PALO ALTO HIGH SCHOOL Palo Alto Unified School District FACILITIES STEERING COMMITTEE MEETING. 11 May 2011, 3:30 5:00 pm

Similar documents
Palo Alto High School Facilities Steering Committee Agenda

20 January 2009, 3:15pm-5:00pm. SUBJECT: Theater Conceptual Design Meeting No. 3

OHIO UNIVERSITY THEATER DIVISION LAB SHOW PROPOSAL GUIDELINES

APPENDIX J Richmond High School Performing Arts Theater Usage Policy (December 2018)

Beresford Republic Four-part Series on the Watchdog Legacy Project. Grace Kennedy Center for the Performing Arts

Hampshire College Theatre. Space Contract

COST SHARING POLICY FOR COMCAST CABLE SYSTEM CONSTRUCTION FOR STREETS WHICH DO NOT MEET MINIMUM DENSITY REQUIREMENTS

Rickman High School Theatre RENTAL INFORMATION

APPENDIX E DeAnza High School Performing Arts Theater Usage Policy (July 2018)

Drayton Festival Theatre

ENTRY FORM. DVASE 2016 Excellence in Structural Engineering Awards Program

ELIGIBLE INTERMITTENT RESOURCES PROTOCOL

SHOW DIRECTOR CONTRACT

6. Institutional Planning and Budgeting Processes

Rental Information. Smothers Theatre Raitt Recital Hall Lindhurst Theatre

FROM: CITY MANAGER DEPARTMENT: ADMINISTRATIVE SERVICES SUBJECT: COST ANALYSIS AND TIMING FOR INTERNET BROADCASTING OF COUNCIL MEETINGS

Lincoln Theatre Company

Teaching Effectiveness Measures. Southern Utah University Music Department

LOAD-IN SET UP SOUND

Town Hall Use Policy Established February 22, 1999 rev. June 22, 2007

2019 WALLED LAKE PERCUSSION DRUM CLUB INFO PACKET

BOARD MEETING MINUTES. February 24, Time: 6:30 pm. Rehearsal Hall. Staff: Laura Lee Mathew Wright. Guests:

TOMMY AWARDS CEREMONY GUIDE TOMMY AWARDS CEREMONY DIRECTOR S & DESIGNER S CEREMONY SCHOOLS AND STUDENTS PERFORMING & RECEIVING AWARDS

The Harrington Theatre Arts Company Production Staff Manual

The Harrington Theatre Arts Company Production Staff Manual

CHATHAM 911 COMMUNICATIONS SERVICES E911 EXECUTIVE ADVISORY BOARD 14 NOVEMBER SHERIFF S COMPLEX

RETURN THIS FORM TO THE OFFICE OF THE CHASKA DEPARTMENT OF PARKS & RECREATION

Lesson Plan. Building A Resume INTO ACTIVITY. CAREERS IN THE ENTERTAINMENT INDUSTRY Grades 8 to 12 UNIVERSAL STUDIOS HOLLYWOODSM

Design Development Concept Plan

[ PRODUCERS PACK] 1 PRODUCERS PACK Union House Theatre

Scheman Building Suite 102, 1805 Center Drive, Ames, IA Fax Number: Website:

Appendix C.4 Assistant Deputy Ministers Project Review Committee Terms of Reference

Regular Meeting of the Board of Trustees MINUTES

RICHARD J. RIORDAN MAYOR FEASIBILITY OF ACQUIRING CAPACITY FOR OVER- THE-AIR BROADCAST OF LA CITYVIEW CHANNEL 3S

Available For Long-Term Lease, Rent or Sale April Palace Production Center Facilities Overview

CALL FOR ENTRIES FIRST ANNUAL SUMMER MOSAIC

2018/19. 5 th Avenue Theatre Awards Application form. PERFORMANCES DATES AND TIMES Include only public performances which you want us to attend

River City Theatre Company Spring 2018

NEW JERSEY PERFORMING ARTS CENTER NEWARK, NEW JERSEY

USE OF JOHN M. GREENE HALL

PLEASE THE FOLLOWING INFORMATION TO THE CONTEST MANAGER BY THE BELOW DEADLINES.

MAINSTAGE MUSICAL: GRADES 6-12 Auditions: September 11-16, 2017 Performances: December 1-10, 2017

PMEA District 7 Jazz Band By-Laws. Approved 8/27/2000. Revised 3/23/2000, 3/01/2001, 3/14/2002, 3/18/2004, 3/30/2005 3/14/2008, 8/30/2009

Katharine Cornell Theatre University at Buffalo

HOLLYWOOD FOREIGN PRESS ASSOCIATION GOLDEN GLOBE AWARD CONSIDERATION RULES

Bendigo Theatre Company Inc. POSITION DESCRIPTIONS INDEX

Willow Grove Event Form: Movie Night

2211 N. Austin Ave. Georgetown, TX x7184

Section I: Renter Information

POLICIES FOR THE USE OF BEACH/SCHMIDT PERFORMING ARTS CENTER AT FORT HAYS STATE UNIVERSITY (Effective Updated March, 2010)

New York State Board of Elections Voting Machine Replacement Project Task List Revised

Meeting & Hospitality Space Request Form Spring 2019 Convention: February 22 24, 2019 Hyatt Regency Sacramento and Sacramento Convention Center

SAN DIEGO UNIFIED SCHOOL DISTRICT Facilities Asset Management. CIVIC CENTER RATE SCHEDULE Board of Education Policy K-4000

Palos Verdes Performing Arts Staff

Facilities Management Design and Construction Services

The adjudicator panel for the day will include Larry Carpenter, Jeanette Filardo, and Mariana Jones Meaders.

National History Day in Wisconsin Southeastern Regional Event March 4, 2017

Reynolds Performance Hall Facility Regulations and Fee Schedule

BEL CANTO CHOIRS POLICIES AND PROCEDURES

Wachusett Regional School District. FY19 Budget Presentation - Princeton March 5, 2018

Red Mask Players Director Application

PENNSAUKEN TOWNSHIP PUBLIC SCHOOLS Board of Education Administration Building 1695 Hylton Road, Pennsauken, New Jersey 08110

Join us for our. A Campaign to Evolve, Elevate, and Inspire

Dunfield Theatre Cambridge

MUSICIAN S HANDBOOK. Penfield Symphony Orchestra 1587 Jackson Road Penfield, NY

Plan for Generic Information Collection Activity: Submission for. National Transportation Safety Board (NTSB).

All members as well as the current production cast and crew may participate in all social events planned by the Masquers.

Dear OAP Directors, Again, please do not hesitate to call me if there s anything I can do for you. I wish each of you a successful show.

Entertaining Options

PROJECT INFORMATION/APPLICATION Application Deadline: January 19, 2018

It is the responsibility of the Region/Area Band Chair to ensure that sites chosen for auditions are ADA compliant.

Technical Information

Duties and Responsibilities Handbook

Page 1 of 6. Effective May 01, Section: Bayou Theater-Theater and Cultural Arts Area: Booking Policies and Procedures

Ancillae-Assumpta Academy. Fine Arts Program

Spamalot. Audition Packet Kaukauna Community Players (KCP) Information Sheet

Challenger Learning Center of Tallahassee

Music Demonstration Schools Project ELEMENTARY SCHOOL MUSIC CHECKLIST

Scheman Building Suite 102, 1805 Center Drive, Ames, IA Fax Number: Website:

EDITORIAL SPECIFICATION for SCRIPTED PRODUCTIONS

RECORDED MUSIC FOR THE PURPOSE OF DANCING MUSIC LICENSING CONSULTATION

RFIs AND RESPONSES; ANSWERS ARE IN RED.

Rental Information For Campus Clients

Media and Video Services Service Request and Fees

STATE BOARD OF EDUCATION PROCLAMATION

Red Mask Players Director Application

MINUTES IT Advisory Committee Meeting November 11, :30-10:00 AM

COLLECTION DEVELOPMENT AND MANAGEMENT POLICY BOONE COUNTY PUBLIC LIBRARY

Hindsley Great Room. Richmond Family Gallery. Ballroom. 9 Liay Conference Room. Matteson Balcony

Grace United Church of Christ. To my eyes and ears the organ will ever be the King of Instruments ~Wolfgang Amadeus Mozart

The 2012 Fall Musical Auditions for: Pippin. Music and Lyrics by: Stephen Schwartz. Book By: Roger O. Hirson. Synopsis:

Recommendations Of The Ad Hoc Performing Arts Center Committee

Roger Grant. Your love story deserves a storied setting.

Lone Star College-Tomball Performing Arts Center Facility Request Form

UIL ONE-ACT PLAY STATE MEET PARTICIPANT GUIDE A, 2A, 3A

2016 Sherwood Percussion Ensemble Information Packet

Facility Rentals at the Royal Alberta Museum

2017/2018 ATSSB Region 23 Rules Updated 7/17/2017

Exclusive Use of a Cinema for a Current Film Screening Private Screenings/Fundraisers

2017/18 TRAWG - Tech Refresh Priority Resource Request Justification Overall / Aggregate Cost

Transcription:

PALO ALTO HIGH SCHOOL Palo Alto Unified School District FACILITIES STEERING COMMITTEE MEETING DATE: SUBJECT: 11 May 2011, 3:30 5:00 pm Palo Alto HS Facilities Steering Committee ATTENDEES: Sign-in sheet (attached) The following are the highlights of the meeting: 1. Introductions: Phil Winston (PW) and Tom Hodges (TH) welcomed the committee and initiated the meeting. Introductions were made around the table and room for the benefit of Dr. Kevin Skelly (SK) who was attending the meeting to discuss the status of the Performing Arts Center (PAC). 2. Performing Arts Center: TH opened the discussion by pointing out that the PAC was originally removed from this afternoon s agenda. However, TH shared that KS s participation today is to bring another perspective to the ongoing PAC discussion regarding the appropriate size of the facility. It s a follow up to similar discussions held at the PAC subcommittee meeting on 5/5/11. Since many were not part of the PAC subcommittee meeting, TH gave a brief history: 600 seat facility was taken to BOE for information 600 seat facility was over budget due to program creep and was pulled before BOE schematic design approval 600 seat facility was reduced in area and other value engineering opportunities were explored to reduce cost 466 seat option was generated which had all of the features of the 600 seat facility except the second level and balcony seating. 466 seat option was presented by the PAC subcommittee to the FSC as their recommendation which the FSC voted unanimously to support and recommend to the BOE. As a result of higher level conversations, it was suggested that the seating capacity was too small Other options were explored based on the above conversations Having met their program needs and the budget, the PAC subcommittee reconfirms their recommendation of the 466 seat option. Page 1

3. KS described his role and interaction with the BOE and how he relies on the expertise of the site and those participating in the process. He noted the important role that the FSC plays in bringing the expertise of the site together to make key decisions and recommendations to the BOE. KS believes that a bottom up approach is much better than a top down approach in connecting with the community. The community relies on the BOE oversight as a reality check for the bottom up recommendations. KS further added that it s very important to avoid putting the BOE and site in opposition over differing opinions that will not serve the BOE well. The BOE needs to be included in the why we are here and the how did we get here thought process. KS suggest the following considerations need further thought: Last BOE presentation was a 600 seat facility with balcony Subsequently six schemes have been explored ranging in seating capacity from 466 to 600 (the BOE is currently interested in approximately 550). Can the group convince the BOE? The group will be fighting early enthusiasm exhibited for the 600 seat facility Need for the classroom within the PAC given other options on campus such as the Haymarket Are the desired program elements what will serve the school best long range? Is the orchestra pit required and how often will it be used? Comparison to the Gunn Theater The following discussions occurred: Stephen Pond (SP) added that he s satisfied with the 466 seat option as a recommendation as it is within budget and meets the PAC department needs. However, it may not meet the BOE needs. He shared that other options to accommodate large numbers were discussed by this group and the FSC such as a future gym or acoustically updating the existing gym. Michael Najar (MN) offered to initiate any conversation necessary with the BOE and asked KS if this was appropriate. KS replied that it is acceptable to contact the BOE directly. MN further responded to KS s comment about the initial enthusiasm for the 600 seat scheme offering that if was the no apology building part that the enthusiasm was for and not the seating capacity. On the topic of the Haymarket Theater, MN noted that he has been at Paly for over eight years and has seen two modernization efforts at the Haymarket that had less than desirable results. Lastly, MN noted that the way that performing art students judge their performance is not by a letter grade but by playing to a full house. Conversely, performing to a non-full house is not a good feeling. Success is performing to a standing room only audience. He added that a major fundraising effort was going to be challenging. KS agreed that fundraising was not the best option. KS wanted to understand the classroom portion need. He asked if the Haymarket can serve that need. Holly Ward (HW) shared that from her Page 2

discussions with Kathleen Wood (KW), the need for adjacency was very important to the program providing direct access to costumes, props, lighting, and supervision. It would also serve as a break out space for smaller groups to practice while others are on stage. KW s preferred scenario would be to always have access to the stage for practice. Anne Anderson (AA) offered that from a non-theater perspective, but from a Master Plan project list and dollar allocation perspective, she was never convinced of the reasons for a larger more costly facility. PK added that the group looked at options to accommodate a large capacity such as fixing the acoustics at the gym and using a hi-tech approach by having the presentation simulcast on large screen monitors which, for example, could happen next door at the new Media Arts Center. HW felt that from her conversations with some of the BOE members, the BOE uncertainty was more a matter of having questions answered rather than a specific seating capacity. TH asked if this should be brought back to the BOE as an informational item and asked if we needed a community meeting first. KS suggested that the BOE meeting would serve as the community/public input meeting. KS asked Erwin Lee (EL) what his opinion was on the seating capacity. EL responded that he was fine designing for either capacity but went on to say that there are currently far more high school theaters being built in the 400-500 seat capacity than there are in the 600-700 seat capacity. SP added why would we want to duplicate the capacity of the Haymarket (approximately 520 plus) in the new facility? KS felt that the best arguments to the BOE for the smaller facility were the use of simulcast, the Haymarket can accommodate a class, and facilities currently being built are in the smaller range. A brief discussion was held on what BOE meeting date would be best to present this information. TH suggested the 14 June meeting. The date was not determined. 4. Boiler Replacement Project: TH informed the FSC that the current boilers need to be replaced sooner than planned, and that a project is in progress which will replace the two boilers and associated piping at the Tower and Haymarket Buildings. This project was one of the first phase projects for the Tower Building to address the issue of heat. The estimated allocation from the Tower Building budget for this work is approximately $800,000. TH asked the FSC if there were any objections to moving forward with this project. The FSC had no objections. 5. Construction Updates: AL gave an update on the Media Arts and Classroom Building indicating that the documents have been approved by the DSA and will be out to bid on May 20 th. For Page 3

the Athletic Stadium Improvements, she noted that the two projects have been submitted to DSA. SP asked if a logistic plan had been generated for the construction. AL indicated that Gilbane was working on a plan and that it would be shared with all before being finalized. SP was concerned that construction deliveries would conflict with school arrival and operations. 6. Group 2b Projects: TH advised the FSC that they would like to start work on the group 2b project which includes the Library Renovation and the Weight/Fitness Building and will ask DLM for a proposal to begin start up tasks. TH indicated that the Library will be programmed together with the Tower building to determine if other uses can be incorporated into the Library. TH also mentioned that the Weight/Fitness Building could be pushed back until after the bids for the group 1 projects are known. 7. Mary Gordon (MG) request that a follow up meeting be held to discuss the landscape portion of the Media Arts and Classroom building. Members of the landscape committee had met with Heidi Rank (HR) to finalize the plan but they had not had a chance to review the final version. EL provided MG with drawings of DLM s interpretation of HR s notes and drawings generated from her landscape meeting. EL indicated that DLM will schedule a meeting with the landscape group to review the plan before finalizing. 8. Churchill Project: TH indicated that the Churchill landscape plan will be implemented and that it is a multi-funded project. It will not impact the Paly project list. Next Meetings: To be determined END Prepared by Erwin Lee of Deems Lewis McKinley. Please advise in writing if you feel that any of the above items are inaccurate. cc: Attendees File Page 4

Scheme Options First Floor 2nd Floor Basement Level 1 Original Scheme 600 seat theater with balcony, 2 classrooms, basement, orchestra pit, & full fly tower. 2 Initial 600 seat theater with balcony, 1 classroom, basement, orchestra pit, & full fly tower. 3 466 seat theater with 1 classroom, basement, orchestra pit, & full fly tower. 4 575 seat theater with 1 classroom, basement, orchestra pit, & full fly tower. 5 575 seat theater with basement, orchestra pit, & full fly tower. 6 600 seat theater with 2nd floor balcony. No classroom, no basement. Performing Arts Center,, May 5th, 2011

New Performing Arts Center Palo Alto Unified School District - Palo Alto, CA DLM D E E M S L E W I S M c K I N L E Y 7 7 V A N N E S S A V E N U E S A N F R A N C I S C O, C A 9 4 1 0 2 4 1 5. 2 5 5. 1 8 1 1 F A X 2 5 5. 0 2 4 8 Key Plan Approvals ENLARGED SITE PLAN SCHEMATIC DESIGN 2009 1000 2.14.2011 PROPRIETARY DESIGN: THE DRAWING, DESIGN, AND INFORMATION CONTAINED ON THIS SHEET ARE THE PROPERTY OF DEEMS LEWIS McKINLEY, ARE DEVELOPED FOR THE USE ON, AND IN CONNECTION WITH THIS SPECIFIC PROJECT, AND ARE DISCLOSED IN THE CONFIDENCE AND SHALL NOT BE COPIED, REPRODUCED, PUBLISHED OR OTHERWISE USED, DIRECTLY OR INDIRECTLY, IN WHOLE OR IN PART TO PROVIDE INFORMATION TO PRODUCE, CONSTRUCT, OR MANUFACTURE DRAWINGS, PRINTS APPARATUS, PARTS, OR ASSEMBLIES WITHOUT FULL KNOWLEDGE AND WRITTEN CONSENT CONSENT OF DEEMS LEWIS McKINLEY. THIS DRAWING IS PROTECTED BY COMMON LAW COPYRIGHT, ALL PATENTABLE MATERIAL CONTAINED HEREIN AND ORIGINATING WITH DEEMS LEWIS McKINLEY SHALL BE THE PROPERTY OF DEEMS LEWIS McKINLEY AND ANY USE OF PATENTABLE MATERIAL SHALL BE SUBJECT TO ROYALTY PAYMENTS TO DEEMS LEWIS McKINLEY. 2005 A-0.2