Cover Sheet In-Lieu Fee Program Proposal Procedures Draft Prospectus/Prospectus March, 2011

Similar documents
Montezuma Wetlands Project Technical Review Team (TRT) Charter September 2002 (revised June 2008)

APPLICATION AND EFFECTIVENESS OF THE SEA DIRECTIVE (DIRECTIVE 2001/42/EC) 1. Legal framework CZECH REPUBLIC LEGAL AND ORGANISATIONAL ARRANGEMENTS 1

FAR Part 150 Noise Exposure Map Checklist

VAR Generator Operation for Maintaining Network Voltage Schedules

Palomar Pacific Chapter Barbershop Harmony Society Mission, Goals, Policies and Procedures

WM2013 Conference, February 24 28, 2013, Phoenix, Arizona USA

NOW THEREFORE, in consideration of the mutual covenants and conditions herein contained, the parties hereto do hereby agree as follows:

REQUEST FOR PROPOSALS AND TERMS OF REFERENCE

Akron-Summit County Public Library. Collection Development Policy. Approved December 13, 2018

Environmental Studies 165A - Environmental Impact Analysis Fall 2015 Chemistry 1171 Tues. and Thurs. 3:30 4:45 p.m.

A MIDI/MP3 actualization or recording of the composition (digital file, web link, or audio CD)

OREGON DEPARTMENT OF GEOLOGY AND MINERAL INDUSTRIES

GROUNDWATER MONITORING DATA RELEASE 2011 SAMPLING EVENT HARSHAW CHEMICAL COMPANY FUSRAP SITE

21. OVERVIEW: ANCILLARY STUDY PROPOSALS, SECONDARY DATA ANALYSIS

21. OVERVIEW: ANCILLARY STUDY PROPOSALS, SECONDARY DATA ANALYSIS

Montezuma Project Technical Review Team First Information Package October 25, 2002

Environmental Impact Statement (EIS)/ Section 106 Public Meeting Level 1 Concept Screening. May 16, 2017

WESTERN PLAINS LIBRARY SYSTEM COLLECTION DEVELOPMENT POLICY

LUPA Proposed Final Programmatic Agreement November 20, 2015

Texas Music Educators Association Region 20 - Band Division. Band Division

Frequently Asked Questions

Blake Grumprecht papers

A. Introduction 1. Title: Automatic Underfrequency Load Shedding Requirements

Plan for Generic Information Collection Activity: Submission for. National Transportation Safety Board (NTSB).

1. Entries must be received or post-marked no later than 5:00 p.m., NOVEMBER 25, Faxed, or late entries will not be accepted.

WORLD ASSOCIATION FOR SYMPHONIC BANDS AND ENSEMBLES GUIDELINES FOR PERFORMING ENSEMBLES AT WASBE INTERNATIONAL CONFERENCES

LOW-BUDGET INDEPENDENT FEATURE FILM ASSISTANCE PROGRAM GUIDELINES FOR

LIBRARY POLICY. Collection Development Policy

2018 SCHOLARSHIP INSTRUCTIONS and APPLICATION

ISO 2789 INTERNATIONAL STANDARD. Information and documentation International library statistics

IMS Brochure. Integrated Management System (IMS) of the ILF Group

Updates to the Form and Filing System

COMMUNICATIONS OUTLOOK 1999

Unofficial Comment Form Project Establish and Communicate System Operating Limits (SOL and SOL Exceedance Definitions)

The new BBC Scotland Channel: Proposed variation to Ofcom s Operating Licence for the BBC s public services. BBC Response

Site Plans, SWPPP Reviews, Checklists & Enforcement, OH MY!

ELIGIBLE INTERMITTENT RESOURCES PROTOCOL

COMMUNICATIONS OUTLOOK 1999

Electronic Thesis and Dissertation (ETD) Guidelines

MPA Capstone Project. The Literature Review

COST SHARING POLICY FOR COMCAST CABLE SYSTEM CONSTRUCTION FOR STREETS WHICH DO NOT MEET MINIMUM DENSITY REQUIREMENTS

HONEYWELL VIDEO SYSTEMS HIGH-RESOLUTION COLOR DOME CAMERA

The Executive Summary of Senate Bill 2106

Reconfiguration Along the U.S.-Mexico Border Meeting in NPSPAC Region 3: Arizona May 16, 2013

City Council Report 915 I Street, 1 st Floor

Australian and New Zealand Energy Performance and Marking Requirements for External Power Supplies

Section 1. On January 24, 2012, the City Council adopted Ordinance No. 12-

COMMUNICATIONS OUTLOOK 1999

FROM: CITY MANAGER DEPARTMENT: ADMINISTRATIVE SERVICES SUBJECT: COST ANALYSIS AND TIMING FOR INTERNET BROADCASTING OF COUNCIL MEETINGS

COMMUNICATIONS OUTLOOK 1999

Notes Generator Verification SDT Project

AUTHOR DECLARATION FORM

Biologia Editorial Policy

POLICY AND PROCEDURES FOR MEASUREMENT OF RESEARCH OUTPUT OF PUBLIC HIGHER EDUCATION INSTITUTIONS MINISTRY OF EDUCATION

800 MHz Band Reconfiguration

Licensing & Regulation #379

Alberta Electric System Operator

Instructions for Submission of Journal Article to the World Hospitals and Health Services Journal

CITY COUNCIL AGENDA MEMORANDUM

What Happens to My Paper?

CITY OF ISSAQUAH CABLE COMMISSION

Phase 2 of System Protection Coordination (Requirement revisions to PRC ) Hydro Québec TransÉnergie

AltaLink Management Ltd.

Impact on Providers. Page 1 of 11

PUP Zoning R-2 R-2 C-1 R-2 R-5 R-6 C-1 R-5 B-2C B-3C B-2 B-1 O-2C B-1 R-2 R-1 C-1 C-1. R-2A Tuckahoe District Patterson West EXISTING TOWER

Gualala Arts Gualala Arts Center Festival Season

Rental Information For Campus Clients

Become an ISA Author WRITE A BOOK! Questions and answers about publishing with ISA

Instructions to Authors

Collection management policy

Preserving Digital Memory at the National Archives and Records Administration of the U.S.

London Public Library. Collection Development Policy

Capital Works process for Medium Works contracts

No online items

Township of Egg Harbor August 15, 2011 Planning Board

Sarasota County Public Library System. Collection Development Policy April 2011

Guidelines for the Preparation and Submission of Theses and Written Creative Works

City of Kingston Report to Committee of Adjustment Report Number COA

Start Recording on Site

3 Resolution of the Board of Supervisors, acting as responsible agency with respect to

GUIDELINES. LOW BUDGET Production Program

800 MHz Band Reconfiguration

ICOMOS Ename Charter for the Interpretation of Cultural Heritage Sites

Load Frequency Control Structure for Ireland and Northern Ireland

ORANGE PUBLIC LIBRARY LOCAL HISTORY COLLECTION DEVELOPMENT

CALL FOR POSTER PAPERS. Subsidiary Body on Scientific, Technical and Technological Advice (SBSTTA) Montreal, Canada, 10 to 14 March 2003

Before the FEDERAL COMMUNICATIONS COMMISSION Washington, DC 20554

Preparing for a Transition from an FI/Carrier to a Medicare Administrative Contractor (MAC) Provider Types Affected

Institutes of Technology: Frequently Asked Questions

Cable Rate Regulation Provisions

III PERFORMANCE MEMBERSHIP AND AUDITIONS A. PERFORMANCE MEMBERSHIP REQUIREMENT AND EXCEPTIONS

Ofcom's proposed guidance on regional production and regional programming

Collection Development

Work Type Definition and Submittal Requirements. Work Type Definition: Traffic Signal Design

ICOMOS ENAME CHARTER

Special Collections/University Archives Collection Development Policy

Finding Aid for the Hobart Johnstone Whitley Papers, ca No online items

History of the Fox Theater:

Before the FEDERAL COMMUNICATIONS COMMISSION WASHINGTON, DC 20554

John Adrian Rademaker Papers

Transcription:

Cover Sheet In-Lieu Fee Program Proposal Procedures Draft Prospectus/Prospectus March, 2011 Section I - General Information This package provides procedures and information to initiate the development of In-Lieu Fee (ILF) proposals in the states of California and Arizona. This package contains two checklists with requirements for submitting an ILF Draft Prospectus and Prospectus. Please follow the instructions carefully. The review and approval of ILFs is a multi-agency process that may involve but is not limited to any or all of the following federal and state agencies: the U.S. Army Corps of Engineers ( USACE ), Region IX of the U.S. Environmental Protection Agency ( USEPA ), the U.S. Fish and Wildlife Service ( USFWS ), NOAA Fisheries ( NOAA ), Natural Resource Conservation Service ( NRCS ), the Arizona Game and Fish Department ( AGFD ), the Arizona Department of Environmental Quality ( ADEQ ), the California Department of Fish and Game ( CDFG ), and the California Water Resources Control Board ( CWRCB ). These agencies, and others which may be added, comprise and are referred to jointly as the Interagency Review Team ( IRT ). Prior to submitting a Prospectus, the IRT agencies strongly encourage the ILF Sponsor to submit a Draft Prospectus to the IRT agencies for comment and consultation. This process is intended to identify potential issues early so the ILF Sponsor may attempt to address those issues prior to the formal review process. A Prospectus must be submitted by the ILF Sponsor, then reviewed, and evaluated by the IRT and public prior to the ILF Sponsor s submittal of a draft ILF Enabling Instrument. The following must also be followed for amendments to existing ILF Programs. The following steps shall be utilized from the Prospectus stage forward: 1) Check the Corps website or the Corps Regional ILF and Bank Information Tracking System (RIBITS) website to obtain the most current ILF information and templates before beginning the Prospectus preparation; 2) Check with your IRT for meeting dates and times. Chair and IRT member contact information is provided at the end of this cover sheet; 3) Submit a preliminary jurisdictional determination for review and approval by the USACE;

4) Submit a Prospectus for completeness review by the IRT Chair(s); 5) Once the Prospectus has been deemed complete by the Chair(s), the Prospectus is reviewed by the IRT agencies and the public; and 6) Upon completion of review of the Prospectus by the IRT agencies and the public, the USACE will coordinate with the other Chairs (if applicable) and will provide a letter to the ILF Sponsor informing the ILF Sponsor whether or not they may begin development of the draft ILF Enabling Instrument. Section II - Definitions Draft Prospectus (optional but strongly encouraged) A brief, concept level proposal submitted when scoping the concept of an ILF program, contemplating pursuing an ILF proposal, or for those new to the ILF process. Prospectus (required) Should be submitted when an ILF Sponsor has a definite ILF proposal. Draft ILF Enabling Instrument The complete ILF Enabling Instrument and all Exhibits submitted for IRT review and approval. Section III - IRT Arizona ILFs: Please contact Marjorie Blaine at the Los Angeles District of the USACE at (520)584-1684 or Marjorie.E.Blaine@usace.army.mil. North Coast California ILFs (counties of San Bernardino, Los Angeles, Ventura, Santa Barbara, San Luis Obispo, Kern, Inyo, and Mono): Please contact John Markham at the Los Angeles District of the USACE at (805) 585-2150 or John.W.Markham@usace.army.mil. South Coast California ILFs (counties of San Diego, Imperial, Orange, and Riverside): Please contact Peggy Bartels at the Lost Angeles District of the USACE at (760) 602-4832 or Peggy.Bartels@usace.army.mil. The IRT meetings are held as needed. In order to receive a time slot on the IRT agenda for a Draft Prospectus or a Prospectus, the ILF Sponsor must provide each IRT participant listed below with 1 hard copy and 1 compact disc (CD) of the proposal at least 14 days prior to the 2

scheduled meeting with the IRT (Please note that some California IRTs may request more than one copy; please check with the appropriate California contact above). In addition to the quantities listed above, please bring 3 extra hard copies and CDs of the completed information for a Prospectus to the IRT meeting at the scheduled time. The IRT may also request additional information if the Prospectus raises additional questions or issues. Time slots for IRT meetings will be filled as the proposals are received and ILF Sponsors will be notified of the time slot and the meeting location. If all slots are full when the proposal is received, the ILF Sponsor will be notified and offered a time slot at the next IRT meeting. ARIZONA IRT March, 2011 Name Agency Email Address Mailing Address Phone Marjorie Blaine IRT Chair USACE Marjorie.E.Blaine@usace.army.mil Bob Broscheid AGFD BBroscheid@azgfd.gov Chris Cawein Pima County RFCD chris.cawein@rfcd.pima.gov Julia Fonseca Pima County Julia.Fonseca@pima.gov Elizabeth Goldmann USEPA Goldmann.Elizabeth@epamail.epa.gov Mike Martinez USFWS Mike_Martinez@fws.gov Bob Scalamera ADEQ Scalamera.Robert@azdeq.gov Wendy Wonderley City of Phoenix wendy.wonderley@phoenix.gov U.S. Army Corps of Engineers Tucson Resident Office 5205 E. Comanche Street Tucson, AZ 85707 Wildlife Management Division Arizona Game and Fish Department 5000 W. Carefree Highway Phoenix, AZ 85086-5000 Pima County Regional Flood Control District 97 E. Congress Street, 3rd Floor Tucson, AZ 85701 Office of Conservation Science & Environment 201 N. Stone Ave. 6th floor Tucson, AZ 85701 EPA, Region IX WTR-8 75 Hawthorne Street San Francisco, CA 94105 US Fish and Wildlife Service Arizona Ecological Services Field Office 2321 W. Royal Palm Road, Suite 103 Phoenix, AZ 85021 Arizona Department of Environmental Quality Mailstop 5415A-1 1110 W. Washington Phoenix, AZ 85007 City of Phoenix Office of Environmental Programs 200 W. Washington Street 14th Floor Phoenix, AZ 85003 (520) 584-1684 (623) 236-7276 (520) 243-1882 (520) 740-6460 (415) 972-3398 (602) 242-0524 x224 (602) 771-4502 (602) 534-1775 3

NORTH COAST CALIFORNIA IRT March, 2011 Name Agency Email Address Mailing Address Phone John Markham IRT Chair USACE John.W.Markham@usace.army.mil Tom Cavanaugh USACE, SPD Thomas.J.Cavanaugh@usace.army.mil U.S. Army Corps of Engineers 2151 Alessandro Drive, Suite 110 Ventura, CA 93001 U.S. Army Corps of Engineers South Pacific Division CESPD-PDS-O, 2042B 1455 Market Street, San Francisco, California 94103-1399 (805) 585-2150 (415) 503-6574 Eric Raffini USEPA Raffini.Eric@epa.gov Colleen Mehlberg USFWS Colleen_Mehlberg@fws.gov Daniel Blankenship CDFG DSBlankenship@dfg.ca.gov U.S. Environmental Protection Agency 600 Wilshire Boulevard, Suite 1460 Los Angeles, CA 90017 U.S. Fish and Wildlife Service 2493 Portola Road, Suite B Ventura, CA 93003 PO Box 221480 Newhall, CA 91322-1480 (213) 244-1830 (805)644-1766 x221 ((661) 259-3750 4

Checklist Draft Prospectus for In-Lieu Fee Programs March, 2011 Please refer to the Cover Sheet dated March, 2011 for procedures related to the submission of an ILF proposal. Please provide the following information and a copy of this checklist with the submittal of a Draft Prospectus: Proposed ILF Name - Use a short name based on a geographic feature or ILF Sponsor s name and include In-Lieu Fee Program in the name; ILF contacts - include the name, address, phone, fax, and email for: ILF Sponsor, Property Owner, Consultants, etc.; Color aerial and on-site photographs that reflect current conditions of the proposed ILF mitigation project site(s) and surrounding properties; Explanation of the general need for the ILF program and basis for such determination; ILF mitigation project site conditions description. This should include a BRIEF description of: site conditions of at least one proposed ILF mitigation project site; habitats and species known or potentially present; description and acreage of existing wetlands and other waters of the U.S.; hydrology; methods for establishing, restoring, rehabilitating, and/or preserving wetlands and other waters of the U.S., and habitat for federal, and state listed species; and site history, including past and present land uses, surrounding land uses and zoning along with the anticipated future development in the area; Explain how the proposed ILF mitigation project site(s) would contribute to connectivity and ecosystem function. Also discuss potential conflicts and compatibility with any conservation plans, conceptual area plans, or other land use plans, policies, or regulations; 5

Has the proposed ILF mitigation project site(s) been: Used as mitigation for a previous project(s); Already designated or dedicated for passive park or open space use, where that use is generally compatible with sustaining biological values; Designated for purposes which are inconsistent with habitat preservation (i.e., lands purchased for roads, landfills, etc.); and Acquired by a public entity (e.g., with State Bond Act funds) or provided to a jurisdiction for park or natural open space purposes; Provide details including ownership information on interest of surface and sub-surface mineral rights; Details regarding public funding received (if applicable) for restoration, acquisition or other purposes on all or a portion of the proposed ILF mitigation project site(s) (e.g., funding source, amount received, purpose, # of acres affected by each purpose, etc.); Preliminary jurisdictional determination (PJD) of on-site wetlands and other waters of the U.S for USACE review and approval 1 ; and Compensation Planning Framework to include: Accurate current map of the proposed geographic service area of the ILF program on a 7.5-minute USGS map showing boundaries of the ILF service area and boundaries of any known areas where ILF mitigation project site(s) may be implemented; A watershed-based rationale for the delineation of each service area(s); A description of the threats to aquatic resources in the service area(s), including how the ILF program will help offset impacts resulting from those threats; An analysis of historic aquatic resource loss in the service area(s); An analysis of current aquatic resource conditions in the service area(s), supported by an appropriate level of field documentation; 1 A PJD can only be used to determine that wetlands or other water bodies that exist on a particular site may be jurisdictional waters of the United States. For the purposes of this document, a PJD is one done in accordance with the requirements of USACE Regulatory Guidance Letter 08-02. 6

A statement of aquatic resource goals and objectives for each service area, including a description of the general amounts, types and locations of aquatic resources the ILF program will seek to provide; A prioritization strategy for selecting and implementing compensatory mitigation activities; An explanation of how any preservation objectives addressed in the prioritization strategy satisfy the criteria for use of preservation in accordance with 33 C.F.R. 332.3(h); A description of any public and private stakeholder involvement in plan development and implementation, including, where appropriate, coordination with federal, state, tribal and local aquatic resource management and regulatory authorities; A description of the long-term protection and management strategies for activities to be conducted by the ILF Sponsor; A strategy for periodic evaluation and reporting on the progress of the ILF program in achieving the goals and objectives of the program, including a process for revising the planning framework as necessary. Following IRT review of this material, additional information may be requested for evaluating the proposal. 7

Checklist Prospectus for In-Lieu Fee Programs March, 2011 Please refer to the Cover Sheet dated March, 2011 for information and instructions related to the submission requirements for an ILF proposal. 1 Please provide the following information and a copy of this checklist with the submittal of a Prospectus: Proposed ILF Name - Use a short name based on a geographic feature or ILF Sponsor s name and include In-Lieu Fee Program in the name; 2 ILF contacts - Include the name, address, phone, fax, and email for: ILF Sponsor, Property Owner, Consultants, etc.; Color aerial and on-site photographs that reflect current conditions of the proposed ILF mitigation project site(s) and surrounding properties; Description of how the ILF program will be established and operated, including the proposed ownership arrangements and long-term management strategy for the ILF mitigation project site(s); include description of phases, boundaries, target habitat/species, and the number of credits associated with each ILF mitigation project site; Qualifications of the ILF Sponsor to successfully complete the type(s) of ILF mitigation project(s) proposed, including information describing any similar activities by the ILF Sponsor; Preliminary jurisdictional determination of on-site wetlands and other waters of the U.S for review and USACE approval; Explanation of the general need for and technical feasibility of the ILF program and basis for such determination; A map depicting other conserved lands in the service area of the proposed ILF program; 1 Additional information may be requested to deem the Prospectus complete. 2 A name change may be requested if the proposed ILF name is already being used. 8

ILF Program Objectives/Conceptual Plan describing the objectives of the ILF program and activities and methods for establishing, restoring, rehabilitating and/or preserving wetlands and other waters of the U.S. and habitat for federal and state listed species at each ILF mitigation project site. Include maps detailing the anticipated location, acreages, and credits of wetlands and other waters of the U.S. within the proposed ILF mitigation project site(s). The plan should detail anticipated increases in functions and services of existing aquatic resources and their corresponding effect within the watershed (i.e., habitat diversity and connectivity, floodplain management, or other landscape scale functions). Describe ecological suitability of the site to achieve the objectives of the ILF program (i.e., watershed/hydrology analysis, soils, topography, compatibility with adjacent land uses, watershed management plans). If restoration is to occur at a proposed ILF mitigation project site, the plan should include historic aerial photographs and/or historic topographic maps, if available. Include proposed Performance Standards and monitoring methods for assessing how the objectives of the ILF program will be met; Explain how the proposed ILF mitigation project site(s) would contribute to connectivity and ecosystem function. Also discuss potential conflicts and compatibility with any conservation plans, conceptual area plans, or other land use plans, policies, or regulations; Has the proposed ILF mitigation project site(s) been: Used as mitigation for a previous project(s); Already designated or dedicated for passive park or open space use, where that use is generally compatible with sustaining biological values; Designated for purposes which are inconsistent with habitat preservation (i.e., lands purchased for roads, landfills, etc.); and Acquired by a public entity (e.g., with State Bond Act funds) or provided to a jurisdiction for park or natural open space purposes; Any other restrictions on the proposed ILF mitigation project site(s); Real Estate Records and Assurances: Current (within one year of submittal) Preliminary Title Report indicating any easements or other encumbrances and a figure depicting all relevant property lines, easements, dedications, etc. on the proposed ILF mitigation project site(s). Note: any liens and easements on the proposed mitigation project sites that may affect a mitigation project s viability will need to be resolved before an ILF program can be approved. Provide a property assessment that summarizes and explains each recorded or unrecorded lien or encumbrance on, or interest in, the proposed ILF mitigation project site(s), including, without limitation, each exception listed in the Preliminary Title Report and describing the manner in which each encumbrance may affect the mitigation project s operation or habitat services; 9

Assurance of sufficient water rights to support the long-term sustainability of the mitigation project; Provide details including ownership information on interest of surface and subsurface mineral rights; Identification and description of access to the proposed mitigation project site(s); and An affirmative statement that a conservation easement covering the proposed ILF mitigation project site(s) in perpetuity or fee title transfer of the proposed mitigation project site(s) to a specified and approved grantee will occur as part of the ILF program establishment. Include number of acres of the proposed ILF mitigation project site(s), excluding any easement areas that allow uses incompatible with conservation. Details regarding public funding received (if applicable) for restoration, acquisition or other purposes on all or a portion of the proposed ILF mitigation project site(s) (e.g., funding source, amount received, purpose, # of acres affected by each purpose, etc.); ILF mitigation project site conditions description. This should include a detailed description of: site conditions of at least one proposed ILF mitigation project site; habitats and species known or potentially present; description and acreage of existing wetlands and other waters of the U.S.; hydrology; methods for establishing, restoring, rehabilitating, and/or preserving wetlands and other waters of the U.S., and habitat for federal, and state listed species; and site history, including past and present land uses, surrounding land uses and zoning along with the anticipated future development in the area; Compensation Planning Framework to include: Accurate current map of the proposed geographic service area of the ILF program on a 7.5-minute USGS map showing boundaries of the ILF service area and boundaries of any known areas where ILF mitigation project site(s) may be implemented; A watershed-based rationale for the delineation of each service area; 10

A description of the threats to aquatic resources in the service area(s), including how the ILF program will help offset impacts resulting from those threats; An analysis of historic aquatic resource loss in the service area(s); An analysis of current aquatic resource conditions in the service area(s), supported by an appropriate level of field documentation; A statement of aquatic resource goals and objectives for each service area, including a description of the general amounts, types and locations of aquatic resources the program will seek to provide; A prioritization strategy for selecting and implementing compensatory mitigation activities; An explanation of how any preservation objectives addressed in the prioritization strategy satisfy the criteria for use of preservation in accordance with 33 C.F.R. 332.3(h); A description of any public and private stakeholder involvement in plan development and implementation, including, where appropriate, coordination with federal, state, tribal and local aquatic resource management and regulatory authorities; A description of the long-term protection and management strategies for activities to be conducted by the ILF Sponsor; A strategy for periodic evaluation and reporting on the progress of the ILF program in achieving the goals and objectives of the program, including a process for revising the planning framework as necessary; and Any other information deemed necessary for effective compensation planning by the IRT. Description of the ILF program account, including: Establishment of the account at a financial institution that is a member of the Federal Deposit Insurance Corporation. All interests and earnings accruing to the program account must remain in that account for use by the ILF program for the purposes of providing compensatory mitigation; A statement in the program account that the USACE has the authority to direct those funds to alternative compensatory mitigation projects in cases where the ILF Sponsor does not provide compensatory mitigation in accordance with the specified time frame; A description of annual reporting requirements; A statement that the USACE has the authority to audit all program accounts at any time. 11

Specification of the initial allocation of advance credits and method of determination of future advance credits, and a draft fee schedule for these credits, by service area, including an explanation of the basis for the allocation and draft fee schedule; Methodology for determining future project-specific credits and fees. 12