ALL TIMES SUBJECT TO CHANGE

Similar documents
TUESDAY, FEBRUARY 16 FD 9 / FD EVA #3 BEGINS (Behnken and Patrick) 08/ 16:55 08:09 PM 09:09 PM 02:09 WEDNESDAY, FEBRUARY 17 FD 10 / FD 11

NASA TELEVISION SCHEDULE STS-124 / 1J Japanese Experiment Module - Pressurized Module REV K 06/07/08

ALL TIMES SUBJECT TO CHANGE

NASA TELEVISION SCHEDULE STS-126 / ULF-2 UTILIZATION AND LOGISTICS FLIGHT TWO REV K 11/25/08

NASA TELEVISION SCHEDULE STS-134 / ULF-6 ISS UTILIZATION LOGISTICS FLIGHT 6 / ALPHA MAGNETIC SPECTROMETER REV I 5/24/11

138 JOINT CREW NEWS CONFERENCE ISS Ku 08/ 17:22 12:05 PM 01:05 PM 17: CREW OFF DUTY PERIOD BEGINS 08/ 18:20 01:03 PM 02:03 PM 18:03

144 DISCOVERY SLEEP BEGINS 09/ 02:30 09:13 PM 10:13 PM 02:13 WEDNESDAY, MARCH 25 FD 10 / FD 11

ALL TIMES SUBJECT TO CHANGE

CORPORATE PRESENTATION. Gurvinder Chohan Director Business Development

AsiaSat Satellite Fleet Operations using EPOCH IPS

RAINIERCISCOCOMMERCIALD9865 D - H - B RECEIVERQUICKTIPS.

The ESA Automated Transfer Vehicle

TC-1 Timeclock. Operating and Programming Instructions Thursday, 25 March Lighting Controls for the World we live in

Fabien Jordan Electrical System Engineer Space Center EPFL Muriel Noca SwissCube Project Manager.

THE PROJECT MOMS/ PRIRODA MAIN RESULTS IN H.-D. Bettac*, K.-D. Missling*, V. Panchenko**, T. Tyan**, V. Voroncov**

A Centers for Medicare and Medicaid Services (CMS) Satellite Broadcast and Webcast

A Centers for Medicare and Medicaid Services (CMS) Satellite Broadcast and Webcast

New Services. VP, Business Development and Regulatory Affairs

Installation Instructions

Unpaid Internship - Job Description

BELINTERSAT-1 HANDBOOK

Digital Television (DTV) Technology And NASA Space/Ground Operations

User s Guide for the Digital Video Recorder

Professional Media Server Quick Start Guide

Satellite Communications Training System

Euro1080 HDTV CHANNELS SATELLITE MODEL

Space Shuttle Orbiter Processing, Monitoring, and Telemetry Systems

2015 NCAA Division I Men's Basketball Championship News Conference Satellite Coordinates

(12) Publication of Unexamined Patent Application (A)

ROGERS TV AVAILABLE CO-OP POSITIONS FOR 2011/2012

DVB-S. User s manual

Television Audience 2010 & 2011

2017 Fall Conservatory Audition Form

DCL Time Controller WTDCL. Universal Lighting Technologies is a subsidiary of Panasonic Electric Works Co., Ltd., a member of the Panasonic Group

Telesat's Canadian Satellite Capacity and Services Plan for the 17 GHz BSS Orbital Resources at lll.l WLandll3 WL.

TEXAS LOTTERY COMMISSION REQUEST FOR PROPOSALS FOR DRAWING STUDIO AND PRODUCTION SERVICES # RESPONSES TO PROPOSERS QUESTIONS

Digital Video Recorder

Digital Video over Space Systems & Networks

MAN-MACHINE INTERFACE AND CONTROL OF THE SHUTTLE DIGITAL FLIGHT SYSTEM

Teacher Workbooks. Social Studies Series Language Arts Integration Beginning Level Biographies of African-Americans, Vol. 2

Video over the Internet Can we break the Net? CBS Interactive

Imation Supports NASA on Space Shuttle Columbia Data Recovery

AUTOPILOT DLM Satellite Downlink Manager USER GUIDE

Development of an SSTV camera (Use of a commercial product)

TELEVISION. Entertainment Plans. Interactive Guide and DVR (Digital Video Recorder) Manual ARVIG arvig.net

!! 1.0 Technology Brief

STORQ System Installation Guide

- Seven is number 1 for total viewers in primetime on primary channels across the current television season.

Product Guide Verizon Pennsylvania Inc. Section 35D Verizon Pennsylvania Inc. Original Sheet 1 RESIDENCE TWO-POINT MESSAGE TOLL SERVICE

Room thermostat Instructions for Use. For the user. Instructions for Use. geotherm

CITY OF LOS ANGELES CIVIL SERVICE COMMISSION CLASS SPECIFICATION POSTED JUNE VIDEO TECHNICIAN, 6145

Broadcasting from 1 West. The leading position in the Nordic region and a hotspot location for broadcasting in Central and Eastern Europe BROADCAST

- Seven is number 1 for total viewers in primetime on primary channels across the current television season.

RC3000 User s Manual additions for the Positive Identification feature.

Digital TV. User guide. Call for assistance

Broadcast Season

Cutting the Cord. Presenter. Watch Video Programs on Your Terms

Broadcast Season

Sending Images. Teacher Information

Analysis of Capacity vs Orbital Spacing for military purpose Ka-band satellites

Seven launches Australia s first new commercial television network in four decades. And it s in digital high definition.

Technology Advances. Ashaad Rambharos CSE Intelsat Africa

Alpha Plus. User Guide

My XDS Receiver- Affiliate Scheduler

IKONOS Ground Segment Interoperability & Experiences after 6+ Years of Operations

Life Changers International Church. Job Description

Our world. Anytime, anywhere, live. Your world.

Telecommunication satellites & services. Azerspace-1, 46 0 E Azerspace-2, 45 0 E

Instructions for use. UFS 810 English IMPORTANT READ CAREFULLY BEFORE USE

SATELLITEMOBILITY WORLD

Satellite Services and Interference: The current situation. ITU International Satellite Communication Symposium Geneva, June 2016

ATTACHMENT J-17 Sample Task Order Link Budget Template

VU + SOLO2 performance above all

- Seven is number 1 for total viewers in primetime on primary channels across the current television season.

GLOBAL INVACOM SGX-WeR1 Investment Seminar 5 October 2016

Digital Television Transition in US

ATTACHMENT 2: SPECIFICATION FOR SEWER CCTV VIDEO INSPECTION

ATLANTA ASF 2033HD+ DVB-S/S2 METER. User`s Manual

ATTACHMENT J-17 Sample Task Order Link Budget Template. Template Instructions

Season YEAR Satellite Info - Generic Format - FCC Info - Fact Sheet - Web Site - Contact Info

RADIO STATION AUTHORIZATION Current Authorization : FCC WEB Reproduction

DIGITAL BROADCASTING. Implementation of new services and their position in Multimedia World

SNG AND OB VANS. Broadcast Contribution Challenges in an IP World SOLUTION GUIDE. New interactive services to boost productivity.

Cox Advanced TV With Cox Advanced TV, you ll experience 100% digital picture and sound, hundreds of channels and the ability to watch shows On DEMAND

- Seven is number 1 for total viewers in primetime across the current television season.

C-band Use and Challenges in the Americas Region. January 2013

Summary of 2011 Direct and Nearby Lightening Strikes to Launch Complex 39B

Interactive Satellite Terminal Installation / Validation Manual

Deep Inlet Schedule 2016

Exhibits. Open House. NHK STRL Open House Entrance. Smart Production. Open House 2018 Exhibits

Digital Satellite Recorder

XTM72 Exerciser Timer Module

The Air Force Association 1501 Lee Highway, Arlington, Virginia

DigiPoints Volume 2. Student Workbook. Module 5 Headend Digital Video Processing

SWISS TIMING Service catalogue FIS World Cup Cross Country 2017/18

SSPT724A Timer Quick Start Guide

The Emergence of Affordable Broadband Services for Remote Locations Using SFOC Technology Dr. William J. Barattino Mr. Nicholas Koopalethes

Ahead of the Curve: Top CTOs Discuss Where to Invest Next

Cox Advanced TV With Cox Advanced TV, you ll experience 100% digital picture and sound, hundreds of channels and the ability to watch shows On DEMAND

Highly Adaptable Satellite (HYLAS): A Platform for Advanced Broadband Applications

Transcription:

************************************************************************************************************************************************************************************* NASA TELEVISION SCHEDULE STS-135 ISS UTILIZATION LOGISTICS FLIGHT 7 / MPLM "RAFFAELLO" REV K 07/16/11 ************************************************************************************************************************************************************************************* NASA TV (Public, Education, Media Channels and HD programming) Digital Satellite C-Band Downlink coordinates for continental North America, Alaska and Hawaii: Satellite = AMC 3 / Transponder = 15C / 87 Degrees West / DVB-S, 4:2:0 / Downlink Frequency = 4000 Mhz / Downlink Polarity = Horizontal / FEC = 3/4 / Data Rate = 38.860 MHz / Symbol Rate = 28.1115. Clients actively participating in Standard-Definition on-orbit interviews, interactive press briefings and satellite interviews must use the LIMO Channel: Satellite = AMC 3 / Transponder = 9C / 87 degrees West / DVB-S, 4:2:0 / Downlink Frequency = 3865.5 Mhz / Downlink Polarity = Horizontal / FEC = 3/4 / Data Rate = 6.0 Mbps / Symbol rate = 4.3404 Msps. A Digital Video Broadcast compliant Integrated Receiver Decoder is required for reception. Mission Audio is available at: http://www.nasa.gov/ntv. ALL TIMES SUBJECT TO CHANGE This TV schedule is available via the Internet. The address is: http://www.nasa.gov/shuttletv Launch occurred at 10:29am CT (11:29am ET) on Friday, July 8th, 2011. An asterisk (*) denotes changes made to the previous revision to the television schedule. ORBIT SUBJECT SITE MET CDT EDT GMT SATURDAY, JULY 16 FD 9 / FD 10 134 ATLANTIS / ISS CREW WAKE UP (begins FD 10) 08/ 11:30 09:59 PM 10:59 PM 02:59 134 ISS FLIGHT DIRECTOR UPDATE JSC 08/ 12:01 10:30 PM 11:30 PM 03:30 SUNDAY, JULY 17 FD 10 / FD 11 135 * MPLM TRANSFERS RESUME 08/ 14:05 12:34 AM 01:34 AM 05:34 139 * NASA EXPLORER SCHOOLS EDUCATIONAL EVENT ISS Ku 08/ 18:40 05:09 AM 06:09 AM 10:09 140 ATLANTIS / ISS CREW OFF DUTY PERIOD 08/ 20:00 06:29 AM 07:29 AM 11:29 143 ISS CREW SLEEP BEGINS 09/ 02:30 12:59 PM 01:59 PM 17:59 144 ATLANTIS CREW SLEEP BEGINS 09/ 03:00 01:29 PM 02:29 PM 18:29 144 MISSION STATUS BRIEFING JSC 09/ 03:01 01:30 PM 02:30 PM 18:30 146 FLIGHT DAY 10 HIGHLIGHTS (replayed on the hour during crew sleep) JSC 09/ 04:31 03:00 PM 04:00 PM 20:00 Page 1 of 7

148 "THE SPACE SHUTTLE" NARRATED BY WILLIAM SHATNER JSC 09/ 08:31 07:00 PM 08:00 PM 00:00 149 "LAUNCHING OUR DREAMS" VIDEO FEATURE PLAYBACK JSC 09/ 09:31 08:00 PM 09:00 PM 01:00 149 ISS FLIGHT DIRECTOR UPDATE JSC 09/ 10:41 09:10 PM 10:10 PM 02:10 150 ATLANTIS / ISS CREW WAKE UP (begins FD 11) 09/ 11:00 09:29 PM 10:29 PM 02:29 MONDAY, JULY 18 FD 11 / FD 12 151 MPLM EGRESS 09/ 13:20 11:49 PM 12:49 AM 04:49 151 MPLM VESTIBULE DEMATING 09/ 13:55 12:24 AM 01:24 AM 05:24 152 MPLM VESTIBULE DEPRESSURIZATION 09/ 15:25 01:54 AM 02:54 AM 06:54 154 SSRMS GRAPPLES MPLM 09/ 18:05 04:34 AM 05:34 AM 09:34 154 SSRMS UNBERTHS MPLM FROM ISS & INSTALLS IN ATLANTIS' PAYLOAD BAY 09/ 19:20 05:49 AM 06:49 AM 10:49 155 MISSION STATUS BRIEFING JSC 09/ 20:31 07:00 AM 08:00 AM 12:00 156 ATLANTIS / ISS FAREWELL AND HATCH CLOSURE 09/ 21:50 08:19 AM 09:19 AM 13:19 157 CENTERLINE CAMERA INSTALLATION 09/ 22:40 09:09 AM 10:09 AM 14:09 157 RENDEZVOUS TOOLS CHECKOUT 09/ 23:20 09:49 AM 10:49 AM 14:49 159 ISS CREW SLEEP BEGINS 10/ 02:00 12:29 PM 01:29 PM 17:29 159 ATLANTIS CREW SLEEP BEGINS 10/ 02:30 12:59 PM 01:59 PM 17:59 160 160 "LAUNCHING OUR DREAMS" VIDEO FEATURE PLAYBACK FLIGHT DAY 11 HIGHLIGHTS (replayed on the hour during crew sleep) JSC 10/ 03:31 02:00 PM 03:00 PM 19:00 JSC 10/ 04:31 03:00 PM 04:00 PM 20:00 164 ATLANTIS / ISS CREW WAKE UP (begins FD 12) 10/ 10:30 08:59 PM 09:59 PM 01:59 Page 2 of 7

TUESDAY, JULY 19 FD 12 / FD 13 167 ATLANTIS UNDOCKS FROM ISS 10/ 14:59 01:28 AM 02:28 AM 06:28 168 ATLANTIS FLYAROUND OF ISS BEGINS 10/ 15:58 02:27 AM 03:27 AM 07:27 168 ATLANTIS FINAL SEPARATION FROM ISS 10/ 16:49 03:18 AM 04:18 AM 08:18 170 RMS / OBSS LATE INSPECTION OF ATLANTIS' TPS 10/ 19:05 05:34 AM 06:34 AM 10:34 170 MISSION STATUS BRIEFING JSC 10/ 20:01 06:30 AM 07:30 AM 11:30 173 OBSS BERTH 10/ 23:20 09:49 AM 10:49 AM 14:49 174 MMT BRIEFING JSC 11/ 01:31 12:00 PM 01:00 PM 17:00 175 ATLANTIS CREW SLEEP BEGINS 11/ 02:30 12:59 PM 01:59 PM 17:59 175 VIDEO FILE HQ 11/ 02:31 01:00 PM 02:00 PM 18:00 175 FLIGHT DAY 12 HIGHLIGHTS JSC 11/ 03:31 02:00 PM 03:00 PM 19:00 177 177 "THE SPACE SHUTTLE" NARRATED BY WILLIAM SHATNER (Media Channel only) NASA CELEBRATES SPIRIT (Public and Education Channels only) JSC 11/ 06:46 05:15 PM 06:15 PM 22:15 JPL 11/ 06:46 05:15 PM 06:15 PM 22:15 180 ATLANTIS CREW WAKE UP (begins FD 13) 11/ 10:30 08:59 PM 09:59 PM 01:59 Page 3 of 7

WEDNESDAY, JULY 20 FD 13 182 * CABIN STOWAGE BEGINS 11/ 13:45 12:14 AM 01:14 AM 05:14 183 * FCS CHECKOUT 11/ 14:45 01:14 AM 02:14 AM 06:14 183 * PICOSAT DEPLOYMENT 11/ 16:25 02:54 AM 03:54 AM 07:54 184 * RCS HOT-FIRE TEST 11/ 16:35 03:04 AM 04:04 AM 08:04 185 ABC News / CBS News / CNN / FOX News / NBC News LIVE INTERVIEWS TDRE 11/ 17:15 03:44 AM 04:44 AM 08:44 186 * SHUTTLE VTR PLAYBACK OF UNDOCKING 11/ 20:30 06:59 AM 07:59 AM 11:59 186 MISSION STATUS BRIEFING JSC 11/ 20:31 07:00 AM 08:00 AM 12:00 189 VIDEO FILE HQ 12/ 00:31 11:00 AM 12:00 PM 16:00 189 KU-BAND ANTENNA STOWAGE 12/ 00:10 10:39 AM 11:39 AM 15:39 190 ATLANTIS CREW SLEEP BEGINS 12/ 02:30 12:59 PM 01:59 PM 17:59 191 192 "LAUNCHING OUR DREAMS" VIDEO FEATURE PLAYBACK FLIGHT DAY 13 HIGHLIGHTS (replayed on the hour during crew sleep) JSC 12/ 03:31 02:00 PM 03:00 PM 19:00 JSC 12/ 04:31 03:00 PM 04:00 PM 20:00 195 ATLANTIS CREW WAKE UP (begins FD 14) 12/ 10:30 08:59 PM 09:59 PM 01:59 197 ATLANTIS DEORBIT PREPARATIONS BEGIN 12/ 13:25 11:54 PM 12:54 AM 04:54 Page 4 of 7

THURSDAY, JULY 21 FD 14 198 PAYLOAD BAY DOOR CLOSING 12/ 14:44 01:13 AM 02:13 AM 06:13 200 ATLANTIS DEORBIT BURN 12/ 17:24 03:53 AM 04:53 AM 08:53 200 MILA C-BAND RADAR ACQUISITION OF ATLANTIS 12/ 18:15 04:44 AM 05:44 AM 09:44 200 KSC LANDING KSC 12/ 18:28 04:57 AM 05:57 AM 09:57 ENTRY FLIGHT DIRECTOR TONY CECCACCI SIGN-OFF TO FLIGHT CONTROL TEAM JSC ~ L+45 MIN. POST-LANDING NEWS CONFERENCE KSC NET L+2 HRS. ENTRY FLIGHT CONTROL TEAM VIDEO REPLAY (replayed after Post-Landing News Conference) JSC ~ L+3 HRS. STS-135 MISSION HIGHLIGHTS VIDEO REPLAY (replayed after Entry Flight Control Team Video) JSC ~ L+3.5 HRS. STS-135 CREW NEWS CONFERENCE (may be postponed or cancelled) ATLANTIS TOWBACK & EMPLOYEE APPRECIATION EVENT KSC KSC NET L+4.5 HRS. NET L+6 HRS. Page 5 of 7

************************************************************************************************************************************************************************************* DEFINITION OF TERMS ************************************************************************************************************************************************************************************* AMC: Americom Satellite CDT: Central Daylight Time Destiny: U.S. Laboratory on ISS Dextre: Special Purpose Dextrous Manipulator on ISS ELC-4: Express Logistics Carrier #4 EMU: Extravehicular Mobility Unit EOTP Enhanced ORU Temporary Platform EDT: Eastern Daylight Time ESP2: External Stowage Platform #2 on ISS EVA: Extravehicular Activity FCS: Flight Control System FD: Flight Day GMT: Greenwich Mean Time Harmony: Node 2 HD: High Definition Television HQ: NASA Headquarters ISLE: In-suit Light Exercise ISS: International Space Station JSC: Johnson Space Center KSC: Kennedy Space Center L: Launch or Landing time LIMO: Live Interview Media Outlet channel LMC: Lightweight Multipurpose Carrier MECO: Main Engine Cut-Off MET: Mission Elapsed Time, which begins at the moment of launch and is read: DAYS/HOURS:MINUTES. LAUNCH=00/00:00 MILA Merritt Island, Florida Tracking Station MISSE: Materials International Space Station Experiment MMT: Mission Management Team MS: Mission Specialist NET: No Earlier Than OBSS: Orbiter Boom Sensor System ODS: Orbiter Docking System OMS: Orbital Maneuvering System ORU: Orbital Replacement Unit PAO: Public Affairs office PDGF: Power and Data Grapple Fixture RCS: Reaction Control System R&R: Return and Replace RRM: Robotics Refueling Mission RSS: Rotating Servicing Structure S1: Starboard One truss segment on ISS SRMS: Shuttle Remote Manipulator System on ATLANTIS Page 6 of 7

SSRMS: Space Station Remote Manipulator System (Canadarm2 ISS Robotic Arm) STBD: Starboard STS: Space Transportation System TI: Terminal Initiation Rendezvous Maneuver TDRE, W: Tracking and Data Relay Satellite, East and West Longitudes TPS: Thermal Protection System Unity: Connecting Node 1 on International Space Station VTR: Videotape Recorder ZSR: Zero-G Stowage Rack Page 7 of 7