TRANSPORTATION COMMITTEE

Similar documents
Metrotown Station and Exchange Upgrades

Urban Design Program. University of Calgary. Metrotown: Regional Town Centre. Metrotown

Yorkdale Station Easier Access Project Public Open House

LOCATION. AMENITIES. TRANSIT.

STRAND ALDWYCH PROPOSALS

City of Charlottesville Bicycle and Pedestrian Master Plan Update

Environmental Impact Statement (EIS)/ Section 106 Public Meeting Level 1 Concept Screening. May 16, 2017

OUR MISSION: We at Metro Transit deliver environmentally sustainable transportation choices that link people, jobs and community conveniently,

FIVE FLAGS CENTER FEASIBILITY STUDY REPORT

Major department stores anchoring Hillsdale Shopping Center are Macy s and Nordstrom.

Preliminary Transportation Recommendations for. Presentation to Sector Plan Work Group/WRAC October 5, 2009

Federal Transit Administration s New Starts Process. Circle Line Alternatives Analysis Study

OFFICE LEASING OPPORTUNITIES

Attachment 7: 5/9/13 Neighborhood Meeting Summary

Michael Fieldman, Architect

David Meller. Labour in Cheadle Hulme North. Better Public Transport in Cheadle Hulme North

6. Institutional Planning and Budgeting Processes

Helpful Information. Christmas at Blenheim. blenheimpalace.com/christmas. Entry times. Ticket information

City of Kingston Report to Council Report Number

Re: Live Streaming/Video Archiving of Board and Standing Committee Meetings

For an Outdoor Kiosk Licence

PUBLIC ART CALL FOR EXPRESSIONS OF INTEREST

THEATRE DIRECTOR, Beck Theatre

SUMMARY REPORT. Consultation Summary Report. January 2016

Bells Corners: A Sustainable Community. Note: This is a Grade 9 Geography Project from June 2015.

Leeds Inspired Light Night Commission 2014

In the proposed amendment below, text shown with underline is proposed to be added and text shown with strikethrough is proposed to be removed.

VANCOUVER 4 WEEK BUS SPACE RATES

Australian Broadcasting Corporation. Department of Broadband, Communications and the Digital Economy

one bloor firstgulf.com FIRST GULF CONTACT: Jonathan Weinberg T:

Accessibility Advisory Committee

one bloor firstgulf.com FIRST GULF CONTACT: Jonathan Weinberg Vice President, Retail T:

Taubman Centers, Inc. Beverly Center Los Angeles, Calif. March 7, 2016

Honorable Mayor and Members of the City Council. Submitted by: Scott Ferris, Acting Director, Parks, Recreation & Waterfront

AUDIOVISUAL TREATY COPRODUCTIONS GOVERNED BY CANADIAN TREATIES THAT HAVE ENTERED INTO FORCE AS OF JULY 1, 2014

Green Line LRT in My Community Report Back Sessions Summary Below, Above and At-Grade Stations March 2018

GLX Project Green Line Extension Project. March 2, 2016 Public Meeting

City Manager Briefing Report

Hollywood Bowl Union Station Shuttle

BICYCLE ADVISORY COMMITTEE

Six Year Capital Plan Fiscal Year

SEARCHLIGHT RECRUITMENT

Impact Of Multiplexes On Urban Traffic PLANNING THESIS IMPACT OF MULTIPLEXES ON URBAN TRAFFIC. (Case study on IMAX AND PVR)

Helpful Information. Entry times

Scheme MOT Facility Improvements

CASE for SUPPORT SETTING THE STAGE THE CAMPAIGN FOR NEWPORT S OPERA HOUSE THEATER

Main Auditorium. Floor plan Main Auditorium Stage Plan

The National Traffic Signal Report Card: Highlights

Street Theater. New Broadway Theater Anchors New Downtown District GTS Development LLC September 20, 2017

City of Kingston Report to Committee of Adjustment Report Number COA

Join us for our. A Campaign to Evolve, Elevate, and Inspire

B C. Where business meets the city. Quartier Belvedere Central. ENGLISH VERSION. 01_SG_QBC_Folder_EN.indd

Brand identity guidelines

City of Richmond. Report to Committee

17 Video Streaming Council and Committee of the Whole Meetings

City Council Report 915 I Street, 1 st Floor

A SMART, SAFE AND SMOOTH FUTURE TELESTE FOR CITY TRANSPORT. Video security and passenger information solution for city transport

Libraries. Goals. The City will:

>> By Jason R. Kack, LS

Train times. Monday to Sunday

Hosted 81 events between the months of April October with a total attendance of 338,000.

WHEREAS; a significant feature of a Community Gathering Place library is an adequately-sized, multi-purpose auditorium; and

Alberta Electric System Operator

PUBLIC CONSULTATION ON THE QUARTIER DES GARES ONLINE QUESTIONNAIRE. Hello!

CITY COUNCIL AGENDA MEMORANDUM

BBC Trust Changes to HD channels Assessment of significance

Appendix C.4 Assistant Deputy Ministers Project Review Committee Terms of Reference

ICOMOS Ename Charter for the Interpretation of Cultural Heritage Sites

Train times. Monday to Sunday. Stoke-on-Trent. Crewe

HIGH PROFILE HEADQUARTER OPPORTUNITY

Proposal Endorsement Signatures

City of Kingston Report to Council Report Number

Table 6.1: Level of Service Thresholds for Basic Freeway Segments. Density Range LOS (pc/mi/ln) A 0 11 B >11 18 C >18 26 D > E >35 45 F > 45

N E W S R E L E A S E

ICOMOS ENAME CHARTER

File: /2018- Director, Arts, Culture and Heritage Services Vol 01

Recommendations Of The Ad Hoc Performing Arts Center Committee

RIDERSHIP SURVEY 2017 Conducted for the San Francisco Municipal Transportation Agency

Broadcasting Decision CRTC

The Lerbäck theatre barn conversion of an old barn into a theatre

F I L M S T U D I O G R O U P

JANUARY Page 1 of 7

VANCOUVER CIVIC THEATRES BOARD MINUTES DECEMBER 13, 2012

Members of the project team and City Staff are present to answer your questions.

SKYCITY signs Heads of Agreement with the New Zealand Government to design, build and operate the New Zealand International Convention Centre (NZICC)

B C. Where business meets the city. Quartier Belvedere Central. ENGLISH VERSION

CAPITAL METRO TRANSIT ADVERTISING

Vice President, Development League of American Orchestras

Institutes of Technology: Frequently Asked Questions

City of Grand Island

FY 2012 Website Visits Up 19% over previous year

In accordance with the Trust s Syndication Policy for BBC on-demand content. 2

Mayor's Task Force Arts and Theatres Recommendations on the Theatres

ICOMOS ENAME CHARTER

City of Palm Coast 2016 Capital Projects Timeline - 1st Quarter

Statement of the National Association of Broadcasters

Community Meeting October 30, 2013

Honorable Members of the Transportation Committee. Historic Broadway Corridor Parking Task Force Update

Date February 2, Recreation and Park Commission Operations Committee. Philip A. Ginsburg, General Manager Dana Ketcham, Division Head.

DISPLAY & ART EXHIBITION POLICY

Transcription:

Meeting 2007 October 15 COUNCIL REPORT TRANSPORTATION COMMITTEE HIS WORSHIP, THE MAYOR AND COUNCILLORS SUBJECT: METROTOWN TRANSIT VILLAGE STUDY RECOMMENDATIONS: 1. THAT Council approve in principle the conceptual approach for improvements related to the Metrotown Skytrain Station as outlined in this report, on the understanding that further reports will be forwarded for Council consideration as specific elements are advanced. 2. THAT Council send a copy of this report to M. Rossi, Program Manager Showcase Program, TransLink. REPORT The Transportation Committee, at its meeting held on 2007 October 10, received and adopted the attached report presenting the findings of the Metrotown Transit Village Study. The study provides a conceptual approach to improvements relating to the Metrotown Skytrain Station with greater emphasis on alternative modes of travel and to upgrade Metrotown Station as a focus of the regional town centre. Respectfully submitted, Councillor N. Volkow Chair Councillor S. Dhaliwal Vice Chair Councillor L. Rankin Member Copied to: City Manager Director Engineering Director Parks, Recr. & Cult. Services Director Planning & Building

2007 October 15... Page 2 Meeting 2007 Oct 10 COMMITTEE REPORT TO: CHAIR AND MEMBERS TRANSPORTATION COMMITTEE DATE: 2007 October 5 FROM: DIRECTOR PLANNING & BUILDING FILE: Reference: PL 94000 20 Urban Transportation Showcase Program SUBJECT: PURPOSE: METROTOWN TRANSIT VILLAGE STUDY To present the findings of the Metrotown Transit Village Study. RECOMMENDATIONS: 3. THAT the Transportation Committee recommend that Council approve in principle the conceptual approach for improvements related to the Metrotown SkyTrain Station as outlined in this report, on the understanding that further reports will be forwarded for Council consideration as specific elements are advanced. 4. THAT Council be requested to send a copy of this report be forwarded to M. Rossi, Program Manager Showcase Program, TransLink. 1.0 BACKGROUND REPORT Metrotown is the most established of four town centres in the City of Burnaby and the largest of Metro Vancouver s regional town centres. Within walking distance of the Metrotown SkyTrain Station are residential uses ranging from single-family to high-rise with employment spread across the retail, office, community, recreation, and tourism sectors. Metrotown is a regional town centre with a robust transportation network including a well developed road network, a high level of transit service and a variety of cycling and pedestrian routes. The continuing growth and development of Metrotown has, however, increasingly taxed the existing capacity of the transit system resulting in overcrowding at the Metrotown SkyTrain station, a transit exchange operating at capacity, and increasing need for improved bike and pedestrian facilities at and connections to and from the Station area. To review these issues, Council, in 2005 September, approved cost share funding for a joint project with TransLink and the federal government under the Urban Transportation Showcase Program to complete a Transit Village Study for Metrotown. The budget for the Transit Village Study was $150,000 shared equally by the partners in the Study.

2007 October 15... Page 3 The primary purpose of the Transit Village Study was to identify concepts to enhance the use of alternative modes of travel in Metrotown in relation to the Metrotown SkyTrain Station, transit exchange, and pedestrian and bike connections to and from the Station area. This report outlines the findings of the study for the information of the Committee and Council. 2.0 TRANSIT VILLAGE APPROACH The transit village approach applied in the study emphasized the need to focus on alternative modes to give higher priority to the needs of pedestrians, cyclists, and transit users in the future planning, design, and improvement decisions in the Station area and the larger Metrotown area. The aim of the study was to identify means to enhance the comfort, safety and legibility of Metrotown SkyTrain Station and its immediate area to support and encourage people to use transit and other sustainable transportation modes. The study developed concepts to improve the Metrotown Station, the transit exchange function, and accessibility to/from the catchment area of the station based on the following specific objectives to: maximize the efficiency of the SkyTrain and bus systems provide better accessibility for all users of the station and the transit exchange improve the transit experience by providing more transit capacity, better bus transit exchange facilities and wayfinding for transit passengers improve the quality of life for local residents, employees, shoppers and visitors support development of the BC Parkway as a community amenity through a high standard of design support future development potential in the station area improve actual and perceived safety and personal security throughout the station area create a strong sense of identity and make the station area a memorable place support national, regional and local efforts to promote a more sustainable future. The study was undertaken with the assistance of a team of consultants and the work has been summarized in a report entitled Metrotown SkyTrain Station Transit Village Plan: Options and Evaluation. The following outlines the key findings of the report for the information of the Transportation Committee and Council. 3.0 METROTOWN TRANSIT VILLAGE STUDY 3.1 Issues The study identified a number of issues to be addressed through a transit village approach primarily related to the functionality of Metrotown Station, the transit exchange and access to and from the station for transit buses, pedestrians and cyclists. Key issues included: Metrotown SkyTrain Station Capacity: The existing SkyTrain Station, as shown in Figure 1, does not have sufficient capacity to meet the existing demand for transit travel

2007 October 15... Page 4 in the Metrotown area. The centre platform, escalators, ticketing concourse and elevators are undersized to meet current demand. Current overcrowding of the station platform during peak periods does not allow bikes to access the system. Figure 1 Existing Metrotown Station Station Access: Access to and from the station and its immediate surroundings is challenged as evident in the overcrowded passarelle between the Station concourse and Metropolis, the need for more direct and convenient at-grade and second level access from the west, and the need for improved access to the office towers, the Maywood neighbourhood to the south and for persons with disabilities. Transit Exchange Connections and Capacity: The existing Metrotown Transit Exchange, currently located across Central Boulevard from the SkyTrain Station, is not well connected to the station, requiring use of an escalator and a crowded passarelle for the able-bodied. For persons with disabilities, access to the Station from the Transit Exchange involves crossing the busy Central Boulevard at-grade and using an elevator. The Metrotown Transit exchange (Figure 2) is also currently operating at capacity with insufficient space for layover buses. Bus access to and from the Exchange is also limited by its single access to Central Boulevard.

2007 October 15... Page 5 Figure 2 Metrotown Transit Exchange Pedestrian and Bicycle Connections: The BC Parkway, as shown in Figure 3, is the major access to Metrotown station from the east and west for pedestrians and bikes. The aging BC Parkway is not built to a sufficient width to appropriately accommodate both cyclists and pedestrians given its increased usage and is not currently lighted. Improvements to pedestrian and cycling connections and wayfinding are also needed to enhance access to the Station through the mall developments from the Kingsway frontage and developments north of Kingsway. As noted, due to overcrowding on the Station platform, bikes are not permitted to use Metrotown Station during peak periods, and bike lockers are not available at Metrotown Station. Figure 3 Existing BC Parkway

2007 October 15... Page 6 3.2 STUDY PROPOSALS The study reviewed these issues and developed preliminary concepts for the Metrotown Station, the transit exchange and alternative modes to improve the functionality, efficiency and accessibility of the Station and station area for pedestrians, cyclists, transit users and bus transit. 3.2.1 Metrotown Station Expansion and Upgrading The major component of the study was the development of a concept for expansion of the Metrotown Station to accommodate ridership growth and upgrading to meet functional requirements. Funding for improvements to Metrotown Station have been included in the TransLink 2008 Transportation Plan and the specific improvements to the station will be considered by Council as part of a forthcoming rezoning application process. Enhancements identified by the study to improve the functionality of and access to Metrotown Station included the following: Redesigned Station Roof and Enclosure: Installation of a new station roof and enclosure similar to those on the Millennium Line, as shown in Figure 4. The new roof would provide weather protection for the entire length of the platform, improve the transparency of the Station, and create a landmark feature for this flagship station. Figure 4 Station Roof and Enclosure Example

2007 October 15... Page 7 Extension of the Station Platform (Figure 5): Extension of the station platform to the west to increase capacity on the platform and to provide for a new west access, concourse and ticketing area to better serve the activity centres further west in Metrotown including Station Square, Library Square and the Crystal. Figure 5 Lengthened Station Platform and West Station Access Improved Passarelle: Replacement or improvement of the existing station passarelle (Figures 1, 5 and 6 ), which currently accommodates 40,000 persons a day, with a widened, more transparent and wheelchair accessible passarelle to provide for better passenger comfort, personal security, accessibility and capacity. Figure 6 Existing Metrotown Passarelle

2007 October 15... Page 8 New Elevators: Replacement of the existing elevator (Figure7) by a pair of modern, transparent elevators located at the new midpoint of the lengthened platform, to provide access from the station platform to a new mezzanine level. The new mezzanine level, under the platform, would connect to the new east station access and the passarelle to Metropolis. Figure 7 Existing Elevator New Mezzanine and Upgraded East Access: Upgrade of the existing east station entrance (Figure 8) to a new mezzanine and with level access to the passarelle. Figure 8 Existing East Station Entrance

2007 October 15... Page 9 Extended Station Mezzanine: Extension of the mezzanine connection (Figure 9) from the re-built East Station House to a new Mid-Station House. This connection will allow handicapped access from the existing passarelle (with no stairs) to the station platform using the new mezzanine to access elevators located at the Mid-Station House. Figure 9 Extended Station Mezzanine Possible Second Passarelle to Mid-Station House: A future second passarelle, as shown in Figure 10, would connect the second level of Metropolis to the planned mid-station house of the upgraded Station. This passarelle connection could be pursued with any future significant redevelopment of Station Square. Figure 10 Future Second Passarelle

2007 October 15... Page 10 New Bus Transit Exchange: A new transit exchange, as shown in Figure 11, is identified within the station area. The proposed design for the New Metrotown Transit Exchange would occupy the area under the station and front on Central Boulevard and Beresford extending for about a block between McKay and Sussex. It would provide four regular bus stopping areas on Central Boulevard and four larger bus bays on the Beresford side. Transit-only lanes would be constructed between Central Boulevard and Beresford southbound at the east end of the transit exchange and northbound at the west end of the transit exchange to McKay. Figure 11 Proposed Transit Exchange As only 15% of bus passengers using the existing Metrotown Transit Exchange transfer from one bus to another while about 73% are transferring between buses and SkyTrain, the new exchange will significantly improve access and convenience for transit-users. Currently, the location of the transit exchange across Central Boulevard from the SkyTrain station requires transferring riders to cross Central Boulevard at grade or via the passarelle. A conceptual layout for the transit exchange with an integrated public Civic Square is shown in Figure 12. The existing transit exchange will be retained and all bus lines serving Metrotown station and Metropolis/Station Square would terminate and continue to pick up and discharge passengers here. This facility would also serve lay over buses providing driver breaks and allowing drivers to catch up with their schedules.

2007 October 15... Page 11 Civic Square: The new transit exchange under Metrotown Station is envisioned as a high amenity, public square or urban plaza (Figure 12) incorporating the new transit exchange abutting the plaza and the BC Parkway. Retail uses may be included to help animate the space along a bike station, hard and soft landscaping features, and other public amenities to serve the multiple purposes of a transit exchange, public plaza, and linear parkway feature with a vibrant, urban character. A Spirit Square application to fund design of this Civic Square was approved by Council on 2007, March 05. Figure 12 Proposed Civic Square 3.2.2 Station Access Concepts The study outlines a number of other ideas to improve access by transit, bike and pedestrians to Metrotown Station including the following: Enhancing the function of McKay Avenue an important north-south route for transit and pedestrian access to and from the station through more pedestrianoriented street design and transit bus corridor improvements. Continuing to create a more pedestrian-oriented environment on Kingsway by creating street fronting with pedestrian scale landscaping, lighting and other improvements.

2007 October 15... Page 12 Improving pedestrian crossings on Kingsway to increase the station s catchment area to the north. Improving pedestrian routes through Metropolis and Station Square through clearer wayfinding signage and creating new and enhanced access through redevelopment opportunities and other initiatives, such as establishing the connection through the Sears development from the new McMurray (Figure 13) pedestrian overpass. Figure 13 Pedestrian Routes to/from the Station Improving Station Wayfinding Signage Improved wayfinding signage is needed at the Metrotown Station platform and station house to orient people to Metropolis, the Metrotowers and the Maywood area. Clearer wayfinding signage should be provided in Metropolis between the station and the McMurray pedestrian overpass to identify the access to the station from Kingsway and the Grange residential areas.

2007 October 15... Page 13 Figure 14 Pedestrian Wayfinding Through Metropolis Upgrade the BC Parkway: The study also supports the planned improvement to the BC Parkway by the City and TransLink to serve its designated function as a major regional pedestrian/cycling corridor. Key improvements would include separated and wider pedestrian and bike paths, lighting and connections across the Parkway to the Maywood area. Other elements which could be added to animate the Parkway and give it a more distinctive character include kiosks, recreation areas, interactive art, bike storage and small retail. Improved wayfinding systems (See Figure 15) directing cyclists to key destinations and offering distance information would further enhance the Parkway. Figure 15 Bike Wayfinding Signage Example

2007 October 15... Page 14 4.0 NEXT STEPS The Metrotown Transit Village Study identifies a concept for improvement of the Metrotown Station, Transit Exchange function, and other station access issues. The next steps will involve developing these ideas further in conjunction with TransLink and other stakeholders. The concept for Metrotown Station would be the subject of a specific rezoning proposal to the City by TransLink. This process will further define the overall concept and address any arising issues in relation to the Station and transit exchange concept. The other station access proposals would be the subject of further staff review and advanced for Council consideration as specific projects are developed. The most likely proposals to be advanced in the short term are the concept for Metrotown station including the transit exchange and the BC Parkway improvements. 4.1 Concept for Metrotown Station Funding has been allocated in the TransLink 2008 Transportation Plan for major renovations to three of the busiest stations on the Expo Line including Broadway/Commercial, Metrotown and Surrey Central. The cost to TransLink of the Metrotown Station improvements has been estimated at approximately $25 M. This is included in the TransLink 2008 Financial Plan. Design could begin this fall with construction to follow in 2008. The changes to the station, the civic square and the transit exchange will be advanced through a rezoning application by TransLink. The concept for the Metrotown Station is an integrated plan including the station improvements and a new transit exchange designed around a public Civic Square as well as upgraded major connections such as the passarelle to Metropolis and the enhanced BC Parkway. Council is requested to approve in principle this conceptual approach on the understanding that further reports will be forwarded for Council consideration as more detailed work is undertaken. The concept will be implemented through the capital funding available from the TransLink 2008 Transportation Plan with some cost sharing from other sources including the Provincial Spirit Squares Program, the City of Burnaby and adjacent development. 4.2 BC Parkway Improvements When financing was approved by Council for the Metrotown Transit Village Planning Study, future funding of $350,000 was identified in the City s Capital Program for implementation of specific Transit Village proposals subject to Council approval through a future report. Matching funding of $350,000 has also been allocated by TransLink for initial short-term capital improvements arising from the Transit Village Planning Study for a total of funding commitment of $700,000. The priority project for this funding is the enhancement of the BC Parkway, as identified by City and TransLink staff in undertaking the Transit Village Study. This specific project will be the subject of a further report to Council to outline the design process, to provide key improvement objectives and to seek expenditure authorization based on a cost shared

2007 October 15... Page 15 approach. Additional funding for the BC Parkway will also be available from TransLink as part of its program to fund the development of the BC Parkway in Vancouver, Burnaby and New Westminster as a regional cycling facility. 4.3 Station Access Proposals The station access proposals would be assessed individually on their own merits and could be implemented through the rezoning process or through cost-shared funding programs with the Province or TransLink including the TransLink MRN Capital Program, Transit-Related Road Infrastructure Program (TRRIP), the Provincial Cycling Program (CIPPS) the TransLink Bicycle Infrastructure Cost Sharing Program (BICCS) and the Provincial Spirit Square Program. These would be advanced to the Committee and Council for consideration as opportunities for implementation arise. 5.0 CONCLUSION The continuing growth and development of Metrotown has created challenges for the transportation system including overcrowding at the Metrotown SkyTrain station, a transit exchange operating beyond its capacity, substandard bike and pedestrian connections to the Station and other pressing issues. To address these issues, Council, in 2005 September, approved $50,000 as its cost share of $150,000 for a Transit Village Study of Metrotown. The study provides a conceptual approach to improvements relating to the Metrotown SkyTrain station with greater emphasis on alternative modes of travel and to upgrade Metrotown Station as a focus of the regional town centre. The study has worked outwards from the station and developed concepts for Metrotown Station to address the issues of station and transit exchange functionality as well as improvements to pedestrian, bike and transit connections from the station to/from its immediate area. TransLink has included $25M in its 2008 Financial Plan for improvements to the Metrotown SkyTrain Station. This report has outlined the findings of the Transit Village Study highlighted by a revised concept for the Metrotown Station area. Council is requested to approve the conceptual approach outlined in this report on the understanding the further review will be required to develop the detailed feasibility and acceptability of the outlined concepts as final solutions. As they become further developed, the proposals will be brought forward for consideration of the Council. It is expected that TransLink will be making a rezoning application to pursue the upgrading of the Metrotown SkyTrain Station and related improvements shortly. Detailed reviews and designs will be pursued in conjunction with this rezoning process. B. Luksun, Director PLANNING & BUILDING RG:jc/sa cc: City Manager Director Engineering Director Parks, Recreation and Cultural Services R:\Long Range Clerical\DOCS\Bob\Committee Reports\Metrotown Transit Village Study Committee Report.doc

2007 October 15... Page 16