CSC Muon Trigger. Jay Hauser. Director s Review Fermilab, Apr 30, Outline

Similar documents
WBS Trigger. Wesley Smith, U. Wisconsin CMS Trigger Project Manager. DOE/NSF Review April 11, 2000

Status of the CSC Track-Finder

Test Beam Wrap-Up. Darin Acosta

US CMS Endcap Muon. Regional CSC Trigger System WBS 3.1.1

Trigger Report. Wesley H. Smith CMS Trigger Project Manager Report to Steering Committee February 23, 2004

Trigger Cost & Schedule

12 Cathode Strip Chamber Track-Finder

CSC Data Rates, Formats and Calibration Methods

Synchronization of the CMS Cathode Strip Chambers

Dick Loveless. 20 November 2008 SLHC Workshop. Dick Loveless SLHC Workshop 20 Nov

WBS Trigger. Wesley Smith, U. Wisconsin CMS Trigger Project Manager. DOE/NSF Review February 17, 1999

Local Trigger Electronics for the CMS Drift Tubes Muon Detector

Optical Link Evaluation Board for the CSC Muon Trigger at CMS

Review of the CMS muon detector system

Global Trigger Trigger meeting 27.Sept 00 A.Taurok

TTC Interface Module for ATLAS Read-Out Electronics: Final production version based on Xilinx FPGA devices

Sector Processor to Detector Dependent Unit Interface

Beam Test Results and ORCA validation for CMS EMU CSC front-end electronics N. Terentiev

CMS Note Mailing address: CMS CERN, CH-1211 GENEVA 23, Switzerland

The CMS Drift Tube Trigger Track Finder

The CMS Detector Status and Prospects

WBS Calorimeter Trigger. Wesley Smith, U. Wisconsin CMS Trigger Project Manager. DOE/NSF Review April 12, 2000

CMS Conference Report

CGEM-IT project update

IPRD06 October 2nd, G. Cerminara on behalf of the CMS collaboration University and INFN Torino

Paul Rubinov Fermilab Front End Electronics. May 2006 Perugia, Italy

Commissioning and Performance of the ATLAS Transition Radiation Tracker with High Energy Collisions at LHC

PIXEL2000, June 5-8, FRANCO MEDDI CERN-ALICE / University of Rome & INFN, Italy. For the ALICE Collaboration

The ATLAS Tile Calorimeter, its performance with pp collisions and its upgrades for high luminosity LHC

ALICE Muon Trigger upgrade

S.Cenk Yıldız on behalf of ATLAS Muon Collaboration. Topical Workshop on Electronics for Particle Physics, 28 September - 2 October 2015

Cathode FE Board. The Ohio State University University of California Davis University of California Los Angeles CERN

arxiv:hep-ex/ v1 27 Nov 2003

THE DIAGNOSTICS BACK END SYSTEM BASED ON THE IN HOUSE DEVELOPED A DA AND A D O BOARDS

Front End Electronics

BABAR IFR TDC Board (ITB): requirements and system description

KEK. Belle2Link. Belle2Link 1. S. Nishida. S. Nishida (KEK) Nov.. 26, Aerogel RICH Readout

ADF-2 Production Readiness Review

Design, Realization and Test of a DAQ chain for ALICE ITS Experiment. S. Antinori, D. Falchieri, A. Gabrielli, E. Gandolfi

The Read-Out system of the ALICE pixel detector

T1 Electronic Design Review

A pixel chip for tracking in ALICE and particle identification in LHCb

Front End Electronics

STUDY OF ANODE SELF-TRIGGER ABILITY OF ME1/1 CMS ENDCAP CATHODE STRIP CHAMBER

li, o p a f th ed lv o v ti, N sca reb g s In tio, F, Z stitu e tests o e O v o d a eters sin u i P r th e d est sezio tefa ectro lity stem l su

Study of the performances of the ALICE muon spectrometer

BABAR IFR TDC Board (ITB): system design

Design of the Level-1 Global Calorimeter Trigger

DAQ Systems in Hall A

The Status of the ATLAS Inner Detector

The Readout Architecture of the ATLAS Pixel System

Tests of the boards generating the CMS ECAL Trigger Primitives: from the On-Detector electronics to the Off-Detector electronics system

TRT Software Activities

The Alice Silicon Pixel Detector (SPD) Peter Chochula for the Alice Pixel Collaboration

Progress Update FDC Prototype Test Stand Development Upcoming Work

Paul Dauncey For the CALICE-UK electronics group. A. Baird, D. Bowerman, P. Dauncey, R. Halsall, M. Postranecky, M.Warren, O.

The TRIGGER/CLOCK/SYNC Distribution for TJNAF 12 GeV Upgrade Experiments

DT Trigger Server: Milestone D324 : Sep99 TSM (ASIC) 1st prototype

Design and Implementation of an AHB VGA Peripheral

FRANCO MEDDI CERN-ALICE / University of Rome & INFN, Italy. For the ALICE Collaboration

SuperFRS GEM-TPC Development Status Report

CMS Upgrade Activities

Electronics procurements

L11/12: Reconfigurable Logic Architectures

An FPGA based Topological Processor Prototype for the ATLAS Level-1 Trigger Upgrade

SuperB- DCH. Servizio Ele<ronico Laboratori FrascaA

PEP-II longitudinal feedback and the low groupdelay. Dmitry Teytelman

BEMC electronics operation

FRONT-END AND READ-OUT ELECTRONICS FOR THE NUMEN FPD

Commissioning of the ATLAS Transition Radiation Tracker (TRT)

Fast Orbit Feedback at the SLS. Outline

The Pixel Trigger System for the ALICE experiment

Electronics for the CMS Muon Drift Tube Chambers: the Read-Out Minicrate.

AE16 DIGITAL AUDIO WORKSTATIONS

Optical DAQ MotherBoard for the ME1/1 stations of the CMS muon endcap detector

CMS Tracker Synchronization

CDA 4253 FPGA System Design FPGA Architectures. Hao Zheng Dept of Comp Sci & Eng U of South Florida

Status of readout electronic design in MOST1

Eric Oberla Univ. of Chicago 15-Dec 2015

Minutes of the ALICE Technical Board, November 14 th, The draft minutes of the October 2013 TF meeting were approved without any changes.

ATLAS Pixel Subsystem and Simulation

LHCb and its electronics. J. Christiansen On behalf of the LHCb collaboration

Update on DAQ for 12 GeV Hall C

L12: Reconfigurable Logic Architectures

with Low Cost and Low Material Budget

EECS150 - Digital Design Lecture 12 - Video Interfacing. Recap and Outline

DT9834 Series High-Performance Multifunction USB Data Acquisition Modules

Latest Timing System Developments

LHCb and its electronics.

Status Radial Services and cable tray. 1) Holes, Flexrails, WireMesh Ctray.

Electronics Status and Upgrade Opportunities for Flash ADC and 12GeV Trigger Hardware

FPGA Design. Part I - Hardware Components. Thomas Lenzi

Drift Tubes as Muon Detectors for ILC

The Silicon Pixel Detector (SPD) for the ALICE Experiment

The Readout Architecture of the ATLAS Pixel System. 2 The ATLAS Pixel Detector System

EECS150 - Digital Design Lecture 2 - CMOS

J-PARC timing system

Anode Front-End Electronics for the Cathode Strip Chambers of the CMS Endcap Muon Detector

A new Scintillating Fibre Tracker for LHCb experiment

AIDA Update. presented by Tom Davinson on behalf of the AIDA collaboration (Edinburgh Liverpool STFC DL & RAL)

Transcription:

CSC Muon Trigger Jay Hauser Director s Review Fermilab, Apr 30, 2002 Outline The CSC muon trigger design Project scope Fall 2000 prototype test Pre-production prototype to be tested Summer 03 Conclusions Jay Hauser, Fermilab Director s Review, Apr. 30, 2002 1

CMS Endcap Muon System 3 or 4 stations Each CSC chamber has six planes: 1. Radial cathode strips for precision muon position and bend direction measurement 2. Anode wires for timing (bunch ID) and non-bend position measurement Jay Hauser, Fermilab Director s Review, Apr. 30, 2002 2

Geometric Coverage ME4 descoped Jay Hauser, Fermilab Director s Review, Apr. 30, 2002 3

Trigger requirements Cathode LCT Identify cathode track segment. P t trigger based on angle of LCT For P t threshold of 20-40 GeV requires Dp/p < 30% (in order to limit single muon trigger rate in Level-1 to a few KHz) Track hits must be located to within ½ strip width in each chamber layer Anode LCT Form anode track segment. Tag bunch crossing of track segment with > 92 % efficiency per chamber Jay Hauser, Fermilab Director s Review, Apr. 30, 2002 4

CSC Trigger Efficiency vs. P T 10 20 40 60 Trigger threshold defined at 90% efficiency Sharper turn-on for better P T resolution Require ME1 for good P T resolution 1.2 < h < 2.4 Jay Hauser, Fermilab Director s Review, Apr. 30, 2002 5

CSC Trigger Efficiency vs. h Loose: 2 or more stations including ME1 in endcap, but any two in DT/CSC overlap region ~97% efficiency Tight: 3 or more stations including ME1 in endcap and MB1 in DT/CSC overlap ~70% efficiency but better P T resolution Jay Hauser, Fermilab Director s Review, Apr. 30, 2002 6

CSC Single Muon Rate h < 2.1 Require tight track conditions ( e» 70%) to get acceptable rate from standalone CSC trigger Multiply by 5 for L = 10 34 Rate must be less than few khz Jay Hauser, Fermilab Director s Review, Apr. 30, 2002 7

Endcap Muon Trigger Primitive Generation Clock Control Board Slow Control Muon Sector Receiver Lev-1 Trigger Trigger-Timing-Control D T D T D T D T D T C M T D T D T D T D M M M M M M M M M M C P M M M M M M M M C B B B B B B B B B B B C B B B B B B B B O N T R O L L E R Trig Motherboard 1 of 5 1 of 5 DAQ Motherboard Readout Data Peripheral Crate on iron disk DDU Board FED Crate in XSC55 CFEB CFEB CFEB CFEB CFEB Cathode Front-end Board 1 of 2 LV Distribution Board LVDB ALCT 1 of 24 Anode LCT Board CSC Anode Front-end Board Jay Hauser, Fermilab Director s Review, Apr. 30, 2002 8

Trigger Motherboard (TMB) Source of CSC trigger primitives for 1 chamber: sent on backplane to Muon Port Card (MPC) Other functions: Generates Cathode LCT trigger with input from CFEB (comparator) Matches ALCT and CLCT; sends anode hits to DMB. Input connectors From 5 CFEB s Main FPGA (on back) XILINX XCV1000E Mezzanine board Input connectors From ALCT Jay Hauser, Fermilab Director s Review, Apr. 30, 2002 9

CSC Sectors Data Mapping Jay Hauser, Fermilab Director s Review, Apr. 30, 2002 10

On-Chamber Trigger Primitives Strip FE cards FE FE LCT Wire LCT card Wire FE cards CSC Muon Trigger Scheme RIM RPC Interface Module Trigger Motherboard LCT TMB Combination of all 3 Muon Systems Muon Port Card Jay Hauser, Fermilab Director s Review, Apr. 30, 2002 11 PC 2µ / chamber In counting house RPC 4µ OPTICAL DT 4µ Sector Receiver SR 3µ / port card Global µ Trigger 3-D Track-Finding and Measurement 3µ / sector CSC Muon Sorter 4µ 4µ Sector Processor SP Global L1

Scope of CSC Trigger Project Baselined with 24 crates, reduced to 6 in 1998, now 1: Prototype version tested Fall 2000: Board MPC Sector Receiver Sector Processor Clock and Control Board CSC Muon Sorter # units 48 24 12 6 1 Responsibility Rice UCLA Florida Rice Rice New version (SR/SP combined) Board MPC SR/SP Clock and Control Board CSC Muon Sorter # units 48 12 1 1 Responsibility Rice Florida Rice Rice Crates, Backplanes 6 Florida Crates, Backplanes 1 Florida DDU readout 1 Florida/Ohio State DDU readout 1 Florida/Ohio State Jay Hauser, Fermilab Director s Review, Apr. 30, 2002 12

Prototype Test in Fall 2000 Muon Port Card produces CSC muon segment data Data sent over Giga-bit optical link Sector Receiver receives and formats data Formatted data sent over backplane Sector Processor links CSC muon segments into track, assigns P T, f, h Hardware operated at full 40 MHz speed Results compared bit-for-bit with simulation Perfect agreement attained Jay Hauser, Fermilab Director s Review, Apr. 30, 2002 13

Track Finder Prototype FY 2000 focus was on producing and testing a Track Finder prototype: DAQ System (VME, Bit3 Controller, PC running Windows NT) Items produced: Backplane (Florida) Sector Processor (Florida) Muon Port Card (Rice) Clock and Control Board (Rice) Sector Receiver (UCLA) Test software support (all) FIFO Port Card FIFO 100m Optical Links FIFO Sector Receiver FIFO Custom Back plane FIFO Sector Processor FIFO Results included in Trigger TDR (Oct. 2000): > Input data bits loaded into Port Card or SR > Data clocked through MPC SR SP at full speed > Results examined for validity Jay Hauser, Fermilab Director s Review, Apr. 30, 2002 14

Muon Port Card Prototype VME Interface Optical links Main FPGA on Daughter Card Jay Hauser, Fermilab Director s Review, Apr. 30, 2002 15

Sector Receiver Prototype Optical Receivers and HP Glinks UCLA SRAM LUTs Front FPGAs Back FPGAs Jay Hauser, Fermilab Director s Review, Apr. 30, 2002 16

Sector Processor Prototype Final Selection Unit XCV150BG352 Extrapolation Units XCV400BG560 Florida 12 layers 10K vias 17 FPGAs 12 SRAMs 25 buffers Assignment Units XCV50BG256 & 2M x 8 SRAM Track Assemblers 256k x 16 SRAM Bunch Crossing Analyzer XCV50BG256 Jay Hauser, Fermilab Director s Review, Apr. 30, 2002 17

Bit3 VME Interface 1st Track-Finder Crate Tests Custom Backplane Clock Control Muon Port Card (Florida) Board (Rice) (Rice): Sector Processor (Florida): Sector Receiver (UCLA): Prototype crate for original six crate design tests very successful but latency too high -- New design in 2001 100m optical fibers Jay Hauser, Fermilab Director s Review, Apr. 30, 2002 18

Clock and Control Board Muon Sorter From Trigger Timing Control To Global Trigger BIT3 Controller New EMU Trigger Design: U. Florida Track-Finder Track-Finder crate (1.6 Gbits/s optical links) SR / SP SR / SP SR / SP SR SR / / SP SP SR / SP MS CCB SR / SP SR / SP SR / SP SR / SP SR / SP SR / SP SP 2002 Card (3 Sector Receivers + Sector Processor) (60 sector) From MPC (chamber 4) From MPC (chamber 3) From MPC (chamber 2) From MPC (chamber 1B) From MPC (chamber 1A) To DAQ Power consumption : ~ 1000W per crate 16 optical connections per SP Custom backplane for SP «CCB and MS connections Jay Hauser, Fermilab Director s Review, Apr. 30, 2002 19

New 1-Crate 1 Design Meets Latency Requirement First prototype dataflow From Muon Port Cards Pre-production prototype data flow From Muon Port Cards 1 1 4 Optical receivers Front FPGAs Lookup tables Channel link transmitters Sector Receiver st.1 Sector Receiver st.2,3 Sector Receiver st.4 1 1 0 SR/SP board Optical receivers Front FPGAs Lookup tables Bunch crossing analyzer (not implemented) To DT Latency 2 3 2 3 3 2 Channel link receivers Bunch crossing analyzer (not implemented) Extrapolation units 9 Track Assembler units (memory) Final selection unit 3 best out of 9 Pt precalculation for best 3 muons Pt assignment (memory) Sector Processor Latency 1 1 1 1 1 Sector Processor FPGA Extrapolation units 9 Track Assembler units Pt precalculation for 9 muons Output multiplexor Pt assignment (memory) Final selection unit 3 best out of 9 Total: 21 BX To Muon Sorter Total: 7 BX To Muon Sorter Jay Hauser, Fermilab Director s Review, Apr. 30, 2002 20

MPC (Muon Port Card) Description of CSC Trigger System Elements Source of muon segment data from chambers SR/SP (Sector Receiver/Sector Processor) Links segments into tracks with known momentum CCB (Clock & Control Board) Clocking and interface to global control system CSC Muon Sorter Collects tracks for transmission to Global Muon Trigger Track Finder crate backplane DDU (Detector-Dependant Unit) For readout, used for diagnostics for the trigger Jay Hauser, Fermilab Director s Review, Apr. 30, 2002 21

New MPC Design (Rice) 9U x 400 MM BOARD VME INTERFACE VME J1 CONNECTOR UCLA MEZZANINE CARD (XCV600E) CCB CCB 3 OPTICAL CABLES TO SECTOR PROCESSOR FINISAR FTRJ-8519-1-2.5 OPTICAL TRANSCEIVERS OPTO OPTO OPTO SER SER SER CCB INTERFACE SORTING LOGIC INPUT AND OUTPUT FIFO TMB_1 TMB_2 TMB_3 TMB_4 TMB_5 TMB_6 TMB_7 TMB_8 CUSTOM PERIPHERAL BACKPLANE TLK2501 SERIALIZERS FPGA TMB_9 SN74GTLP18612 GTLP TRANSCEIVERS Jay Hauser, Fermilab Director s Review, Apr. 30, 2002 22

Optical Link Radiation Tests Three serializers: up to 270 krad TID. No permanent damage or SEU Two Finisar optical modules: No errors up to 70 krad. Failed at ~70kRad (well above ~10 krad TID inner CSC dose for 10 years) -- Rice Jay Hauser, Fermilab Director s Review, Apr. 30, 2002 23

EEPROM Indicators TLK2501 Transceiver Sector Processor 2002 Board Layout Phi Global LUT Eta Global LUT Phi Local LUT DC-DC Converter EEPROM EEPROM VME/CCB FPGA Front FPGA From CCB DDU FPGA Optical Transceiver Main FPGA Mezzanine Card PT LUT To MS TRANSITION BOARD WITH LVDS TRANSCEIVERS TO/ FROM BARREL Jay Hauser, Fermilab Director s Review, Apr. 30, 2002 24

ME1 SR LUT Triad FRONT FPGA A18 C3 PHIL LUT 256K x 18 Flow Through SRAM CLCT PAT# - 4 Q - 4 Phi_L -10 CLCT_ID - 8 PhiB_L - 6 L/R -1 PhiB_L - 6 Phi_L - 2 CSC_ID - 4 WG_ID - 7 ETAG LUT 512K x 18 Flow Through SRAM PhiB_G - 5 Eta_G - 7 MAIN FPGA A11 CSC_ID 4 WG_ID 7 CSC ID - 4 CLK40P1 C3 D16 C2 C4 D12 CLK40P2 16 Bit Trans ceiver Phi_L - 10 WG_ID - 5 CSC_ID - 4 PHIG LUT 512K x 36 Flow Through SRAM 16 Bit Phi_G -12 Phi_DT - 12 To DT C2 Trans ceiver CLK40 Legend: A Address Lines D - Data Lines C Control Lines CLK Clock 45 synchronous memories for conversion of 15 track segments >64 MB per board Need high VME bandwidth, broadcast capability to identical chips, and crate broadcast capability to SPs CLK40 Jay Hauser, Fermilab Director s Review, Apr. 30, 2002 25

ME2/ ME4 STUBS 9xD24 9xD5 3xD1 Main Sector Processor FPGA MAIN FPGA C3 3xD12 + 4xD1 MUX ME1 STUBS 6xD24 6xD9 2xD1 3xA22 3xC4 PT PT LUT 3xD8 3xD8 DT STUBS 2xD25 D8 TRAN 3xD8 3xC1 DDU INT CCB & VME INT C2 C4 D32 C2 C9 CLK40 A8 D16 C1 C3 CFG ROM Legend: G Number of Signal Groups GxAn G Groups of n Address Lines GxCn G Groups of n Control Lines GxDn - G Groups of n Data Lines TRAN - Transceiver CCB&VME Int Combined CCB and VME Interface CFG ROM Configuration ROM CLK40 Clock 40 MHz DDU- INT Readout Interface Placed on mezzanine card Firmware written in Verilog++ and implemented in ORCA as well Latency only 4 BX Jay Hauser, Fermilab Director s Review, Apr. 30, 2002 26

CCB for Track Finder Crate Same CCB for peripheral and Track Finder crates 20 sets (main 9U board + Altera-based mezzanine card) have been fabricated so far 15 boards are assembled and tested 2 boards will be used for Track Finder tests (UF & Rice) TTCrx mezzanine board Jay Hauser, Fermilab Director s Review, Apr. 30, 2002 27

Sorter FPGA TMB 1 DFF MUX 4 PIPELINE MUON 1 MUX DFF MUON 1 VME FIFO A FIFO_B MUON 1 VME DFF MUX 4 PIPELINE MUON 2 DFF MUON 2 VME FIFO A FIFO_B MUON 2 TMB 2 TMB 9 DFF VME MUON 3 VME SORTER 3 OUT OF 18 54 FIFO_B MUON 3 CCB CCB INTERFACE 9 VME WINNER Jay Hauser, Fermilab Director s Review, Apr. 30, 2002 28

CSC Track Finder Backplane Standard VME 64x J1/P1 backplane A24/D16 (but D32 possible using address lines) Standard VME J2/P2 backplane SRSP 1 SRSP 2 SRSP 3 SRSP 4 SRSP 5 SRSP 6 Clock and control Muon sorter SRSP 7 SRSP 8 SRSP 9 SRSP 10 SRSP 11 SRSP 12 Signals specified, routing to commence Custom GTLP 6U backplane Jay Hauser, Fermilab Director s Review, Apr. 30, 2002 29

Mirror CSC DAQ Path OSU now plans 20 slices to equalize bandwidth 15 optical fibers CSC DDU designed by Ohio State Univ. 36 Sector Processors send L1 data 12 optical fibers DDU SLINK + 1 Jay Hauser, Fermilab Director s Review, Apr. 30, 2002 30

CSC Trigger Status/Plans Prototype 1 tests now complete Prototype 2 and production follow EMU components to optimize technology MPC, SP, CCC modules, backplane* milestones: Apr-02 Prototype 2 designs done Freeze CSC-DT interface Determine DDU compatibility with OSU module for EMU Nov-02 Prototype 2 construction done Apr-03 Prototype 2 testing done Sep-03 Final designs done Oct-04 Production done Apr-05 Installation done (*backplane schedule ~3 months ahead of above dates to provide platform for testing and integration) Muon Sorter module: only 1, design by Jan-04 Jay Hauser, Fermilab Director s Review, Apr. 30, 2002 31

CSC 02 Milestones Syst. Item Action Date Status Comment CSC Bckpl Specified Dec-01 Done OK CSC Bckpl Proto done Jun-02 Delay: Aug-02 OK CSC CCB Proto done Jun-02 Delay: Aug-02 OK CSC SR/SP Proto done Sep-02 Delay: Nov-02 OK CSC Bckpl Proto tested Sep-02 Delay: Apr-03 OK CSC MPC Proto done Sep-02 OK CSC CCB Proto tested Sep-02 Delay: Apr-03 OK Jay Hauser, Fermilab Director s Review, Apr. 30, 2002 32

Personnel Professors Darin Acosta (Florida), Robert Cousins (UCLA), Jay Hauser (UCLA), Paul Padley (Rice) Postdocs Song Ming Wang (Florida), Benn Tannenbaum (UCLA), Slava Valouev (UCLA) Students Bobby Scurlock (Florida),Jason Mumford (UCLA) Engineers JK (UCLA), Alex Madorsky (Florida), Mike Matveev (Rice), Ted Nussbaum (Rice) Collaborating engineers (all PNPI) Victor Golovtsov, Lev Uvarov Jay Hauser, Fermilab Director s Review, Apr. 30, 2002 33

Coordination and Oversight Four institutions: Rice, UCLA, UF, UW Central link to all documentation: http://afs-web.hep.wisc.edu/~wsmith/cms/trig_pm.html Monthly progress reports Videoconferences ~6 weeks 2-day meetings 3x or 4x per year, rotate between Rice, UCLA, and UF, minutes posted UF, March 22-23, 2002 UCLA, Dec. 14-15, 2001 Rice, Aug 14-15, 2001 etc Jay Hauser, Fermilab Director s Review, Apr. 30, 2002 34

Conclusions First Track Finder system prototyped successfully in Fall 2000 Exact match to CMS OO simulation package Second generation pre-production prototype is well underway with significant improvements Present and future activities 2001: R&D on optical links, FPGA logic, memory look-ups, backplane technology, and DAQ readout 2002: build the 2 nd generation prototype 2003: test with multiple CSC chambers, cosmic rays and/or structured beam, tweaks for final design (if necessary) 2004: full production 2005: installation No trouble expected: all-digital system with off-the-shelf components, well-defined internal and external interfaces, and a stable and capable engineering team Jay Hauser, Fermilab Director s Review, Apr. 30, 2002 35