DSM Violation Report of Western Region for September-2016 1.DSM Violation for WR Constituents: 1.1 Violation Type-1 ( Max no.of time blocks Violation in a month -30 Days*96Blocks=2880) 1.2 Violation Type-2, Zero Crossing Violation ( Max Violation in a month -8*30 Days=240) 2 P a g e
1.3 DSM Violation Summery for WR Constituents: DSM Violation for the Month of September 2016 for Constituents of Western Region Constituents Total Time Block Violation Type-1 No.of Blocks Violated % of Non-Compliance Max Violation in a month Violation Type-2(ZCV) No. of Violations % of Non-Compliance Chhattisgarh 2880 1225 43 240 89 37 Guajrat 2880 770 27 240 50 21 Madhya Pradesh 2880 860 30 240 59 25 Maharashtra 2880 938 33 240 35 15 Goa 2880 810 28 240 130 54 Daman and Diu 2880 551 19 240 138 58 Dadar Nagar Haveli 2880 75 3 240 76 32 ESIL 2880 1499 52 240 7 3 Violation Type-1 Violation Type-2 Deviation in excess of (+/-)12% of Schedule or 150 MW whichever is less (*except Renewable Rich State) Sustained deviation from schedule in one direction beyond 12 consecutive time block *Deviation Limits for Renewable Rich States S.No States having combined installed capacity of Wind and Solar projects Deviation Limits (MW)-"L" Name of State 1 1000 3000 MW 200 Madhya Pradesh 2 > 3000 MW 250 Maharashtra, Gujarat 2.DSM Violation WR Generating Stations(Regional Entities) 2.1 Violation Type-1 (Max no. of Violation in a month -30Days*96Blocks=2880): 3 P a g e
4 P a g e
2.2 Violation Type-2, Zero Crossing Violation(Out of Max Violation - 8*30Days=240): 5 P a g e
Note- Entities having Zero Schedule are excluded from the report. 2.3 DSM Violation Summery for Generators: DSM Violation for the Month of September 2016 for Generators(Regional Entities) of Western Region Violation Type-1 Violation Type-2(ZCV) Constituents Max Violation in a Total Time Block Violation Type -1 % of Non-Compliance Violation Type -2 month % of Non-Compliance KSTPS 2880 53 1.8 240 37 15.4 VSTPS I 2880 462 16.0 240 50 20.8 VSTPS II 2880 189 6.6 240 33 13.8 VSTPS III 2880 147 5.1 240 38 15.8 Sipat2 2880 19 0.7 240 22 9.2 Jindal 2880 46 1.6 240 46 19.2 Kawas 2880 7 0.2 240 141 58.8 Gandhar 2880 69 2.4 240 98 40.8 Lanco 2880 35 1.2 240 181 75.4 NSPCL 2880 147 5.1 240 66 27.5 Korba7 2880 121 4.2 240 30 12.5 sipat1 2880 33 1.1 240 31 12.9 RGPPL 2880 35 1.2 240 20 8.3 ACBIL 2880 41 1.4 240 152 63.3 BALCO 2880 855 29.7 240 135 56.3 CGPL 2880 8 0.3 240 42 17.5 DCPP 2880 151 5.2 240 73 30.4 VSTPS IV 2880 205 7.1 240 35 14.6 Mauda 2880 130 4.5 240 147 61.3 Emco 2880 408 14.2 240 16 6.7 ksk 2880 49 1.7 240 47 19.6 Essar Mahan 2880 72 2.5 240 85 35.4 Sasan 2880 94 3.3 240 109 45.4 DB Power 2880 57 2.0 240 40 16.7 JP Nigrie 2880 65 2.3 240 16 6.7 KWPCL 2880 178 6.2 240 89 37.1 MB Power 2880 45 1.6 240 103 42.9 JPL-II 2880 107 3.7 240 45 18.8 DHARIWAL 2880 9 0.3 240 19 7.9 VSTPS V 2880 112 3.9 240 32 13.3 TRN Energy 2880 385 13.4 240 126 52.5 Violation Type-1 Deviation in excess of (+/-)12% of Schedule or 150 MW whichever is less/ 48MW if schedule <= 400MW Violation Type-2 Sustained deviation from schedule in one direction beyond 12 consecutive time block 6 P a g e
3.Monthly Deviation Summery of Constituents: Deviation Monthly Summery -for September 2016 Deviation Deviation in Excess of (+/-) 12% of Schedule or 150MW whichever is less when frequency is in the band(>=49.7hz &<50.1Hz) Deviation when grid frequency is below 49.7 Hz. Deviation when grid frequency is 50.1 Hz. and above Constituents Schedule In Actual In Total OD In Total UD In No of No of Block OD Block UD Total OD In Total UD In No of Block OD No of Block UD Total OD In No of Block OD Total UD In No of Block UD Chhattisgarh 854565 888601 68879-34843 1615 1265 30125-8374 844 372 0 0-142 5 Gujarat 2309629 2238743 28764-99649 883 1997 1213-17422 128 637 0 0-114 3 Madhya Pradesh 2550094 2466334 13351-97110 594 2286 1213-17602 68 781 0 0-278 8 Maharashtra 3381697 3331450 51330-101578 1183 1697 9209-29880 289 639 0 0-586 6 Goa 235229 235347 10955-10837 1406 1474 2667-2026 458 345 0 0-18 4 DD 199623 207814 10681-2490 1919 961 2598-174 519 26 0 0-5 3 DNH 524032 514163 1963-11832 816 2063 0-566 0 63 0 0-85 8 ESIL 315506 323118 27216-19604 1585 1295 11605-6850 864 629 0 0-43 4 7 P a g e
Distribution List- 1. Chief Engineer(LD), Maharashtra State Electricity Transmission Co.Ltd., State Load Despatch Centre,Kalwa, Thane-Belapur Road, Airoli, Navi Mumbai 400 708. 2. Chief Engineer (LD), State Load Despatch Centre, Getco, Gotri, Vadodara-390021. 3. Chief Engineer (Comml.), M.P. Power Management Co. Ltd., Shakti Bhavan, Rampur, Jabalpur- 482008 4. Chief Engineer (Commercial),C.S. Power Distribution Company Ltd., Danganiya, Raipur- 492013 5. Chief Engineer,Electricity Department, Division-III, Curti, Ponda, Goa 403401 6. Executive Engineer,Electricity Department, Daman & Diu, Oidc, Corporate Office,Plot No. 35, Somnath,Daman-396210 7. Executive Engineer, Electricity Department, Dadra Nagar Haveli, 66kv Amli Road, Silvassa-396230 8. Vice President-Power Infrastructure Plant- B MRSS, Essar Steel Ltd 27th KM, Surat Hazira Road,Surat-394270 Gujarat. 9. General Manager (Comml.), NTPC, Samruddhi Trade Complex,2nd Floor, Midc, Marol, Andheri (E), Mumbai-400 093. 10. Chief Power Controller,Jindal Power Limited, O.P. Jindal Superthermal Power Plant,Village & Po : Tamnar, Tehsil :Gharghoda,Dist: Raigarh (Chhattisgarh ) 496107. 11. General Manager (Comml), Lanco Amarkantak Power Private Ltd., Gurgaon 122 016 12. General Manager (Com. & CP), NTPC Sail Power Co. Pvt. Ltd., New Delhi -110 066 13. Dy. General Manager (Comml), Ratnagiri Gas & Power Pvt. Ltd., Mumbai-400 093 14. Vice President (Powe CG) Acb India Ltd., 2*135 Mw Kasaipali Power Project, Kasaipali, P.O.- Jawali, Tehsil-Katghora, Korba Chhatisgarh-495445 15. GM (O&M)Bharat Aluminium Co. Ltd (BALCO), P.O. Balco Nagar, Distt. Korba -495684 Chhattisgarh 16. Head (O & M),Coastal Gujrat Power Limited, Tunda Bndh Road, Tunda Village,Mundra, Kutch, Gujarat-370435 17. AGM(F&A), DCPP JSPL, Dongamahua Captive Power Plant(4*135 Mw), Dhaurabhata(PO) Raigarh-496107 (CG) 18. Plant Head,GMR EMCO Energy Ltd. B1, MIDC, Growth Centre, Warora-Post Chandrapur- Dist, Mahrashtra-442907 19. KSK Mahanadi Power Co. Ltd, 8-2-293/82/A/431/A, Road No 22, Jubilee Hills, Hyderabad-500033 20. Sr. Vice President (EPMPL), Essar Power Mp Limited, Thana Road, Near Chunkumari Stadium, Waidhan, Dist. Singrauli (MP)-486886 21. Sasan Power Limited, Dhirubahi Ambani Knowledge City, 1 Block, 2nd Floor, North Wing, Thane Belapur Road, Navi Mumbai-400710 22. MS. D B Power Ltd., 3rd Floor, Naman Corporate Link, C-31, G-Block, Bkc Bandra East,Mumbai- 400051 23. M/S. GMR Energy Trading Limited, New Udaan Bhawan, Terminal-3, Opp. Ats Complex, International Terminal, Indira Gandhi International Airport, New Delhi- 110037 24. Jaypee Nigrie Super Thermal Power Project( A Unit Of Jaiprakash Power Ventures Limited )Vill- Nigrie, Tehsil- Saraidistt.- Singrauli, Mp-486669 25. Korba West Power Co. Limited, Village Chhotte Bhandar, P.O. Babe Bhandar,Tehsil Pussore Dist. Raigarh, Chhattisgarh-496001 26. Vice President(Comml.), Vandana Vidhut Ltd., Vandana Bhavan, M.G. Road, Raipur-492001-Cg 27. GM (Operations)MB Power (Madhya Pradesh) Limited, hotel Govindam, Kotma Road,Anuppur, Madhya Pradesh 484224 28. Torrent Energy Limited, DGEN Mega Power Project, Plot No Z-9, Dahej SEZ Area(Eastern Side),Taluka Vagra Distt Bharuch-392130, Gujrat. 29. GM-Coordination, Dhariwal Infrastruture Ltd,CESC House, Chowringheesquare, Kolkata-700001 30. Chief General Manager, RKM Powergen Pvt Ltd, Village Uchpinda, PO Dhurkot, Via Chandrapur, Tehsil- Dabra, Janjgir-Champa Dist, Chhattisgarh-495692 31. Head-Business Development, Jhabua Power Ltd.,6th Floor,Vatika City Point M.G.Road Gurgaon- 122002 32. Sr. VP Power, TRN Energy Pvt ltd, 18, Vasant enclave, Rao tula ram marg,new delhi-110057 8 P a g e