March 4 th, Addendum No. 1. Brooklyn College Systems Integrator Broadcast Television Equipment Project No: BY019/

Similar documents
RFIs AND RESPONSES; ANSWERS ARE IN RED.

REQUEST FOR PROPOSALS UK Audiovisual System to Renovate/Expand the Law Building ADDENDUM #2 1/16/2019

REQUEST FOR PROPOSALS UK Audiovisual System to Renovate/Expand the Law Building ADDENDUM #3 1/17/2019

BILOXI PUBLIC SCHOOL DISTRICT. Biloxi Junior High School

Summary Timeline Selection of bids The mission of PWPL

Request for Proposal, 15MCO503 VIDEO VISITATION Date Required: Thursday, Jun 4, 2015 Time Required: 3:00 PM Local Time

CASS COUNTY, MICHIGAN CASSOPOLIS, MI REQUEST FOR PROPOSAL SPECIFICATIONS

CASS COUNTY, MICHIGAN CASSOPOLIS, MI REQUEST FOR PROPOSAL SPECIFICATIONS

City of Winter Springs, FL

DESIGN STANDARD FOR AUDIOVISUAL SYSTEMS

PURCHASING DEPARTMENT. Project # Addendum # # of pages Original Issue Date Request Doc # April 15, see text below

Facilities Management Design and Construction Services

Colorado River Union High School District 1004 Hancock Rd Bullhead City, AZ (928)

DESIGN STANDARD FOR AUDIOVISUAL SYSTEMS

CITY OF DIXON REQUEST FOR PROPOSAL

Family Health Centers, Inc. Request for Proposal. for. Family Health Centers East Broadway Data and Communications Cabling Project

COLUMBIA COUNTY, WISCONSIN COURTROOM VIDEO CONFERENCE & AV SYSTEMS REQUEST FOR PROPOSALS

RETURN THIS AMENDMENT TO THE ISSUING OFFICE AT: AMENDMENT (1) ONE to RFP

Purchasing and Property Services AOC East Fowler Avenue Tampa, Florida (813)

ADDENDUM NO. 1 CITY OF FREDERICK

Target Interface / Construction Compliance Inspection Checklist

1.4 Conduit Position Clearance from Wall mm minimum mm+ prefer

RFP No R VIDEO PRODUCTION SYSTEMS & INSTALLATION FOR ANNE ARUNDEL COUNTY PUBLIC SCHOOLS. ADDENDUM NO. 2 April 21, 2016

ADDENDUM NUMBER 02 TO THE BID DOCUMENTS. BID DOCUMENT: RFP #G PE Building Audio Visual System San Jose City College

BUSD Ramona Middle School Gymnasium Project AV Project

Minimum qualifications for the Telecommunications Engineer are: A. Texas Licensed Profession Engineer (PE)

HONEYWELL VIDEO SYSTEMS HIGH-RESOLUTION COLOR DOME CAMERA

UNIFIED FACILITIES GUIDE SPECIFICATIONS

TEXAS LOTTERY COMMISSION REQUEST FOR PROPOSALS FOR DRAWING STUDIO AND PRODUCTION SERVICES # RESPONSES TO PROPOSERS QUESTIONS

New York MX700 Room. PWD-NY5-MX700-P60 List Price: $11, SLA Price: $1,100.00/year (Other options available See Appendix B)

Monday, January 7, 2019

Frankfurt MX700 with 90 Display

ADDENDUM NO. 6 PORT OF NOME SECURITY CAMERA PROJECT RFP

CHIEF BROADCAST ENGINEER

Installation Agreement

SECTION INTEGRATED AUDIO-VIDEO SYSTEMS AND EQUIPMENT

FLORIDA DEPARTMENT OF TRANSPORTATION

ELECTRICAL LEGEND NOTES AND FIXTURE SCHEDULE

BID APPENDIX A CITY HALL TELEVISION PRODUCTION SYSTEMS IMPROVEMENTS NARRATIVE

insors Grid Room System Installation Guide

MIDDLESEX COUNTY COLLEGE WIRE AND CABLE NETWORK REQUIREMENTS BH, CB, CH, ED, MH, LH, Camera Project

Special Specification 6293 Adaptive Traffic Signal Control System

Department of Corrections Facilities Bureau Security Equipment Solicitation #TO8133

Lyndhurst Secondary Technology Package Addendum # Bid Date: Wednesday, August 30, 1:00PM. Items issued in this addendum:

AUDIO/VIDEO CONNECTIVITY

REQUEST FOR QUOTE: TELECOMMUNICATIONS CABLING Library/Classroom Building, Beltline Campus

University Center AV Integration Construction Documents February 8, 2012

UNM IT/Telecommunications Guide Specification Labeling 11/07/

Request for Proposal Questions and Responses. Request for Proposal: Software Based CMED Radio Console and Associated Equipment

Information Technology Services DESIGN AND INSTALLATION STANDARDS

DT RFP # Public Safety Building Microwave Radio Communication System Design-Build Services. e-questions and Answers April 10, 2014

Furnish & Install Video Surveillance System for Lot B. Exhibits

Request for Proposals Fiber Optic Network Backbone Upgrades

City of Columbia Purchasing

Golden Empire Transit District Addendum #3 to Request for Proposals # G061 On-Board Video Surveillance System

Purchasing Department Finance Group INVITATION TO BID

ADDENDUM #3. SPECIAL NOTE: Addendum #3 information shall supersede the information contained in the Contract Documents

SPECIAL SPECIFICATION :1 Video (De) Mux with Data Channel

Block No. 12, CGO Complex Lodhi Road, New Delhi Dated: TENDER NOTICE NO.12/SSC(NR)/2015

November 5, 2001 Pacific Lutheran University SECTION Center for Learning and Technology, Video/Audio Systems Page 1

Downtown Arts Center Tech Packet. General Information

Introduction and Opening Remarks. 1. Discuss the County s Current System

UNIVERSITY of NORTH DAKOTA LOW VOLTAGE COMMUNICATIONS STANDARDS FOR CABLING, PATHWAYS, AND SPACE

42 LCD Overhead Video Display Support Specifications (No Electrical required on rear curtain wall)

Request for Purchase DESIGN AND INSTALLATION OF STRUCTURED COMMUNICATIONS CABLE SYSTEMS

IFB # ADDENDUM #1 & ACKNOWLEDGMENT

Tender Report for Supply and installation of LAN in *Biomedical Imaging and Bioinformatics Lab*

2. Are there any outside connectivity requirements? No, we will not have a need to allow outside devices to connect

Statement of Work. Falcon Stadium Locker Room Audio-Visual & Telecommunications Package. 3 May 2018

WHITE PAPER. RECOMMENDATIONS FOR SPORTS VENUES: Scoreboard Control Room Infrastructure and Operations

Questions and Answers to the Call for Tender

CHABOT- LAS POSITAS COMMUNITY COLLEGE DISTRICT

INTEGRATED AUDIO-VIDEO SYSTEMS AND EQUIPMENT

PROSPER INDEPENDENT SCHOOL DISTRICT TECHNOLOGY DEPARTMENT 605 E. SEVENTH STREET PROSPER, TX NOTICE TO BIDDERS RFP IFP

STRUCTURED CABLE SYSTEM (SCS)

32 LCD Overhead Video Display Support Specifications (No Electrical required on rear curtain wall)

California Polytechnic State University ITS Telecommunications PART 1 GENERAL SECTION AUDIO VISUAL STATION CABLES 1.

SECTION FIBER OPTIC STATION CABLES

ELECTRICAL LEGEND NOTES AND FIXTURE SCHEDULE

Montclair, NJ ADDENDUM NO. 1 Issue Date: August 11, Request for Proposal # 981 Finley Hall Audio Visual Systems

Tucker Theatre Policies and Procedures MTSU Department of Theatre 205 Boutwell Dramatic Arts Murfreesboro, TN 37132

Mfgr. Berk Tek ea , Berk Tek ea , Berk Tek ea. Berk Tek ea ,350.

ISS New Audio & Visual installations Design and Physical install guidelines v1.5

Exhibitor Package. Smart Grid Conference. Grounding & Lightning Conference. 10th Annual. 3rd Annual. Oct 2-3, 2018 Co-located Conferences Anaheim, CA

I1000M Rough-In Instructions

Request for Proposals PIO. Installation of Broadcast System for Community Services Building (CSB) 104

42 LCD Overhead Video Display Support Specifications Electricity required on the rear curtain wall

Hong Kong Science & Technology Parks Corporation Request for Quotation on Monitors (Ref: RFQ-IT )

SECTION AUDIOVISUAL. A. The objective of this document is to describe audio-visual systems.

Edition 1, August 2011 Copyright 2011 Smart-e (UK) Ltd.

Addendum 2 August 15, 2017 ALL BIDS MUST BE SUBMITTED ON THE UPDATED ADDENDUM #2 BID SHEET OR THEY WILL BE CONSIDERED NON RESPONSIVE!

Request for Quote E- Rate Eligible Services Scope of Work - Wireless LAN and Cabling for Access Points

Digital Video Engineering Professional Certification Competencies

about us the company synergy Clyde Broadcast are experts in the design, specification and installation of radio studios and radio stations.

CD Recording System for Angelle Hall

PHYSICAL FACILITIES Consultant s Handbook Specifications Division 27 Communication 0553 Identification for Communications Systems

(1) (2) (3) Bedienungs- und Montageanleitung. Safety instructions. Structure of the device

ISS Small Lecture Theatre Specification 2017

Training and Conference Room Audio Enhancement RFP 2019 Q&A

Furnish and Deliver New Light Emitting Diode (LED) Fluorescent Light Tubes

Transcription:

Facilities Planning, Construction, and Management Office of Financial Management Procurement Services 555 West 57 th Street 11 th Floor New York, New York 10019 CUNY.Builds@mail.cuny.edu March 4 th, 2013 Addendum No. 1 Brooklyn College Systems Integrator Broadcast Television Equipment Project No: BY019/020-010 This Addendum is issued for the purpose of conveying the Questions & Answers and amending the subject Bid Documents and is hereby made part of said Bid to the same extent as though it were originally included therein. QUESTIONS & ANSWERS Question 1 Answer 1 Please confirm if cabling that will run beneath the racks, and connect equipment from the equipment room to other production areas via tranches will be Non Plenum cable? All cabling will be plenum type cable. Question 2 Answer 2 Confirm start date of Project for the SI if awarded the project, the beginning of the 152 day project cycle? The start date is calculated from the date of the contract Kick-Off meeting. Question 3 Answer 3 Is there a written description of the broadcast systems that Brooklyn College wants to implement. Reference page 11590-1 Section 1.02 item 8 Brooklyn College will be implementing their own system, currently there is no written description.

Question 4 Answer 4 Drawings TS307 depicts two (2) 5600MSC and one (1) 5600AC02. The Equipment list currently has one (1) 5600MSC listed, are the other items customer furnished? The equipment list supersedes the drawings relative to any discrepancies of quantities for all specified items; therefore, one (1) 5600m SC is to be supplied as noted on the equipment list. Question 5 Answer 5 Please confirm what classification the onsite Audio/Video integration would be classified under. Classification for this job shall be under: Electrician (including all low voltage cabling carrying data; video; and voice in combination with data and/or video). All A/V related cabling and termination work will need to be done by an onsite electrical contractor. Question 6 Answer 6 Please identify where tape decks and operator will live item 17 on the equipment schedule? This equipment is located in the Video Operator s Room. Question 7 Answer 7 Equipment Listed on item 33 on the Equipment schedule, please identify final location of these items? This equipment is located in the Equipment Room. Question 8 Answer 8 Studio Miscellaneous equipment schedule lists video projectors. Please describe how this is to be integrated into the studio? Vendor is responsible for providing the video projectors to the College. There is no integration required for this item. Question 9 Answer 9 With respect to Re-commissioning lighting system, dimmers, lighting control, hanging focusing instruments, please confirm it is not currently in the SI Scope of Work? This is not in the Scope of Work.

Question 10 Will the SI be responsible for mounting and securing speakers to the grid any other monitors in the Studio? Answer 10 Yes, the Systems Integrator will be responsible for mounting and securing speakers to the grid and any other monitors in the studio. Question 11 Please confirm any securing of items or mounts to the wall, ceilings and floors will be under the general contractor s responsibility? Answer 11 Structural mounting is work required under this contract not under the general contractor s responsibility. Question 12 Pro-tools System is this system to be stand-alone or will it connect to the main studio production systems or outside systems? Answer 12 Pro-Tools System is not a stand-alone system. It will be integrated with the main studio production systems only. Question 13 Video Server functional T308 Please describe the cable path to the Post Production lab and elaborate on the interconnect required and the SI responsibilities for Post Production system design and wiring? Answer 13 Cable path is via existing trench system and into the edit room raised access floor. Provide termination of cable and leave under raised floor. Integration will occur in a subsequent, separate contract when the College upgrades the workstations. No post production system design and wiring is required. Question 14 Video Encoder/Server (items under 39) please describe the use or intent of the equipment listed under this heading? Answer 14 The use of this equipment is for video recording, video playback, and edit storage. Question 15 Confirm the below encompass all areas outside the studio that are within the SI Scope of Work. Confirm are areas will be connect via conduit and if they will require plenum cable assemblies (Viewing Room; Maintenance shop; Green room; Hallway display)? Answer 15 Areas listed below are confirmed in the SI Scope of Work. All plenum rated wiring is required. Reuse and re-terminate existing data wiring to 2 nd floor data closet.

Question 16 Has it been determined that the service elevator going to lower level will have clearance for transport of equipment racks listed in the bid? Answer 16 Yes, the service elevator will have clearance for the equipment racks. Question 17 Although not specifically indicated in the Brooklyn College TV Center document; are there any anticipated requirements or interface for a Announce/Voiceover Booth for either Production or Post Applications? Answer 17 No, there is no announce/voiceover booth in this project. Question 18 Answer 18 Provide access to site and working hours allowed? Access to the site is allowed during regular working hours. Any off-hour work shall be coordinated with the College. Question 19 Spring Break and Summer Schedule What dates is school not in session during this time? Answer 19 School is not in session the following times: Spring recess March 25 through April 2 Summer Session 1 July 10 through July 12 Summer Session 2 August 19 through August 23 Question 20 Are construction meetings held weekly currently, if yes what day and time? Answer 20 Process meeting times and dates will be determined at the time of the contract Kick-Off Meeting. Question 21 The (2) units ZA17X7.6BERM lenses appear to be in a common Studio configuration on a tripod. The most common way the lens is controlled in this configuration is with the MS-11 Semi-Servo Rear Control Kit. If your client wants to have full servo control, the correct Full Servo Rear Control Kit is the SS-11(Not the SS-13 as on the Equipment List for Bid). Answer 21 Provide SS-11 Full Servo Kit in lieu of SS-13 shown on Equipment List for Bid. Question 22 Are you going to send out the attendee list of those who are in the Mandatory Onsite Pre-bid conference? Answer 22 Please visit our website www.cuny.edu/cunybuilds

Question 23 In the equipment Spread Sheet, comparing to last RFQ, can you confirm if the Room 27 on Intercom equipment is totally removed? Answer 23 Confirmed as shown on the Equipment List for Bid. Question 24 On Drawing TS102.00, the Symbol Legend references Single Gang Telecom Plate with (2) Data, (1) Voice RJ45 Connectors for (3) CAT6 Plenum Cables by SI. However, note 1 indicates (2) CAT6 Cables to each outlet by SI. How many CAT6 cables are to be provided by SI to each wall plate identified on this drawing? Answer 24 Provide (2) CAT6 cables to each wall telecom plate shown on the drawing. Question 25 Are the Telecom Wall Plates to be provided by SI? Answer 25 Yes, telecom wall plates are to be provided by SI, including cable, termination to plate, and CAT6 patch panel in Equipment Room. Question 26 On Drawing TS102.00, note # 4 indicates existing Network/Voice cables to be routed from 005A to new Patch Panel. As a specific rack location is TBD, are we correct in assuming the new Patch Panel is to be located in Equipment Room (005B0) Racks? Answer 26 Yes, the new patch panel is to be located in the Equipment Room (005B) Racks. Question 27 How many Network/Voice Cables are to be extended from room 005A? Answer 27 Twelve (12) cables are to be extended. Question 28 Note-5, on drawing TS102.00, references extending (16) CAT6A shielded cables to adjacent Edit Lab Work Stations. Is the Edit Lab the Post Production Lab noted on the drawing? If so, are we correct in assuming the (CFE) Edit Lab Workstations will be located within partial section of the room provided on the drawings? Answer 28 Yes the Edit Lab is in the Post Production Lab. Yes, the Edit Lab workstations will be located within a partial section of the room and are directly adjacent. Question 29 On drawing TS101.00, note -1 indicates that the System Integrator is to provide all Furniture & Equipment Racks shown on this drawing. In the

Equipment Room 005B, the drawing indicates (6) racks while the supplied equipment list indicates 5. Which listing should take precedence? Answer 29 The Equipment List for Bid takes precedence over the drawings. Question 30 Are we correcting in assuming the Supplied Equipment list take precedence over the drawings (i.e.: Master Control Monitor Wall) for equipment manufacturer/model numbers? Answer 30 Yes, the Equipment List for Bid takes precedence over the drawings. Question 31 Please clarify union affiliation requirements of Telecom/IT Installers.? Answer 31 There are no union requirements. Prevailing wage is required. Question 32 Please provide a list of Telecom/IT installers that have done satisfactory work at Brooklyn College in the past? Answer 32 There is no list of Telecom/IT installers that have done work at the College. Question 33 Can racks be pre-built and wiring pre-terminated off site by non-union wireman? Answer 33 Yes, racks can be pre-wired and pre-terminated off-site by non-union wireman. Question 34 During test and commissioning can the SI remove and re-wire equipment as required by the process or does this need to be accomplished by union personnel on site? Answer 34 Removal and re-wiring of equipment can be done by the SI during testing and commissioning. Question 35 Will all deliveries need to be by union drivers? If so, who is to upload the equipment and move it to its final destination? Answer 35 Deliveries can be carried out by non-union personnel. The SI is responsible for all deliveries and moving of equipment to the final destination in the project site.

Question 36 Please clarify the Location of the Pro-tools Audio System? Answer 36 The location is in the Audio Room. Question 37 Please clarify the physical layout of Audio room 006A. Drawing 102 show the room width to be 8 6 with a 7 0 audio console table, and this is verified on drawing 201. Drawing 101 shows a 5 8 wide audio console table flanked by 2 equipment racks, on 24U and 1 44U. Which is correct? Answer 37 Drawing 102 is the correct layout. Question 38 Drawing 307 Shows a Dual sync generator system with a changeover. The BOM lists a single sync generator. Please clarify? Answer 38 The Equipment List for Bid is correct, and supersedes the drawings. Question 39 There are no UPS listed on the BOM are they required? Answer 39 No, they are not required. Question 40 Please verify that all data cabling must be plenum rated CAT 6E? Answer 40 All data cabling shall be CAT6. Question 41 Please confirm that no other cabling is to be plenum rated? Answer 41 All other cabling shall be plenum rated. Question 42 Please clarify which rooms have raised floor, and which rooms are served by wire troughs, overhead wire ladders, ect.,? Answer 42 The Computer Lab has a raised floor as stated on in the specification. Drawings call for connection between the Studio and Equipment Room to be overhead. All other connections to be via trough in floor.

Question 43 Please provide detail on how existing telecom and network cables exit the ceiling in storage room 005A? Answer 43 Existing cables are overhead on j-hooks. This Addendum is issued pursuant to Standard form of Agreement, Article 1 & Invitation to Bid form. Bidders are asked to acknowledge receipt of the Addendum by returning it signed with their submitted Bid. Failure to do so shall be considered grounds for rejection of your Bid. Contact: Ines Eden, CUNY.Builds@mail.cuny.edu By signing in the space provided below, the Bidder acknowledges receipt of this Addendum. This Addendum must be signed by the Bidder and submitted with the Bid. Name of Bidder Name of Authorized Bidder Title Signature Date Representative