Pre-Inspection Reports Part 2a Orange and Blue Lines

Similar documents
Mezzanine Inspection Reports Part 1b Green and Yellow Lines

This SOP is applicable to all WMATA personnel working on the Rail System, contractors performing the work and WMATA contractor escorts.

SITE All work shall be performed at Center Park Substation (1895 Kernan Blvd, Jacksonville, Fl ). DATE: 04/03/2018

Minimum qualifications for the Telecommunications Engineer are: A. Texas Licensed Profession Engineer (PE)

Toronto Hydro - Electric System

Target Interface / Construction Compliance Inspection Checklist

Operating Manual (Edition 04/2004) sinamics. Line Reactors SINAMICS G130

March 4 th, Addendum No. 1. Brooklyn College Systems Integrator Broadcast Television Equipment Project No: BY019/

ELECTRICAL SAFETY INSPECTION REPORT.

SINAMICS G130. dv/dt filter plus Voltage Peak Limiter. Operating Instructions 03/2013 SINAMICS

ACADEMIC SUCCESS CENTER THE COLLEGE AT BROCKPORT STATE UNIVERSITY OF NEW YORK PROJECT NO

Center For The Arts Towson, Maryland

Tab 10 - The NESC and Underground Applications. Restricted Siemens Industry, Inc All rights reserved.

Engineering Instruction

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

UNIVERSITY of NORTH DAKOTA LOW VOLTAGE COMMUNICATIONS STANDARDS FOR CABLING, PATHWAYS, AND SPACE

UNIFIED FACILITIES GUIDE SPECIFICATIONS

Electrical Depth CAL IT 2. Brian Smith. Introduction

Identification - electrical services

SECTION INTERCOMMUNICATIONS AND PROGRAM SYSTEMS

CONSTRUCTION SPECIFICATION FOR TRAFFIC SIGNAL EQUIPMENT

Washington Metropolitan Area Transit Authority (WMATA) Ridership

GESTAMP CHATTANOOGA, LLC CHATTANOOGA, TENNESSEE

Ralph Engelstad Arena. PROMOTER S GUIDE Technical Facility Information. REA Technical Facility Information Updated 7/28/14

SECTION MEDIUM VOLTAGE CABLE INSTALLATION. 1. Section Underground Ducts and Manholes.

IndyGo Facility Upgrades Project 35671EE

ELECTRICAL SAFETY INSPECTION REPORT. MTM Garments Ltd.

HONEYWELL VIDEO SYSTEMS HIGH-RESOLUTION COLOR DOME CAMERA

1. The contractor shall ensure that: c) Contractor or sub-contractor has at least 5 years experience

Magnecraft General Purpose Relays 750R Series DPDT and 3DPT, 10 A

ITU/PITA Workshop on Submarine Cable Access in the Pacific Islands Countries Holiday Inn Hotel, Suva, Fiji, 31 July-3 August 2017

Mobility Pass. Mobility

SECTION BASIC COMMUNICATIONS TECHNICAL REQUIREMENTS

SINAMICS G130 / G150. Line harmonics filter. Operating Instructions 05/2010 SINAMICS

BILOXI PUBLIC SCHOOL DISTRICT. Biloxi Junior High School

Trusted 40 Channel 120 Vac Digital Input FTA

Generator protection relay

TRAFFIC SIGNAL DESIGN GUIDELINES

Operating Instructions 07/2007 Edition. SINAMICS G130/G150 Line harmonics filter. sinamics

1. Technology: Solar PV 2. Maximum Power: 50 kw 3. Contribution to fault levels: N/A 4. Size & rating of the relevant Transformer: N/A 5.

ELECTRICAL SAFETY INSPECTION REPORT

ELECTRICAL SAFETY INSPECTION REPORT

UNM IT/Telecommunications Guide Specification Labeling 11/07/

Operating Instructions Dimmer for V Incandescent Lamps

Trusted 40 Channel 120 Vac Digital Input FTA

VERIZON MARYLAND INC.

Automatic Transfer Switch Control PLC Operator s Manual

SceneStyle2 User Guide

Order Form SwingRiser (HRG 220) Single Gate Operator

OPTEVA 828 LOBBY ATM FRONT LOAD PLAN VIEW FRONT ELEVATION SIDE ELEVATION

MILLITARY SPECIFICATION SHEET

M-relays, 2, 3 or 4 pole, 7-12 A Datasheet

Screening Lumps and Foreign Particles from Sugar

INSTALLATION INSTRUCTIONS MODEL VSBX-236 LED 3 X 8 INDOOR SCOREBOARD

JAMAR TRAX RD Detector Package Power Requirements Installation Setting Up The Unit

INSTALLATION INSTRUCTIONS FOR. MODEL 2230LED

Illustrated Feature. Options

Automatic Test System AT-S + with STAR + Technology Features

Georgia World Congress Center 285 Andrew Young International Blvd Atlanta, GA Engineering Dept: Fax:

The Chan-L-Wire Pro Series Lighting Distribution

GUIDELINES FOR CABLE LAYING (PEM ELECTRICAL)

Upgrading to LEDs?: Things to Think About So it Doesn t Go Horribly, Horribly Wrong

High performance circuit breakers

Cable installation guidelines

CONSTRUCTION SPECIFICATION FOR CLOSED-CIRCUIT TELEVISION INSPECTION OF PIPELINES

SECTION CONTROL, COMMUNICATION AND SIGNAL WIRING

Trusted 40 Channel Analogue Input FTA

Safety Codes Council Conference Banff C Panel Discussion

ELECTRICAL SAFETY FOLLOW UP INSPECTION REPORT (8th) Factory Name Address Factory ID

CONSTRUCTION SPECIFICATION FOR CLOSED-CIRCUIT TELEVISION (CCTV) INSPECTION OF PIPELINES

42 LCD Overhead Video Display Support Specifications Electricity required on the rear curtain wall

INSTALLATION INSTRUCTIONS FOR

Student Services & Classroom Addition

In the proposed amendment below, text shown with underline is proposed to be added and text shown with strikethrough is proposed to be removed.

Accessibility Advisory Committee

A IR-BL O W N SOLUTION C O D. M I C R O C O D. M I C R O D U C T

Product Information. EIB 700 Series External Interface Box

General 64E4 Cultural Center is a flexible black box theater that holds 72 people including cast and crew

CAMTO LTD. Arc detecting system DC/AC

Section Communications Optical Fiber Backbone Cabling

ALTERNATIVE BROADCAST INSPECTION PROGRAM

System 2000 System 2000 HLK relay insert. 1 Safety instructions. 2 Device components. 3 Function. Order No. : Operating instructions

2019 Ford Theatres Artists Partnership Program. Day of Show Guidelines. Day of Show Guidelines. Arrival. Departure. Know Before You Go.

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of January 23, 2016 SUPPLEMENTAL REPORT REVISED DRAWINGS AND AMENDED CONDITIONS

FORENSIC CASEBOOK. By Bob Huddleston, Eastman Chemical Co. One of the most common. reasons for marriage failure

Power and Control T YPE BY RAVI GANATR November/December IAEI NEWS

LIGHTING: ENCLOSED AND GASKETED AREA FLUORESCENT. Applications. Illustrated Feature. Certifications and Compliances

Information Technology Services DESIGN AND INSTALLATION STANDARDS

SECTION O FIBER OPTICS

TRANSCENSION 6-CHANNEL DMX DIMMER PACK (order code: BOTE40) USER MANUAL

Basic Level Crossing CCTV Notes. Page one of five

50 mw green DMX laser

Installation Manual IPT Installation of skillet systems with 125 A track current. MV a-E.

1A - Region 3, Area 1 OAP Competition Saturday, March 31, 2018

16 Amp Electronic 24 Hour/7 Day Time Controller

CLT17620AVControlRoom-RA.doc Page 1 CENTER FOR LEARNING AND TECHNOLOGY - A/V PRODUCTION ROOM 104 CLT PROD ROOM.doc

Selecting the correct cable type for Outside Plant Application

Triax TechInfo. Installing and pulling Fibre Optic cables

Functional overview. System configuration FAQ

VSAT Installation and Maintenance. Presenter: E. Kasule Musisi ITSO Consultant Cell:

Transcription:

ELECTRICAL AND DATA CABLE INSTALLATION for Washington Metropolitan Area Transit Authority Contract Number FQ17021 VOLUME 4 Pre-Inspection Reports Part 2a Orange and Blue Lines November 13, 2016 Final Submission

WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY VOLUME 4 PRE-INSPECTION REPORTS PART 2A ORANGE & BLUE LINES TABLE OF CONTENTS PAGE NO. 1 MIR_C01_METRO CENTER (NORTH MEZZANINE)_MZ035 2 MIR_C01_METRO CENTER (SOUTH MEZZANINE)_MZ052 3 MIR_C02_MCPHERSON SQUARE (EAST MEZZANINE)_MZ036 3 4 MIR_C02_MCPHERSON SQUARE (WEST MEZZANINE)_MZ037 21 5 MIR_C03_FARRAGUT WEST (EAST MEZZANINE)_MZ038 37 6 MIR_C04_FOGGY BOTTOM-GWU_MZ040 50 7 MIR_C05_ROSSLYN_MZ041 72 8 MIR_C05_ROSSLYN (PLATFORM)_MZ041M 9 MIR_C05_ROSSLYN (SIDE/NEW ENTRANCE)_MZ113 85 10 MIR_C06_ARLINGTON CEMETERY_MZ042 96 11 MIR_C06_ARLINGTON CEMETERY (PLATFORM)_MZ042M 12 MIR_D01_FEDERAL TRIANGLE_MZ053 120 13 MIR_D02_SMITHSONIAN (NORTH MEZZANINE)_MZ054 138 14 MIR_D02_SMITHSONIAN (SOUTH MEZZANINE)_MZ055 155 15 MIR_D02_SMITHSONIAN (EASTBOUND PLATFORM)_MZ055M 16 MIR_D03_L'ENFANT PLAZA (WEST MEZZANINE)_MZ056 177 17 MIR_D03_L'ENFANT PLAZA (EAST MEZZANINE)_MZ057 191 18 MIR_D04_FEDERAL CENTER SW_MZ058 199 19 MIR_D05_CAPITOL SOUTH_MZ059 211 20 MIR_D06_EASTERN MARKET_MZ060 226 21 MIR_D07_POTOMAC AVENUE_MZ061 243 22 MIR_D08_STADIUM-ARMORY (SOUTH MEZZANINE)_MZ062 266 23 MIR_D08_STADIUM-ARMORY (NORTH MEZZANINE)_MZ063 283 24 MIR_D09_MINNESOTA AVENUE_MZ064 300 25 MIR_D10_DEANWOOD_MZ065 316 26 MIR_D11_CHEVERLY_MZ066 333 27 MIR_D12_LANDOVER_MZ067 351 28 MIR_D13_NEW CARROLLTON_MZ068 368 29 MIR_G01_BENNING ROAD_MZ090 383 30 MIR_G02_CAPITOL HEIGHTS_MZ091 399 31 MIR_G03_ADDISON ROAD_MZ092 421 32 MIR_G04_MORGAN BOULEVARD_MZ110 440 33 MIR_G05_LARGO TOWN CENTER_MZ111 456 34 MIR_J02_VAN DORN STREET_MZ094 471 35 MIR_J03_FRANCONIA-SPRINGFIELD_MZ095 481 36 MIR_K01_COURT HOUSE_MZ096 491 37 MIR_K02_CLARENDON_MZ097 503 38 MIR_K03_VIRGINIA SQUARE_MZ098 518 39 MIR_K05_EAST FALLS CHURCH_MZ100 541 40 MIR_K06_WEST FALLS CHURCH_MZ101 553 41 MIR_K07_DUNN LORING_MZ102 575 42 MIR_K08_VIENNA_MZ103 590

Pre-Inspection Mezzanine Walkthrough Checklist Date: 12/11/2014 Station Name: McPherson Sq (East) - C02 Mezzanine #: 036 Completed By: Tino Sahoo Check Task Equipment Room ID Notes Verify that electrical power design matches the field/record. Identify locations of the electrical equipment. Verify if disconnect switch is connected to the AFC electrical power panel. Low or High voltage SMNT/POWR escorts requirements? Electrical Source Panel Name/Number: Source Breaker Name/Number: Electrical AFC Panel Name/Number: Disconnect Name/Number: "Trans NEMM-1B" SMNT/POWR escorts: NEPOA Breaker #8,10,12 Rm 211 NEMM-IB Rm 211 LOW Voltage Rm 211 Rm 211 Check if there is a shared raceway between AFC Panel and Kiosk and identify additional source panels to be de-energized. Do AFC Panel loads feed into a shared raceway e.g. trench or trough? If Yes, specify source panels in notes. NO Identify the assumed pathway of duct / conduit, the location of the handholes, manholes and boxes and accessibility or special escort requirement? PLNT COMM / IT ELES RAIL CMNT Other Access/Support: Identify handhole or manhole access requirement. Emergency Power Verification Required PLNT Mason for handhole/manhole access? Identified Conduit/Duct Transition to mezzanine level? YES (see notes) Check Task Equipment Room ID Notes YES All conduit/ducts on one level. Two handholes. Power run from Kiosk to AFC Panel is approx. 87'. Verify if AFC electrical panel is connected to an Automatic Transfer Switch (ATS). Verification of Kiosk Emergency Panel(s) (KE, KES, KESS, etc) ATS Name/Number: Source Panel Name/Number: NEME Rm 211 Source Breaker Name/Number: Breaker #'s 21,23 Rm 211 Panel Name/Number: KE (Kiosk Emergency Power) Kiosk Notes and Discrepancies: Sign Off GFP Representative WMATA PRGM Name: Signature: Date: Tino Sahoo 12/11/2014 Ver

Pictures 1&2: C02 McPherson Sq (East) Handholes in mezzanine

Picture 3: C02 McPherson Sq (East) New Kiosk to be installed in mezzanine

Pictures 4&5: C02 McPherson Sq (East) Emergency panel in Kiosk

Picture 6: C02 McPherson Sq (East) AFC Panel NEMM-IB in room 211

Picture 7: C02 McPherson Sq (East) AFC Panel NEMM-IB in room 211

Picture 8: C02 McPherson Sq (East) AFC Panel NEMM-IB in room 211 Bottom duct

Picture 9: C02 McPherson Sq (East) AFC Panel NEMM-IB in room 211 Panel schedule

Picture 10: C02 McPherson Sq (East) Disconnect switch for Trans NEMM-IB in room 211

Picture 11: C02 McPherson Sq (East) Panel NEPOA in room 211

Picture 12: C02 McPherson Sq (East) Panel NEPOA in room 211

Picture 13: C02 McPherson Sq (East) Panel NEPOA in room 211 Panel schedule

Picture 14: C02 McPherson Sq (East) Emergency Panel NEME in room 211

Picture 15: C02 McPherson Sq (East) Emergency Panel NEME in room 211 Panel schedule

Pre-Inspection Field Verification 12/11/2014 2-18"x18" square handholes

Pre-Inspection Field Verification 12/11/2014

Pre-Inspection Field Verification 12/11/2014

Pre-Inspection Field Verification 12/11/2014

Pre-Inspection Mezzanine Walkthrough Checklist Date: 12/11/2014 Station Name: McPherson Sq (West) - C02 Mezzanine #: 037 Completed By: Tino Sahoo Check Task Equipment Room ID Notes Verify that electrical power design matches the field/record. Identify locations of the electrical equipment. Electrical Source Panel Name/Number: Source Breaker Name/Number: Electrical AFC Panel Name/Number: NWPOA Breaker #2,4,6 212 212 NWMM-IB Rm 212 S.O. Request: Disconnect Switch "Trans NWMM-1B" to de-energize AFC Panel NWMM-1B; Breakers #8,10,12 on Source Panel NWPOA will de-energize Panel NWMM-1A (Shares Raceway); Verify if disconnect switch is connected to the AFC electrical power panel. Low or High voltage SMNT/POWR escorts requirements? Disconnect Name/Number: "Trans NWMM-1B" SMNT/POWR escorts: LOW Voltage Rm 212 Disconnect Switch "Trans-NWME" will de-energize Panel NWME to kill emergency power to faregates. Check if there is a shared raceway between AFC Panel and Kiosk and identify additional source panels to be de-energized. Do AFC Panel loads feed into a shared raceway e.g. trench or trough? If Yes, specify source panels in notes. YES (see notes) Panel NWMM-1A shares raceway with AFC Panel NWMM-1B. Breakers #8,10,12 on Panel NWPOA will de-energize Panel NWMM-1A. Identify the assumed pathway of duct / conduit, the location of the handholes, manholes and boxes and accessibility or special escort requirement? Identify handhole or manhole access requirement. Emergency Power Verification PLNT COMM / IT ELES RAIL CMNT Other Access/Support: Required PLNT Mason for handhole/manhole access? Identified Conduit/Duct Transition to mezzanine level? Check Task Equipment Room ID Notes NO YES Power Run from Kiosk to AFC Panel is approx 80'. All conduit/ducts on one level. No handholes. Straight shot from AFC panel to Kiosk with a 90 degree bend. Verify if AFC electrical panel is connected to an Automatic Transfer Switch (ATS). ATS Name/Number: Source Panel Name/Number: Verification of Kiosk Emergency Panel(s) (KE, KES, KESS, etc) Source Breaker Name/Number: Panel Name/Number: Disconnect switch "Trans NWME" Rm 212 Notes and Discrepancies: Sign Off GFP Representative WMATA PRGM Name: Signature: Date: Tino Sahoo 12/11/2014 Ver

Picture 1: C02 McPherson Sq (West) No handholes in mezzanine

Pictures 2&3: C02 McPherson Sq (West) Current kiosk is to be replace with new one

Pictures 4&5: C02 McPherson Sq (West) Emergency panel in Kiosk

Picture 6: C02 McPherson Sq (West) AFC Panel NWMM-1B in room 212

Picture 7: C02 McPherson Sq (West) - AFC Panel NWMM-1B in room 212

Picture 8: C02 McPherson Sq (West) - AFC Panel NWMM-1B in room 212

Picture 9: C02 McPherson Sq (West) - AFC Panel NWMM-1B in room 212 Bottom duct and conduits

Picture 10: C02 McPherson Sq (West) Transformer for AFC Panel NWMM-1B in room 212

Picture 11: C02 McPherson Sq (West) Disconnect switch for Trans NWMM-1B in room 212

Picture 12: C02 McPherson Sq (West) Emergency Panel NWME in room 212

Picture 13: C02 McPherson Sq (West) - Emergency Panel NWME in room 212 Panel schedule

Handhole not seen in field Pre-Inspection Field Verification 12/11/2014

Pre-Inspection Field Verification 12/11/2014

Pre-Inspection Field Verification 12/11/2014

Pre-Inspection Field Verification 12/11/2014

Pre-Inspection Mezzanine Walkthrough Checklist Date: 11/18/2014 Station Name: Farragut West - C03 Mezzanine #: 038 Completed By: Tino Sahoo Check Task Equipment Room ID Notes Verify that electrical power design matches the field/record. Identify locations of the electrical equipment. Verify if disconnect switch is connected to the AFC electrical power panel. Low or High voltage SMNT/POWR escorts requirements? Electrical Source Panel Name/Number: Source Breaker Name/Number: Electrical AFC Panel Name/Number: Disconnect Name/Number: SMNT/POWR escorts: SEPOA Breaker #3,5,7 Rm 201 SEMA Rm 201 HIGH Voltage Rm 201 Check if there is a shared raceway between AFC Panel and Kiosk and identify additional source panels to be de-energized. Do AFC Panel loads feed into a shared raceway e.g. trench or trough? If Yes, specify source panels in notes. NO Identify the assumed pathway of duct / conduit, the location of the handholes, manholes and boxes and accessibility or special escort requirement? PLNT COMM / IT ELES RAIL CMNT Other Access/Support: Two handholes in entrance passageway. Identify handhole or manhole access requirement. Emergency Power Verification Required PLNT Mason for handhole/manhole access? Identified Conduit/Duct Transition to mezzanine level? YES (see notes) Check Task Equipment Room ID Notes YES All conduit/ducts on one level. Verify if AFC electrical panel is connected to an Automatic Transfer Switch (ATS). Verification of Kiosk Emergency Panel(s) (KE, KES, KESS, etc) ATS Name/Number: Source Panel Name/Number: Kiosk Panel (unlabeled) Kiosk Source Breaker Name/Number: Breaker #3 Kiosk Panel Name/Number: Emergency Power to Faregates Notes and Discrepancies: Sign Off GFP Representative WMATA PRGM Name: Signature: Date: Tino Sahoo 11/18/2014 Ver

Pictures 1&2: C03 Farragut West Handholes in mezzanine

Pictures 3&4: C03 Farragut West Emergency panel in Kiosk

Picture 5: C03 Farragut West AFC Panel SEMA in Rm 201

Picture 6: C03 Farragut West AFC Panel SEMA in Rm 201

Picture 7: C03 Farragut West AFC Panel SEMA in Rm 201, bottom ducts

Picture 8: C03 Farragut West AFC Panel SEMA in Rm 201, panel schedule

Picture 9: C03 Farragut West Panel SEPOA in Rm 201

Picture 10: C03 Farragut West Panel SEPOA in Rm 201, panel schedule

Square Handholes 48' 5" First 90- degree bend 32' 6" 54' 5' Second 90- degree bend End of Hallway / Start of Escalators

Pre-Inspection Field Verification 11/18/2014

Breaker #3,5,7 Pre-Inspection Field Verification 11/18/2014

Pre-Inspection Field Verification 11/18/2014

Pre-Inspection Mezzanine Walkthrough Checklist REVISION 1 Date: 12/11/2014 Station Name: Foggy Bottom - C04 Mezzanine #: 040 Completed By: Tino Sahoo Check Task Equipment Room ID Notes Verify that electrical power design matches the field/record. Identify locations of the electrical equipment. Electrical Source Panel Name/Number: Source Breaker Name/Number: Electrical AFC Panel Name/Number: M Breaker #15 1MM & 2MM Rm C204 Rm C204 Rm C204 Verify if disconnect switch is connected to the AFC electrical power panel. Low or High voltage SMNT/POWR escorts requirements? Disconnect Name/Number: Disconnect Switch (See notes) SMNT/POWR escorts: LOW Voltage Rm C204 Disconnect switch "Panels 1MM & 2MM fed from Panel M, Circuit #15". Check if there is a shared raceway between AFC Panel and Kiosk and identify additional source panels to be de-energized. Do AFC Panel loads feed into a shared raceway e.g. trench or trough? If Yes, specify source panels in notes. NO Panels 2MPO, 1MPO, M, 1MM, and 2MM share common trough. Identify the assumed pathway of duct / conduit, the location of the handholes, manholes and boxes and accessibility or special escort requirement? PLNT COMM / IT ELES RAIL CMNT Other Access/Support: Has apron skirt. Identify handhole or manhole access requirement. Required PLNT Mason for handhole/manhole access? Identified Conduit/Duct Transition to mezzanine level? YES (see notes) Emergency Power Verification Check Task Equipment Room ID Notes YES Overhead conduit runs. Kiosk has apron skirt. Kiosk to AFC Panel power run is walker duct from Kiosk to handhole in mezzanine area via 2-2" conduits to service area room into manhole and then under slab in walker duct to AFC Panel (2MM) Verify if AFC electrical panel is connected to an Automatic Transfer Switch (ATS). ATS Name/Number: Verification of Kiosk Emergency Panel(s) (KE, KES, KESS, etc) MEE Source Panel Name/Number: Source Breaker Name/Number: Breaker #13 Rm C204 Rm C204 Kiosk Panel (unlabeled) located in Kiosk, Breaker #5 de-energizes emergency power to faregates. Panel Name/Number: KE (Kiosk Emergency Panel) Kiosk Notes and Discrepancies: Sign Off GFP Representative WMATA PRGM Name: Signature: Date: Tino Sahoo 12/11/2014 Ver

Pictures 1&2: C04 Foggy Bottom Handholes in Mezzanine

Pictures 3&4: C04 Foggy Bottom Apron skirt around Kiosk

Pictures 5-7: C04 Foggy Bottom Conduits on Mezzanine ceiling and passing through drop ceiling

Pictures 8&9: C04 Foggy Bottom Emergency panel in Kiosk

Picture 10: C04 Foggy Bottom Manhole in room C204

Picture 11: C04 Foggy Bottom AFC Panel 1MM in room C204

Picture 12: C04 Foggy Bottom AFC Panel 1MM in room C204

Picture 13: C04 Foggy Bottom AFC Panel 1MM in room C204

Picture 14: C04 Foggy Bottom AFC Panel 1MM in room C204 Bottom of panel

Picture 15: C04 Foggy Bottom AFC Panel 2MM in room C204

Picture 16: C04 Foggy Bottom AFC Panel 2MM in room C204

Picture 17: C04 Foggy Bottom AFC Panel 2MM in room C204 Panel schedule

Picture 18: C04 Foggy Bottom Disconnect Switch PANELS 1MM & 2MM FED FROM PANEL M CIR.15

Picture 19: C04 Foggy Bottom Emergency Panel MEE in room C204

Picture 20: C04 Foggy Bottom Emergency Panel MEE in room C204

Picture 21: C04 Foggy Bottom Emergency Panel MEE in room C204 Panel schedule

Picture 22: C04 Foggy Bottom Common trough for multiple panels in room C204

Pre-Inspection Field Verification 12/11/2014

Pre-Inspection Field Verification 12/11/2014

Pre-Inspection Field Verification 12/11/2014 Breaker #15-200/3P via Disconnect Switch "Panels 1MM and 2MM" via 112 KVA Transformer

DS "Panels 1MM and 2MM" Pre-Inspection Field Verification 12/11/2014

Pre-Inspection Mezzanine Walkthrough Checklist Date: 01/15/2015 Station Name: Rosslyn - C05 Mezzanine #: 041 Completed By: Tino Sahoo Check Task Equipment Room ID Notes Verify that electrical power design matches the field/record. Identify locations of the electrical equipment. Electrical Source Panel Name/Number: Source Breaker Name/Number: Electrical AFC Panel Name/Number: SWBD Rosslyn XFMR F1-F2 F2 Rm 112 Rm 112 Rm C304 Room 112 is AC SWBD room. For LOTO Procedures, steps should be done in this order: 1) Place ATS #2 in Maintenance mode. 2) LOTO 'Enclosed MCB#2'. 3) LOTO Breaker 'XFMR F1-F2' found on 'SWBD Rosslyn'. Verify if disconnect switch is connected to the AFC electrical power panel. Low or High voltage SMNT/POWR escorts requirements? Disconnect Name/Number: SMNT/POWR escorts: HIGH Voltage Check if there is a shared raceway between AFC Panel and Kiosk and identify additional source panels to be de-energized. Do AFC Panel loads feed into a shared raceway e.g. trench or trough? If Yes, specify source panels in notes. NO Identify the assumed pathway of duct / conduit, the location of the handholes, manholes and boxes and accessibility or special escort requirement? Identify handhole or manhole access requirement. Emergency Power Verification PLNT COMM / IT ELES RAIL CMNT Other Access/Support: Required PLNT Mason for handhole/manhole access? Identified Conduit/Duct Transition to mezzanine level? Check Task Equipment Room ID Notes Verify if AFC electrical panel is connected to an Automatic Transfer Switch (ATS). ATS Name/Number: ATS #2 Rm 112 Source Panel Name/Number: Kiosk Panel (Not labeled) Kiosk Verification of Kiosk Emergency Panel(s) (KE, KES, KESS, etc) Source Breaker Name/Number: Breaker #2 Kiosk Panel Name/Number: Emergency Power Faregates Notes and Discrepancies: NO YES Straight shot. No visible handholes. All conduit/ducts on one level. Emergency feed to ATS #2 is enclosed MCB #2. Sign Off GFP Representative WMATA PRGM Name: Signature: Date: Tino Sahoo 1/15/2015 Ver

Picture 1: C05 Rosslyn Handholes in mezzanine on paid side

Picture 2: C05 Rosslyn No handholes in mezzanine on free side

Picture 3: C05 Rosslyn SWBD breaker for XFMR F1-F2 in room 112

Picture 4: C05 Rosslyn AFC Panel F2 in room C304

Picture 5: C05 Rosslyn AFC Panel F2 in room C304, Panel schedule

Picture 6: C05 Rosslyn AFC Panel F1 in room C304

Picture 7: C05 Rosslyn AFC Panel F1 in room C304, Panel schedule

Pictures 8&9: C05 Rosslyn Shared trough for panels F1 & F2 in room C304

Straight shot. No visible handholes. Pre-Inspection Field Verification 1/15/2015

Pre-Inspection Field Verification 1/15/2015

Pre-Inspection Field Verification 1/15/2015 Breaker 'XFMR F1-F2'

Pre-Inspection Field Verification 1/15/2015

Pre-Inspection Mezzanine Walkthrough Checklist Date: 01/15/2015 Station Name: Rosslyn - C05 (NEW) Mezzanine #: 113 Completed By: Tino Sahoo Check Task Equipment Room ID Notes Verify that electrical power design matches the field/record. Identify locations of the electrical equipment. Electrical Source Panel Name/Number: Source Breaker Name/Number: Electrical AFC Panel Name/Number: LM-MCC Breaker 'XFMR TF-1' F1 Rm W108 Rm W108 Rm W110 Room W108 is mechanical room. Room W110 is electrical room. Verify if disconnect switch is connected to the AFC electrical power panel. Low or High voltage SMNT/POWR escorts requirements? Disconnect Name/Number: SMNT/POWR escorts: HIGH Voltage Check if there is a shared raceway between AFC Panel and Kiosk and identify additional source panels to be de-energized. Do AFC Panel loads feed into a shared raceway e.g. trench or trough? If Yes, specify source panels in notes. NO Identify the assumed pathway of duct / conduit, the location of the handholes, manholes and boxes and accessibility or special escort requirement? PLNT COMM / IT ELES RAIL CMNT Other Access/Support: Identify handhole or manhole access requirement. Emergency Power Verification Required PLNT Mason for handhole/manhole access? Identified Conduit/Duct Transition to mezzanine level? YES (see notes) Check Task Equipment Room ID Notes YES Conduit/ducts on multiple levels. Power duct run from Kiosk to AFC Panel is approx. 70'. Verify if AFC electrical panel is connected to an Automatic Transfer Switch (ATS). Verification of Kiosk Emergency Panel(s) (KE, KES, KESS, etc) ATS Name/Number: Source Panel Name/Number: Source Breaker Name/Number: Panel Name/Number: Notes and Discrepancies: Sign Off GFP Representative WMATA PRGM Name: Signature: Date: Tino Sahoo 1/15/2015 Ver

Pictures 1&2: C05 Rosslyn (NEW) Handholes in mezzanine

Picture 3: C05 Rosslyn (NEW) Handholes in mezzanine

Picture 4: C05 Rosslyn (NEW) Emergency Panel KN and Panel KE in Kiosk

Pictures 5&6: C05 Rosslyn (NEW) Emergency Panel KN and Panel KE in Kiosk, Panel schedules

Picture 7: C05 Rosslyn (NEW) AFC Panel F1 in room W110

Picture 8: C05 Rosslyn (NEW) AFC Panel F1 in room W110, Conduits and troughs above panel

Picture 9: C05 Rosslyn (NEW) AFC Panel F1 in room W110, Ducts below panel

Picture 10: C05 Rosslyn (NEW) AFC Panel F1 in room W110, Panel schedule

Pre-Inspection Field Verification 1/15/2015 Room W108 Mechanical room. Room W110 Electrical room. CONTRACT NO. DESIGNED DRAWN CHECKED APPROVED DATE DATE DATE DATE DATE BY REVISIONS DESCRIPTION DEPARTMENT OF ENVIRONMENTAL SERVICES Transportation Division 2100 Clarendon Boulevard, Suite 900 Arlington, VA 22201 WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY APPROVED PROJECT MANAGER SCALE ROSSLYN STATION ACCESS IMPROVEMENT PROJECT DRAWING NO.

KEYED NOTES: GENERAL NOTES: Pre-Inspection Field Verification 1/15/2015 SINGLE LINE DIAGRAM CONTRACT NO. DESIGNED DRAWN CHECKED APPROVED DATE DATE DATE DATE DATE BY REVISIONS DESCRIPTION DEPARTMENT OF ENVIRONMENTAL SERVICES Transportation Division 2100 Clarendon Boulevard, Suite 900 Arlington, VA 22201 WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY APPROVED PROJECT MANAGER SCALE ROSSLYN STATION ACCESS IMPROVEMENT PROJECT DRAWING NO.

Pre-Inspection Mezzanine Walkthrough Checklist Date: 11/18/2014 Station Name: Arlington Cemetery - C06 Mezzanine #: 042 Completed By: Tino Sahoo Check Task Equipment Room ID Notes Verify that electrical power design matches the field/record. Identify locations of the electrical equipment. Verify if disconnect switch is connected to the AFC electrical power panel. Low or High voltage SMNT/POWR escorts requirements? Electrical Source Panel Name/Number: Source Breaker Name/Number: Electrical AFC Panel Name/Number: Disconnect Name/Number: SMNT/POWR escorts: N. Dist. PNL; S. Dist. PNL Rm C206 Breaker #1; Breaker #7 Rm C206 F-1; F-2 Rm 100 HIGH and LOW Voltage S.O. Request: Breaker #1 on source Panel N. Dist. PNL to de-energize AFC Panel F-1. Breaker #7 on source Panel S. Dist. PNL to de-energize AFC Panel F-2. Check if there is a shared raceway between AFC Panel and Kiosk and identify additional source panels to be de-energized. Do AFC Panel loads feed into a shared raceway e.g. trench or trough? If Yes, specify source panels in notes. NO Identify the assumed pathway of duct / conduit, the location of the handholes, manholes and boxes and accessibility or special escort requirement? Identify handhole or manhole access requirement. Emergency Power Verification PLNT COMM / IT ELES RAIL CMNT Other Access/Support: AFC Required PLNT Mason for handhole/manhole access? Identified Conduit/Duct Transition to mezzanine level? YES (see notes) Check Task Equipment Room ID Notes YES Exit fare machines AM2972 and AM2974 need to be opened to see if possible handholes are located inside machines. PLNT requested in case there is handhole inside AFC machine. Power run from Kiosk to AFC Panel is overhead 2" conduit and is 70' long. Verify if AFC electrical panel is connected to an Automatic Transfer Switch (ATS). ATS Name/Number: Source Panel Name/Number: E Rm C206 Verification of Kiosk Emergency Panel(s) (KE, KES, KESS, etc) Source Breaker Name/Number: Breaker #5 Rm C206 Panel Name/Number: Kiosk Emergency Panel Kiosk Notes and Discrepancies: Sign Off GFP Representative WMATA PRGM Name: Signature: Date: Tino Sahoo 11/18/2014 Ver

Picture 1: C06 Arlington Cemetery Handholes in Mezzanine

Picture 2: C06 Arlington Cemetery Handholes in Mezzanine

Picture 3: C06 Arlington Cemetery Handholes possibly located under fare-card machines

Pictures 4: C06 Arlington Cemetery Emergency panel in Kiosk

Pictures 5: C06 Arlington Cemetery AFC Panel F-1 in Room 100

Picture 6: C06 Arlington Cemetery AFC Panel F-1 in Room 100

Picture 7: C06 Arlington Cemetery AFC Panel F-1 in Room 100

Picture 8: C06 Arlington Cemetery AFC Panel F-1 in Room 100 Conduits above panel

Picture 9: C06 Arlington Cemetery AFC Panel F-1 in Room 100 Conduits below panel

Picture 10: C06 Arlington Cemetery AFC Panel F-1 in Room 100 Panel schedule

Picture 11: C06 Arlington Cemetery Emergency Panel E in Room C206

Picture 12: C06 Arlington Cemetery Emergency Panel E in Room C206 Panel schedule

Picture 13: C06 Arlington Cemetery North Dist. Panel in Room C206

Picture 14: C06 Arlington Cemetery North Dist. Panel in Room C206 Breaker 1

Picture 15: C06 Arlington Cemetery North Dist. Panel in Room C206 Panel schedule

Picture 16: C06 Arlington Cemetery South Dist. Panel in Room C206

Picture 17: C06 Arlington Cemetery South Dist. Panel in Room C206 Panel schedule

Picture 18: C06 Arlington Cemetery Panel F-2 in Room C206

Picture 19: C06 Arlington Cemetery Panel F-2 in Room C206 Panel schedule

~70ft Pre-Inspection Field Verification 11/18/2014

Pre-Inspection Field Verification 11/18/2014

Pre-Inspection Field Verification 11/18/2014 Breaker #1

Pre-Inspection Field Verification 11/18/2014