Rider Part1: Technical Requirements, A Cappella Show

Similar documents
Get Funked Compact 6-piece. Technical Rider 2017/18. Contents Page 1/2 Technical Rider Page 3 Channel List Page 4 Monitor List Page 5 Stage Diagram

Irish Heartbeat TECHNICAL RIDER. Video Projection Requested

Artist: Michael and Amy

Paradiso (ch. Václav Kuneš) (30min) Technical requirements / List of light equipment Focus sheet on demand - (standard focusing)

TECHNICAL SPECIFICATIONS: STICKS STONES BROKEN BONES Company: Bunk Puppets, contact :Jeff Achtem,

The performance is about 100 minutes long, excluding intermission. ACT 1 is 75min, ACT 2 is 20min. Intermission 20-25min.

Technical Rider Vocal Point Season Performing Arts Management

PSYCHIC SALLY PRODUCTION RIDER & FOH REQUESTS (UPDATED 2016)

BITUSA 2019 General DRESSING ROOMS

SIMON & GARFUNKEL THROUGH THE YEARS TECHNICAL INFORMATION PACK

Little River Band Production Rider 2018

The Willoughby Brothers

Section A: Front of House (FOH) Public Address (PA) Speaker System

New Theatre Royal Lincoln Technical Information

Access to back stage is off Fletcher St on the eastern side of the building

SOUND TECH RIDER FIDO

RHAPSODY & RHYTHM Technical Rider

20 hemp bars, set at random intervals (SWL=150lbs) Fixed position situated Stage Right. Operated stage level, SL (counterweighted)

BPM KREW 2013 Technical and Hospitality Rider For Large College/ University Performances

The Taal Inc. Rhythm Ensemble Tech Rider

The Haymarket Basingstoke Technical Specifications

Technical Rider Attached is a technical Rider covering schedule, technical and practical requirements, and contacts. Changes may occur.

"A Dance Tribute to Ping Pong " by Jo Strømgren Kompani. Technical Requirements

Uprising & The Art of Not Looking Back

Notes for Lighting and Sound Technicians

Avant Garde Dance & The Place Fagin s Twist Tech Spec 2016

Tech specs: Main Auditorium. Dimensions. Prompt Corner. Stage Floor. Dressing Rooms (Under stage)

Not Fade Away. The Ultimate Buddy Holly Experience. TECHNICAL RIDER Video Projection is Recommended

MAJESTIC (Circus Tent)

Phil L. Thomas Performing Arts Center Shiprock, New Mexico

Stephen Roy s. Black & White. On-Site Requirements Stage Setup. Ideal Performance Space Set-up Other Practical Considerations Load In Show Control

University of Pittsburgh at Bradford Blaisdell Hall/Pitt-Bradford Arts

Technical specifications Main theatre. Sound. Console: Soundcraft Si Performer 3

Enormous Room Technical Rider & General Lighting Plan

Technical requirements & conditions for hirers

PHOTO : SÉBASTIEN DION TECHNICAL RIDER. imperialbell.com

TECHNICAL RIDER. If you have problems to fulfil some of our demands, please don t hesitate to contact us. We will find a solution!

Scale of Hire Charges

Thank you for thinking of The Fonda Theatre for your private event!

Technical Services and Specification

ISLAND HALL TECHNICAL INFORMATION

CONTACTS Jani Lauzon Managing Artistic Director

Hard Rock Cafe Times Square Sound System Advance Sheet

Technical Production Rider degeneration For venues in mainland Europe

TOURING RIDER Where Magic & Motion Meet!

US 2015/16 TECH RIDER

FASO DANCE COMPANY KALAKUTA REPUBLIK

Main Stage Technical Specs - Hall #2

Notes for Lighting and Sound Technicians (A Supplement to Notes for Playing Companies)

SUSAN AGLUKARK. Keynote Speaker/ Solo Presentation TECHNICAL RIDER HOSPITALITY RIDER 2018 Revision 1/15/18 KEY CONTACT:

Multi-Purpose Auditorium Sound Reinforcement System Design ECE Spring Zach Vander Missen Muhammad Farooq Garrett McMindes

HORACE X PERFORMANCE REQUIREMENTS (Technical)

Camden Opera House Theater. Technical Information

Where performance matters

The Lantern Technical Information

Amarillo Civic Center Auditorium 401 S. Buchanan Amarillo, Texas 79101

Matt Dann Cultural Centre

HOTEL ACCOMODATIONS Current as of Attachment A

Equipment Inventory. Seating. Stage. Dressing Rooms. Loading Bay

The Ultimate Musical Odyssey

JOHN W.H. BASSETT THEATRE

WRIGHT AUDITORIUM TECHNICAL INFORMATION. 1. Contact Information. 2. General Information

SECREST AUDITORIUM TECHNICAL PACKAGE

Main House Technical Specification

BANYULE THEATRE TECHNICAL INFORMATION. 10 Buckingham Drive Heidelberg VIC Page 0 of 10

Capacity: 60 2 Roxburgh Place, EH8 9SU. Assembly Roxy - Downstairs

ARTISTIC RENTALS RATE CARD. Royal Festival Hall AUDITORIUM CAPACITIES ARTISTIC HIRE RATES

Barbican Concert Hall Sound System Spec

2017 TECHNICAL SPECIFICATIONS

LOAD-IN SET UP SOUND

PRELIMINARY TECHNICAL RIDER - LITTLE RED RIVER

Technical Specification

Lights. Carlos Leyva Cel: (619) (52)(664) Audio

Equipment Inventory. Seating. Stage. Dressing Rooms. Loading Bay

The set is very simple. It consists of one small box, a small stool, and a small ping- pong table.

Technical Information Guide PLEASE FORWARD TO TECHNICAL DIRECTOR

ETC Congo Desk 1024 channels in two universes ( Universe 1 House dimming, Universe 2 Toured dimming) Digital light processor dimmers

Theatre SPECIFICATIONS UPDATED: 13/08/13 21 KINGLAND ROAD, POOLE, DORSET, BH15 1UG TELEPHONE: FAX: ADDRESS: TECHNICAL MANAGER:

technical rider version August 2015 People s Place Stadhouderskade ES Amsterdam

THEATRE INFORMATION PACK

Monolake Live Surround 2011/2012

CENTRE FOR PERFORMING ARTS

Jane Mallet Theatre Technical Specifications

The Tower Theatre Contact - Peter Heselden Theatre Manager Tel

Hopgood Theatre NOARLUNGA CENTRE

DEREHAM MEMORIAL HALL

Technical Specifications Nov 2016

Smothers Theatre Technical Specifications Pepperdine University

Theatre Technical Specifications

TECHNICAL SPECIFICATIONS AND INVENTORY RIALTO THEATER

JERWOOD VANBRUGH THEATRE

Barney Simon Theatre Technical Specifications

Dr. Fred Speckeen Theatre. Information and Technical Specifications

Summary. Access and Parking

Marjorie S. Deane Little Theater

RPAC REDLANDS PERFORMING ARTS CENTRE

The Anvil Technical Specifications

Smothers Theatre Rental Technical Specifications

The Haymarket. Technical Specifications. The Haymarket, Wote Street, Basingstoke, Hampshire, RG21 7NW

Technical Rider. GöteborgsOperans Danskompani. Spirit Tour to XX DATE to DATE. Table of Contents: 1. The Company

Transcription:

Rider Part1: Technical Requirements, A Cappella Show The Swingles agree to provide, at no cost to the promoter:* 1. 10 channel wireless microphone system (AKG WMS4500: 650-710MHz) 2. 8 mix wireless IEM (in-ear monitor) system (AKG IVM4: 500-530MHz) 3. FOH mixing console (Yamaha LS9-16)** 4. Sound Engineer- the performance will be mixed by the Swingles sound engineer *Whilst every effort is made to ensure that the Swingles touring equipment is well maintained and in good working order, the Swingles will not be held liable in the unlikely event that any equipment provided by the group fails. The promoter is recommended to arrange for suitable backup equipment to be on standby. **The show requires exclusive use of a Yamaha LS9 with MY16-AT expansion card. No other console is acceptable. The Swingles normally tour with their own LS9-16, although the promoter will usually be liable in the case of airline excess luggage charges. In some circumstances it may be more convenient or cost effective for the console to be provided by the promoter. In this case, please contact the group s sound engineer (hugh@swinglesingers.com) no less than 2 weeks prior to the concert to discuss. The Promoter agrees to provide, at no cost to the artists: 1. A fully maintained professional sound system from a reputable manufacturer. Preferred manufacturers: D&B, L Acoustic, Meyersound, Martin Audio, Nexo, Adamson, EAW, JBL (not JRX or EON) System must be positioned to minimise spill on to stage. Singers CANNOT perform in front of the sound system. The Swingles sound engineer must have access to speaker management systems where possible. The interconnection of the LS9 to the sound system should have no desk channel or graphic EQ inserted. Where possible direct lines to system controllers are requested. Noisy amp racks should be located off stage. The system must provide high quality consistent and even coverage for ALL areas of the audience. System must include SUBS, and where appropriate, front fills and delays for balcony areas. If flown (particularly high proscenium arch systems), adequate stage level PA is required to provide image for front rows. Where multiple options exist, please contact the group s sound engineer to discuss. Up to eight (8) outputs are available on the LS9 for driving the sound system. Please provide the Swingles engineer with as much control over the sound system as possible. Page 1

2. Front of house mix position A suitable FOH position must be arranged to comply with the following criteria: It must be as close to the centre of the auditorium as possible at ground level (stalls). Balcony mix positions are not acceptable Please provide a table large enough to accommodate an LS9-16, a 2U 19 rack, and a laptop. IMPORTANT - THE CONSOLE MUST NOT BE UNDER A BALCONY OR IN A SOUND BOOTH 3. Analogue FOH multicore (snake) A minimum of 20 sends (male XLR tails at FOH end & female XLR stagebox) must link the stage to the FOH position in addition to lines required to feed the sound system. Please note, IEM looms are dual gendered to facilitate the use of send lines where required. All lines must be balanced XLR ANALOGUE lines for the entire link. No active line splitters or digital snakes. Please contact the group s engineer at least 2 weeks before the concert if this is a problem. In the case of guest artists and choirs, additional lines must be provided according to guest artist requirements. Channel Description Notes 1-10 AKG WMS4500: Singers Tails provided for stage end only Microphones 11-18 AKG IVM4: In ear returns XLR tails are gender reversed 19-20 Ambience mics Not provided by The Swingles 4. Stage Monitors Two (2) identical stage monitors are required. These can be driven from one mix. Note: The Swingles will use IEMS. Stage monitors are required only for backup or when the group perform with guest artists. 5. Microphones & microphone stands Two(2) x Cardioid or hyper-cardiod condenser microphones (KM184/C414/SM81 etc.) positioned on tall stands either side of stage facing audience for IEM ambience. Seven (7) x Tall microphone stands with booms are required: three for antennae, two for stage use, and two for ambience mics. ******The singers microphones are hand-held and do not all require microphone stands****** Page 2

6. Batteries 28 x AA (HP7) good quality alkaline batteries (DURACELL/PROCELL/ENERGIZER INDUSTRIAL preferred) PLEASE CONTACT THE SWINGLES SOUND ENGINEER AT LEAST TWO WEEKS BEFORE THE PERFORMANCE WITH FULL SYSTEM DETAILS TO ENSURE THE EQUIPMENT IS SUITABLE. THE SOUND SYSTEM MUST BE COMPLETELY RIGGED, TESTED AND RUNNING BEFORE THE ARTIST GET-IN Any queries regarding equipment and set up should be addressed to the Swingles sound engineer. Contacts: Hugh Walker (Sound engineer) +44 (0)7986 708702 hughwalker@gmx.com hugh@swinglesingers.com LIGHTING A full lighting rig with an experienced lighting operator is required. The group does not provide a dedicated lighting engineer, however a member the group will work with the lighting engineer for 2 hours before the group s soundcheck. The groups lighting designer will be required to sing during the whole of the soundcheck so it is essential that all lights are rigged and focused before the artist get-in. If it is more convenient to start programming and setting cues earlier in the day, please contact Sara Brimer. sara@swinglesingers.com Washes Parcan/Fresnel colour washes are required in deep red, ambers, deep blue, pale blue. These colours should be matched by front-of-house, box-boom, side-of-stage and cyclorama light wherever possible. If LEDs are avaible, we prefer to use them. Specials Can be made using a combination of profile light from front and above Silhouettes Light focused on the rear curtain or cyclorama may be used on its own, to create a silhouette effect. Any lights focused on the rear curtain should be paired or centred. Please do not use lights facing outwards towards the audience to create a silhouette as this is often reported to be painful for the audience. Gobos Please have any available gobos on standby for use on the stage or the rear curtain. Follow Spot A follow-spot is not usually necessary. It will only be required when the solo specials are not available. ****Please see attached lighting plot document for more detailed information about how the lights should be set**** Page 3

Guest Chorus If a Guest Chorus is involved in the performance, extra wash and front light will be required to cover these extra participants. This is usually required upstage from the Swingles performance area described above. Please contact the lighting designer through sara@swinglesingers.com to make final arrangements. ALL LIGHTS MUST BE RIGGED, PATCHED AND READY PRIOR TO THE BEGINNING OF THE ARTIST GET-IN. PERSONNEL 1. Sound Technician The Promoter should ensure a competent and able sound technician is present to assist the Swingles sound engineer from the start of the artist get-in until the end of the concert. 2. Foyer / Front of House Assistant The Promoter is requested to provide an assistant to sell CDs and merchandise during the interval of the concert and afterwards. 3. Lighting Operator and Crew An experienced lighting operator should be available upon the arrival of the lighting designer. They must be available to program the board before the soundcheck and operate during the concert without the aid of the group s lighting designer. Sufficient crew should be available for re-focusing and patching where necessary. Specific call arrangements should be made in advance through sara@swinglesingers.com. **** If venue staff and house technical crew do not speak English, the group requires an interpreter to be on site for the duration of their time at the venue, including technical get-in**** TIMINGS When Time SOUND LIGHTING SIX HOURS BEFORE -6h.00m THE PERFORMANCE FOUR HOURS BEFORE THE PERFORMANCE -4h.00m Beginning of GET IN/RIG (2 hours). Sound system should be rigged, fully tested and working, and lines tested BEFORE this time. Beginning of SOUNDCHECK (1.5 hours). Beginning of GET IN/RIG (2 hours). Lights rigged, patched and ready BEFORE this time. Lighting cues will be programmed with the Swingles lighting designer during this time. Beginning of SOUNDCHECK (1.5hours). The Swingles Lighting Designer unavailable during this time. Page 4

TWO HOURS BEFORE THE PERFORMANCE -2h.00m BREAK Lighting Crew on Standby. Final programming and focusing before house opens if required. PERFORMANCE 1ST 0h.00m Approx. 45 mins. Sound Crew HALF on Standby INTERVAL 0h.45m Approx 15mins Sound Crew on Standby Lighting Operator required to run the lighting board. PERFORMANCE 2ND HALF 1h.00m Approx. 1 hour Sound Crew on Standby Lighting Operator required to run the lighting board. APPROXIMATE END OF PERFORMANCE 2h.00m De-rigging and load-out Public Access to the auditorium Under no account should audience members be allowed into the concert hall before the Swingles have cleared the stage after the soundcheck. In the unusual case of a techncal delay occurring, this may not be until 15-20 minutes before the performance starts. RECORDING & BROADCAST NO RECORDINGS OF ANY KIND MAY BE TAKEN WITHOUT THE PRIOR PERMISSION OF THE SWINGLES Where permission is granted, a recording contract must be signed and usually an additional fee payable. Audio Feeds Any feeds given by the Swingles sound engineer will be stereo or mono only. Requests for audio feeds must be discussed and agreed before the day of the performance. Archive / News Access (TV and Radio) Requests for Archive/News recordings must be discussed and agreed before the day of the performance. The sound feed must come from the FOH console unless another solution has been specifically agreed with the Swingles. Copies A copy of the recorded material must be made and given to the Swingle Singers as a condition of the recording. Page 5