Information here generates the timing configuration and is hence the definitive source. The situation is quite volatile, new events and telegram

1. General principles for injection of beam into the LHC

beam dump from P2 losses this morning

LHC COMMISSIONING PLANS

LHC Machine check out

LHC Beam Instrumentation Further Discussion

RF PERFORMANCE AND OPERATIONAL ISSUES

2008 JINST 3 S LHC Machine THE CERN LARGE HADRON COLLIDER: ACCELERATOR AND EXPERIMENTS. Lyndon Evans 1 and Philip Bryant (editors) 2

OPERATIONAL EXPERIENCE WITH CIRCULATING BEAM

Accelerator Controls Part2: CERN central timing system

North Damping Ring RF

REVIEW OF LHC OPERATION

Procedures for the Commissioning of the Beam Interlock System for the CNGS and SPS-LHC Transfer Lines

WHAT WE WILL DO FOR BEAM PREPARATION IN 2009 : BEAM INTERLOCKS

The Elettra Storage Ring and Top-Up Operation

CERN S PROTON SYNCHROTRON COMPLEX OPERATION TEAMS AND DIAGNOSTICS APPLICATIONS

Full IEFC workshop Feb.

ANKA RF System - Upgrade Strategies

Friday 05/03/ :00 13:00 : Establishing reference orbit golden Jorg Wenninger. Problems Wrong polarity on MCBXH3.L8 Polarity flag changed in DB

LCLS RF Reference and Control R. Akre Last Update Sector 0 RF and Timing Systems

Session 07 - What did we learn with beam in 2008? LHC Performance Workshop Chamonix Rhodri Jones on behalf of BE/BI & all our collaborators

Beam systems without failures what can be done?

SPEAR 3: Operations Update and Impact of Top-Off Injection

INITIAL BEAM COMMISSIOMING OF INJECTION AND BEAM DUMP

LHC_MD292: TCDQ-TCT retraction and losses during asynchronous beam dump

PEP II Design Outline

Injectors. Injectors ready

The 2011 LHC Run - Lessons in Beam Diagnostics

Status of SOLARIS Arkadiusz Kisiel

S67: PRE-CYCLE & RAMP

A Fast Magnet Current Change Monitor for Machine Protection in HERA and the LHC

New Filling Pattern for SLS-FEMTO

Fast Orbit Feedback at the SLS. Outline

Equipment Installation, Planning, Layout, organisation and updates

Libera Hadron: demonstration at SPS (CERN)

PEP-II Status. U. Wienands, PEP-II Run Coordinator for the PEP-II team

Digital BPMs and Orbit Feedback Systems

The ESRF Radio-frequency Data Logging System for Failure Analysis

Spear3 RF System Sam Park 11/06/2003. Spear3 RF System. High Power Components Operation and Control. RF Requirement.

arxiv: v1 [physics.acc-ph] 9 Aug 2016

PEP-I1 RF Feedback System Simulation

PoS(EPS-HEP2015)525. The RF system for FCC-ee. A. Butterworth CERN 1211 Geneva 23, Switzerland

Top-Up Experience at SPEAR3

Brilliance. Electron Beam Position Processor

Development of an Abort Gap Monitor for High-Energy Proton Rings *

MACHINE PROTECTION WORKSHOP REVISITED OPEN ISSUES, PROGRESS AND DECISIONS ON MAJOR TOPICS

What can be learned from HERA Experience for ILC Availability

ABORT DIAGNOSTICS AND ANALYSIS DURING KEKB OPERATION

Bunch-by-bunch feedback and LLRF at ELSA

1 Digital BPM Systems for Hadron Accelerators

TRANSVERSE DAMPING AND FAST INSTABILITIES

LESSONS LEARNT FROM BEAM COMMISSIONING AND EARLY BEAM OPERATION OF THE BEAM LOSS MONITORS (INCLUDING OUTLOOK TO 5 TEV)

THE ANTIPROTON DECELERATOR (AD)

Control of Intra-Bunch Vertical Motion in the SPS with GHz Bandwidth Feedback

SUMMARY OF SESSION 4 - UPGRADE SCENARIO 2

LLRF at SSRF. Yubin Zhao

Synchrotron Light Facility. Operation of ALBA RF. Angela Salom on behalf of RF team: Francis Perez, Bea Bravo and Jesus Ocampo

P. Adamson, Fermi National Accelerator Laboratory, Batavia, IL 60510, USA. Abstract

CLIC Feasibility Demonstration at CTF3

Upgrading LHC Luminosity

System: status and evolution. Javier Serrano

Phase (deg) Phase (deg) Positive feedback, 317 ma. Negative feedback, 330 ma. jan2898/1638: beam pseudospectrum around 770*frev.

OPERATIONAL EXPERIENCE AT J-PARC

COMMISSIONING OF THE ALBA FAST ORBIT FEEDBACK SYSTEM

30 GHz Power Production / Beam Line

Linac 4 Instrumentation K.Hanke CERN

THE ARCHITECTURE, DESIGN AND REALISATION OF THE LHC BEAM INTERLOCK SYSTEM

Commissioning of the CNGS Extraction in SPS LSS4

Sérgio Rodrigo Marques

Lessons Learnt from LEP/LHC ML

4.4 Injector Linear Accelerator

COMMISSIONING SCENARIOS FOR THE J-PARC ACCELERATOR COMPLEX

Status of SOLARIS. Paweł Borowiec On behalf of Solaris Team

Beam Diagnostics for the BNL Energy Recovery Linac Test Facility

The basic parameters of the pre-injector are listed in the Table below. 100 MeV

HIGH POWER BEAM DUMP AND TARGET / ACCELERATOR INTERFACE PROCEDURES *

NSLS-II RF BEAM POSITION MONITOR COMMISSIONING UPDATE

An Overview of Beam Diagnostic and Control Systems for AREAL Linac

PEP II STATUS AND PLANS *

PEP-II longitudinal feedback and the low groupdelay. Dmitry Teytelman

Photoinjector Laser Operation and Cathode Performance

Detailed Design Report

LHC TRANSVERSE DAMPER OBSERVATIONS VERSUS EXPECTATIONS

Experience with the Cornell ERL Injector SRF Cryomodule during High Beam Current Operation

Trigger-timing signal distribution system for the KEK electron/positron injector linac

Status of Elettra, top-up and other upgrades

A HIGH-POWER SUPERCONDUCTING H - LINAC (SPL) AT CERN

Summary of the 1 st Beam Line Review Meeting Injector ( )

Requirements for the Beam Abort Magnet and Dump

IOT OPERATIONAL EXPERIENCE ON ALICE AND EMMA AT DARESBURY LABORATORY

Development of beam-collision feedback systems for future lepton colliders. John Adams Institute for Accelerator Science, Oxford University

RF upgrade program in LHC injectors and LHC machine

An Operational Diagnostic Complement for Positrons at CEBAF/JLab

Status of BESSY II and berlinpro. Wolfgang Anders. Helmholtz-Zentrum Berlin for Materials and Energy (HZB) 20th ESLS-RF Meeting

COGGING & FINE ADJUST OF THE BEAM BEAM PHASE

EPJ Web of Conferences 95,

FINAL DESIGN OF ILC RTML EXTRACTION LINE FOR SINGLE STAGE BUNCH COMPRESSOR

Design and Simulation of High Power RF Modulated Triode Electron Gun. A. Poursaleh

Electrical and Electronic Laboratory Faculty of Engineering Chulalongkorn University. Cathode-Ray Oscilloscope (CRO)

Status of RF Power and Acceleration of the MAX IV - LINAC

Transcription:

LHC Nominal injection sequence Mike Lamont Acknowledgements: Reyes Alemany Fernandez, Brennan Goddard

Nominal injection Overall injection scheme Pilot R1, Pilot R2, Intermediate R1 Optimise Intermediate R2 Optimise Dump & re-inject pilot R1 Dump & re-inject pilot R2 Interleafed nominal injection R1/R2 LHCCWG - injection 2

Mode: Setup Mode: Pilot Injection LHCCWG - injection 3

Mode: Intermediate Injection Mode: Nominal Injection LHCCWG - injection 4

Injection plateau no beam On entry Check power converter settings Check RF 400 MHz ON - 8 MV; RF frequency Load LFB, TFB settings Monitor power converters Set TDI settings parked Set collimators parked Set TCDQ parked Injection kickers ON Start auto harmonic decay correction Check and monitor transfer lines Beam dumps Ready Set BPM gains to pilot, set capture bunch and turns Check Beam interlock system Change injection master to LHC LHCCWG - injection 5

Injection plateau no beam - RF 400 MHz ON - 8 MV. Set RF frequency program to injection level Set the gain of the phase loop amplifier to filling value Set the gain and time constant of the synchronization loop amplifier to the filling value Close the phase loop around the VCO Switch the RF DRIVE ON Switch the phase loop to the cavity sum signal Reset the revolution frequency generator Check synchronization. LHCCWG - injection 6

Injecting pilot R1 On entry On event Check settings Load and/or check injection timing table [BCT, BPMs, BLMs, SRM] Make request to CBCM with ring, bucket number, PS user (intensity) and number of PS batches Injection into LHC - injection kickers, BI receive prepulses. BST sends out acquisition event for BPMs, BLMs as required. LFB,TFB,RF: Batch dependent settings triggered by timing events. Jump phase loop onto beam (beam/cavity sum) Switch synchro loop on LHCCWG - injection 7

Circulating pilot R1/R2 BPF SBF Entry False True Exit True True On entry On entry On entry On exit Check first turn, energy offset, beam loss, intensity, emittance, RF response, longitudinal emittance Check BLMs, trajectory in transfer line Measure tune, orbit, chromaticity Configure and start global orbit feedback Monitor lifetime, beam losses Monitor harmonic correction TDI,TCDQ to coarse Collimators to coarse Change mode LHCCWG - injection 8

Inject intermediate R1/R2 BPF SBF Entry True True Exit True False On event Check settings Monitor transfer lines Monitor pilot (check harmonic correction) Load LFB, TFB, RF settings Check timing table Set BPM gains to pilot, set capture bunch and turns Set Safe Beam Flag false Intermediate injection request Injection into LHC LHCCWG - injection 9

Circulating intermediate BPF SBF Entry True False Exit True False On entry On entry On entry On event On exit Check first turn, energy, beam loss, intensity, emittance, RF response, longitudinal emittance Check checks on BLMs, trajectory in transfer line Measure & correct tune, orbit, chromaticity Monitor lifetime, beam losses Fine adjustment: TDI to protect Fine adjustment: Collimators to protect Fine adjustment: TCDQ to protect Check crossing angle, separation, compensation Monitor pilot (check harmonic correction) Lifetime problems, high beam loss abort Change mode LHCCWG - injection 10

Re-inject pilot R1/R2 BPF SBF Entry True False Exit True False On event Check settings Monitor transfer lines Set BPM gains to pilot, set capture bunch and turns Load LFB, TFB settings Load disable PM timing table Dump beam [BPF to false] Re-enable PM LBDS XPOC Pilot injection request Injection into LHC [BPF to true] Check injection LHCCWG - injection 11

Inject nominal R1/R2 BPF SBF Entry True False Exit True False On entry On event Check settings Monitor transfer lines Monitor pilot (check harmonic correction) Set BPM gains to pilot, set capture bunch and turns Load LFB, TFB settings Load & Check timing table Intermediate injection request Injection into LHC ICQ*: abort gap, beam loss, lifetime, energy mis-match, injection oscillations, trajectory in lines, mountain range, beam sizes Measure tune, chromaticity, orbit, beam sizes, lifetimes, abort gap * See Verena s presentation at PM workshop LHCCWG - injection 12

Implicit On event TDI, TCDQ, Collimators not at Inhibit injection protect On event Beam permit pulled Both beams dumped On event ICQ fails Inhibit injection On event Injection BIS inhibit Hold sequence On event Cryo not OK Hold sequence On event Vacuum not OK Hold sequence On event SPS extraction inhibit Wait On event etc etc LHCCWG - injection 13

Triggered data acquisition at injection Beam based information: Beam loss monitors (snap-shot, 1..2 seconds?) BCT and FastBCT snap-shot Radiation monitors 2 seconds of tune/coupling trace (1 second before/1 second after) 2 seconds of orbit, including some r.m.s. calculations for specific regions (e.g. collimation) 2 seconds of chromaticity trace bunch length of selected bunch (bes), RF voltage -> momentum spread transverse beam profile (/emittance) (time stamp of the event) Some more hardware status information: position of movable objects in the LHC (collimators, screens, Roman Pots) temperature of the most important cryo-circuits (indicates also losses) tunnel temperature (esp. in IR3 and IR7) SPS/LHC injection momentum mismatch (energy feedback) Number of people in the CCC. Status/current of the main lattice circuits (main bends/quads) Status of the BIC, QPS, SIS, Ralph Steinhagen LHCCWG - injection 14

Events HX.BTNI 0x1401FFFF Next injection beam type HX.BPNM 0x1402FFFF Basic Period Number HX.BKNI 0x1403FFFF Next injection RF bucket HX.RNGI 0x1404FFFF Next injection ring HX.ENG 0x1405FFFF Beam energy HX.INT1 0x1406FFFF Beam intensity - Ring 1 HX.INT2 0x1407FFFF Beam intensity - Ring 2 HX.SBF1 0x1408FFFF Safe beam flag - Ring 1 HX.SBF2 0x1409FFFF Safe beam flag - Ring 2 HX.MODE 0x140AFFFF What the LHC is doing HX.FILLNUM 0x140BFFFF Fill number HX.BTC1 0x140CFFFF Circulating beam type - Ring 1 HX.BTC2 0x140DFFFF Circulating beam type - Ring 2 HX.DISPM1 0x14210000 Disable Post-Mortem Ring 1 HX.DISPM2 0x14220000 Disable Post-Mortem Ring 2 HX.ENBPM1 0x14230000 Enable Post-Mortem Ring 1 HX.ENBPM2 0x14240000 Enable Post-Mortem Ring 2 HX.DUMP1 0x14250000 Dump ring 1 HX.DUMP2 0x14260000 Dump ring 2 HX.PM1 0x14270000 Postmortem ring 1 HX.PM2 0x14280000 Postmortem ring 1 HIX.FW 0x14290000 Injection forewarning (Currently 1S) HX.SRMP-POW 0x142AFFFF Start ramp power converters HX.ARMP-POW 0x142BFFFF Abort ramp power converters HIX.REQ-RF 0x142CFFFF RF Injection request HX.SFRMP-RF 0x142DFFFF Start frequency ramp RF HX.SVRMP-RF 0x142EFFFF Start voltage ramp RF HIX.STFB-RF 0x142FFFFF Start TFB injection RF HIX.SLFB-RF 0x1430FFFF Start LFB injection RF HX.SYNC-RF 0x1431FFFF Synchronize rings RF Julian Lewis & friends HIX.W100 0x1432FFFF Warning injection 100ms (900ms after HIX.FW) HIX.W20 0x1433FFFF Warning injection 20ms (980ms after HIX.FW) HIX.AMC 0x1434FFFF Injection NOW (Acquisition master C, 1S after HIX.FW) HIX.APOST 0x1435FFFF Injection +10ms (1010 after HIX.FW) HX.RPLS 0x14FE0000 Ready telegram MX.CTRIG 0x0100FFFF The millisecond event LHCCWG - injection 15

Injection Event Table Injection forewarning (Currently 1S) -1000 Warning injection 100ms (900ms after HIX.FW) 100 Warning injection 20ms (980ms after HIX.FW) -20 Injection NOW (Acquisition master C, 1S after HIX.FW) 0 Start function TFB 0 Start function LFB 0 BLM snapshot 0 SRM 0 BPM capture 0 Injection +10ms (1010 after HIX.FW) 10 A variation will be played at each injection. Telegrams (ring, beam type, next bucket etc.) also going out LHCCWG - injection 16

CBCM API injection request Error = Set Next Injection Beam Type: Beam Type OK, Not in Filling-Mod, Wrong LIC settings (LIC LHC Injector Chain) The value is checked against the beam type in the SPS telegram - if its not the same; then the BTNI parameter is set to NO-BEAM in the LHC telegram. Error = Set Next Injection Ring: Ring OK, Not in Filling-Mode, Out of Range 1..2 If the HLLSA sets the wrong value an out of range error is returned, and the RNGI parameter in the LHC telegram is forced to zero. Error = Set Next Injection RF Bucket: RF Bucket 1..35640 OK, Not in Filling-Mode, Out of Range 1..356402 If the HLLSA sets the wrong value an out of range error is returned, and the BKNI parameter in the LHC telegram is forced to zero. Error = Set CPS Batches: Batches 1..4 OK, Not in Filling-Mode, Out of Range 1..4 If the HLLSA gets this value wrong an out of range error is returned, and the internal variable controlling the number of injected CPS batches is set to zero. All subsequent CPS beams are dumped. (Modification in the CBCM needed here). Julian Lewis LHCCWG - injection 17

RF - injection LHC RF system expects the bunch number and the destination ring to be delivered to SR4 by the LHC timing system. This would be delivered every SPS cycle whenever the LHC is in injection mode. The LHC be the master for the SPS-LHC transfer. The SPS receives a train of pulses at the SPS-LHC common frequency. With its bucket selector the LHC can select the position for transfer from the SPS. RF system updates the bucket selector and the phase of the 400 MHz sent to the SPS. Fine positioning of the beam injection phase in the LHC buckets is adjusted with the phase of the LHC RF signal sent to the injectors. Signals for RF synchronization must be available in the PS about 450 ms before extracting to the SPS. RF generates injection pre-pulses LHCCWG - injection 18

sps frev f c = = 27 f 7 lhc rev P. Baudrenghien LHCCWG - injection 19

Conclusion Timing requirements agreed (more-or-less) Interface to timing system (Version 0) defined Testing should start so Loose FSM approach to defining LHC sequence Work in progress A first version of LHC beam modes defined. LHCCWG - injection 20