P90 Technical Specifications &

Similar documents
P90 Technical Specifications &

P200 Technical Specifications &

DEREHAM MEMORIAL HALL

Technical Specification Pavilion Dance

Capacity: 60 2 Roxburgh Place, EH8 9SU. Assembly Roxy - Downstairs

O Donoghue Centre for Drama, Theatre and Performance National University of Ireland Galway

Main House Technical Specification

SR Wing space = 2m SL Wing space = 1.1m There is an upstage cross over with pass doors onto stage USR & USL.

Technical Specifications Updated 01/10/2017. Stage

Technical Specification for the Alley Theatre, Strabane

ROSE THEATRE BASEMENT

CHELSEA THEATRE. Technical Specifications

Standard (with END ON seating) 8.75m Wide x 7.3m Deep (to US black) Open Floor (seating retracted) 8.75m Wide x 13m Deep (to US black)

New Theatre Royal Lincoln Technical Information

There are 18 wheelchair positions which will result in the loss of one seat for every wheelchair position allocated.

Main House Technical Specifications

Stage. Get In & Parking

Technical Specification Ardhowen Theatre

Visy Theatre technical information and general specifications 2019

Studio 180. Electronic and Print versions of the venue ground plan are available from the Technical Director.

Auditorium Seating VISY THEATRE TECHNICAL SPECIFICATIONS

Notes for Lighting and Sound Technicians

Harlequin Vinyl floor (permanently installed) Clean removable Harlequin vinyl floor available for hire Rake

Matt Dann Cultural Centre

Technical Data Sheet

Technical Specification

VISY THEATRE TECHNICAL SPECIFICATIONS Version 2.6 3/7/2013. Auditorium Seating. Page 1 of 4 STAGE CONFIGURATIONS

ETC Congo Desk 1024 channels in two universes ( Universe 1 House dimming, Universe 2 Toured dimming) Digital light processor dimmers

Notes for Lighting and Sound Technicians (A Supplement to Notes for Playing Companies)

Technical Specification 2016

2017 TECHNICAL SPECIFICATIONS

THE STREET THEATRE. Technical Specifications

JERWOOD VANBRUGH THEATRE

Technical Specification

Theatre Technical Specifications

TECHNICAL SPECIFICATIONS

PLEASE NOTE THAT DUE TO A VOIDED FLOOR PYROTECHNICS ARE NOT PERMITTED IN THE STUDIO.

The Haymarket Basingstoke Technical Specifications

Technical requirements & conditions for hirers

Hirers Technical Information Pack

Hopgood Theatre NOARLUNGA CENTRE

Technical Pack. Attenborough Arts Centre

TOWER THEATRE TECHNICAL INFORMATION & GENERAL SPECIFICATIONS 2014 PLEASE DIRECT ALL ENQUIRIES TO THE OPERATIONS MANAGER:

Latrobe Performing Arts Centre

Dr JOHN GALLAGHER CONCERT CHAMBER

Hopgood Theatre NOARLUNGA CENTRE

CENTRE FOR PERFORMING ARTS

Dr. Fred Speckeen Theatre. Information and Technical Specifications

Faris Family Studio at the Dance Centre, Vancouver BC 677 Davie Street, Vancouver, British Columbia. V6B 2G6

UNIVERSITY CONCERT HALL. Technical Specification

Pleasance London Main House Visiting Company Information Pack May 2017

Theatre SPECIFICATIONS UPDATED: 13/08/13 21 KINGLAND ROAD, POOLE, DORSET, BH15 1UG TELEPHONE: FAX: ADDRESS: TECHNICAL MANAGER:

Irish Heartbeat TECHNICAL RIDER. Video Projection Requested

The Mannie Manim Technical Specifications

Lighthouse Theatre Technical Specification

COURTYARD!!!!! THEATRE

TECHNICAL SPECIFICATIONS

DOMINO THEATRE INC. THEATRE TECHNICAL SPECIFICATIONS AND INFORMATION

Studio Theatre. Technical Specifications. Theatre Manager Kim Scarlata Box Office Coordinator Laura Johnston

Dugdale Centre Technical Specification

Technical Information

INFORMATION FOR VISITING COMPANIES

"A Dance Tribute to Ping Pong " by Jo Strømgren Kompani. Technical Requirements

Technical Specification

Technical Specifications

DANCE BASE TECHNICAL SPECIFICATION

John Leslie Theatre. Technical Specifications. Updated July 2018

The Tower Theatre Contact - Peter Heselden Theatre Manager Tel

TECHNICAL RIDER. A full-scale diagram of the theatre can be downloaded at

PRELIMINARY TECHNICAL RIDER - LITTLE RED RIVER

Barney Simon Theatre Technical Specifications

Avant Garde Dance & The Place Fagin s Twist Tech Spec 2016

Stage. Please see Tron, Main House Lighting Rig Info.pdf for more information. Get In & Parking

HIRE AND TECHNICAL INFORMATION

Information for Incoming Companies

Powerhouse Theatre technical information and general specifications 2017

Technical Specifications

Technical Specification

Technical specifications Main theatre. Sound. Console: Soundcraft Si Performer 3

Technical Information

Divadlo Kampa (di-vad-lo Kam-pa)

Gilded Balloon s Basement Theatre is a brand new 120 capacity theatre space in the heart of Edinburgh s West End.

20 hemp bars, set at random intervals (SWL=150lbs) Fixed position situated Stage Right. Operated stage level, SL (counterweighted)

Compass Theatre - Technical Information Pack

Harbourfront Centre Theatre Technical Specifications As of Jan. 2018

The Haymarket. Technical Specifications. The Haymarket, Wote Street, Basingstoke, Hampshire, RG21 7NW

The performance is about 100 minutes long, excluding intermission. ACT 1 is 75min, ACT 2 is 20min. Intermission 20-25min.

Darlington Hippodrome Technical Specification

ROSE THEATRE MAIN THEATRE

THE ROUNDHOUSE THEATRE

Stage Right wing = 3m 10cm Depth X 6m 40cm Width. Stage to underside of fly galleries from flat floor = 7m

The Standard Bank Studio is a music venue made from the choir stalls and the stage of the Cape Town City Hall Auditorium. It

WRIGHT AUDITORIUM TECHNICAL INFORMATION. 1. Contact Information. 2. General Information

Derby Theatre. Technical Information Main Stage. Derby Theatre. 15 Theatre Walk. St. Peters Quarter. Derby DE1 2NF.

TECHNICAL SPECIFICATIONS AND INVENTORY RIALTO THEATER

Esso BHP Billiton Wellington Entertainment Centre

Harrow Arts Centre, Harrow Council, Uxbridge Road, Hatch End, Harrow, HA5 4EA tel

DRAÍOCHT Technical Specification: MAIN SPACE

Queensland Performing Arts Centre

Cornerstone Technical Specifications 2018 / V1

Transcription:

P90 Technical Specifications Seating Configurations Team Artistic Director Jez Bond Executive Director Rachael Williams Development Director Dorcas Morgan Development Assistant Daniel Cooper Creative Director Melli Marie Sacha Queiroz Deputy Neal Gray Venue Volunteer Manager Ehti Aslam Finance Manager Elaine Lavelle Finance Administration Officer Susie Italiano Marketing Manager Dawn James Deputy Marketing Manager Rachel McCall Administrator Melissa Bonnelame Cafe Bar General Manager Tom Bailey 11-13 LONDON Page 1 Park90 Technical Specifications Last Updated 01/01/18

Useful Contacts: : Deputy : Front of House: ehti.aslam@parktheatre.co.uk Box Office: rachel.mccall@parktheatre.co.uk Administration: melissa.bonnelame@parktheatre.co.uk Please make contact with the relevant department to find out more information. Important Information: Submit LX plans, Set plans, Hanging Plots and Risk Assessments no later than 7 days before the Get-In. Set plans should be submitted 14 days before the Get-In. Access times are 10am till 10pm until the first Saturday or Press Night, whichever comes first. There must be a Production Manager/Company Appointed Person present for both the Get- In and Get-Out. Front row, floor seats (nearest the audience entrance) must be free to be used as wheelchair positions with no obstructions. Including a small turning circle. There are two fire exits in P90, these cannot be obstructed. A site visit is mandatory. P90 house lights will need to be made out of the lantern stock and circuits in the space. The doorway into P90 is 2040mm x 1004mm, all items delivered must fit through. The load in from the front door to the Park90 door is approximately a 46 metre walk and up one half flight of stairs. The theatre walls cannot be re-painted. Check with us before screwing into the floor or walls. Any damage to walls or floor through fixings, will need to be restored on the Get-Out. No double-sided carpet tape to be used on the floor or walls. Any show waste must be dealt with by the company. holds no masking. We does not have any storage for flight cases/rubbish/tools. Post Get-Out, all of your shows equipment/costumes/props/hires/returns/tools must be dealt with and leave the building on that Sunday. Storage may be available at a cost. Page 2 Park90 Technical Specifications Last Updated 01/01/18

Space: Stage Height to Grid = 4400mm Stage Height to underside of gallery = 2684mm Stage Height to concrete slab = 3380mm Mixer Desk Position = Located on upper walkway Lighting Desk Position = Located on upper walkway Screwing and fixing of any kind into the floor, walls and ceiling requires written authorisation. If your request is authorised screw lengths must not exceed 36mm. Lighting: Desk: ETC ELEMENT The desk is positioned on the technical gallery but can be placed in the Theatre during technical rehearsals. There are multiple DMX outlets to IWB s and patch panels, they can be patched in the dimmer room by Park Technical ONLY. Working light is provided through recessed ceiling skylights, providing natural light these can only be operated by Park Technical and cannot be used as part of your show. There are Fluorescent tubes located in the grid and blue LED bulkheads in wing spaces providing additional working light and backstage blues. Depending on the seating configuration the view of the stage can be slightly obscured for the Operator. A Camera and monitor may be a solution (not supplied). Dimmers There 53 circuits on ETC Sensor3 2.3kw dimmers distributed around the theatre. 8 circuits on each of 6 internally wired bars totalling 48 circuits overhead. There are 6 circuits on the stage level which are paired with 6 circuits on the technical gallery. All outlets are European Ceeform 16amp sockets and the DMX is standard 5 pin XLR. House Lights P90 house lights will need to be made out of P90 stock, usually the 6 birdies. They will need to be serviced by the 53 dimming circuits available in the space. Levels must be approved by before the 1st preview performance of the production. House Lights should also be available on a submaster for Access Performances. Page 3 Park90 Technical Specifications Last Updated 01/01/18

P90 DMX Patch Please ensure the following addresses are NOT in your patch: 481, 482, 483, 484, 486, 487, 488, 490, 491, 497, 498, 499, 500, 501, 502, 503 Lanterns 4 X Selecon Rama 1kw Fresnel 12 X Selecon Acclaim 650w Fresnel 12 X source 4 25/50 JNR 575w 6 X Birdies (for house lights) 6 X Short Nose Parcan 1k We do not stock gobos or gobo holders Layout of Bars Park90 has been designed in a grid system offering a total of 6 internally wired bars running across the space and 4 plain rigging bars running and down. There is an LX bar separate running under a concrete slab. Please note there are no flying facilities in Park90 and any scenic cloths and drapes must be dead hung or installed on fixed curtain tracks (not supplied). Other Lighting Information Assorted lengths of TRS, DMX and cat5e data cable. Visiting companies are strongly advised to ensure provision is made for required cable length prior to your arrival. All lanterns are supplied with a hook clamp, safety bond and colour frame. Incoming productions and designers will be allowed to re-colour, focus and rearrange equipment to the needs of their own purposes. If your production requires any accessories such as a clamp to be removed it is a requirement as part of your get-out to reinstate these. House Lights are to be made from circuits in the P90 and out of the lantern stock (6 birdies). Levels must be approved by before the 1st preview performance of the production. Please submit a lighting plan to Park Technical no later than 7 days before your production is due at the. Where possible have all circuits and gel colour CLEARLY MARKED. Any equipment hired or owned by the visiting company must be PAT tested prior to use in house at and related paperwork must be provided. Any lighting Practicals brought in to the theatre can be inspected at any time. If they are deemed unsafe reserve the right to ban their use until they are corrected. All the lighting is controlled by DMX 512 protocol distribution network. would be more than happy to source any additional equipment and gel required for your production prices can be made available on request. On completion of your run during the Get-Out you are required to de-rig all fixtures and return the room to how it was found on your arrival. Page 4 Park90 Technical Specifications Last Updated 01/01/18

Sound: Equipment 2 x Tannoy VX8 speakers with amps Soundcraft FX16ii Mixing Desk Tascam CD-200i CD MP3/iPod Dock 4 channel cue light system (10 outstations shared between venues) 6 x Tecpro party-line wired comms (shared between venues) Co-ax and Cat 6 throughout. Show relay and BGM all BOH speakers switchable between venues. Other Sound Information Any externally sources radio equipment used on premises must not infringe on frequencies used in house and/or other visiting companies. reserves the right to instruct visiting companies to control the frequencies of radio equipment should any issues arise. Please feel free to contact Park Technical for details of current frequencies used. Power Distribution: General local power outlets are located through the auditorium. Set Rigging: If you are hanging pieces of set or steel works, we must see a hanging plot at least 7 days before your Get In. We will need to see weight loads and method statements. Any rigging equipment required must be supplied, tested and appropriately rated. Page 5 Park90 Technical Specifications Last Updated 01/01/18

Stage: On the Thrust 2, L Shape and End On configurations there is a shaded area of the playing spaces where you cannot raise the stage without permission (See P90 Plans and Configurations at the end of this document). This is because it may cause an obstruction to the Fire Escape. If your raised set plan is approved it may be under the condition that you provide an ASM at stage level to oversee your Risk Assessed Fire Evacuation Plan, one can be supplied at a cost to the Company. If you wish to raise the stage in this area please contact Park Technical ASAP for approval. when your crew and company enter the space until after the Get-Out we expect you to follow these Safety and Housekeeping rules: If your Company s Risk Assessment deems it appropriate, steel toe cap boots, hard hats (when overhead work is carried out) and high-vis vests should be worn. You are not to climb on, cut materials or paint on or around the seating in the auditorium. If the Cafe Bar is open, these spaces must be kept clear and tidy with minimal noise being made. We have one set of 7ft Zarges, 10ft Zarges plus 2 step ladders. On a double Get-In/Get- Out these must be shared between both spaces. We do not have storage for flight cases, equipment, tools or rubbish. All rubbish/scrap/off cuts must be dealt with and removed by the first Saturday or Press Night, whichever comes first. When the Get-Out is complete Park Technical and the Production Manager/Company Appointed Person will do a final walk around to check everything is satisfactory. Drapes and Masking: does not stock any soft or hard masking. However, we have a collection of masking from old shows which may be recycled. Please check with Park Technical about looking at these items. Page 6 Park90 Technical Specifications Last Updated 01/01/18

Stage Management: Calls Stage managers must be on 2-way radio (with an ear piece) from the half until the end of the show, this is for essential communication with Technical and FOH and to facilitate an evacuation or emergency situation. SMs will also need to make their FOH and BOH calls from a paging system (located at show control). This will include House Open, 5, 3, 1 minute calls, as directed. Smoking Smoking on stage can be authorised. Please be aware that only allow the smoking of HERBAL cigarettes on our stages. Laundry There is a laundry room with a washing machine and tumble dryer backstage. This is for the use of both companies and you can usually work out a rota between you. Get-Out: You will have 30 minutes after your last show comes down (Saturday PM). Then your Get-Out time will be on the Sunday from 10am till 2pm. In this time you must ensure: All of your show s equipment, costumes, props, hires, tools and returns are dealt with and leave the building on the Sunday of your Get-Out. Limited off site storage may be arranged at a cost. All of the set is removed and the stage is as you found it. will decide if the stage area needs to be re-painted, please bring a tin of Flints Black paint. You have removed any nails, screws or staples used. All props and costumes are packed up. You have cleared and cleaned your dressing rooms (including the dressing room and green room fridges). The auditorium is clean and tidy as agreed with Park Technical and the Production Manager/Company Appointed Person. Page 7 Park90 Technical Specifications Last Updated 01/01/18

Also Available: Also at an additional charge we can provide the following additional technical equipment (subject to availability): Equipment Day Hire Week Hire 4 Week Hire Unique Hazer 40+VAT 70+VAT 224+VAT Le Maitre G-Force 1 Smoke Machine 30+VAT 60+VAT 214+VAT Wireless Hand-held Microphone 30+VAT 60+VAT 192+VAT Sure SM58 5+VAT 10+VAT 32+VAT Christie LX605 Projector 100+VAT 500+VAT 1920+VAT Yamaha Digital Piano 60+VAT 100+VAT 200+VAT If you require and crew for a Get-In or Get-Out we may be able to help book them. This is on a show by show basis. may be able to supply some other consumable items at a cost- screws, Flints black paint, painting equipment, Flambar, tape, drill bits. Prices available on request. : are as follows: Room A 7 Stations Room B 5 Stations Room C 4 Stations All dressing rooms have make up lights, mirrors and fridges. Companies will be expected to share dressing rooms in a festival style where necessary. Private/Star are not possible and it should be expected that different companies and different sexes may share dressing rooms, particularly when we have large casts. All company members should be aware of this so that their expectations are clearly managed by the Producer prior to arrival. This should be seen as a collaborative and non-territorial approach to providing great shows to audiences. Please contact the Venue Volunteer Manager to arrange dressing room allocation. Backstage Washroom Facilities: Two toilets (one with disabled access) plus two unisex showers. Page 8 Park90 Technical Specifications Last Updated 01/01/18

General Information: The entire building, including the auditoria, is air conditioned. Show relays (switchable between our two spaces) are feed to the BOH areas (dressing rooms, green rooms etc). The lighting desk and dimmers are ETC. There are patch panels in both spaces to facilitate running video/projection for shows without having to run cables around the building. Access/Parking: Get-in access is through the front doors of on. cannot offer any parking at all. On Sundays the parking restriction outside the theatre are exempt. However, as we are located close to Arsenal Football stadium, full parking restrictions are in place when there is a home match. Items coming into Park90 must comfortably fit though a doorway measuring w1004mm x h2040mm. Large items may need to be removed from flight cases in the main foyer/cafe area and carried into the theatre space. There is a small passenger lift that can also be used to transport flight cases one case at a time from street to stage level. The lift has a maximum weight capacity of 630kg. Any damage caused to the lift will result a charge to the Producer. There is very limited space outside of the theatre spaces and due to this the visiting company must make arrangements to store any empty flight cases off site for the duration of your run. It is advised that if you undertake hires for your production that an arrangement is made with the hire company to take away any empty cases following your get-in, as space is very limited. Limited off site storage may be arranged at a cost. Thank you have a great run VWX, DXF/DWG, DWF files available on request Seating, LX and Set plans Are Below: Page 9 Park90 Technical Specifications Last Updated 01/01/18

Access THRUST 1 87 Seats Crossover 4,480mm 5,361mm, Park90 Park 90 Corridor Deputy

Access *Raised stage in this area must be aproved 1,200mm THRUST 2 6,070mm 82 Seats Crossover 4,276mm *SET DESIGN - PLEASE NOTE: If you plan to raise the stage above floor level in the hatched area of the playing space shown on this seating configuration - this will need to be Risk Assessed by youselves and must be approved by Park Technical. In addition, if you raise the floor here you may need to provide an ASM at stage level to oversee your Risk Assessed Fire Evacuation Plan., Park90 Park 90 Corridor Deputy

Access *Raised stage in this area must be approved 1,200mm 4,709mm +450mm L SHAPE 4,411mm 92 Seats Crossover *SET DESIGN - PLEASE NOTE: If you plan to raise the stage above floor level in the hatched area of the playing space shown on this seating configuration - this will need to be Risk Assessed by youselves and must be approved by Park Technical. +450mm In addition, if you raise the floor here you may need to provide an ASM at stage level to oversee your Risk Assessed Fire Evacuation Plan. +600mm, Park90 Park 90 Corridor Deputy

Access *Raised stage in this area must be aproved 1,200mm +450mm +600mm END ON 88 Seats Crossover 7,194mm 3,461mm *SET DESIGN - PLEASE NOTE: If you plan to raise the stage above floor level in the hatched area of the playing space shown on this seating configuration - this will need to be Risk Assessed by youselves and must be approved by Park Technical. In addition, if you raise the floor here you may need to provide an ASM at stage level to oversee your Risk Assessed Fire Evacuation Plan., Park90 Park 90 Corridor Deputy

Access IN THE ROUND 4,276mm 94 Seats 5,430mm Crossover, Park90 Park 90 Corridor Deputy

Access IN THE ROUND (Extra Short Row) 4,276mm 98 Seats 4,480mm Crossover, Park90 Park 90 Corridor Deputy

Access IN THE ROUND (Extra Long Row) 102 Seats 5,430mm 3,326mm Crossover, Park90 Park 90 Corridor Deputy

Access +600mm Tread Tread TRAVERSE 8,346mm 76 Seats Crossover 3,530mm Tread Tread +600mm +600mm, Park90 Park 90 Corridor Deputy

Access +600mm Tread Tread TRAVERSE (Extra Row) 88 Seats 2,557mm 8,346mm Crossover Tread Tread Tread +600mm, Park90 Park 90 Corridor Deputy

1,567mm Roof Light Lighting Grid Technical Gallery 1,106mm 4,400mm 1,897mm 3,380mm 2,684mm 9,594mm Section Through Park 90, Park90 Deputy

10,087mm 1,741mm 1,821mm 1,010mm Access ALCOVE Ceiling Height Approx 2096mm OVERHANG Height Approx 3380mm 1,567mm 6,775mm MAIN SPACE Height Approx 4659mm 9,594mm 8,346mm 1,108mm Crossover, Park90 Park 90 Corridor 1,054mm 6,689mm Deputy 1,697mm

1,040mm Access 1,162mm PLB3 Crossover 1 2 3 DMX1 4 5 ND101 Floor Level *Paired with 6 sockets on Tech Gallery Only Ladder On/Off the Tech Gallery 40 33 26 19 47 Lower Bar @ 3200mm from floor 12 39 32 25 18 46 6,000mm 11 38 37 31 30 24 23 17 16 10 43 44 45 6,778mm 6,778mm 9 15 8 Tech Gallery @ 2656mm to ceiling Park Equipment Storage 36 29 22 8 7 ND106 ND105 ND104 ND103 ND2 34 35 DMX 7 27 28 DMX 6 20 21 DMX 5 13 14 DMX 9 DMX 3 42 DMX 48 6 41 PLB4 1 2 3 DMX2 4 5 ND101 Tech Gallery @ 2656mm to ceiling Tech Control Amp Racks Park Equipment Storage Tech Gallery Level *Paired with 6 sockets on Floor Level 8,372mm LX DESIGN - PLEASE NOTE: LX Bars in GREEN are approx 4400mm from floor level. LX Bar in BLUE are approx 3200mm from floor level., Park90 Park 90 Corridor Deputy