TRIAL OF PEAK TIMINGS ON JOHNSONVILLE LINE

Similar documents
Extra scenario with three versus four E-ferries for the total ferry service of Aeroe

EMERSON SMART WIRELESS RADIO SILENCE REPORT

Actors Television Programs Agreement

VIVO INDIAN PREMIER LEAGUE 2019 REGULATIONS FOR NEWS AND CURRENT AFFAIRS BROADCASTERS FOR AUDIO VISUAL BROADCASTING

Belfast - Carrickfergus - Larne

INDIAN INSTITUTE OF TECHNOLOGY KHARAGPUR NPTEL ONLINE CERTIFICATION COURSE. On Industrial Automation and Control

This Chapter does not apply to applications and decisions on, development on land reserved in corridor maps.

Concert Day Information

IEEE C a-02/26r1. IEEE Broadband Wireless Access Working Group <

SWITCHED INFINITY: SUPPORTING AN INFINITE HD LINEUP WITH SDV

Belfast - Carrickfergus - Larne

Installation Instructions

In the proposed amendment below, text shown with underline is proposed to be added and text shown with strikethrough is proposed to be removed.

Larne - Carrickfergus - Belfast

Notice Pursuant to Section 32H of the Telecommunications Ordinance (Chapter 106)

Speaking and Vocabulary

Telecommunication Development Sector

IP Telephony and Some Factors that Influence Speech Quality

Lesson 7: Measuring Variability for Skewed Distributions (Interquartile Range)

INSTALLATION AND OPERATION M

Lesson 84: Station and Airport Announcements (20-25 minutes)

MTR Digital Escalator Crown Sales Presentation

A. Introduction 1. Title: Automatic Underfrequency Load Shedding Requirements

Train times. Monday to Sunday

Introduction. Facial Expressions, Manners and Reactions Physical actions Tools to help understanding (Hand gestures, illustrations, etc.

Blackburn and Darwen

ADDITIONAL MUSIC OPPORTUNITIES IN THE JUNIOR SCHOOL FOR 2016 INSTRUMENT TUITION, THEORY OF MUSIC LESSONS, INSTRUMENT HIRE AND ENSEMBLES

Edinburgh Waverley. Infrastructure works Haymarket connection guide 27 Dec May 2007

American National Standard for Lamp Ballasts High Frequency Fluorescent Lamp Ballasts

Children s Television Standards

For an Outdoor Kiosk Licence

Penistone Train Times

Exhibitor Registration Form June 10-13, 2015

91.7 The Edge, WSUW-FM Training Manual

VR5 HD Spatial Channel Emulator

Fiber-Coupled Acoustic-Optics Modulator (AOM) Module

The BBC s services: audiences in Scotland

Lesson 7: Measuring Variability for Skewed Distributions (Interquartile Range)

Table 6.1: Level of Service Thresholds for Basic Freeway Segments. Density Range LOS (pc/mi/ln) A 0 11 B >11 18 C >18 26 D > E >35 45 F > 45

Liquid Mix Plug-in. User Guide FA

J.M. Stewart Corporation 2201 Cantu Ct., Suite 218 Sarasota, FL Stewartsigns.com

BURNLEY GROUP OPERATING PROCEDURES

ATENEO PROFESSIONAL SCHOOLS

Actors Feature Film Agreement

SAINT MARY S UNIVERSITY DEPARTMENT OF GEOGRAPHY AND ENVIRONMENTAL STUDIES

COMMUNICATIONS OUTLOOK 1999

University of North Carolina at Charlotte Student Union Event Policy

RECOMMENDATION ITU-R BT Studio encoding parameters of digital television for standard 4:3 and wide-screen 16:9 aspect ratios

Lesson 35: Sick Day (20-25 minutes)

TSO Composers Project

EXTERNAL. A digital version of this document is available to download and submit online at ADDRESS POST CODE

AUGUST 30 - SEPTEMBER 2, 2018 METRO TORONTO CONVENTION CENTRE 2018 RETAILER KIT OVER 140,000 FANS OVER 750,00 SQ.FT OVER 500 GUESTS. fanexpocanada.

Processor time 9 Used memory 9. Lost video frames 11 Storage buffer 11 Received rate 11

Winter Wonderland Train Show

Level 1 English, 2012

Operating licence for the BBC s UK Public Services

Dissertation/Thesis Preparation Manual College of Graduate Studies Austin Peay State University

BEREC Opinion on. Phase II investigation. pursuant to Article 7 of Directive 2002/21/EC as amended by Directive 2009/140/EC: Case AT/2017/2020

ECE FYP BRIEFING SEMESTER 1, 2012/2013

Theatre Bay Area General Auditions FAQ (for actors)

BOOKLET. Preparing Papers for 15th REAAA Conference in Bali Guidelines for Authors

Clarification for 3G Coverage Obligation Verification Data

1. Click on the PRODUCTION INFORMATION tab and click on **Professional Project Registration Form**

9.5 Add or Remove Samples in Single Access Mode

ADVANCED MULTI-CAMERA TELEVISION WORKSHOP

Green Line Bus Times. From 28 January Save time and download your timetables from. Meltham Broadlands. Meltham Market Place

Beam Test Results and ORCA validation for CMS EMU CSC front-end electronics N. Terentiev

Piano and Instrumental

MTS/T-BERD 8000 Platform

MTS/T-BERD 8000 Platform Optical Spectrum Analyzer Modules

Service availability will be dependent on geographic coverage of DAB and digital television services 2

SAMPLE COURSE OUTLINE VISUAL ARTS ATAR YEAR 11

ENSEMBLE & COMPANY AUDITIONS 2019 Information for Students and Parents

THE MINACK THEATRE. Notes for Playing Companies. Please note 2016 amendment to Section 5 - Public Liability & Employer Liability Insurance

Train times. Monday to Sunday. Stoke-on-Trent. Crewe

Philips LightMaster. KNX Timeclock Installation and Operation Manual

USER DOCUMENTATION. How to Set Up Serial Issue Prediction

BICYCLE ADVISORY COMMITTEE

STUDENT RECITALS

GEO-Netcast White Paper Final Draft 9 December Improving access to data, products and services through GEOSS

Automatic Transfer Switch Control PLC Operator s Manual

A Midsummer Night s Dream

ISSUE DEADLINE RELEASE DATE

Actors Feature Film Agreement [Actors Feature Film Award, 1979]

NJU26125 Application Note PEQ Adjustment Procedure Manual New Japan Radio Co., Ltd

6.3 DRIVERS OF CONSUMER ADOPTION

FREE TIME ELECTION BROADCASTS

Improved Synchronization System for Thermal Power Station

VTAPE. The Analog Tape Suite. Operation manual. VirSyn Software Synthesizer Harry Gohs

Bus Timetable 14A. City Centre - Ninewells Hospital - Dryburgh - Clepington Road - Douglas

Level 1 English, 2016

2 Work Package and Work Unit descriptions. 2.8 WP8: RF Systems (R. Ruber, Uppsala)

TC-1 Timeclock. Operating and Programming Instructions Thursday, 25 March Lighting Controls for the World we live in

Basic rules for the design of RF Controls in High Intensity Proton Linacs. Particularities of proton linacs wrt electron linacs

Train times. northernrailway.co.uk. Manchester to. Hadfield. and Glossop. 15 May 2 October Manchester Piccadilly. Guide Bridge.

SPIRIT. SPIRIT Attendant. Communications System. User s Guide. Lucent Technologies Bell Labs Innovations

For personal use only

Overview of Information Presentation Technologies for Visually Impaired and Applications in Broadcasting

Exclusive Use of a Cinema for a Current Film Screening Private Screenings/Fundraisers

2017 INDIANA SECTION ARES SIMULATED EMERGENCY TEST. ARRL Indiana Section ARES Simulated Emergency Test 2017 Exercise Plan

Transcription:

DRAFT EVENT PLAN SATURDAY 18TH OCTOBER 2014 TRIAL OF PEAK TIMINGS ON JOHNSONVILLE LINE Details Cancellations On the above date, trial runs will be made on the Johnsonville line to test timings for peak periods using 4 services On Saturday 18th October: services from 9314 to 9349 inclusive will be CANCELLED. These services will be replaced as under: Special Trains Inclusion on Daily Information Bulletin requested Special Trains will run as under 9900 9902 9904 Wellington 0602 0618 0632 0642 0657 0712 0727 0742 0607 0623 0637 0647 0702 0717 0732 0747 0652 0707 0722 0737 0752 0612 0628 0642 0657 0712 0727 0742 0757 0649 0704 0719 0734 0749 0804 0619 0635 0650 0705 0720 0735 0750 0805 Johnsonville 0624 0640 0655 0710 0725 0740 0755 0810 DOWN Johnsonville 0630 0645 0700 0715 0730 0745 0800 0815 0635 0650 0705 0720 0735 0750 0805 0820 0642 0657 0712 0727 0742 0757 0812 0827 0647 0702 0717 0732 0747 0802 0817 0832 Wellington 0652 0707 0722 0737 0752 0807 0822 0837 9902 9904 9904 EMU EMU 0757 0812 0802 0817 0807 0822 0812 0827 0819 0834 0820 0835 0825 0840 9917 9919 EMU EMU 0830 0845 0835 0850 0842 0857 0847 0902 0852 0907 9917 9922 Schedules continued on pages 2 & 3 Ops Plan 14_xx 4 set Jville DRAFT VERSION 1.0 Page 1 Issued 01/10/2014

Wellington Johnsonville EMU 0827 0832 0837 0842 0849 0850 0855 9917 9919 9922 9924 9926 EMU EMU EMU 0857 0932 1002 0902 0937 1007 0907 0912 0942 1012 0919 0949 1019 0924 0954 1024 9919 9921 9923 9925 9928 9930 9932 EMU EMU EMU EMU EMU EMU 1032 1047 1102 1117 1132 1147 1037 1052 1107 1122 1137 1152 1042 1057 1112 1127 1142 1157 1049 1104 1119 1134 1149 1204 1054 1109 1124 1139 1154 1209 9927 9927 DOWN Johnsonville Wellington 9921 9923 9925 9927 EMU EMU EMU EMU 0900 0930 1000 1030 0905 0935 1005 1035 0912 0942 1012 1042 1047 0917 0947 1017 1052 0922 0952 1022 1057 9922 9924 9926 9928 9930 EMU EMU EMU EMU EMU EMU 1059 1114 1129 1144 1159 1214 9932 1104 1119 1134 1149 1204 1219 1126 1141 1156 1211 1226 1112 1127 1142 1157 1212 1227 1117 1132 1147 1202 1217 1232 1122 1137 1152 1207 1222 1237 1127 1142 1157 1212 1227 1242 9932 Ops Plan 14_xx 4 set Jville DRAFT VERSION 1.0 Page 2 Issued 01/10/2014

Wellington Johnsonville 9954 1202 1217 1232 1247 1302 1317 1332 1402 1207 1222 1237 1252 1307 1322 1337 1407 1212 1227 1242 1257 1312 1327 1342 1412 1219 1234 1249 1304 1319 1334 1349 1419 1224 1239 1254 1309 1324 1339 1354 1424 9949 9949 9951 9951 9953 DOWN Johnsonville Wellington 9949 9951 9953 9955 1229 1244 1259 1314 1329 1344 1400 1430 1234 1249 1304 1319 1334 1349 1405 1435 1241 1256 1311 1326 1341 1242 1257 1312 1327 1342 1356 1412 1442 1247 1302 1317 1332 1401 1252 1307 1322 1337 1347 1407 1417 1447 1257 1312 1327 1342 1352 1412 1422 1452 9954 9954 9350 From and including 9350/9351, a normal SATURDAY timetable will operate. No 9350 will cross No 9955 at NGAIO Ops Plan 14_xx 4 set Jville DRAFT VERSION 1.0 Page 3 Issued 01/10/2014

General The Wellington Regional Council are looking into the possibility of introducing a 4th train consist onto the Johnsonville line during peak periods. A provisional timetable has been prepared and it is desired to test how this operates in service conditions. The above schedules have therefore been prepared to undertake this test. The morning peak schedule is emulated starting with train 9900 through to /9921. These services are timetabled to run exactly to the proposed morning peak timetable. Services 9922, 9924 & 9926 provide a clear margin before the afternoon peak scenario commences. The afternoon peak scenario commences with service 9926 at 10:02hrs, ( In reality, this will be the 15:02 ) and runs through to service 9954/55 which in reality will be the 19:02 ex Wellington. In the morning peak scenario, timetable preference is given to "Down" services and "Up" services will have a 5 minute wait when crossing Down services at, and another minutes wait when crossing at. Similarly, preference is given to Up services in the afternoon peak and down services will have a 1 minute wait when crossing at and a further 5 minutes wait when crossing at. These delays, while a nuisance, are unfortunately unavoidable given the parameters the timetables have been designed to meet. Additionally, an extra minute has been inserted into the schedule in each direction to reflect actual Matangi performance. Consists Numbering To achieve closer reality to peak conditions, all the above services will run as a 4 car Matangi set. On these 4 car services, 2 cars will be open for passengers and 2 cars will be isolated. services will stop at all stations, except, and remain stationary for not less than 30 seconds to simulate peak time passenger loadings. For the purpose of this exercise, permission has been received from Network to use running numbers in the 9900 series Ops Plan 14_xx 4 set Jville DRAFT VERSION 1.0 Page 4 Issued 01/10/2014

Briefing Performance Analysis A briefing will be held in the Metro Meeting room, ( old CSS office ), at 05:30hrs on Saturday 18th. Each of the above services will be accompanied by a Supervisor as under who will record performance and other relevant data. To be confirmed Other Contacts Project Co-ordinator Ian Robson 027 447 4295 Platform Supervisor 04 495 3294 Train Control 04 498 3664 Ops Plan 14_xx 4 set Jville DRAFT VERSION 1.0 Page 5 Issued 01/10/2014