Responses to Vendor Submitted Questions

Similar documents
Thesis/Dissertation Submission Guide

Request for Proposals Fiber Optic Network Backbone Upgrades

Gualala Arts Gualala Arts Center Festival Season

OUR CONSULTATION PROCESS WITH YOU

REQUEST FOR PROPOSALS AND TERMS OF REFERENCE

Recognized Crafts at the ADG Awards:

Document Management Integration. The Document Logistix guide to

-Technical Specifications-

BILOXI PUBLIC SCHOOL DISTRICT. Biloxi Junior High School

Information for Authors

Foundations Upgrade Institutional Readiness

New York MX700 Room. PWD-NY5-MX700-P60 List Price: $11, SLA Price: $1,100.00/year (Other options available See Appendix B)

CASS COUNTY, MICHIGAN CASSOPOLIS, MI REQUEST FOR PROPOSAL SPECIFICATIONS

Water adsorption on bimetallic PtRu/Pt(111) surface alloys. Julia M. Fischer, David Mahlberg, Tanglaw Roman and Axel Groß

City of Winter Springs, FL

POST-SUBMISSION INFORMATION PACKET

NATIONAL FILM ARCHIVE OF INDIA MINISTRY OF INFORMATION AND BROADCASTING GOVT OF INDIA LAW COLLEGE ROAD, PUNE NOTICE INVITING TENDER

RULES AND REGULATIONS

REQUEST FOR PROPOSALS: FOR AN INTEGRATED IN-CAR AND BODY-WORN VIDEO MANAGEMENT SYSTEM

Tender Notification for the procurement of a Scanning Electron Microscope" at IISc (Last Date for submission of tenders: 3 rd October 2018)

Request for Proposal Questions and Responses. Request for Proposal: Software Based CMED Radio Console and Associated Equipment

Manuscript writing and editorial process. The case of JAN

INTUITIVE, REAL-TIME LAUNDROMAT DATA THAT S CUSTOM-MADE FOR THE WAY YOU OPERATE. LAUNDROMAT - LOCATION 1 - HUEBSCH.COM/COMMAND

THEATRICAL DOCUMENTARY PROGRAM

Spring Professional Auditions

CASS COUNTY, MICHIGAN CASSOPOLIS, MI REQUEST FOR PROPOSAL SPECIFICATIONS

2019 JUNIOR AND INTERMEDIATE COMPETITION RULES AND REGULATIONS

Rural Development Department Old secretariat, Patna. Sub: - Invitation for Quotations for Printing & Supply of Booklets and Pamphlets To

Torture Journal: Journal on Rehabilitation of Torture Victims and Prevention of torture

Broadcasting Decision CRTC

Rose Bowl LED Sports Lighting Request for Qualifications (RFQ) May 02, 2018

Guidelines for Publishing with the Society of American Archivists (SAA)

Talent Academy 2018 Preparation Notes and Checklist for Film Applicants International Baccalaureate Diploma Programme (IBDP) DSA-JC

Deadlines. Audition Material

APPENDIX J Richmond High School Performing Arts Theater Usage Policy (December 2018)

APPENDIX E DeAnza High School Performing Arts Theater Usage Policy (July 2018)

Purchasing and Property Services AOC East Fowler Avenue Tampa, Florida (813)

Author Guidelines Tier 1 Articles

Recognized Crafts at the ADG Awards:

IJSHS Guidance for Submission

Rockville, Maryland August 27, 1984

Delivery, installation, commissioning and warranty of multi-channel Programmable High Voltage Supply System

American Players Theatre Art in the Woods. Adding a new dimension to the APT adventure.

G.G.S.INDRAPRASHTHA UNIVERSITY Registration of Vendor(s) for Supply of Books

Guide to contributors. 1. Aims and Scope

Sponsor/Exhibitor/Advertising Prospectus. F or m ore i n f o r m a t io n v isit o u r w e bp a g e! CONFEREN C E FEBRUARY 4 6, 2018

Theatre Talent Scholarships

4. The Filmmaker/s/Screenwriter/s retain/s all submission and intellectual property rights.

New ILS Data Delivery Guidelines

Review of the Comcast. Fort Collins Cable System. Technical Characteristics

Mirth Solutions. Powering Healthcare Transformation.

Theatre Transfer Talent Scholarships

New Jersey Department of Education

GUIDELINES TO AUTHORS

Bahrain Medical Bulletin

Building Your DLP Strategy & Process. Whitepaper

SPRING 2018 APPLICANTS

INTERNATIONAL COMPETITION FOR YOUNG MUSICIANS RIZZARDO BINO

How many seconds of commercial time define a commercial minute? What impact would different thresholds have on the estimate?

GUIDELINES. LOW BUDGET Production Program

Left Margin 1.25 inches Right Margin 1.25 inches Top and Bottom Margins are 1 inch

Name: Type of Art (please be specific): Make checks payable to: Temple Railroad & Heritage Museum, 315 W. Ave. B, Temple, TX,

The complete tender documents are available for download on the Danish Agency of Culture and Palaces website under the DTT Udbud (DDT Tender) point.

Instructions for authors

DM Scheduling Architecture

for Actors Contents Revised: December 5, 2016

NJ Record Retention & Disposal

Eligibility Guidelines

Table of Contents. Section E: Inspection and Acceptance

2018 MAJF VENDOR APPLICATION

Market Index Definition Statement Review 2011 ISG Recommendations

TRAINING DOCUMENT LOS ANGELES UNIFIED SCHOOL DISTRICT (LAUSD) BELL SCHEDULING SYSTEM

2017 DUE DATE CHECKLIST

What really changes with Category 6

All members as well as the current production cast and crew may participate in all social events planned by the Masquers.

ECE FYP BRIEFING SEMESTER 1, 2012/2013

AUSTRALIAN GEMS REGULATOR

Device Management Requirements

New York State Board of Elections Voting Machine Replacement Project Task List Revised

Author Guidelines. Table of Contents

FRANCISCAN FESTIVAL OF FINE ARTS

1st INTERNATIONAL UNIVERSITY CHOIR COMPETITION MEDELLÍN 2016

About journal BRODOGRADNJA(SHIPBUILDING)

No. NITTTR/CEMT/RE/ /Switcher Date: To QUOTATION DUE DATE. Date:

Digital Display Monitors

ELIGIBLE INTERMITTENT RESOURCES PROTOCOL

LOW-BUDGET INDEPENDENT FEATURE FILM ASSISTANCE PROGRAM GUIDELINES FOR

DT RFP # Public Safety Building Microwave Radio Communication System Design-Build Services. e-questions and Answers April 10, 2014

Questions and Answers to the Call for Tender

Robsham Theater Arts Center (RTAC) Box Office Policies Updated CONTACT INFORMATION RTAC Box Office

VFA Participation Agreement 2018 (Year 5)

ATTACHMENT 2: SPECIFICATION FOR SEWER CCTV VIDEO INSPECTION

FAR Part 150 Noise Exposure Map Checklist

BURNSIDE HIGH SCHOOL

NOVA Digital Media System Guidelines Northern Virginia Community College 2017

9I273 01/10/2012 COU-03/0 AUTOMATIC CHANGEOVER UNIT TO BACK-UP AMPLIFIER

SECTION 686 VIDEO DECODER DESCRIPTION

EX LIBRIS GENERAL QUESTIONS & ANSWERS SESSION

ENGINEERING COMMITTEE

Sausalito Public Library Quarterly Update to City Council

Transcription:

Responses to Vendor Submitted Questions CRISP Mirth Connect Quality Assurance Engineering Services May 3 rd, 2017 All responses due no later than Friday May 5 th, at 5pm

Mirth Connect Quality Assurance Engineering Services Request for Proposal RFP TO ALL PROPOSERS You are invited to submit a Proposal to explain your services related to quality assurance and testing of Mirth Connect channels and describe how it will meet Chesapeake Regional Information System for our Patients (CRISP s) requirements as described herein. All Proposals should be submitted electronically to: ryan.bramble@crisphealth.org 1. Questions from potential vendors are due by Monday, May 1st at 4:00pm ET 2. Responses to Questions will be available before Wednesday, May 3 rd, at 12:00pm ET 3. Final Proposals must be received no later than 8:00pm ET on Friday May 5 th. Should you have any questions concerning the preparation of your Proposal, please do not hesitate to contact us. Contact: Ryan Bramble Phone: (443) 718-9048 Email: ryan.bramble@crisphealth.org Please note that this Request for Proposal letter does not constitute a guarantee on the part of CRISP that a contract will be awarded. No payment will be made for costs incurred in the preparation and submission of a Proposal in response to this Request for Proposal. THIS IS NOT AN ORDER OR A CONTRACT www.crisphealth.org 2

Vendor Submitted Questions and Replies from CRISP 1. Is there a preference for where the Mirth QA environment will be hosted (by the responder or CRISP)? The Mirth QA environment is and will continue to be hosted by CRISP. 2. Does CRISP have an existing visualization application such as Tableau or similar? Data that is validated will eventually be viewed in a number of applications. CRISP currently uses Mirth Results to view the information that passes through Mirth Connect. 3. Is CRISP currently using a Version Control System (VCS) like GIT or SVN? Yes, but not for Mirth development work so it is not currently available for services in the scope of this RFP. Mirth Connect itself does have version control capability and the ability to restore to previous versions of code. 4. Is it CRISP s intent to build an integrated Software Configuration Management Process. We are open to that. a. Are there other long term goals associated with this RFP? None that aren t stated. 5. Is CRISP building project specific test cases today, if so how is that currently managed? No 6. Is CRISP currently documenting the channels developed by staff in a 3rd party software suite like Atlassian? No all documentation resides in the Mirth Connect channels thenselves. 7. If you feel those weekly channel numbers are optimistic (liberal), could you give us a "low end" threshold number so we can assess the engagement from a "low - high range" perspective on an annual basis? The numbers provided are what should be used as they represent realistic data flows. 8. Are "audited" financials still a requirement for a privately held company that already has an existing master agreement in place with CRISP and is already providing other services? If you have provided audited financials to us in the past year then resubmitting those is sufficient. 9. Are all Mirth Connect (11) instances on the same release? What release or releases? What plans does CRISP have to upgrade in the next 12 months? Yes, appliance version 3.11.0 and Mirth Connect version 3.4.2.8129. We will take upgrades as released by Mirth Corp in compliance with best practices. www.crisphealth.org 3

10. While access to PHI is not needed, will CRISP provide deidentified test data from the source to test the interfaces? Yes 11. Do we need to provide proof of Mirth Certification with the RFP response or can that be provided should our organization be short-listed? It can be provided during the short listing. 12. Can we expect that our response will remain confidential to CRISP only? The response would only be shared with CRISP staff and any of CRISP s committees. Members of CRISP s Technology Committee may be consulted. Those members do not work for CRISP but rather for provider organizations affiliated with CRISP. 13. How many years of audited financial statements need to be provided? 2 years 14. What is the size of current CRISP development team? CRISP has 2 full time engineers on site and another 4-6 FTE consultant engineers in Maryland. The number of consultant engineers vary based on the amount of work that needs to be done. 15. What is the current incident management, change management and release management process followed by CRISP? Incident management is logged by Tier 1 support and escalated to CRISP s engineers when appropriate. Change Management authorizes all projects before they start and CCB also approves releases to production after testing is completed and documented. An output of the QA process would be test documentation needed for change control. 16. By when will a decision on the RFP be made? May 30 17. What is the current Defect Management Process followed by CRISP? None 18. Who will be the audience for testing & Walkthroughs (Business Analysts, Project Managers, Business Managers and SE Leads) Project Managers and Systems Analysts 19. Do we have a dedicated test environment for QA or vendors needs to leverage existing 3 test instances? You will need to leverage our existing test instances. 20. Does CRISP want to conduct performance testing for Mirth Connect? If yes, please provide the details about type of performance testing required. For ex. Load, Stress or Volume testing. No 21. Please provide the details of any testing tools used by CRISP today. For ex. Load testing (Selenium) None 22. Any Third-Party Libraries being used along with Mirth Connect? No www.crisphealth.org 4

23. Besides HL7v2, HL7v3, CCDs are there any messages being processed/will be processed in future? Possibly we cannot be sure at this time. 24. What is the average size of messages/files (HL7/CCD) We don t have a good way to calculate that but the size is not untraditional. 25. Does CRISP have CCDA Integrations with XDS.b or any other API Integrations? Yes, many of each. 26. Technology stack (if any) outside of Mirth Connect the engineers would need familiarity on from a QA perspective? Yes Engineers would need to be trained on how the channels interact with downstream services especially the Master Patient Index (Initiate). 27. What other types of data formats does CRISP support that could potentially be used to generate a payload (ex. PDF, rtf, jpeg, and tiff) apart from message types like ADT, ORU, and CCD? We do not support any file formats like PDF, JPG, TIF. 28. Number of interfaces and frequency of Interfaces going live on a weekly basis This question was answered in the RFP. www.crisphealth.org 5