE COURSE CURRICULUM


CONSTRUCTION SPECIFICATION FOR TRAFFIC SIGNAL EQUIPMENT

The oldest Broadcast Antenna Company in North America.

SIRIUS HOME ANTENNA USER GUIDE & WARRANTY

Special Specification 6293 Adaptive Traffic Signal Control System

TELECOMMUNICATIONS V S WATER UTILITIES NATURE STRIP CONGESTION. Leigh Trevaskis. Riverina Water County Council

High Resolution Concrete Imaging

SPARK. Swing Manual READ MANUAL FIRST. Version 1.2

A Collaborative Future in HiVol to Sell and Install

Continuous Currents. When inspectors see a photovoltaic (PV) power system. through Curious Cables. by John Wiles

Page Number Official Detail Name Contact Title Primary Contact E mail Secondary Contact E mail

Installation Guide VL-MV10. Model No.

Field Instruction. Any registered training organisation UETTDRCJ21A Lay ESI electrical cables. Before commencing work:

CABLE TRAY MANUAL Based on the 2014 National Electrical Code

ELECTRICAL SAFETY INSPECTION REPORT. MTM Garments Ltd.

3 Locating and Marking Products DOCUMENT OBSOLETE

SPECIAL SPECIFICATION 6559 Telecommunication Cable

C A R G O C O N T R O L. By Fritz Dahlin

ACADEMIC SUCCESS CENTER THE COLLEGE AT BROCKPORT STATE UNIVERSITY OF NEW YORK PROJECT NO

THE CABLE TRAY SYSTEM

Cable Installation Tips

Cable Installation Tips

Max. temp. of sensor C. Capillary tube mm. Switching difference K. Sensor cartridge mm

SPECIAL SPECIFICATION 8540 Telecommunication Cable


Numerous cables one solution: Serpa cable organization

Remote Tuner Options for the DXE-MBVE-5A Vertical Antenna DXE-MBVE-5UGBRT3 for the MFJ-993BRT 300 Watt Remote Tuner


FIBER OPTIC CABLE PULLING

Understanding the True Cost of Cable Cuts

Winch Adjustable Feed Level Tubes for the Adult Turkey Feeder Installation & Operator s Instruction Manual MF /99

Colour Explosion Proof Video Camera USER MANUAL VID-C

Customer Feedback Summary

ginia Virg Show ch 10 Marc EX KIT

ROAD COMMISSION FOR OAKLAND COUNTY SPECIAL PROVISION FOR LIGHT EMITTING DIODE (LED) VEHICLE TRAFFIC SIGNALS

Selecting the correct cable type for Outside Plant Application

Invitation to Bid SCOREBOARD - WHH

Structural Plate Design Guide. 5 th Edition MULTI-PLATE. Aluminum Structural Plate. Aluminum Box Culvert SUPER-SPAN SUPER-PLATE.

BROCHURE MC LUMINARY CABLES

42 LCD Overhead Video Display Support Specifications Electricity required on the rear curtain wall

Weatherproofing Coaxial Cable Connections

The Owner's Guide to Piano Repair

AE-341 SERIES PROCESS INDICATORS 2 TO 6 DIGITS 0-20 MA, 4-20 MA, 0-5V, OR 0-10V SCALED INPUT

Electromechanical Level Measurement Systems silopilot FMM 760, FMM 760 Z

32 LCD Overhead Video Display Support Specifications (No Electrical required on rear curtain wall)

3M 710 Splicing System. Modular. Solutions. for Copper Splicing

OA White OA Black. Owner s Manual. Low Profile Digital HDTV Over-the-Air Antenna. w/built-in KING SureLock Digital TV Signal Meter

Section 8 FIBERLIGN Hardware for Aerial FTTP Applications

42 LCD Overhead Video Display Support Specifications (No Electrical required on rear curtain wall)

JACK Digital HDTV Over-the-Air Antenna w/built-in SureLock Digital TV Signal Meter

1. The contractor shall ensure that: c) Contractor or sub-contractor has at least 5 years experience

Installation Manual for New or Retrofit Installations

Cable Retainers UTILITY PRODUCTS. Cable Retainer Assy, For 4 Foundation Anchor, Galvanized Steel SP-6224-GLV

lumenalpha spot Specification Sheet

75 Elliptical Antenna System

Lashing Rods NOMENCLATURE GENERAL RECOMMENDATIONS. C = D x m = D x.666. m = D x.414. m = D x.483. C = (D + m) x.850. Length.

Section Communications Optical Fiber Backbone Cabling

GS-HYDRO END FORMING MACHINES

SECTION COMMUNICATIONS HORIZONTAL CABLING

Georgia World Congress Center 285 Andrew Young International Blvd Atlanta, GA Engineering Dept: Fax:

Identification - electrical services

SUBCARRIER TRANSFER FILTER INSTRUCTION BOOK IB622702

SCREEN WINCH SYSTEM INSTALLATION MANUAL FOR SCREENS FROM 300 cm. UP TO 450 cm. of width

PRJTPFL inch PRJTPFL inch PRJTPFL inch. Fixed Wall Mount Projector Screen. Universal Home/Office Projector Viewing Display

INSTALLATION INSTRUCTIONS FOR

May 8-11, Wisconsin State Fair Grounds West Allis, WI EXHIBITOR KIT

IBC. CODE AND COMMENTARY Volume 2

Installation Manual IPT Installation of skillet systems with 125 A track current. MV a-E.

TWIN-PUMP. Dual line system. Designed to work all the day, every day in extreme condition and difficult environments

SITE All work shall be performed at Center Park Substation (1895 Kernan Blvd, Jacksonville, Fl ). DATE: 04/03/2018

Hitachi Kokusai Electric Comark LLC

Mediacom Upgrade/Splicing Procedures (based on original document from Corporate dated 4/16/98)

Tube Cricket Build Guide

Blasting to Open Ramelli Pit

T850 Day & Night Security Camera

Installation and Operation Manual. for the. SM-6 Programmable Stereo Mixer

Meeting the Challenge of a Difficult Job Speciality Contractor ACE Awards

Küba compact DF. The space-saving helper in filling stations, gastronomy and the trade

Pulp and Paper Screens

Build your own: Track Display

Low Profile Digital HDTV Over-the-Air Antenna CONTENTS

ELECTRICAL SAFETY FOLLOW UP INSPECTION REPORT (8th) Factory Name Address Factory ID

Transcription:

My Kohler Generator Installation, Model 20RESD MIKE LIZOTTE MARION, MA.

Why Kohler Like any major purchase that I make I do a significant amount of research to ensure that I am getting a good value, high quality, and when applicable good resale value. I looked at all the major home generator manufacturers and after significant time online I felt that the Kohler brand was going to best meet my requirements and protect my investment I would also like to say that there is a tremendous amount of data out there and if you do your homework you can learn and not make the same purchase mistake that others have documented and put out for the rest of the world to see

Choosing a Dealer While I had pretty much decided that I was going with the Kohler product I had to ensure the price I was quoted was fair so I received calls, emails and visits from Kohler and Generac dealers. Home Depot which sells Generac was also running a promotion which offered $1,000.00 off the price of their 20KW which I thought might make me have to reconsider and lean more to Generac When I received my estimates I found that the price quoted to me by the Kohler dealer (Paul Foley Electric / Generator Inc.) was very close to the Generac with the Home Depot discount. This was a very nice surprise as I felt that the generator and type of installation I had chosen was superior to the Generac offer

Paul Foley Electric I was very impressed with Paul Foley, his knowledge of the product line and his attention to detail was very obvious. After I explained what my needs were he took the time to explain all the options to me and never pressured me to buy things I did not need. I also felt that his proposal with a list of references was I nice touch and something no one else had done, it gave me confidence that I was choosing a good product, dealer, and contractor. Paul made many good suggestions like the all aluminum housing for my 20KW generator instead of the composite case. While I am sure that the composite case is very strong in my installation I had to be concerned with falling tree limbs which might crack or damage a non metal case. I was glad to have the option and am quite pleased with the strength and look of the aluminum housing

The Installation Paul Foley Electric has assembled a very good crew and I was extremely impressed with their workmanship and work ethic. All of the employees who worked at my house did excellent work and were very respectful of my property

The Installation Paul Foley electric took care of all the permits including contacting Dig Safe so that they could safely dig a trench that would bring the generator power into the house Again attention to detail like placing the dirt on tarps so that when it was time to backfill all the dirt and stone could be put back like it was before

The Installation Paul s crew poured two concrete pads one for the generator and the second for the propane gas tanks that would be behind my tool shed. I liked the poured concrete option instead of a precast pad and was glad I had this option too. Some YouTube videos showed competitive products being installed on crushed stone or pads that were not level

The Installation The back pad had to be large enough to support two 100 gallon propane tanks. I live in a flood zone so the pad was fitted with large galvanized steel eyebolts to ensure that the two tanks could be properly strapped down and could not float away in a severe flood situation

House to Generator Connections, Very Neat! The bends and spacing on all these PVC conduit pipes is another example of Paul s crew attention to detail. This picture does not show that they had to remove a bunch of pavers and topsoil to do this, it was all returned back to normal and you could not tell that it had been excavated

Automatic Transfer Switch Installation The ATS was mounted on flame retardant plywood and as you can see the wiring is very neat and organized All my circuits were labeled and tested This is the brains of the system and to take the wiring from a 30 year old house and redirect and organize like this impressed me

Ready to Go All inspections, Plumbing, Electrical, and Fire were completed on the first inspection, no changes or repeat visits were necessary This picture shows the two fuel tanks, the system is now ready to use I am very pleased with my generator and the installation done by Paul Foley Electric and would highly recommend them if you are considering a similar purchase or if you need other electrical work