UPGRADE OF THE LENS/NREP PROTON LINAC: COMMISSIONING AND RESULTS

Similar documents
LENS Operating Experience

The Construction Status of CSNS Linac

Proton Engineering Frontier Project

Oak Ridge Spallation Neutron Source Proton Power Upgrade Project and Second Target Station Project

BEAM DYNAMICS AND EXPERIMENT OF CPHS LINAC *

ESS: The Machine. Bucharest, 24 April Håkan Danared Deputy Head Accelerator Division. H. Danared Industry & Partner Days Bucharest Page 1

The ESS Accelerator. For Norwegian Industry and Research. Oslo, 24 Sept Håkan Danared Deputy Head Accelerator Division Group Leader Beam Physics

Workshop on Accelerator Operations August 6-10, 2012 Glen D. Johns Accelerator Operations Manager

RF plans for ESS. Morten Jensen. ESLS-RF 2013 Berlin

The PEFP 20-MeV Proton Linear Accelerator

Upgrading LHC Luminosity

DELIVERY RECORD. Location: Ibaraki, Japan

Evaluation of Performance, Reliability, and Risk for High Peak Power RF Sources from S-band through X-band for Advanced Accelerator Applications

Commissioning of Accelerators. Dr. Marc Munoz (with the help of R. Miyamoto, C. Plostinar and M. Eshraqi)

Mullard INDUCTOR POT CORE EQUIVALENTS LIST. Mullard Limited, Mullard House, Torrington Place, London Wel 7HD. Telephone:

THE OPERATION EXPERIENCE AT KOMAC*

DESIGN OF 1.2-GEV SCL AS NEW INJECTOR FOR THE BNL AGS*

Requirements for the Beam Abort Magnet and Dump

Beam Loss Detection for MPS at FRIB

Quick Report on Silicon G-APDs (a.k.a. Si-PM) studies. XIV SuperB General Meeting LNF - Frascati

IOT OPERATIONAL EXPERIENCE ON ALICE AND EMMA AT DARESBURY LABORATORY

PRESENT STATUS OF J-PARC

Obsolete Product(s) - Obsolete Product(s)

OPERATIONAL EXPERIENCE AT J-PARC

III. Proton-therapytherapy. Rome SB - 3/5 1

COMMISSIONING SCENARIOS FOR THE J-PARC ACCELERATOR COMPLEX

Screen investigations for low energetic electron beams at PITZ

RF considerations for SwissFEL

Diamond RF Status (RF Activities at Daresbury) Mike Dykes

Linac 4 Instrumentation K.Hanke CERN

Towards an X-Band Power Source at CERN and a European Structure Test Facility

HIGH-INTENSITY PROTON BEAMS AT CERN AND THE SPL STUDY

The FAIR plinac RF Systems

Jefferson Lab Experience with Beam Halo, Beam Loss, etc.

A HIGH-POWER SUPERCONDUCTING H - LINAC (SPL) AT CERN

Activities on FEL Development and Application at Kyoto University

Performance of a DC GaAs photocathode gun for the Jefferson lab FEL

PROJECTOR SFX SUFA-X. Properties. Specifications. Application. Tel

Design, Fabrication and Testing of Gun-Collector Test Module for 6 MW Peak, 24 kw Average Power, S-Band Klystron

4.4 Injector Linear Accelerator

Commissioning the TAMUTRAP RFQ cooler/buncher. E. Bennett, R. Burch, B. Fenker, M. Mehlman, D. Melconian, and P.D. Shidling

W (25-p) drift tubes for precision tracking in a magnetic

Beam Instrumentation for CTF3 and CLIC

Hall-B Beamline Commissioning Plan for CLAS12

Digital BPMs and Orbit Feedback Systems

BEAMAGE 3.0 KEY FEATURES BEAM DIAGNOSTICS PRELIMINARY AVAILABLE MODEL MAIN FUNCTIONS. CMOS Beam Profiling Camera

Design Studies For The LCLS 120 Hz RF Gun Injector

Particle Beam Production - A Synchrotron-Based System - Prof. Dr. Thomas Haberer Scientific-technical Director Heidelberg Iontherapy Center

Production of quasi-monochromatic MeV photon in a synchrotron radiation facility

New Spill Structure Analysis Tools for the VME Based Data Acquisition System ABLASS at GSI

Low-Energy Electron Linacs and Their Applications in Cargo Inspection

RECENT PROGRESS IN UPGRADE OF THE HIGH INTENSITY THzzz zz-fel AT OzSAKzA UNIVERSITYzzzz

P. Emma, et al. LCLS Operations Lectures

DOSE DELIVERY SYSTEM OF THE VARIAN PROBEAM SYSTEM WITH CONTINUOUS BEAM

A dedicated data acquisition system for ion velocity measurements of laser produced plasmas

Non-Invasive Energy Spread Monitoring for the JLAB Experimental Program via Synchrotron Light Interferometers

Review Report of The SACLA Detector Meeting

TESLA FEL-Report

Status and Plans for PEP-II

30 GHz Power Production / Beam Line

Progress of Beam Instrumentation in J-PARC Linac

The hybrid photon detectors for the LHCb-RICH counters

High Brightness Injector Development and ERL Planning at Cornell. Charlie Sinclair Cornell University Laboratory for Elementary-Particle Physics

Preparations for Installation, Testing and Commissioning based on Experience at CERN, SNS and Siemens

The Cathode Ray Tube

Tutorial: Trak design of an electron injector for a coupled-cavity linear accelerator

Recent developments in cyclotrons for proton therapy at IBA

Status of RF Power and Acceleration of the MAX IV - LINAC

Updates on the Central TOF System for the CLAS12 detector

Photo cathode RF gun -

The European Spallation Source

DC ELV Accelerators: Development and Application

4.9 BEAM BLANKING AND PULSING OPTIONS

Current status of XFEL/SPring-8 project and SCSS test accelerator

Low Frequency Gyrotrons for Fusion

STATUS OF THE SWISSFEL C-BAND LINEAR ACCELERATOR

GV3P80 TeSys GV3P thermal-magn motor circuit breaker 70-80A EverLink

OSTAR -Lighting. OSTAR -Lighting / OS LED M / SS 25/01/2006 Page: 1

Beam instrumentation at the 1-MW proton J-PARC RCS

PEP II Design Outline

Detailed Design Report

LIGHT PROTON THERAPY PROJECT

WAH WANG HOLDINGS (HONG KONG) CO., LTD.

Y.XST225-VF. INTERCONTROLE Escoffier 1 XYLON MG225VF RX PDS

Photoinjector Laser Operation and Cathode Performance

Karin Rathsman, Håkan Danared and Rihua Zeng. Report from RF Power Source Workshop

Precision measurements of beam current, position and phase for an e+e- linear collider

reported by T. Shintake KEK / RIKEN Japan Summary of C-band R&D for Linear Collider at KEK New soft-x-ray FEL Project at RIKEN/SPring-8

Description. Kingbright

The sc cw-linac project TASCA2012, S. Mickat, LINAC

1.0 Abstract : 2.0 The drift tube Linac for LEHIPA

Miniature Thermal Imaging Engines

CLIC Feasibility Demonstration at CTF3

Photocathodes FLASH: Quantum Efficiency (QE)

P. Adamson, Fermi National Accelerator Laboratory, Batavia, IL 60510, USA. Abstract

Empirical Model For ESS Klystron Cathode Voltage

THE NEW LASER FAMILY FOR FINE WELDING FROM FIBER LASERS TO PULSED YAG LASERS

SNS Target Imaging and Related Developments

New gas detectors for the PRISMA spectrometer focal plane

Linac strategies for the lower beam energies. U. Ratzinger

Transcription:

UPGRADE OF THE LENS/NREP PROTON LINAC: COMMISSIONING AND RESULTS Barbara vo Przewoski HEART 2008 Distributio statemet A: Aroved for Public Release, Cotract # N00164-05

Outlie What is NREP? Curret status Desig goals. Ugrades. Neutro flux Coclusio. Distributio statemet A: Aroved for Public Release, Cotract # N00164-05

LENS/NREP LENS/NREP is a accelerator drive ulsed eutro source. Neutros are geerated i low-eergy (, x) ) reactios (E( <13MeV) i Beryllium. 9 Be+ ( ( )+ x Protos are rovided by a liear accelerator. LENS rovides cold eutros for materials research, eutro hysics ad techology ad NREP rovides eutros i the thermal to MeV eergy rage for eutro radiatio effects research. The beam has a variable ulse width (from ~10 μs s to ~1.4 ms). Dedicated beamlies devoted to materials research ad eutro radiatio effects research are available. Distributio statemet A: Aroved for Public Release, Cotract # N00164-05

Neutro Outut from Be as a fuctio of roto eergy Assumed LINAC oeratig oit 16 ma/ 0.8 ms.w./1% duty cycle Yield at 13 MeV ~ 10 14 /mc DUT as close to target as ossible Fluece over 4 i er LINAC ulse = 1x10 14 /mc x 16 ma x.0008 s = 10 12 /ulse Neutros/cm 2 er ulse @ 1 cm from target = 10 12 / (4 i) = 8x10 10 /cm 2 /ulse 13 ulses/s Sadia SPR III reactor, 6x10 14 /cm 2 /ulse, 2 ulses/h Distributio statemet A: Aroved for Public Release, Cotract # N00164-05

IUCF facility layout Distributio statemet A: Aroved for Public Release, Cotract # N00164-05

LENS/NREP layout Distributio statemet A: Aroved for Public Release, Cotract # N00164-05

timelie Dec 2004 first eutros Dec 2005 first ublished data (Dyer) Dec 2006 ew klystro RF system Ju 2007 2 d beamlie Dec 2007 ew DTL (13 MeV) Distributio statemet A: Aroved for Public Release, Cotract # N00164-05

1 st Target uder costructio (Nov 04) Device uder test Distributio statemet A: Aroved for Public Release, Cotract # N00164-05

Milestoes 14 Dec 2004 First roto beam first eutros 21 Dec 2006 Klystro commissioig 11 ma roto curret Distributio statemet A: Aroved for Public Release, Cotract # N00164-05

Dec 2007: New ACCSYS DTL existig ios existig RFQ existig DTL 7 MeV 13 MeV Distributio statemet A: Aroved for Public Release, Cotract # N00164-05

February 2008 Istall klystro ower for ew DTL Distributio statemet A: Aroved for Public Release, Cotract # N00164-05

LENS Power Ugrade Path Goal: higher average ower of a roto beam, delivered to the target Ugrade Klystro istallatio Beam Eergy Beam Curret Beam Duty Power, Peak/Av Neutro Rate 7 MeV 25 ma 0.6% 175/1 kw 10 12 /s New DTL sectio 13 MeV 25 ma 1% 325/3 kw 10 13 /s New ower suly for klystro tubes New ijector ad RFQ 13 MeV 25 ma ~2.5% 325/8 kw 10 13 /s ////////////////////////////////////////////ot fuded////////////////////////////////////////// 13 MeV 50 ma ~2.5% 650/16 kw 10 14 /s Distributio statemet A: Aroved for Public Release, Cotract # N00164-05

RF System Ugrade Peak curret Old RF System With Klystros 10 ma 25 ma Duty Factor 0.4% 0.6% Mi Pulse Legth Max Pulse Legth Beam Imrovemets 50 µsec 10 µsec 150 µsec 300 µsec Distributio statemet A: Aroved for Public Release, Cotract # N00164-05

Accelerator Ugrade A ew DTL sectio desiged by AccSys Techology Ic. DTL Parameters Beam Parameters Iut eergy 7 MeV Iut eergy 7 MeV Outut eergy 13 MeV Outut curret 50 ma Outut eergy 13 MeV Outut curret 25 ma Beam trasmissio at 50 ma 100% Beam trasmissio at 50 ma 100% Duty Factor 6% Beam Duty Factor 2.5% Peak RF ower at 50 ma 750 kw Peak RF ower at 50 ma 750 kw Distributio statemet A: Aroved for Public Release, Cotract # N00164-05

Beamlie Ugrades Both beamlies feature a oliear beam sreadig system to make a beam uiformly distributed over the target surface Cold Neutro Target 7MeV 25mA df 0.02% NRERP target 7MeV 25mA df 0.6% Distributio statemet A: Aroved for Public Release, Cotract # N00164-05

Beehive Be target H 2 O reflector Polyethylee i eoxy Proto beam Lead shot i eoxy Distributio statemet A: Aroved for Public Release, Cotract # N00164-05

Beryllium target Proto beam 1 Mout 2 Be Target 15 X 9 cm 2 3 mm thick High beam ower Thermal stress Mechaical stress MAX 650 W/cm 2 7 MeV @ 25 ma @ 1% >1 kw/cm 2 Gauss σ x =σ y =0.5 cm 13 MeV @ 25 ma @ 2.5% ~5 kw/cm 2 Gauss σ x =σ y =0.5 cm 13 MeV @ 25 ma @ 5% >1 kw/cm 2 Gauss σ x =σ y =1.5 cm Make a beam uiformly distributed over ~ 9 X 9 cm 2 Distributio statemet A: Aroved for Public Release, Cotract # N00164-05

Beam damage to viewer Distributio statemet A: Aroved for Public Release, Cotract # N00164-05

Remedy: No-liear exasio Focus beam tails, but do t t chage core Sigle octuole focuses i laes ad defocuses o diagoals Combie two octuoles o-liear tail foldig Distributio statemet A: Aroved for Public Release, Cotract # N00164-05

Magetic octuoles Force: v F v q v = qe + ν c v B Multiole exasio: B( x) = b b 2 3 1 2 3 0 + + + + 1! x b x 2! b x 3!... Octuole term: B ( x) = b x 3 3 3! Distributio statemet A: Aroved for Public Release, Cotract # N00164-05

Foldig with Octuole Distributio statemet A: Aroved for Public Release, Cotract # N00164-05

Simulatio X histogram Y histogram XY sace Octuoles ON Octuoles ON Octuoles OFF Octuoles OFF Distributio statemet A: Aroved for Public Release, Cotract # N00164-05

Diagostics: HARPs Wire diameter ~ 20μm HARP_01 HARP_02 HARP_01 Wire sacig, mm Area covered, mm*mm H: 2 V: 2 32 X 32 H: 9c 2.5, 6o - 5 V: 11c 0.4, 2m 0.5, 4o 2.5 15 X 50 Distributio statemet A: Aroved for Public Release, Cotract # N00164-05 H: 6 V: 6 90 X 90

Diagostics: Viewer Beryllium Oxide 4 ieces 1'x1 ea Distributio statemet A: Aroved for Public Release, Cotract # N00164-05

Use CID camera to moitor viewer Subtract backgroud Smoothig/Average Sa Picture Record Image Beam Profile Distributio statemet A: Aroved for Public Release, Cotract # N00164-05

Beam arameters: 2 ma 7 MeV 10 Hz 10 µsec CID Octuoles OFF Octuoles ON Octuoles ON Distributio statemet A: Aroved for Public Release, Cotract # N00164-05

Calculated sectra 3,7,13 MeV 3 MeV 7 MeV 13 MeV I(E) (/sr/uc/mev) 1.E+15 1.E+14 1.E+13 1.E+12 1.E+11 1.E+10 1.E+09 1.E+08 1.E+07 1.E+06 1.E+05 Vary edoit! 1.E+04 1.E-09 1.E-08 1.E-07 1.E-06 1.E-05 1.E-04 1.E-03 1.E-02 1.E-01 1.E+00 1.E+01 1.E+02 Neutro Eergy (MeV) Distributio statemet A: Aroved for Public Release, Cotract # N00164-05

Positio deedece (MCNPX) thermal Folded w/ Si damage fuctio Distributio statemet A: Aroved for Public Release, Cotract # N00164-05

TOF measuremet Distributio statemet A: Aroved for Public Release, Cotract # N00164-05

Measured eutro flux (old RF system) 7.3 ma eak, 150 μs ulse width, 30 Hz re rate (Oct 2005) Thermal, < 0.55 ev,, Au, I, 3 He Fast, > ~3 MeV,, Ni, S 1 MeV equiv., 2N2222A measured 10 7 /s/cm 2 8.13+/-.17.17 3.29+/-.21.21 10.50+/-.45.45 MCNP 10 7 /s/cm 2 11.0 5.9 18.1 Ni, S ad Au, I, 3 He measuremets agree Measured flux is ~25-45% lower tha redicted Gamma dose egligible (TLD: 1.5 krad i 24h) Distributio statemet A: Aroved for Public Release, Cotract # N00164-05

detector couts 120000 100000 80000 60000 40000 20000 Neutro flux measuremets 0 6/6/05 12:00 6/7/05 0:00 6/7/05 12:00 6/8/05 0:00 date ad time Moitor detectors 3He detector gamma boer Ni Au & Au(Cd) S 2N2222As Ni S Ni Au & Au(Cd) Ni EBT film TLDs S Distributio statemet A: Aroved for Public Release, Cotract # N00164-05

Thermal eutro bit cross-sectios sectios Dyer et al., IEEE 53,7 (2006) 3596 10-11 TRIUMF 2005 Idiaa 2005 NPL 2002 10-12 Bit cross-sectio (cm 2 ) 10-13 10-14 10-15 10-16 10-17 10-18 Mfr B - dev 2a 1Mfr B - dev 2b Hitachi A Toshiba Mitsubishi Samsug B Mfr B - dev 1 Hitachi B Distributio statemet A: Aroved for Public Release, Cotract # N00164-05 Toshiba A Mfr C Mfr A

Projected itesity Beam eergy, MeV Peak curret, ma Pulse width, μs Duty factor, % N-flux (/s/cm 2 ), 1MeV equiv Achieved 7 25 10 < L < 300 0.005 < f < 0.6 1.05 10 10 8 Goal 13 25 1600 3.5 1.15 10 10 10 Distributio statemet A: Aroved for Public Release, Cotract # N00164-05

Coclusios Istallatio ad commissioig of the klystro based RF system is comleted. Neutro flux has bee measured Ugrade of the high voltage suly for the klystro tubes is uder way. Istallatio of the 13 MeV 50 ma DTL is comleted. Come to full oeratio with 25 ma 13 MeV 2.5% beam delivered to either target i 2008. Distributio statemet A: Aroved for Public Release, Cotract # N00164-05