Helioseismic Magnetic Imager Program at LMSAL

Similar documents
Mosaic 1.1 Progress Report April, 2010

LAT I&T Peer Review, 2003

GLAST Large Area Telescope:

Instrument Status Review. GSC Meeting October 2009

Acquisition Control System Design Requirement Document

Welcome and FRIB Project Status. FRIB Highlights and Plan Ahead

AREAL- Phase 1. B. Grigoryan on behalf of AREAL team

A 400MHz Direct Digital Synthesizer with the AD9912

GLAST Large Area Telescope:

Interface Control Document From: Back End To: Correlator

BTC and SMT Rework Challenges

High Performance TFT LCD Driver ICs for Large-Size Displays

WBS Trigger. Wesley Smith, U. Wisconsin CMS Trigger Project Manager. DOE/NSF Review April 11, 2000

Deliverable 2.17 Periodic WP2 Progress Report 3

CMS Upgrade Activities

MAURICE TE PLATE EUROPEAN SPACE AGENCY ESA-ESTEC

2 Work Package and Work Unit descriptions. 2.8 WP8: RF Systems (R. Ruber, Uppsala)

NanoCom ADS-B. Datasheet An ADS-B receiver for space applications

Review Report of The SACLA Detector Meeting

Trigger Cost & Schedule

ARTES 11. Small GEO Platform Contract. 28 th March 2007 Berlin 1

Innovative Fast Timing Design

Program Risks Risk Analysis Fallback Plans for the. John T. Seeman DOE PEP-II Operations Review April 26, 2006

January 24, Dr. Lakshman One School of Engineering Science Simon Fraser University Burnaby, BC, V5A 1S6

CBETA Quarterly Report 7

BOARD-LEVEL TUNING PROCEDURE FOR THE GYROSCOPE SUSPENSION SYSTEM (GSS) MUX/OSCILLATOR/CHARGE CTRL (MUX) BOARD

Why Use the Cypress PSoC?

Next Linear Collider. The 8-Pack Project. 8-Pack Project. Four 50 MW XL4 X-band klystrons installed on the 8-Pack

UNIT V 8051 Microcontroller based Systems Design

New York State Board of Elections Voting Machine Replacement Project Task List Revised

ADDRESSING THE CHALLENGES OF IOT DESIGN JEFF MILLER, PRODUCT MARKETING MANAGER, MENTOR GRAPHICS

GLASGOW 2014 LIMITED RESPONSE TO OFCOM CONSULTATION DOCUMENT Submitted 15 November 2012

In-process inspection: Inspector technology and concept

P. Emma, et al. LCLS Operations Lectures

REPORT DOCUMENTATION PAGE

A Cathode Development Cornell Cultera This scope includes all labor and purchases required produce photocathodes required by CBETA.

Highly Accelerated Stress Screening of the Atlas Liquid Argon Calorimeter Front End Boards

Agilent MSO and CEBus PL Communications Testing Application Note 1352

PHI 5000 VersaProbe TM Operator s Guide

Vicon Valerus Performance Guide

Application Note AN SupIRBuck MCM Power Quad Flat No-lead (PQFN) Inspection Application Note

Special Specification 6293 Adaptive Traffic Signal Control System

Local Trigger Electronics for the CMS Drift Tubes Muon Detector

Considerations for Specifying, Installing and Interfacing Rotary Incremental Optical Encoders

COLUMBIA COUNTY, WISCONSIN COURTROOM VIDEO CONFERENCE & AV SYSTEMS REQUEST FOR PROPOSALS

RX40_V1_0 Measurement Report F.Faccio

DT9834 Series High-Performance Multifunction USB Data Acquisition Modules

Exercise 4-2. Counting of Actuator Cycles EXERCISE OBJECTIVE & & &

Logisim: A graphical system for logic circuit design and simulation

March 4 th, Addendum No. 1. Brooklyn College Systems Integrator Broadcast Television Equipment Project No: BY019/

Emerging Subsea Networks

CITY OF LOS ANGELES CIVIL SERVICE COMMISSION CLASS SPECIFICATION POSTED JUNE VIDEO TECHNICIAN, 6145

REFURBISHMENT OF SECONDARY SYSTEMS IN HIGH VOLTAGE SUBSTATIONS LESSONS LEARNED IN VENEZUELA

The DM7 and the Future of High

TWO BUNCHES WITH NS-SEPARATION WITH LCLS*

Digital Audio Design Validation and Debugging Using PGY-I2C

* This configuration has been updated to a 64K memory with a 32K-32K logical core split.

SUBSYSTEMS FOR DATA ACQUISITION #39. Analog-to-Digital Converter (ADC) Function Card

Timing EECS141 EE141. EE141-Fall 2011 Digital Integrated Circuits. Pipelining. Administrative Stuff. Last Lecture. Latch-Based Clocking.

2012: Celebrating 40 Years of the World s Best Audio Systems

Removing the Pattern Noise from all STIS Side-2 CCD data

OEM Basics. Introduction to LED types, Installation methods and computer management systems.

On-board detection electronics in spanish optical satellite: INGENIO. Thales Alenia Space España

Dynamic re-referencing Microvolt-level measurements with the R&S RTO oscilloscopes

1. The contractor shall ensure that: c) Contractor or sub-contractor has at least 5 years experience

UCR 2008, Change 3, Section 5.3.7, Video Distribution System Requirements

Andrei Seryi, Toshiaki Tauchi. December 15-18, 2008

There are many ham radio related activities

Status of JRA-SRF in CARE

Modernized Day Sensor Assembly (M-DSA)

Abstract. Keywords INTRODUCTION. Electron beam has been increasingly used for defect inspection in IC chip

ESA STUDY CONTRACT REPORT SUBJECT : CONTRACTOR ESA CONTRACT N

ex 800 Series ematrix System

GALILEO Timing Receiver

National Park Service Photo. Utah 400 Series 1. Digital Routing Switcher.

We bring quality to light. SNT 10 DC Power Supply

Richard B. Haynes Philip J. Muniz Douglas C. Smith

DA CHANNEL AES AUDIO MIXER/ ROUTER MODULE

EE 367 Lab Part 1: Sequential Logic

Super-Doubler Device for Improved Classic Videogame Console Output

CHARACTERIZATION OF END-TO-END DELAYS IN HEAD-MOUNTED DISPLAY SYSTEMS

Summary of CBETA Independent Cost Reviews. R. Michnoff January 19, 2017

Houston METRO Rail Expansion Program

Designing Intelligence into Commutation Encoders

Design for Testability

CSC Data Rates, Formats and Calibration Methods

Practical De-embedding for Gigabit fixture. Ben Chia Senior Signal Integrity Consultant 5/17/2011

RF Testing of A Single FPIX1 for BTeV

Pulsed Klystrons for Next Generation Neutron Sources Edward L. Eisen - CPI, Inc. Palo Alto, CA, USA

1993 Specifications CSJ , etc. SPECIAL SPECIFICATION ITEM CCTV Central Equipment

Adding Analog and Mixed Signal Concerns to a Digital VLSI Course

How to overcome/avoid High Frequency Effects on Debug Interfaces Trace Port Design Guidelines

Technical Guide. Installed Sound. Loudspeaker Solutions for Worship Spaces. TA-4 Version 1.2 April, Why loudspeakers at all?

UniVision Engineering Limited Modpark Parking System Technical Description. Automatic Vehicle Access Control by Video Identification/

Your quality in safe hands. Electronics Manufacturing Services from a world-leading RF specialist

ORM0022 EHPC210 Universal Controller Operation Manual Revision 1. EHPC210 Universal Controller. Operation Manual

In total 2 project plans are submitted. Deadline for Plan 1 is on at 23:59. The plan must contain the following information:

DLP200M 2 Relay Module for Heating and Cooling Plants

Drift Tubes as Muon Detectors for ILC

Airport Applications. Inside: 500ACS. Announcement. Control System 500ACS. Hardware. Microphone Stations. Courtesy. Announcement. System (CAS) Flight

Transcription:

Helioseismic Magnetic Imager Program at LMSAL Contract PY-2223 Progress Report for January 2004 Introduction This is the 16 th monthly progress report on the HMI program at LMSAL. It would have been the fifth report under the second phase of the contract but the original contract was extended several months to allow more time to establish the Phase C/D/E contract. We/LMSAL are collaborators with Stanford University on the HMI/SDO solar physics investigation being led by Prof. P. Scherrer of Stanford University. Summary of Status Highlights this month included having an interface working group meeting in Palo Alto, receiving a proposal from e2v for the flight CCDs, receiving a proposal from RAL for the flight CEBs, receiving a non-flight processor board from BAE and firing it up, and progressing on all manner of instrument designs. A disappointment was not signing the contract for the next phase of the program but rather receiving a no-cost extension. We continued to have weekly SDO Project telecons, weekly HMI-specific telecons, nearly weekly CCD camera system telecons, weekly telecons with LightMachinery, weekly HMI status meetings, and a constant stream of internal technical meetings. Schedule and Milestones The original HMI proposal contained a top-level schedule that was based on the dates given in the AO. Now that the program is in full swing and the 8-month launch slip is a fact, a more detailed schedule has been developed and is undergoing constant iteration/expansion. The latest version was provided at the PDR, and an update will be provided in mid February. Shown below are some key program milestones, with an emphasis on those that will occur in the near term, or have occurred recently (for completeness). HMI PDR Nov 18-19 At LMSAL Numerous splinter meetings Nov 18-21 Project, e2v, RAL, I&T, AIA, Ops Received prototype HCM Nov 20 Performs nicely I/F Working Group Meeting #4 Jan 12-14 At LMSAL Ordered life-test HCMs January Vendor is H. Magnetics Peer Review of HEB & Oven Feb 4 Mechanical aspects only Grounding/Bonding Meeting Feb 5-6 At Boulder, Colorado

Visit RAL and e2v Feb 9-11 Various topics as moving into flight phases M&P and EEE PCBs Feb 24-26 Initial Board meetings at Palo Alto Define GSFC common buy February EEE parts Begin Phases C/D/E February Phase A/B being extended until then Begin shutter life test February Slipped from November Michelson Performance Review March 1-2 At LightMachinery Mission PDR March 9-12 At GSFC SDO Science Meeting March 22-25 At Boulder Complete SM instrument August 04 HMI CDR Nov 04 Deliver HMI to S/C Nov 06 Launch Apr 08 Five-year baseline mission Major Activities During this Reporting Period Steady progress was made in the mechanical and optical areas. The HEB enclosure and Oven structure have matured to where we will have a Peer Review (mechanical only) on them, and on our optical mount alignment method, on 4 February. The bracket/legs for mounting the CEBs were reviewed internally and the details of the interface are being worked with RAL. Various procurement drawings for the more simple optics were completed. Design of the oven internals progressed hand-in-hand with the appropriate thermal analyses of some subtle design options. This has been aided by the addition of thermal engineer Carin Lundquist to the team. Good progress continued to be made at LightMachinery. They have now provided us with a Michelson Test Plan to review and comment upon. We will meet with them in early March to look at test results from the prototype beam-splitter they are producing. The front window/filter and blocking filter specifications were iterated and put into the release cycle. They have already been informally shared with three potential vendors. Sample ADP and KDP crystals are being produced by Cleveland Crystals. Evaluating them will both enable us to confirm their appropriateness for flight and establish more precisely the lengths of the calcite elements that will go into the Lyot filter with them. A trip to Lambrecht, the vendor who will cut and polish the calcite elements has been arranged for early February. We will take along some raw calcite as well as the equipment we use for evaluating the quality of calcite pieces. The new housings for the life-test shutters were received and are now in inspection as are the additional motors. Unfortunately, due to some mix-ups, the higher precision rotors were not ordered as soon as they should have been and we may be faced with either delaying the life test to use them or sticking with the older style rotors. Two life test HCMs were ordered from H. Magnetics, our heritage supplier for such mechanisms. After considering the number of mechanism life tests that need to be performed for the combination of HMI and AIA, we have decided to rework an existing large chamber to accommodate all of the life tests rather than have separate chambers for each test. The advantage is that we can then afford to make this chamber highly reliable and monitored, and spend less 2

total time chamber tending. If the large chamber is not ready in time for the HMI shutter life test, however, this will be done in the previously planned smaller chamber that is already ready for it. Although we had planned to decrease the frequency of Working Group telecons with RAL and e2v there have been so many items to discuss that involved both groups that we have continued to do them weekly. Good technical progress is being made at both suppliers. e2v provided RAL with a mechanical sample CCD so that they can work up their GSE accordingly. They also began to probe test the second batch of thin-gate devices and the third batch of devices progressed well along towards completion. Meanwhile, they are commissioning their screening camera and packaging some functional devices, with the two activities coming together to produce results in early February. The e2v flight-phase proposal was received over the Holiday break and after reading it we discussed various points they brought up, none of which are showstoppers. Near the end of the month we received the RAL proposal for the flight CEBs. We are in the process of reviewing it and discussing some specifics of it with them. By the time of the meetings in the UK on 9-11 February we will may have both groups under undefinitized letter subcontracts and e2v may will have initial results from some packaged CCDs. Meanwhile, locally we received a first CCD protective cover and will shortly (after ITAR paperwork) send it to e2v. Steady progress was made this month in the electrical area. Of high priority is getting the mini brassboard box completed for use by the software team. It will contain a CPU, a Local Bus Bridge/1553 Interface board, a Mechanisms Controller board, and a specialized backplane. All of these items are getting close to layout. The specifications for the other PWBs continued to mature and undergo reviews prior to detailed design. Parts (ATMEL space wire chips, LVDS drivers, and such) were ordered to enable us to fabricate a breadboard setup to evaluate the subtle difficulties (often noise) one may encounter with the high-speed interfaces between the camera and HEB and the HEB and spacecraft. Meanwhile, we have had little new interaction on the topic of EEE parts common buys and have encouraged the Project to remedy this before it becomes to late. On the positive side of this, however, the Project has placed a common buy order for a variety of non-flight power converters, some of which will come to us. Software continued to move forward on a variety of fronts. The non-flight PCU is now in house as is some recently ordered software, and we have begun to exercise the PCU (successfully). The Sun Workstations are also now in house and we installed a version of our standard EGSE software into them. A system for generating updates to command and telemetry lists and keeping everything under configuration control was put in place. Significant progress was also made in getting commands to flow from our EGSE to the SUROM. A new person, Ralph Sequin, was hired to help with the EGSE software. Lastly, we continued to consider what, if any, fundamental differences will exist between the basic flight and GSE software for HMI and AIA; on AIA s nickel of course. On 12-14 January, we hosted a successful interface working group meeting with many members of the Project team to iterate the ICD and progress in various other areas. Significant progress was made in resolving open items in the requirement areas of Mechanical, Thermal, Command and Data Handling, and Guidance, Navigation and Control. Other topics of discussion, and further understandings, were jitter requirements, Observatory I&T for HMI, and co-alignment of 3

HMI with AIA and its primary guide telescope. The S/C-HMI ICD will now be updated, released, and put under configuration control; all well before the Mission PDR. Other Activities During January 1. S. Meyer and F. Lee attended a contamination working group meeting at GSFC. Some action items were received and are being worked. F. Lee is assuming the position of HMI Contamination Control Engineer while S. Meyer concentrates on AIA. Lee is the Solar-B FPP CCE. The FPP, like HMI, is a visible light instrument. 2. A discrepancy between the spacecraft thermal model and the HMI thermal model was resolved, and changes are being incorporated into the HMI thermal model. The updated model will be delivered in mid February. 3. We received the final versions of the SOW, Contract Performance Specification, and CIDRL that will apply to the remainder of the program. There were no real surprises rather just areas that need clarification. 4. We provided responses to 17 of the 28 RFAs that we received after our PDR, and provided an updated matrix of when we anticipate completing the remainder. 5. Members of the Project team, led by Risk Coordinator Jerry Klein, visited us on the 28 th to describe their approach to Risk Management, learn of our approach, and discuss how to blend the two most effectively. It was a productive meeting and we think this can be done in a practical manner. 6. The approved HMI PAIP was modified to cover both HMI and AIA, with no changes to its meaning/content. 7. Internal requirements/design meetings were held on a variety of subsystems and assemblies. 8. The synergism between HMI and AIA continued to evolve in a positive manner as additional personnel joined the team to work specifically on one or the other of the two programs. We also began to have weekly meetings of the leaders of the two programs. 9. A writeup describing the planned fidelity of the HMI Structural (physical) Model was drafted. It is still unclear if the Project requires a SM (or mass model) that is vacuum compatible and flight-like clean. 10. As suggested in one of the PDR RFAs, we decided to use the 3 unused thermal control circuits to provide redundancy for the most important of the existing 5 thermal zones. Planned Activities For February 1. Participate in meetings at both e2v and RAL. 4

2. Conduct the first LMSAL EEE Parts Control Board Meeting and the first M&P Control Board meeting. These will be in Palo Alto on 24-25 February and the Project, who have a member on each board, have been invited to attend. 3. Lay out the two HEB printed wire boards that are needed early by the software and mechanisms teams as well as the motherboard for the GSE box that will contain these two boards along with a CPU. 4. Provide the Project with an updated thermal math model, now that the discrepancies between the prior model and their model have been resolved. 5. Continue drafting procurement specifications for all of the optical elements. 6. Receive rotors for the life-test shutters that have more precisely aligned magnetics than those that came with the motor originally. 7. Participate in an Observatory Contamination Control Peer Review on the 24 th, following by a working group meeting on the 25 th. 8. Participate in a meeting on grounding, bonding, and shielding that will be held in Boulder, Colorado in early February. 9. Work with the Project to determine if the Structural Model instrument needs to be vacuum compatible and contamination free. Both would be upscopes to our plans but have been mentioned (by the Project) as perhaps being needed. 10. Continue to work with the AIA team to organize LMSAL personnel for both programs in an optimal manner. 11. Conduct a Peer Review on the HEB enclosure and Oven structure (mechanical only) as well as on our optical mount alignment method. 12. Get Vision Composite under contract for the flight phase portion of their work, including the structural model box and telescope. 13. Submit the remaining 11 PDR RFAs. 14. Attend/participate in the Operations Peer Review that will take place at GSFC on the 5 th. 15. Scherrer and Title will go to GSFC for a top-level discussion on how HMI+AIA plan to deal with the large amount of SDO in a cost effective manner 5

16. On a routine (mostly weekly) basis continue to participate in telecons with the complete SDO group, the combined HMI/AIA-Project specific telecons, CCD Working Group telecons, LightMachinery telecons, BAE telecons; and to conduct HMI team meetings as well as specific meetings on Electronics/ Software, Filters, and Mechanical topics. Design Updates There were no significant design updates this month. A minor update that we will make use of the three unused thermal control circuits to provide redundancy for the three most important of the five zones presently being controlled. Resource Requirements The monthly power and mass status reports are being provided as separate files. The HMI estimates and allocations are not changed this month, and remain as shown at the recent PDR. Issues/Concerns Undertaking the AIA program at LMSAL requires obtaining additional personnel quite rapidly and redistributing personnel between these two, and other, programs. Obtaining the waveform generator for the CEB is presenting a schedule concern and various options are being discussed with RAL. These are being shared with the Project who are incorporating this into their risk documentation. The existing version of the SMCSLite chip that is used in the CEB and in the Camera Interface board needs to undergo radiation testing to verify it is acceptable, and we need to keep on top of whether the newer version of this chip will be available in time for our programs. 6