Activities from Cyclotron facility at German Cancer Research Center (DKFZ), Heidelberg

Similar documents
III. Proton-therapytherapy. Rome SB - 3/5 1

Improvements to Siemens Eclipse PET Cyclotron Penning Ion Source

Cyclotron Institute upgrade project. H. L. Clark, F. Abegglen, G. Chubarian, G. Derrig, G. Kim, D. May, B. Roeder and G. Tabacaru

Recent developments in cyclotrons for proton therapy at IBA

Laboratory for Ion Beam Interactions Facilities Overview. Damir Španja

Proton Engineering Frontier Project

High Power Cyclotrons

IOT OPERATIONAL EXPERIENCE ON ALICE AND EMMA AT DARESBURY LABORATORY

Performance of a DC GaAs photocathode gun for the Jefferson lab FEL

Diamond RF Status (RF Activities at Daresbury) Mike Dykes

TECHNICAL SPECIFICATION Multi-beam S-band Klystron type BT267

The ESS Accelerator. For Norwegian Industry and Research. Oslo, 24 Sept Håkan Danared Deputy Head Accelerator Division Group Leader Beam Physics

100 MeV H - CYCLOTRON DEVELOPMENT AND 800 MeV PROTON CYCLOTRON PROPOSAL*

Particle Beam Production - A Synchrotron-Based System - Prof. Dr. Thomas Haberer Scientific-technical Director Heidelberg Iontherapy Center

RUNNING EXPERIENCE OF FZD SRF PHOTOINJECTOR

Status of BESSY II and berlinpro. Wolfgang Anders. Helmholtz-Zentrum Berlin for Materials and Energy (HZB) 20th ESLS-RF Meeting

Workshop on Accelerator Operations August 6-10, 2012 Glen D. Johns Accelerator Operations Manager

DOSE DELIVERY SYSTEM OF THE VARIAN PROBEAM SYSTEM WITH CONTINUOUS BEAM

Solid State Modulators for X-Band Accelerators

THE IBA SUPERCONDUCTING SYNCHROCYCLOTRON PROJECT S2C2

NEW CYCLOTRON DEVELOPMENTS AT IBA

Detailed Design Report

RF plans for ESS. Morten Jensen. ESLS-RF 2013 Berlin

DELIVERY RECORD. Location: Ibaraki, Japan

The PEFP 20-MeV Proton Linear Accelerator

2 Work Package and Work Unit descriptions. 2.8 WP8: RF Systems (R. Ruber, Uppsala)

Cyclotron Institute upgrade project. H. L. Clark, F. Abegglen, G. Chubarian, G. Derrig, G. Kim, D. May, and G. Tabacaru

DC ELV Accelerators: Development and Application

THE OPERATION EXPERIENCE AT KOMAC*

ESS: The Machine. Bucharest, 24 April Håkan Danared Deputy Head Accelerator Division. H. Danared Industry & Partner Days Bucharest Page 1

HIGH CURRENT IMPLANTER 200KeV - SERIES 1090 TECHNICAL DESCRIPTION

The Construction Status of CSNS Linac

Commissioning the TAMUTRAP RFQ cooler/buncher. E. Bennett, R. Burch, B. Fenker, M. Mehlman, D. Melconian, and P.D. Shidling

report L.M. Fraile, CERN PH/IS Impact of technical issues Running statistics 2006 Planning for 2007

Etching Part 2. Saroj Kumar Patra. TFE4180 Semiconductor Manufacturing Technology. Norwegian University of Science and Technology ( NTNU )

K800 RF AMPLIFIER TUBE UPGRADE

STATUS OF INDUSTRIAL ELECTRON LINAC DEVELOPMENT PROGRAMME AT BARC, INDIA

45 MW, 22.8 GHz Second-Harmonic Multiplier for High-Gradient Tests*

Status of the Jefferson Lab Polarized Beam Physics Program and Preparations for Upcoming Parity Experiments

A Brief History of High Power RF Proton Linear Accelerators

High Brightness Injector Development and ERL Planning at Cornell. Charlie Sinclair Cornell University Laboratory for Elementary-Particle Physics

RF Solutions for Science.

Operating Experience and Reliability Improvements on the 5 kw CW Klystron at Jefferson Lab

SRS and ERLP developments. Andrew moss

Upgrading LHC Luminosity

Development of high power gyrotron and EC technologies for ITER

RF considerations for SwissFEL

A PASSION FOR PERFECTION. OktaLine. The Power Pump Portfolio. Roots Pumps for Every Low and Medium Vacuum Application.

EPJ Web of Conferences 95,

Particle Therapy with the Varian / ACCEL 250 MeV S.C. Proton Cyclotron

LENS Operating Experience

Photo cathode RF gun -

RF Power Generation II

KARA and FLUTE RF Overview/status

Energy Upgrade Options for the LCLS-I Linac

The Elettra Storage Ring and Top-Up Operation

GENCOA Key Company Facts. GENCOA is a private limited company (Ltd) Founded 1995 by Dr Dermot Monaghan. Located in Liverpool, UK

Pseudospark-sourced Micro-sized Electron Beams for High Frequency klystron Applications

Status and Plans for PEP-II

Linac 4 Instrumentation K.Hanke CERN

PRESENT STATUS OF J-PARC

Development of Multiple Beam Guns for High Power RF Sources for Accelerators and Colliders

Design of the linear accelerator for the MYRRHA project

Status of the FAIR Project. Jürgen Henschel FAIR Project Leader / Technical Director GSI & FAIR

Universal High Current Implanter for Surface Modifications with ion beams Extensive range of ion species, including refractory metals Magnetic mass

Linac strategies for the lower beam energies. U. Ratzinger

G. Pittá(*), S. Braccini TERA Foundation, Novara, Italy (*) Corresponding author.

Oak Ridge Spallation Neutron Source Proton Power Upgrade Project and Second Target Station Project

PEP-II Overview & Ramp Down Plan. J. Seeman DOE PEP-II Ramp Down-D&D Review August 6-7, 2007

INFN School on Electron Accelerators. RF Power Sources and Distribution

Capability Improvements: Polarized Photoinjector*

An RF Excited Plasma Cathode Electron Beam Gun Design

Cyclotrons at Turku PET Centre

ILC Damping Ring Lattice Status Report. Louis Emery and Aimin Xiao Argonne National Laboratory Presented at KEK workshop Dec 18th, 2007

A HIGH POWER LONG PULSE HIGH EFFICIENCY MULTI BEAM KLYSTRON

Tutorial: Trak design of an electron injector for a coupled-cavity linear accelerator

Design, Fabrication and Testing of Gun-Collector Test Module for 6 MW Peak, 24 kw Average Power, S-Band Klystron

DISCLAIMER. Portions of this document may be illegible in electronic image products. Images are produced from the best available original document.

Current status of XFEL/SPring-8 project and SCSS test accelerator

2008 JINST 3 S LHC Machine THE CERN LARGE HADRON COLLIDER: ACCELERATOR AND EXPERIMENTS. Lyndon Evans 1 and Philip Bryant (editors) 2

PEP II Design Outline

The European Spallation Source

Particle Accelerator Focus Automation

CERN S PROTON SYNCHROTRON COMPLEX OPERATION TEAMS AND DIAGNOSTICS APPLICATIONS

SLAC R&D Program for a Polarized RF Gun

Hadron Therapy Technologies

Electron linac photo-fission driver for rare isotope program at TRIUMF

Periodic Seasonal Variation of Magnets Level of the STB ring

Full IEFC workshop Feb.

5 Project Costs and Schedule

DESIGN OF 1.2-GEV SCL AS NEW INJECTOR FOR THE BNL AGS*

High-power klystrons. The benchmark in scientific research. State-of-the-art RF sources for your accelerator

Joint Institute for Nuclear Research Flerov Laboratory of Nuclear Reactions

A Facility for Accelerator Physics and Test Beam Experiments

This work was supported by the National Cancer Institute, Division of Research Resources and Centers, Department of Health, Education, and Welfare.

Empirical Model For ESS Klystron Cathode Voltage

Ion Beam Analyis on the Upgraded CSIRO Nuclear Microprobe

CLP s first 400kV XLPE cable application

The FAIR plinac RF Systems

Operation of CEBAF photoguns at average beam current > 1 ma

Transcription:

7/12/2016 Page 1 Activities from Cyclotron facility at German Cancer Research Center (DKFZ), Heidelberg

7/12/2016 Page 2 Biggest Transition in the last two years

7/12/2016 Page 3 A Brief Historical Overview 1971: Bought first AEG Cyclotron (proton and He 22MeV, 3He: 28, Deutrons: 11 MeV). The acceptance test of this cyclotron was not yet finished when AEG closed their cyclotron unit due to financial problems. Thus, the cyclotron team worked for themselves for ist maintenance and repairs, ran for around 18 years

7/12/2016 Page 4 Historical overview continues.. 1988: Approval from International Peer Review Committee 1991: MC32NI cyclotron was delivered to Heidelberg. First compact cyclotron for the production of negative H and D ions (this year 2016, it complete its 25 years) 32 MeV protons, 16 MeV deuterons One year later the production of RNs for the PET was started on a regular basis

7/12/2016 Page 5 Some Important Paramenters of MC32NI Particles & energies 17 32 MeV protons / 8.5 16 MeV deuterons External beam currents 60 µa Extraction efficiency 100 % Magnet design (K = 32) Pole face Field strength Accelerating system Accelerating voltage Ion source Vacuum Gross weight Conventional open H-shape, 4 spiral sectors 135 cm ø, 10 18 cm gap 1.59 Tesla average 2 dees, 90 each 24 MHz, 30 kv Dual PIGtyp, arc: 2 kv / 2 A max. 2 x 10-7 mbar 53 tons

7/12/2016 Page 6 Layout of Heidelberg Cyclotron Hall 20 m 18m

7/12/2016 Page 7 Ion Source Tantalum Cathode Slit Opening: 0.5x 5mm 2

Viplav Gupta Division E030/E072 Heidelberg 7/12/2016 Page 8 Currently radioisotopes production from our cyclotron The cyclotron is employed for daily production of 18 F - which is further used for labelling of precursors of ; [ 18 F]Fluorodeoxyglucose (FDG), [ 18 F]Fluorethyltyrosine (FET), [ 18 F]Natrium Fluoride (NaF), [ 18 F]Fluorothymidine (FLT), [ 18 F]Fluoroazomycin Arabinoside (FAZA) [ 18 F]??? Nuklides Nuclear Reactions (Production in Cyclotron) 11 C 13 N 15 O 18 F 11 B(p,n) 11 C 16 O(p,α) 13 N 15 N(p,n) 15 O 18 O(p,n) 18 F T ½ [min] 20,3 9,97 2,03 109,8 64 Cu 64 Ni(p,n) 64 Cu 12,8 h And bimonthly/monthly production of 64 Cu for PET studies

Viplav Gupta Division E030/E072 Heidelberg 7/12/2016 Page 9 Solid Target Design

E030/E072 Division 7/12/2016 Page 10 Targets cont.. Liquid Target Design (18O)

Viplav Gupta E030/E072 Division 7/12/2016 Page 11 Diffusion Pump maintenance last week

Viplav Gupta E030/E072 Division 7/12/2016 Page 12 After 3 hours of scrubbing

7/12/2016 Page 13 Daily Problems and Confusions Problems 1) Vacuum Pumps Oil 2) Vacuum Pumps and their maintenances 3) Sparking in the tank 4) Strange Patches on Dees 5) PLC Control Panel (Tableau) defected after blackout

7/12/2016 Page 14 Confusions Upgrade is needed? Which? What? Automation Software? Which PLC RF Upgrade? Pumping upgrades?

7/12/2016 Page 15 Vacuum Pump Oils 1) Which Diffusion Pump Oils are readily available and recommended? 2) Cheap and the best? 3) Is Santovac 5 only solution for long run? Any imporvement seen? 4) Which oil now replaces the old 66A oil which is not available, Balzer 71 A or Silicon oil DC 704, or mineral oilits availability??

7/12/2016 Page 16 Vacuum Pumps and Maintenance Diffusion Pumps for next 20 years? Combination of 2 set of prevacuum systems (can it be replaced by 1 pump, efficiency in vacuum??) Maintenance?? Oil Change?? Acording to color and use or according to time interval?

7/12/2016 Page 17 Sparking in the Tank Occuring since years. Explanation? Bad transparency between radius 15cms and 50 cms Frequency of occurence increasing day by day Ion Source? Vacuum at the center??

7/12/2016 Page 18 Strange Patches on Dees Cant be only due to Oil in the tank or bad vacuum in the tank!!!!!!!!!!!!!

7/12/2016 Page 19 PLC Control Panel Defected In February 2016 there was a complete black out here and one of the PLC Tableau for feedback signals got defected. Since then looking for drawings, and the company that was responsible then in 1994 to built it in the system. It was from AEG Mannheim. The company is now overtaken by Schneider elcectric. The responsible gentlemen is retired now. In future how to deal with these problems???? Do we have all the drawings? If not then whom to contact?

7/12/2016 Page 20 Confusions 1) Upgrade SIMATIC S5?? Future of S5??????? S7???? Labview?? Any other?? Time issue? Money issue??? 2) RF Upgrade?? Is it feasible economically?? Needed?? 3) Pumps?? Oil diffusion is enough or Turbos??

7/12/2016 Page 21 Radiology Research Center (starts 2014 )

Heidelberg Division 7/12/2016 Page 22 Proposal for Research and Development Center for Radiopharmaceutical Chemistry (FER) Radiologic Research Center 900 m 1000 m 50 m 900 m 0 m in-house Courtesy: Prof. Dr. Heinz-Peter Schlemmer

Klaus Kopka E030 Division Heidelberg 7/12/2016 Page 23 Proposal for Research and Development Center for Radiopharmaceutical Chemistry (planned )???

Viplav Gupta Division E030/E072 Heidelberg 7/12/2016 Page 24 Upcoming Plans In coming years plans are: Production of more RN s from our Cyclotron for PET studies for e.g 66 Ga, 44 Sc, 89 Zr etc... Looking forward for aquiring a new Cyclotron (2018 probably) that could be used for routine production ( 18 F, 11 C) and utilizing the existing Scanditronix machine for more research work (production of more radiometals). Complete automation of our target system, beamlines, vacuum system with the help of existing automation tool SIMAT Collaborations with other partners to work more closely towards a similar goal. We Intend to run our machine, our Rolls Royce for next 20 years atleast!! Together we can and we will make difference!!

Viplav Gupta Division E030/E072 Heidelberg 7/12/2016 Page 25 Ultimate Goal

Thank You