EC456 Power System Protection Lab #1 Overcurrent Protection Relay

Similar documents
BE3-GPR GENERATOR PROTECTIVE RELAY

1 Summary screens are split into two with one screen showing Overcurrent settings and the

Synchronization Check Relay ARGUS 7

Generator protection relay

IQ Analyzer 6400/6600 Series. Cutler-Hammer Power Management Products High End Metering Capabilities

Kyongbo Electronics Co., Ltd.

Functional overview. System configuration FAQ

Transient Stability Events & Actions

ECE 2274 Pre-Lab for Experiment Timer Chip

PQ-Box 100 Quick Start Instructions

Intertie Protection M 3520

An Analysis of a Permissive Overreaching Transfer Trip Scheme at a 120kV Substation

PSC300 Operation Manual

INSTRUCTION MANUAL BREAKER FAILURE RELAY GRC100

Panasonic Broadcast. AW-HE100 Menu Information

ORDERING Page 6 BASLER RELAY STANDARDS, DIMENSIONS, ACCESSORIES Request bulletin SDA

SC24 Magnetic Field Cancelling System

REF620_NAFCCAC3FFxxxAx1xx SINGLE LINE DIAGRAM (TYPICAL) 1MAC DR. Bus 1 (Open Delta) (2)

CURRENT INJECTION RELAY TESTER CR-100. ( Code P60212 (770081) ) INSTRUCTIONS MANUAL ( M / 05A ) (c) CIRCUTOR S.A.

CAMTO LTD. Arc detecting system DC/AC

PRINCIPLES AND APPLICATIONS

SC24 Magnetic Field Cancelling System

LAB 1: Plotting a GM Plateau and Introduction to Statistical Distribution. A. Plotting a GM Plateau. This lab will have two sections, A and B.

LMH0340/LMH0341 SerDes EVK User Guide

POWER MONITORS ENERIUM RANGE. Minimize your energy consumption and optimize your installation

Software Manual Control Panel for Professional Single Booster Units Models: MM3 BW3

Communication-Assisted Transfer Trip Schemes

multi-function meters

Grid Interactive Advanced Features Self-Supply Mode

PHY221 Lab 1 Discovering Motion: Introduction to Logger Pro and the Motion Detector; Motion with Constant Velocity

ECE438 - Laboratory 4: Sampling and Reconstruction of Continuous-Time Signals

ORDERING Page 6 STANDARDS, DIMENSIONS and ACCESSORIES Request bulletin SDA

User Guide Stand-Alone Metering for OptiPlant

CDHD Servo Drive. Technical Training Manual. Manual Revision: 2.0 Firmware Version: 1.3.x Software Version: 1.3.x.x

Toronto Hydro - Electric System

SC26 Magnetic Field Cancelling System

Telephony Training Systems

ME EN 363 ELEMENTARY INSTRUMENTATION Lab: Basic Lab Instruments and Data Acquisition

Controllers, series CON Indicators, series IND. Controllers and indicators

E X P E R I M E N T 1

CHA EVAPORATOR Short Reference User guidelines

The DataView PowerPad III Control Panel

OWL micro+ WIRELESS ELECTRICITY MONITOR

DMX and 4000 air circuit breakers from 800 to 4000 A

AMIQ-K2 Program for Transferring Various-Format I/Q Data to AMIQ. Products: AMIQ, SMIQ

Activity P27: Speed of Sound in Air (Sound Sensor)

MSP 200PRO Quick Start

Operating Manual RISH OPTIMA VAF

MCR3 POWER EQUIPMENT. Microprocessor Controlled Constant Current Regulator. Compliance with Standards. Uses. Features

DAAB DB409 INSTRUCTION MANUAL FOR THE VFD-EL FREQUENCY CONVERTER. For the DAAB EP104 automatic control system with software version 4.

Experiment: Real Forces acting on a Falling Body

D-901 PC SOFTWARE Version 3

Agilent MOI for HDMI 1.4b Cable Assembly Test Revision Jul 2012

VSP 516S Quick Start

Aurora Grid-Tie Installation Instructions (Model Number: PVI-3.0-OUTD-US-W) Revision 4.1

MICROPROCESSOR-BASED METERING EQUIPMENT SECTION SECTION 16901

TL-2900 AMMONIA & NITRATE ANALYZER DUAL CHANNEL

VSP 198CVS Quick Start

NERC Reliability Standard PRC-024 Generator Frequency and Voltage Protective Relay Settings

RYKO Italia s.r.l. V. Casale Morano Po (Al) t f

Form C: Type Test Verification Report

Form C: Type Test Verification Report

A summary of all menu lines available in self-diagnostic mode is shown below.

For applications from 0.25 to 5 HP, the MD60 is a simple AC Microdrive that can be panel mounted as well as wall or machine mounted.

Telephony Training Systems

Marshall. M-CT5 Camera-Top Monitor Owner s Manual M-CT5. Camera-Top Monitor. Owner s Manual

Dimensions. Model Number. Electrical connection. Features. Pinout Product information. Indicators/operating means. LGS25 Serie.

CyAn User Manual. Flow & Mass Cytometry Center Biomedical Core facility. Technion Faculty of Medicine

We ve got the best technology to fit your power monitoring needs. Scenario works on all!

ITS-I. Test station for evaluation of image quality of image intensifier tubes. Fig. 1. Photo of the ITS-I test station: a)photo, b)block diagram

GS122-2L. About the speakers:

MonitorKey Operation Manual: content/uploads/ MonitorKey Operation Manual.pdf

INSTRUCTION MANUAL AUTORECLOSING RELAY GRR100 - B

PHASE HL SEL 1 HL SEL 2 EXT MONITOR ELAN ELAN ELAN ELAN MLM-201 HLM-201 HLM-201 TBM-201 MLM-201 GAIN GAIN GAIN LEFT GAIN RIGHT SELECT SELECT SELECT

B2 Spice A/D Tutorial Author: B. Mealy revised: July 27, 2006

Operating Instructions

Safety Light Curtain Orion1 Extended

RT-DRIVE DLM808 DIGITAL PROCESSOR AUDIO MATRIX PROCESSOR

INSTRUCTION MANUAL POWER QUALITY ANALYZER

User Manual CC DC 24 V 5A. Universal Control Unit UC-1-E. General Information SET. Universal Control Unit UC-1 Of Central Lubrication PAUSE CONTACT

Calibrating and Profiling Your Monitor

HS-509 VIBRATION TRIP MODULE

EDL8 Race Dash Manual Engine Management Systems

UNIVERSAL DIGITAL METER DC Volts and Amps AC RMS Volts and Amps Thermocouples and RTDs Process Signals Strain Gauge and Load Cell

Procurement of IC TESTER & TRAINER KITS, OSCILLOSCOPES, FG S, DECADE BOXES AND ANALOG METERS

COMPANY. MX 9000 Process Monitor. Installation, Operating & Maintenance Manual AW-Lake Company. All rights reserved. Doc ID:MXMAN082416

Session 1 Introduction to Data Acquisition and Real-Time Control

Automatic Transfer Switch Control PLC Operator s Manual

USER MANUAL. Compact dimensions 6 DIN modules, with 4 LED s display with 7 segments, for an excellent reading of the measurements

P XGA TFT Monitor. User s Manual

Installation and User Guide 458/CTR8 8-Channel Ballast Controller Module

VIDEO ALARM VERIFICATION UNIT VIVER

Dual Power and Control. Backup System. Armor. SUT43X Series. Ideal Solution For Control Room

Yellow Frog. Manual Version 1.1

SEL-251 SEL SEL DISTRIBUTION RELAY

DUCATI SISTEMI S. P. A. DUCA47-96 USER MANUAL

ECE 372 Microcontroller Design

VAD Mobile Wireless. OBD-II User's Manual Version 1.0

Tutorial 3 Normalize step-cycles, average waveform amplitude and the Layout program

SlimLine. Compliant to DO-160D Document # Rev H. www. rosenaviation.com. www. rosenaviation.com

Transcription:

EC456 Power System Protection Lab #1 Overcurrent Protection Relay Learning Objectives: Understand the building blocks of a numerical protection relay Understand the HMI of the relay. Establish communication between the numerical relay and computer o Setting the relay o Monitoring the relay status Set the relay parameters for the given system Inject balanced rated load to the relay and monitor its measurement online Test IDMT characteristics of the relay and plot the theoretical and actual IDMT characteristics Equipments used 1. SEL351 Overcurrent relay 2. SEL AMS relay low voltage test kit Pre-lab assignment For the section of the power distribution system shown in Figure 1 below, find the current pick-up, time dial for relay Ra. The setting of relay Rb is given below. Use the IEC normal inverse curve given by Equation 1.1 for co-ordination. 0.14 t = TD Equation 1.1 0.02 I f 1 I p I f Where: M= Multiple of pick-up setting I p TD Time dial setting Setting of relay Rb: Pick up setting = 5A; Time dial = 0.3 Figure 1. Pre-lab assignment.

Procedure Understanding the relay setting 1. Open AcSELerator software, for communicating with the SEL351 relay (icon on the desktop). 2. Open the setting file Lab #1 (In Settings => Open, select Lab#1) 3. Go through the Group 1\Set 1\ General Settings menu and check the relay general settings: Figure2. General settings The relay has been set previously to the following data: CTR Phase (I A, I, B IC ) CT Ratio, CTR:1 2000 - equivalent to the ratio of (10,000A : 5A) PTR Phase (V A, V B, B VC) PT ratio, PRT : 1 100.00 (11,000/110) - equivalent to the ratio of (11,000V : 110V) Change the phase and neutral CT ratio for the relay Rb defined in the Pre-lab. 4. Go through the Group 1\ Set 1\ Phase Time Overcurrent and check if Time Delayed Phase Overcurrent element is enabled (51T). The selection on the top dialog box must be set to 1 ECE 456b Lab #1 / 2008 2

Figure3. Phase Time Overcurrent settings The pick-up setting is set to: 5.00 A The IDMT curve is selected as C1 (IEC normal inverse) 0.14 t = TD sec 0.02 I f 1 I s The time dial setting is set to 1.0 Change the pick-up setting and time dial setting for the relay Rb defined in the Pre-lab. 5. Check the programming of the output contacts in the Group1\Logic 1\Output Contacts section of the setting file. The OUT 101 Output Contact supposed to be set to TRIP. Figure 4. Output contact settings ECE 456b Lab #1 / 2008 3

6. Save setting file and send it to the relay SEL-351. First from File menu select Save and store it in Lab#1_Rb. There are two File menus in Figure 4 - choose the one below. Then select Send from the same File menu and transfer settings file to the device. This procedure takes few minutes. Injecting a balanced load to the relay 1. We will use SEL-AMS relay low voltage test kit to test the relay 2. Start SEL-5401 software (icon on the desktop). 3. Open the front panel control interface of SEL-AMS from Run=>Front Panel Mode Figure 5. Front Panel settings 4. On the Front Panel set the three phase current values (IA, IB, IC) to 1.00A and set the phase angles of A, B and C phases to 0, -120 and 120 degrees respectively. Set the three phase voltages VA, VB and VC to 63.5 and phase angles of A, B and C phases to 0, -120 and 120 degrees respectively. 5. Press the start button on the software window. 6. Reset the SEL-351 relay by pressing the TARGET RESET button on the front panel of the relay. 7. On the front panel of the SEL-351 relay press METER button and read the data from the LCD display. 8. With the software running, switch to the AccSelerator window and select Meter & Control from HMI menu to monitor the relay status on-line. ECE 456b Lab #1 / 2008 4

Figure 6. Meter and Control window. 9. Read the data from HMI window. 10. Observe the three phase currents and voltages measured by the relay and compare with the values injected (Remember that the relay will display the values in primary). 11. Switch to the SEL-5401 software and stop the signal injection from the Front Panel module. Close the Front Panel module alone. Testing the IDMT characteristics 1. You have the loaded IDMT test file, which was created to test the operating time of the relay and plot the IDMT characteristics. Through this test, the relay is being tested for 5 faults. (M=2, 4, 6, 8 and 10) 2. From the SEL5401 software open the pre-created IDMT test file (File => Open, select IDMT.RTA file from the C:\ECE 456\Lab#1 directory). 3. Go through the 12-stage test sequence of the loaded IDMT file and understand what is being done. ECE 456b Lab #1 / 2008 5

Figure 7. Testing sequence settings 4. Download the test file and run the test by going to Run \ Download Test and Run it on the top menu bar. 5. Observe what happens. Wait for the testing to complete. 6. Note down the operating time of the relay from the result displayed after the test is completed. The measurements for each of the test stages are displayed on a Result window (Figure 8). Figure 8. Test results ECE 456b Lab #1 / 2008 6

7. Verify the obtained result with the expected theoretical value. 8. Plot the expected and obtained curves on the graph sheet. 9. Repeat the entire experiment for the relay Ra defined in the Pre-lab. ECE 456b Lab #1 / 2008 7