Home Products Projects What is Penetron?

Similar documents
EWB-USA BRAND GUIDELINES

Newsletter

CAPITAL METRO TRANSIT ADVERTISING

SUMMARY REPORT. Consultation Summary Report. January 2016

640 kv XLPE HVDC cable system

AREMA 2015 ANNUAL CONFERENCE. NYSDOT / Amtrak. Hudson Line Improvement Program. David W. Emerich, PE CHA. Minneapolis, MN October 4-7, 2015

TruePlate Structural Plate

CASE STUDY. Smart Motorways Project. Temporary CCTV Monitoring Systems for England s Motorway network.

Environmental Impact Statement (EIS)/ Section 106 Public Meeting Level 1 Concept Screening. May 16, 2017

Join us for our. A Campaign to Evolve, Elevate, and Inspire

Owner-User/ Investor Opportunity

A SMART, SAFE AND SMOOTH FUTURE TELESTE FOR CITY TRANSPORT. Video security and passenger information solution for city transport

North American Assemblies Ltd.

OMNI FIT Connectors and Universal Trimming Tools

Taubman Centers, Inc. Beverly Center Los Angeles, Calif. March 7, 2016

Selecting the correct cable type for Outside Plant Application

F I L M S T U D I O G R O U P

TRANSPORTATION COMMITTEE

Defining Visual Technology! Bringing Visual Clarity to every Display

News at Donnybrae Winter 2018

Report of International Internship Program

IS MOBILE TV (MTV) REALLY A MOBILE DELIVERY VEHICLE (MDV)

Members of Flexible Pavements of Ohio. Cliff Ursich, P.E., President & Executive Director

Introducing Non Sequiturs and Constraints for Sustainable Development

Warren County Port Authority

The National Traffic Signal Report Card: Highlights

IoT trends in the Americas and considerations on the importance of National IoT plans

Sealed Air s PriorityPak Automated Packaging System is One for the Books

Msquare Innotech Solutions Pvt. Ltd. Complete integration of business solution. About Us: Mission:

Urban Design Program. University of Calgary. Metrotown: Regional Town Centre. Metrotown

EXHIBITOR & SPONSORSHIP PROSPECTUS. April 18-20, 2018 Boston, MA Hynes Convention Center #ESACon18

LOCATION. AMENITIES. TRANSIT.

WORLD CLASS MEDIA PRODUCTION/RECORDING STUDIO FOR SALE STUDIOS OF CONCENTRIX MUSIC AND SOUND DESIGN, INC.

Our circuit is the third largest in the U.S. with 339 theatres and 4,566 screens in 41 states.

THEATRE DIRECTOR, Beck Theatre

BINA PURI MEDIA CLIPPINGS

Based on our maintenance efforts, during the second quarter of 2018, Comcast s plant was 99.9% reliable.

DIGITAL DISPLAY SOLUTIONS

Growing the Digital Business: Spotlight on the Internet of Things. Accenture Mobility Research 2015

URBAN IMPACT OF ABU DHABI GRAND PRIX

MINNEHAHA COUNTY ON-SITE WASTEWATER TREATMENT SITE EVALUATION WORKSHEET Form #1. Land Owner. Legal Description

N E W S R E L E A S E

Healthcare AYASE HEART HOSPITAL. Japan

COMPANY PROFILE. clydebroadcast.com

(415) TH ST. SAN FRANCISCO, CA

Located in the ever-popular, prestigious suburb of Cobbitty and a mere stroll away from Oran Park Town Centre, Harmony promises buyers and investors

SPECIFICATION FOR FIBER OPTIC SPLICE CLOSURE

OpenAir. Air damper actuators for power and flexibility. Building Technologies

The BIGGEST. The 2 nd Saudi International Exhibition & Conference for Internet of Things February 2019

Muhr und Bender KG. PRESENTATION Muhr und Bender KG

BUILT WITH PASSION. BUILT BY EMAAR. We are the UAE s premier real estate developer. We have reshaped Dubai s

HyPrecision Waterjet. Optimizing waterjet performance

ORGANIC REGENERATION OF THE HISTORIC DOWNTOWN OF SHANTOU

Evaluating Oscilloscope Mask Testing for Six Sigma Quality Standards

Railway Interchange 2019 Railway Supply Institute Indoor Exhibit Space Application & Contract

Smart Communities Using GIS

Customer-Owned Outside Plant

3M Graphics Warranties. Once we ve got you covered, you re covered. 3M Basic Product Warranty 3M Performance Guarantee 3M MCS Warranty

STRAND ALDWYCH PROPOSALS

Ending the Multipoint Videoconferencing Compromise. Delivering a Superior Meeting Experience through Universal Connection & Encoding

SKYCITY signs Heads of Agreement with the New Zealand Government to design, build and operate the New Zealand International Convention Centre (NZICC)

Speech for the Association for International Broadcasting (AIB) #iamabroadcaster global media summit London UK

PERFORMANCE, PACKAGED FLEXIBLES VERTICAL PACKAGING SOLUTIONS THAT FIT

The Region s Largest and Best Attended Home Show! FEBRUARY , Rockland Community College Field House Arena, Suffern, New York

HyPrecision Waterjet. Optimizing waterjet performance

Southbank Centre Business Model Case Study

BINA PURI MEDIA CLIPPINGS

Libraries. Goals. The City will:

Durata. Defibrillation Lead

EasySHED. QUALITY BOXED GARDEN SHEDS

Technical Information

TITLE OF THE PAPER. Picture of Author mm. 40 mm ( good resolution) AUTHOR`S NAME 2

Gigabit Multi-mode SX to Single Mode LX Converter. User s Manual NGF-728 Series. Warning COPYRIGHT

Reconfiguration Along the U.S.-Mexico Border Meeting in NPSPAC Region 3: Arizona May 16, 2013

2nd Aesthetics Committee Meeting March 1, Tarpon Springs Yacht Club. Beckett Bridge

Major department stores anchoring Hillsdale Shopping Center are Macy s and Nordstrom.

Enjoy the spectacular site of balloons gracefully floating across the sky September 23, 24, & 25, 2016

Good Faith 14 THE FEED

- 1 - Friedrichstadt-Palast Berlin. Friedrichstraße 107 D Berlin-Mitte. General Director: Dr. Berndt Schmidt

>> By Jason R. Kack, LS

blink USER GUIDE Bluetooth capable Reclocker Wyred 4 Sound. All rights reserved. v1.0

- Outdoor & Indoor Telephone Cables - Fiber Optic Cables - Electronic Control Cables - Control Cables - Data/LAN Cables - Coaxial Cables

ADS Basic Automation solutions for the lighting industry

Partnership Opportunities

Enjoy the spectacular site of balloons gracefully floating across the sky September 22, 23, & 24, 2017

APPLICATION OF POWER SWITCHING FOR ALTERNATIVE LAND CABLE PROTECTION BETWEEN CABLE LANDING STATION AND BEACH MAN HOLE IN SUBMARINE NETWORKS

B C. Where business meets the city. Quartier Belvedere Central. ENGLISH VERSION. 01_SG_QBC_Folder_EN.indd

Headquarters: 1270 N. Pontiac Trail, Suite 200 Walled Lake, MI 48390

City of Palm Coast 2016 Capital Projects Timeline - 1st Quarter

Product Safety Summary Sheet

What is the 5G Network impact on the IoT Market?

WHO WE AE. March, 2018

NEW YORK CHIROPRACTIC COLLEGE LIBRARY HANDBOOK AND POLICIES

Why intu Milton Keynes?

Department of Corrections Facilities Bureau Security Equipment Solicitation #TO8133

N DRAFT O.4 S T A T I O N R O A D C H E A D L E H U L M E S O U T H M A N C H E S T E R E N T E R >

INDUSTRY OVERVIEW. Global Demand for Paper and Paperboard: Million tonnes. Others Latin America Rest of Asia. China Eastern Europe Japan

Electron Beam Technology

Hilti CP678 Cable Coating

Celestica Solar Panel Manufacturing Thailand

Transcription:

Home Products Projects What is Penetron? DOWNLOAD PENETRON BROCHURE INSIDE THIS ISSUE Penetron Feature: IPT Brazil: Penetron Admix demonstrates its ability to dry out concrete under continuous water pressure Penetron Industry Newsletter September 2008 Engineers Without Borders - USA (EWB-USA) is a non-profit humanitarian organization established to partner with developing communities worldwide in order to improve their quality of life. This partnership involves the implementation of sustainable engineering projects, while involving and training internationally responsible engineers and engineering students. ICS Penetron proudly supports this cause and provided scholarships for two chapters. Read more under Penetron news below. Penetron news: Penetron supports Engineers without borders. Penetron Worldwide China: Long Tan Hydroelectric Dam, Guangxi Province Malaysia: Dataran Gemilang, Precinct 4, Putrajaya Australia: Chatswood Transport Interchange, Chatswood Penetron Feature: IPT Brazil: Penetron Admix demonstrates its ability to dry out concrete under continuous water pressure In April, 2007, the following test was initiated at the reputed Brazilian IPT (Technological Research Institute of São Paulo State, Brazil) facility to demonstrate the ability of Penetron Admix to completely dry out concrete under continues water pressure. Porous (20 MPa) concrete samples treated with Penetron Admix were subjected to continuous water pressure up to 0.7 MPa (234 ft. head water). The concrete was then observed for a period of 4 weeks. The images below demonstrate the waterproofing progress over this 4 week period. USA: Lakeshore Drive Wastewater Treatment Plant, Trumbull County, Ohio FAST FACTS Penetron Admix completely waterproofs concrete under continuous water pressure 1 week after start of water pressure 2 weeks after start of water pressure

An intricate web of insoluble crystals forms in the presence of Penetron and H 2 O creating a permanent protective seal 3 weeks after start of water pressure 4 weeks after start of water pressure Please contact info@penetron.com if you wish to receive the complete test report. Penetron news: Penetron supports Engineers without borders Witness Penetron's crack sealing ability Penetron is currently involved in supporting Engineers Without Borders-USA, a non-profit humanitarian organization that strives to improve the quality of life of developing communities worldwide. The EWB-USA Annual Conference was held at the University of Washington and had over 600 attendees comprised of engineering students, academia and private enterprise professionals. The conference focused on the issues related to Sustainable Engineering and Global Health. The keynote speaker Bill Gates Sr., co-chair of the Bill & Melinda Gates Foundation offered an inspirational speech to the attendees, affirming the audience of their social responsibility and challenging them to be active in implementing sustainable engineering solutions to significantly impact the developing communities in which they serve. View a 3 minute video demonstrating how Penetron works Send to a friend or colleague. Ms. Sue Yi (4th from the right), ICS Penetron Corporate Relations, with UT scholarship recipients In support of the event, Penetron provided scholarships for two Student Chapters; the University of Iowa and the University of Texas at Austin. Jessica Smith, chapter President of the University of Iowa shared their process of implementing a future project in Ecuador. Christopher Lombardo, chapter President of EWB-UT/Electrical Engineering PhD student, and his colleagues offered insight to their missions to utilize their available resources to implement basic infrastructure projects in developing communities and to train internationally responsible engineering students through real-life, hands-on projects. Currently the EWB-UT chapter has five ongoing projects--water projects in Limbe, Cameroon; Sieykin Naso Community in Panama and Jaboncillos Chicos, Mexico; a computer project in Coahuila Desert and a Mobile HQ Project to improve overall project functionality. Established in 2002, EWB-USA now has over 11,000 members engaged in over 300 projects around the world, providing access to basic needs like clean water, sanitation and renewable energy. Visit www.ewb-usa.org to learn more about Engineers Without Borders.

Villanova Chapter: Baan Bo Mai, Thailand Project Penetron worldwide: China: Long Tan Hydroelectric Dam, Guangxi Province With a height of 216.5m (710 ft.), a crest length of 830.5m (2725 ft.) and a normal water level of 400m (1312 ft.) Long Tan Hydroelectric Dam located at the upper reaches of Jiangshui River in China 's Guangxi Province is the world's largest roller-compacted concrete (RCC) dam. Built with the support of Black & Veatch as the design and construction consultant Long Tan dam provides 18.7 billion kilowatt-hours of power annually to the Pearl River Delta between Guangzhou and Hong Kong. The project protects 12 million people and 4856km 2 (1.2 million acres) of land, in one of the country's main manufacturing and investment centers, from flooding. The Long Tan Dam also incorporates the largest underground power house ever built, housing seven 700-megawatts turbine generators. Ships pass the dam via a 179m high vertical lift, which is currently the highest and fastest ship lift in the world. The zoning of the RCC concrete dam was divided into three parts. For each part the properties in terms of construction conditions, stress-strain behavior and stability conditions were determined. Further to this the concrete structure of the dam needed to be completely watertight and able to resist high hydrostatic pressure. Penetron was successfully applied on this project as a waterproofing coating to ensure the impermeability of the entire upper side of the dam and to increase the anti-slide stability of the RCC layer's surface. Malaysia: Dataran Gemilang, Precinct 4, Putrajaya Putrajaya is Malaysia's new government administration center, which was moved to its present location 25km south of Kuala Lumpur in 1999. Five core precincts form this site covering over 45km 2 (4581 hectares) of land

between the Kulala Lumpur International Airport (KLIA) and the capital. Putrajaya is home to a number of official buildings including the prime minister's office, the Putrajaya International Convention Center (PICC) and the Putra Mosque. The newly developed Precinct 4 is located across the Seri Gemilang Bridge from the PICC at the southeast end of the Putrajaya Boulevard and serves mainly as Business and Commercial Precinct. Being built in a wetland area it was essential to provide a sustainable protection for the basement structures of the government buildings in Precinct 4. The Penetron system was chosen to effectively waterproof and protect a sub-structure area of 40.000m 2 to ensure long-term use of the 4- level basements of lot 4g8 to 10. Basement works in Putrajaya, Precinct 4 Aerial render Gemilang Square, Putrajaya Australia: Chatswood Transport Interchange, Chatswood The Chatswood Transport Interchange (CTI) is being developed as part of the Epping to Chatswood Rail Line project. The Interchange, scheduled for completion 2008, is a $360 million transport and retail facility being developed in the heart of Chatswood. The main features of the Chatswood Transport Interchange include: New railway station comprising two new island platforms to accommodate the existing North Shore Line and the new Epping to Chatswood Rail Line; Relocation and upgrade of bus interchange, taxi ranks, and kiss-and-ride spaces, to accommodate some 760 bus movements and an anticipated 100,000 commuters and general pedestrians per day; A convenience and food based Retail Centre of some 10,000m 2 ; Three iconic residential towers containing 509 units with secure basement car spaces; and Significantly improved urban design, connectivity and accessibility through the heart of Chatswood to the surrounding residential, commercial and retail areas. In order to effectively protect the concrete structure, Penetron Australia was selected by Laing O'Rouke, the D & C Contractor and DeMartin Gasparini, concrete placement specialists, to waterproof all below ground structures, including lift pits and tanks as well as above ground areas including suspended slabs and car park decks. To date, over 1700 cubic metres of concrete has been batched by Boral Concrete with Penetron Admix as part of the concrete mix design.

Aerial view of the construction works at the Chatswood Chatswood Transport Interchange Transport Interchange site USA: Lakeshore Drive Wastewater Treatment Plant, Trumbull County, Ohio In its efforts to accommodate continuing development around Mosquito Lake, one of Ohio's largest lakes, in Trumbull County, upgrades to the existing treatment plant are being undertaken. The overall improvements included converting the existing treatment tanks to a flow equalization tank for wet weather events, the installation of an 85,000 GPD dual train packaged treatment system, and increasing the sand filtration area by an additional 50 percent. The original plant expansion design specified a painted steel treatment system, however, due to the sites small footprint and staging space, the steel system proved to be undesirable. Penetron teamed with the contractor and Ohio's largest precaster to submit a more durable Penetron Admix treated precast concrete system which was also able to meet the installations restrictions of the site. In addition to a more flexible footprint to fit within the project confines, the precast system Site works at Lakeshore Drive Waste Water Treatment Plant also offered additional benefits such as a dual train system which allowed for convenient operation and maintenance, and a greater life span expectancy with Penetron Admix treated concrete over that of the steel plant. The Owner, Trumbull County, and the design engineers, ES & C International, have been so pleased with the performance of the plant and Penetron Admix that they have specified Penetron's surface applied products to resolve leaks in the existing treatment tanks. www.penetron.com Copyright ICS Penetron International Ltd. 45 Research Way, 203, East Setauket NY 11733