Sample Test Project. District / Zonal Skill Competitions. Skill- Electrical Installation. Category: Construction and Building Technology

Similar documents
Identification - electrical services

Installation Guide VL-MV10. Model No.

Instrukcja montażu. FLEX LED Neon Instalacja

ELECTRICAL SAFETY INSPECTION REPORT

3M Sensored Termination (15 kv) QX-T15I-vi1-E

VITALink Taped Splice Straight Through Crimp

POET-1 P.O.E. TEST PORT MEASUREMENT TOOL INSTRUCTION BOOK

TVAC20000 User manual

Industrial Monitor Update Kit

3M Cold Shrink Splice Kit QS-III 5416A

DSX-1 Cross-Connect Procedures

Cambria County Association for the Blind and Handicapped 175 Industrial Park Road Ebensburg, PA Prepared for: Prepared by:

Wiring. Requirements

A449-6S 70 CENTIMETER FM YAGI ANTENNA MHz

TRANSCENSION 6-CHANNEL DMX DIMMER PACK (order code: BOTE40) USER MANUAL

Amphenol. Amphenol-Tuchel Electronics GmbH. C 112 Series M12 - Connectors

Instructions for Use P.154-UP (9/4) P.155-UP (9/8) P.150-UP-12 (9/12) P.150-UP-16 (9/16)

Instructions for Use P.160-AP-8 (13/8) P.160-CP-8 (13/8) P.160-CP-12 (13/12) P.160-CP-16 (13/16)

INSTRUCTION DE SÉCURITÉ SAFETY INSTRUCTION Mandatory as defined in SAPOCO/42 FIRE PREVENTION FOR CABLES, CABLE TRAYS AND CONDUITS

3M Scotchcast Mine and Portable Cable Splice and Jacket Repair Kit M-40

Vibratory Deck Sieves 15 in. (380 mm)

SAQCC FIRE D&GS TRAINING SUB COMMITTEE COURSE CURRICULUM

GENUINE PARTS ! CAUTION

USER MANUAL. WARNING Read the instructions before using the machine. EN (Original Instruction) / 1704

Connecting cables for valves, Sub-D Type codes

1byone Products Inc E Belmont Street, Ontario, CA Customer Service: GARDEN LASER LIGHT User Manual

Draft for Public Comment

Achat 115 Sub A active subwoofer. user manual

Be sure to check the camera is properly functioning, is properly positioned and securely mounted, every time you operate your vehicle.

DSP 18 Sub active subwoofer. user manual

3M Scotchcast Flexible Power Cable Splice Kits 82-F Series

Copyright Black Box Corporation. All rights reserved.

Replacing the PanelMate epro PS, PanelMate epro PS Classic, PanelMate epro PS EE, and PanelMate epro PS OD 7685x-15xx Series Backlight Assembly

Laying of cables and lines in electrical installations and data networks

3M Cold Shrink Splice Kit QS-III 5515A

COOPER POWER SERIES. 600 A 15/25 kv class DT625 T-body installation and cable preparation instructions. Deadbreak Apparatus Connectors MN650017EN

Peak Atlas IT. RJ45 Network Cable Analyser Model UTP05. Designed and manufactured with pride in the UK. User Guide


NZQA unit standard version 3 Page 1 of 7. Demonstrate knowledge of telecommunications cable systems

ISS New Audio & Visual installations Design and Physical install guidelines v1.5

Monochrome Video Monitors

HDBT Installation Guide

HighBand 25. TrueNet Category 6 Solutions

3M Cold Shrink QS-III Silicone Rubber Splice Kit 5488A-TOW/WOT

Installation Manual SaVi Note Underwater LED Light

3M Cold Shrink Splice Kit QS-III 5514A

PEM1124ENG ENGLISH. STK TERMINATION KIT FOR PLASTIC CABLE WITHOUT ARMOURING 1 kv STKR TERMINATION KIT FOR PLASTIC CABLE WITH ARMOURING 1 kv

A CENTIMETER FM YAGI ANTENNA MHz

3M Cold Shrink QS-III Splice Kit 5467A(S)-WF

BILOXI PUBLIC SCHOOL DISTRICT. Biloxi Junior High School

ELECTRICAL SAFETY INSPECTION REPORT

Backlight Replacement

Signalling Cable Equivalent Sizes

Instructions Manual

COLOUR CHANGING USB LAMP KIT

Preventing Fieldbus Physical Layer Problems

INSTRUCTION AND MAINTENANCE VIDEO MOTORE PROJECTION SCREEN

2.0 Wall Mount TV Soundbar Instruction Manual

3M Better Buried Compound Compression Closure System

CM-S23349SV. Vari-Focal IR Bullet Camera

Outdoor IR Audio Camera

CM-S38901SV TVL IR Long Range camera

Metal and Glass TV Stand for TVs up to 65 or 110 lbs. NS-HMG1856

TV44. Owner s Manual. Amplified/Outdoor Satellite Dish Clip-on Antenna

CNK JR. SERIES CABLE-NOOK JR. TABLETOP INTERCONNECT BOXES USER'S GUIDE

National Wire and Cable and National Cable Molding Headquarters Los Angeles California

MJK 7030 Float Switch Installation Instructions. Applies to Part Numbers , , and ft.

ART 7 SERIES PROFESSIONAL ACTIVE SUBWOOFERS. a new generation of speakers is born and it s ready to rock audiences all over the world

Trusted 40 Channel 120 Vac Digital Input FTA

Fieldbus Testing with Online Physical Layer Diagnostics

WCH Slack Storage Housing (WCH-SSH-2 & WCH-SSH-4-12)

CNK221 CABLE-NOOK JR. INTERCONNECT BOX USER S GUIDE

MODELS USIX-024 AND USIX-120 INSTRUCTION SHEET FOR FEDERAL SIGNAL UNISTAT STATUS INDICATOR MODEL USIX

Aspect 2 Circuit Digital Scene Control

Building + Mounting Learn Rooftop Basics

SINAMICS G130 / G150. Line harmonics filter. Operating Instructions 05/2010 SINAMICS

Register your product and get support at SDV5122/27. EN User manual

Getting ready for Fibre to the home (FTTH)

3M Cold Shrink QS4 Integrated Splice Kit QS4-15JCN-4/0-500

RECOGNITION OF PRIOR LEARNING CANDIDATE APPLICATION FORM UEE30811 CERTIFICATE III IN ELECTROTECHNOLOGY - ELECTRICIAN

Operating Instructions Dimmer for V Incandescent Lamps

INSTRUCTION MANUAL [J] [E] [C] [G] [B] [I] [H] [D] [F] [A] 0 INTRODUCTION 1 RECOMMENDATIONS 2 ACCESSORIES INCLUDED

Operating Manual (Edition 04/2004) sinamics. Line Reactors SINAMICS G130

CLF Manuals CLF Colour Par CLF Colour 12 Par CLF Colour Par 12 Version 1.0 November 2012 Version 1.0 1

T850 Day & Night Security Camera

3M Cold Shrink QS4 Integrated Splice Kit QS4-15JCN

Instructions. Cable with Armor F CAUTION. October Rev A

FORENSIC CASEBOOK. By Bob Huddleston, Eastman Chemical Co. One of the most common. reasons for marriage failure

ELECTRICAL SAFETY FOLLOW UP INSPECTION REPORT (8th) Factory Name Address Factory ID

Operating instructions

Operating Instructions

Replacing the PanelMate epro PS, PanelMate epro PS EE, and PanelMate epro PS OD 7685x-12 Series Backlight Assembly

SINAMICS G130. dv/dt filter plus Voltage Peak Limiter. Operating Instructions 03/2013 SINAMICS

ELECTRICAL SAFETY INSPECTION REPORT. MTM Garments Ltd.

Service Call: Fiber Optic Installation and Repair

Cable Testing Basic guide to cable testing for newly qualified SMTH staff or trainees.

TECHCONNECT OWNERS MANUAL

Cambridge National Engineering. Mark Scheme for June Unit R113: Electronic principles

Trusted 40 Channel Analogue Input FTA

Mobility Pass. Mobility

Transcription:

Sample Test Project District / Zonal Skill Competitions Skill- Electrical Installation Category: Construction and Building Technology Version 1 Dec 2017 Skill- Electrical Installation 1

Table of Contents A. Preface... 3 B. Test Project... 4 C. arking Scheme... 6 D. Infrastructure List... 18 E. Instructions for candidates... 19 F. Health, Safety, and Environment... 20 Version 1 Dec 2017 Skill- Electrical Installation 2

Section - A A. Preface Skill Explained: An electrician works on commercial, residential, agricultural, and industrial projects. There is a direct relationship between the nature and quality of the product required and the payment made by the customer. Therefore, the electrician has a continuing responsibility to work professionally in order to meet the requirements of the customer and thus maintain and grow the business. Electrical installation is closely associated with other parts of the construction industry and with the many products that support it, normally for commercial purposes. The electrician works internally, including the homes of customers and on small and major projects. He or she will plan and design, select and install, commission, test, report, maintain, fault find, and repair systems to a high standard. Work organization and self-management, communication, and interpersonal skills, problem solving, flexibility and a deep body of knowledge are the universal attributes of the outstanding electrician. Whether the electrician is working alone or in a team the individual takes on a high level of personal responsibility and autonomy. From working to provide a safe and reliable electrical installation and maintenance service, in accordance with relevant standards, through to diagnosing malfunctions, programming, and commissioning home and building automation systems, concentration, precision, accuracy, and attention to detail every step in the process matters and mistakes are largely irreversible, costly, and potentially life threatening. Eligibility Criteria (for IndiaSkills 2018 and WorldSkills 2019): Competitors born on or after 01 Jan 1997 are only eligible to attend the Competition. Total Duration: 4 Hrs Version 1 Dec 2017 Skill- Electrical Installation 3

Section - B B. Test Project Competitor Instruction Sheet You have 4 hours to complete this task. Each competitor has to do following to complete the given task: 1. Design the electrical circuit and submit to the expert. 2. Do wiring and installation as per the instruction while following the measurement guidelines. 3. Commissioning and testing of installation as per standard. 4. Do give utmost care to all personal and health safety while working. Example of Test Project- Electrical Installation Staircase Wiring Introduction The circuit is to be designed to operate staircase light. The staircase system taken into consideration here has one floor. The ground floor and first floor has two switches to operate a light bulb mounted on roof of staircase of the house/flat. The competitors need to do electrical wiring to achieve following functions: 1. To switch ON the light bulb (L1) from ground floor by switch (SW1),if switched OFF by first floor switch (SW2). 2. To switch OFF the light bulb (L1) from first floor by switch (SW2),if switched ON by ground floor switch (SW1). 3. It means, the light bulb can be switched ON or OFF from both SW1 and SW2. 4. The neutral wire should connect directly to light bulb L1 and phase wire of input line 5. voltage should connect to light bulb L1 through SW1 and SW2. Competitors need to complete the given tasks, keep in the mind the following observations a. Competitor need to draw the electrical circuit diagram on paper by giving all connection details of staircase wiring. b. The wiring and connection to be made on given wooden plank which is assumed as walls and roof of staircase. c. The competitor should take care of all electrical and personal safety. Version 1 Dec 2017 Skill- Electrical Installation 4

Electrical Drawing Version 1 Dec 2017 Skill- Electrical Installation 5

Section C C. arking Scheme The Assessment is done by awarding points by adopting two methods, easurement and Judgments easurement - One which is measurable Judgments - Based on Industry expectations Aspects are criteria s which are judged for assessment. In Electrical installation skill markings are done on both measurement and judgmental basis. For measurement marks awarded will be 0 or full marks and for judgmental marks will be awarded as 0- Below industry standard or no attempt: 1- eets industry standard 2- Industry standard with elements of good practice 3- Excellent in comparison to industry standard Example: If maximum marks for Judgment criteria is 1 and if all 3 Experts (Juries) give 3 points to a candidate, the candidate will get 1 mark for that aspect. If 2 Experts give 3 and 1 Expert gives 2 points, then candidate will get (3+3+2)/9*1 = 0.89 marks for that aspect out of 1 mark. Criteria ax. arks A Safety (electrical and personal) 10.00 B Commissioning and function 25.00 C Circuit design 15.00 D easurements 10.00 E Installation of equipment and wire-ways 15.00 F Wiring and termination 15.00 G Installation testing 10.00 Version 1 Dec 2017 Skill- Electrical Installation 6

Sub Criteria Name or Description Aspect Type = eas J = Judg Aspect - Description Judge Score ax ark arks Obtained A1- Health & Safety No breaches and maintained a tidy workspace = 0.5 marks 0.50 Any breach must be confirmed by at least 2 Experts and recorded in a skill log book No breaches and maintained a tidy workspace = 0.5 marks 0.50 Any breach must be confirmed by at least 2 Experts and recorded in a skill log book A2- Health & Safety No breaches and maintained a tidy workspace = 0.5 marks 1.00 Any breach must be confirmed by at least 2 Experts and recorded in a skill log book No breaches and maintained a tidy workspace = 0.5 marks 1.00 Any breach must be confirmed by at least 2 Experts and recorded in a skill log book A3- Health & Safety No breaches and maintained a tidy workspace = 0.5 marks 1.50 Version 1 Dec 2017 Skill- Electrical Installation 7

Any breach must be confirmed by at least 2 Experts and recorded in a skill log book No breaches and maintained a tidy workspace = 0.5 marks 1.50 Any breach must be confirmed by at least 2 Experts and recorded in a skill log book A4- Health & Safety No breaches and maintained a tidy workspace = 0.5 marks 2.00 Any breach must be confirmed by at least 2 Experts and recorded in a skill log book No breaches and maintained a tidy workspace = 0.5 marks 2.00 Any breach must be confirmed by at least 2 Experts and recorded in a skill log book B1- Commissioning process Installation fully complete (all equipment and covers in place) when electrical supply is requested - confirmed by at least 2 Experts with a visual check 3.00 Installation electrically safe (all equipment fixed in place and all cables connected) when electrical supply is requested - confirmed by at 3.00 Version 1 Dec 2017 Skill- Electrical Installation 8

least 2 Experts with a visual check Safe work practices during power-up (all circuits powered). If any unsafe practices observed and confirmed by at least 2 experts = 0 marks 4.00 Safe work practices during commissioning. If any unsafe practices observed and confirmed by at least 2 experts = 0 marks 4.00 Safe work practices during testing. If any unsafe practices observed and confirmed by at least 2 experts = 0 marks 4.00 No short circuits or earth faults during power-up and commissioning. If any short circuit or earth fault observed and confirmed by 2 experts = 0 marks 3.00 All equipment labelled correctly following commissioning. 2.00 Function chart completed by competitor reflecting actual function 2.00 C1-Circuit design Size - supply cabling Switch 1 1.50 Colour code as per instructions 1.50 Size - supply cabling Switch 2 1.50 Version 1 Dec 2017 Skill- Electrical Installation 9

Colour code as per instructions 1.50 Size - supply cabling CB 1.50 Colour code as per instructions 1.50 Size - supply cabling Socket 2.00 Size - cabling for lights 2.00 Size - cabling for power outlets 2.00 D1- easurements easurement 1 (Centres of socket to CB) 2.00 easurement 2 (Centres of CB to Switch2) 2.00 easurement 3 (Centres of Switch2 to Lamp1 ) 2.00 easurement 4 (Center of Lamp1 to Switch2) 2.00 easurement 5 (Center of Socket to Switch 1) 2.00 E1-Installation of Equipment Correct equipment in correct locations on back wall of cubicle as per drawing 1.25 Correct equipment in correct locations on left hand wall of cubicle as per drawing 1.25 Socket securely installed 1.25 Switch 1 securely installed 1.25 Switch 2 securely installed 1.00 Lamp 1 securely installed 1.00 Version 1 Dec 2017 Skill- Electrical Installation 10

E2-Installation of Wire ways (Trunking and tray) J PVC Trunking. Securely fitted. Joints and angles are neat with no gaps. Secure with no roll. 2.00 Below industry standard or no attempt: Joints are badly cut with excessive gaps. Lids not fitted or not fitted correctly. Roll or movement of trunking. 0 eets industry standard: Joints are neat and even but with gaps. Covers fitted. No roll or movement. 1 Industry standard with elements of good practice: Joints are neat with only some minor gaps. Covers fitted. No roll or movement. 2 Excellent in comparison to industry standard: Joints are neat with no gaps. Covers fitted. No roll or movement. 3 J Cable tray. Securely fitted. Joints and angles are neat with no gaps. Secure with no roll or movement. 2.00 Below industry standard or no attempt: Joints are badly cut with excessive gaps Cuttings have sharp edges and/or burrs. Roll or movement of tray or brackets. 0 Version 1 Dec 2017 Skill- Electrical Installation 11

eets industry standard: Joints are neat and even but with gaps. Some cuttings have sharp edges and/or burrs. No roll or movement of tray or brackets 1 Industry standard with elements of good practice: Joints are neat with only some gaps. Cuttings have no sharp edges but some burrs. No roll or movement of tray or brackets 2 Excellent in comparison to industry standard: Joints are neat with no gaps. Cuttings have no sharp edges or burrs. No roll or movement of tray or brackets 3 E3-Installation of wire ways (Cable and conduits) J Cable. Correctly clipped with straight runs and even bends. 2.00 Below industry standard or no attempt: Clips unevenly spaced. Cable not straight and even. Bends too sharp or too long. 0 eets industry standard. Cable straight and even with good bends but clips not evenly spaced. 1 Industry standard with elements of good practice: Cable straight and even with good bending and the majority of cable clips evenly spaced. 2 Version 1 Dec 2017 Skill- Electrical Installation 12

Excellent in comparison to industry standard: Cable straight and even with good bending and all cable clips evenly spaced. 3 J PVC and metal conduit. Bends, angles and jumps are even with no distortions 2.00 Below industry standard or no attempt: Saddles not evenly spaced, poor termination to trunking or boxes, poor bends with uneven radius and distortions. Jump overs not matching 0 eets industry standard: ajority of bends have even radius with some minor distortion. Saddles evenly spaced and correct terminations to trunking and boxes. Jump overs not matching. 1 Industry standard with elements of good practice: All of the bends have even radius with no distortion. Saddles evenly spaced and correct terminations to trunking and boxes. Jump overs closely matching. 2 Excellent in comparison to industry standard: All of the bends are smooth, have identical bend radius and are at the correct angles. Jump overs are matching. 3 F1-Wiring in boards J Neatness of wiring in Switch1 2.00 Version 1 Dec 2017 Skill- Electrical Installation 13

Below industry standard or no attempt: All cables not loomed or loomed but untidy. Cabling not straight and vertical into switchgear. 0 eets industry standard: All looms are neat and tidy but with some cabling crossover. Some cabling straight and vertical into switchgear. 1 Industry standard with elements of good practice: All looms neatly with very few cabling crossovers. ajority of cabling straight and vertical into switchgear. 2 Excellent in comparison to industry standards: All looms with no cabling crossovers. All cabling straight and vertical into switchgear. 3 J Neatness of wiring in Switch2 2.00 Below industry standard or no attempt: All cables not loomed or loomed but untidy. Cabling not straight and vertical into switchgear. 0 eets industry standard: All looms are neat and tidy but with some cabling crossover. Some cabling straight and vertical into switchgear. 1 Industry standard with elements of good practice: All looms neatly with very few cabling crossovers. ajority of cabling straight and vertical into switchgear. 2 Excellent in comparison to industry standards: All looms with no cabling crossovers. 3 Version 1 Dec 2017 Skill- Electrical Installation 14

All cabling straight and vertical into switchgear. J Neatness of wiring in Lamp1 2.00 Below industry standard or no attempt: All cables not loomed or loomed but untidy. Cabling not straight and vertical into switchgear. 0 eets industry standard: All looms are neat and tidy but with some cabling crossover. Some cabling straight and vertical into switchgear. 1 Industry standard with elements of good practice: All looms neat with very few cabling crossovers. ajority of cabling straight and vertical into switchgear. 2 Excellent in comparison to industry standards: All looms with no cabling crossovers. All cabling straight and vertical into switchgear. 3 F2-Cabling on tray J Neatness of cables on cable tray 1.50 Below industry standard or no attempt: All cables not cable tied or cable tied but untidy. Cables not secured properly to tray. Bends on cables are uneven. No segregation of cabling 0 eets industry standard: Cables neat and tidy but cable ties are unevenly spaced. No kinks or twists on cables. ost of the bends on 1 Version 1 Dec 2017 Skill- Electrical Installation 15

cables are even. Cables segregated correctly. Industry standard with elements of good practice: Cables neat and tidy and cable ties are evenly spaced. No kinks or twists on cables. ost of the bends on cables are even. Cables segregated correctly. 2 Excellent in comparison to industry standards: Cables well grouped and stacked, very neat and tidy and cable ties are evenly spaced. No kinks or twists on cables. All of the bends on cables are even. Cables segregated correctly. 3 F3-Terminations Switch1: All conductors securely terminated with no bare copper showing 1.50 Switch2: All conductors securely terminated with no bare copper showing 1.50 CB: All conductors securely terminated with no bare copper showing 1.50 Lamp1: All conductors securely terminated with no bare copper showing 1.50 Socket: All conductors securely terminated with no bare copper showing 1.50 Version 1 Dec 2017 Skill- Electrical Installation 16

G1-Installation Testing Insulation resistance test - instrument and procedure 2.00 Insulation resistance test - value and unit report sheet 2.00 Earth Continuity test - instrument and procedure 2.00 Earth Continuity test - value and unit report sheet 2.00 Overall operation testing of circuit 2.00 Total 100.00 Version 1 Dec 2017 Skill- Electrical Installation 17

Section - D D. Infrastructure List Infrastructure List (Tool and equipment including raw material) The quantity is given for each candidate S. No. Item Requirement/specification 1 ulti Screw Drive 1 Set 2 Plier Insulated 1 Per Competitor 3 easuring tape 1 Per Competitor 4 Spirit Lever 1 Per Competitor 5 Chauck 1 Per Competitor 6 Light Hammer 1 Per Competitor 7 ultimeter (Digital 3 ½ digit) 1 Per Competitor 8 Line Tester 1 Per Competitor Version 1 Dec 2017 Skill- Electrical Installation 18

Section E E. Instructions for candidates The Health, Safety, and Environment Policy and Regulations are given below for the skill competition on electrical installation. During the Competition Competitors UST wear ear protection and eye protection at all times. All marking points regarding health and safety marks will be made clear to all Competitors before competition begins. If the supervising Experts, who are watching the Competitors, witness any breach of the Health, Safety and Environment requirements during the Competition they will: o o o On the first occasion: Warn the Competitor and make a note of the breach; On the second occasion: Warn the Competitor and make a note of the breach; On the third occasion: A record of the breach will be made and result in a loss of the Health and Safety marks. Version 1 Dec 2017 Skill- Electrical Installation 19

Section F F. Health, Safety, and Environment 1. All accredited participants, and supporting volunteers will abide by rules and regulations with regards to Health, Safety, and Environment of the Competition venue. 2. All participants, technicians and supporting staff will wear the required protective Personnel clothing. 3. All participants will assume liability for all risks of injury and damage to property, loss of property, which might be associated with or result from participation in the event. The organizers will not be liable for any damage, however in case of Injury the competitor will immediately inform the immediate organizer for medical attention. Version 1 Dec 2017 Skill- Electrical Installation 20