Simulation of DFIG and FSIG wind farms in. MATLAB SimPowerSystems. Industrial Electrical Engineering and Automation.

Similar documents
PERFORMANCE ANALYSIS OF DFIG WIND TURBINES WITH CROWBAR PROTECTION UNDER SHOR CIRCUIT

Behavior of DFIG Wind Turbines with Crowbar Protection under Short Circuit

King Fahd University of Petroleum and Minerals Electrical Engineering Department 1. Homework 5 - SOLUTION KEY

Removal of Decaying DC Component in Current Signal Using a ovel Estimation Algorithm

Transient Stability Events & Actions

NERC Reliability Standard PRC-024 Generator Frequency and Voltage Protective Relay Settings

TUTORIAL IGBT Loss Calculation in the Thermal Module

Form C: Type Test Verification Report

Form C: Type Test Verification Report

A Unique Power Supply for the PEP II Klystron at SLAC*

Expert Workgroup on Fast Fault Current Injection stage 1 Terms of Reference

16 th Annual PQSynergy International Conference and Exhibition 2016

ECEN 667 Power System Stability Lecture 5: Transient Stability Intro

Zero Crossover Dynamic Power Synchronization Technology Overview

TEST WIRE FOR HIGH VOLTAGE POWER SUPPLY CROWBAR SYSTEM

PEP-I1 RF Feedback System Simulation

SCR Characteristics Trainer NV6530 Learning Material Ver 1.1

TAL TAL TAL 049

Design and Simulation of High Power RF Modulated Triode Electron Gun. A. Poursaleh

Maschinenfabrik Reinhausen Germany Power Quality

1 Power Protection and Conditioning

Electrical and Electronic Laboratory Faculty of Engineering Chulalongkorn University. Cathode-Ray Oscilloscope (CRO)

Application Note 5098

HIGH VOLTAGE SWITCH PERFORMANCE OF THE EIMAC X-2159 TETRODE ABSTRACT

50 Hz 60 Hz VOLTAGE Connections

DATA SHEET. Synchronisers, FAS-113DG ANSI code 25

Improved Synchronization System for Thermal Power Station

A HIGH POWER LONG PULSE HIGH EFFICIENCY MULTI BEAM KLYSTRON

EL302 DIGITAL INTEGRATED CIRCUITS LAB #3 CMOS EDGE TRIGGERED D FLIP-FLOP. Due İLKER KALYONCU, 10043

BE1-81O/U Frequency Protection. Washington State University Hands-On Relay School.

Hornsdale 2 Wind Farm. FCAS Capability Test Plan

Self Excited Automatic Voltage Regulator For Generator Compatible with Marathon SE350* Operation Manual

FCP Project Summary report

Operating Manual (Edition 04/2004) sinamics. Line Reactors SINAMICS G130

MULTISIM DEMO 9.5: 60 HZ ACTIVE NOTCH FILTER

The effect of converter configurations of HVDC links on sub- and super-synchronous disturbances to turbine units

Detailed Design Report

Switched Mode Power Supply

Laboratory Assignment 3. Digital Music Synthesis: Beethoven s Fifth Symphony Using MATLAB

Operation of offshore wind power plants connected with HVDC

Basic rules for the design of RF Controls in High Intensity Proton Linacs. Particularities of proton linacs wrt electron linacs

A Unified Control Strategy in Grid-Tied and Islanded Operations in Distributed Generation for 3-Phase Inverter

CHAPTER 3 SEPARATION OF CONDUCTED EMI

TOSHIBA Industrial Magnetron E3328

MIE 402: WORKSHOP ON DATA ACQUISITION AND SIGNAL PROCESSING Spring 2003

JOSEPH T. BRADLEY I11 MICHAEL COLLINS ' 9 7 PULSED POWER CONFERENCE JUNE JULY 2, BALTIMORE, DISCLAIMER

Real Time Monitoring for SMART Grid Initiatives Synchronized Measurement & Analysis in Real Time SMART program by

RF Upgrades & Experience At JLab. Rick Nelson

All-Tube SRPP on Steroids. Only $ February Support the Tube CAD Journal. get an extremely powerful tubeamplifier

KLYSTRON GUN ARCING AND MODULATOR PROTECTION

COHERENCE ONE PREAMPLIFIER

Mitigation of Cascading Outages and Prevention of Blackouts:System-Wide Corrective Control

Feedback: Part A - Basics

An Effective Filtering Algorithm to Mitigate Transient Decaying DC Offset

Keysight Technologies De-Embedding and Embedding S-Parameter Networks Using a Vector Network Analyzer. Application Note

R G Alcorn, W C Beattie. The Queen s University of Belfast

CX1725W Liquid Cooled, Hollow Anode Two-Gap Metal/Ceramic Thyratron

REGO Start&Go USER MANUAL

WELDING CONTROL UNIT: TE 450 USER MANUAL

Nutube.US. 6P1 Evaluation Board. User Manual

Understanding the Limitations of Replaying Relay-Created COMTRADE Event Files Through Microprocessor-Based Relays

EA350. Generator Automatic Voltage Regulator Operation Manual

MANAGING POWER SYSTEM FAULTS. Xianyong Feng, PhD Center for Electromechanics The University of Texas at Austin November 14, 2017

PRINCIPLES AND APPLICATIONS

The Effect of Time-Domain Interpolation on Response Spectral Calculations. David M. Boore

R.2. Power capacitors, LV. Power factor correction and harmonic filtering. Homepage : Circutor-NRW Büro Köln

MICROMASTER Encoder Module

Notes Generator Verification SDT Project

STEVAL-ISA001V1. 6W Dual Output Supply using VIPer12A. Features. Blue angel. Applications

HYL-080D1750G358. Constant current LED driver DALI Dimmable. LED Driver. Product description. Benefits. Interfaces.

Analog Circuits Prof. Nagendra Krishnapura Department of Electrical Engineering Indian Institute of Technology, Madras. Module - 04 Lecture 12

WHEN a fault occurs on power systems, not only are the

Modify the UL40-S2 into a Super-Triode amplifier. Ir. Menno van der Veen

Low Power VLSI Circuits and Systems Prof. Ajit Pal Department of Computer Science and Engineering Indian Institute of Technology, Kharagpur

AMEK SYSTEM 9098 DUAL MIC AMPLIFIER (DMA) by RUPERT NEVE the Designer

Studies on an S-band bunching system with hybrid buncher

E2V Technologies CX2668A, CX2668AX Air-Cooled, Hollow Anode, Two-Gap Metal/Ceramic Thyratrons

Research on Control Strategy of Complex Systems through VSC-HVDC Grid Parallel Device

SINAMICS G130 / G150. Line harmonics filter. Operating Instructions 05/2010 SINAMICS

K800 RF AMPLIFIER TUBE UPGRADE

2. Depletion MOSFET (DE-MOSFET).

Chapter 3: Sequential Logic Systems

HYL-035D0850G103. Constant current LED driver DALI Dimmable. LED Driver. Product description. Benefits. Interfaces.

DATA SHEET. TDA8433 Deflection processor for computer controlled TV receivers INTEGRATED CIRCUITS

DECAYING DC COMPONENT EFFECT ELIMINATION ON PHASOR ESTIMATION USING AN ADAPTIVE FILTERING ALGORITHM

Thyratrons. High Energy Switches. Features. Description

GCC Interconnection Grid: Operational Studies for the GCC Interconnection with United Arab Emirates (UAE) N. AL-SHAHRANI GCCIA Saudi Arabia

Agilent N9355/6 Power Limiters 0.01 to 18, 26.5 and 50 GHz

16 Stage Bi-Directional LED Sequencer

Measurement of overtone frequencies of a toy piano and perception of its pitch

South Australian Energy Transformation

A FOUR GAIN READOUT INTEGRATED CIRCUIT : FRIC 96_1

APQ Series Type C Power Factor Correction Banks

14 GHz, 2.2 kw KLYSTRON GENERATOR GKP 22KP 14GHz WR62 3x400V

EA63-7D. Generator Automatic Voltage Regulator Operation Manual. Self Excited Automatic Voltage Regulator

Real-time Chatter Compensation based on Embedded Sensing Device in Machine tools

Primary Frequency Response Ancillary Service Market Designs

2 MHz Lock-In Amplifier

Flicker Caused by Operation of Industrial Technology

How to Obtain a Good Stereo Sound Stage in Cars

Transcription:

CODEN:LUTEDX/(TEIE-7235)/1-007/(2009) Industrial Electrical Engineering and Automation Simulation of DFIG and FSIG wind farms in MATLAB SimPowerSystems Francesco Sulla Division of Industrial Electrical Engineering and Automation Lund University

Simulation of DFIG and FSIG windfarms in MATLAB SimPowerSystems 1. Introduction In this report, results from simulations of Doubly Fed Induction Generators (DFIG) and Fix Speed Induction Generators (FSIG) wind farms performed in MATLAB SimPowerSystems [1] are presented. Many issues arise when simulating such wind turbines. In reference [2], it is shown how for ex. the order of the induction machine used in the simulation, the double mass model of the wind turbine, the type of simulation (rms or instantaneous values), all have a more or less determinant effect on the results of the simulations. The message from the reference is that if accurate simulations results are necessary, a very detailed model is required. Here however, these modeling issues are not considered and existing models have been used with some modifications (crowbar protection). The attention is focused in understanding the different behavior of DFIG and FSIG Low Voltage Ride Through (LVRT) after a tree-phase fault in the system. A crowbar system for the DFIG will be designed following [2]. Section 2 of the report describes the models used in the simulations. The third and fourth sections present the results from simulations of LVRT of DFIG and FSIG wind farms, respectively. Some conclusions are presented in the last section. 2. Description of Simulation Models The same induction machine and wind turbine models have been used for modeling the DFIG and the FSIG wind farms. Therefore only the DFIG wind farm model will be described here. Wind turbine model The wind turbine model is a lumped mass one, i.e. it does not model the double mass phenomenon. The turbine is a pitch controlled one. The pitch angle β control signal comes from the DFIG control block. The C p coefficient is calculated through a look-up table and the output of the wind turbine block is the torque on the induction generator axis. The pitch angle β is only varied to limit the over-speed of the generator. The wind speed is considered constant and equal to 10 m/s during the simulations. Induction Machine model The model of the IG is an instantaneous values full order one, i.e. fifth order with the derivative of the stator fluxes included. This is the best choice to accurately simulate transients in the power systems when the electrical dynamics of the IG is of primary interest. Saturation is not included in the model, but reference [2] states that this only leads to small negligible errors in the prediction of the maximum short-circuit current and LVRT behavior (this is a credible assumption, since it is primarily the series stator and rotor inductances that determine the short-circuit current, and these inductances saturate only slightly because the leakage flux goes through the air). The values of the IG parameters have been chosen as in [2] and are reported in Table 1. The DFIG wind farm is composed of 6 aggregated units of 1.5MW each, while the FSIG wind farm is composed of only 2 units of 1.5 MW each.

Parameter Pnom Value 9 or 3 (MW) cos(phi) 0.9 Rs 0.01 Rr 0.01 Xs 0.12 Xr 0.2 Table 1. Induction generator parameters for DFIG (9MW) and FSIG (3MW) windfarms Grid Side Converter The GSC is modeled using a universal bridge model with IGBTs connected to the IG terminals through a series RL filter. The control of the GSC aims at keeping the DC-link capacitor voltage constant at nominal value. It does not contribute to grid voltage regulation or reactive power injection (I q = 0). This is a limitation, since reactive power injection through the GSC could be used to improve LVRT helping in a faster voltage recovery. The converter maximum power is half the IG rated power. The grid voltage angle is calculated with a PLL. The switching frequency for both the GSC and the RSC is 1620 Hz. The nominal DC-link capacitor voltage is 1200V. Rotor Side Converter The rotor side converter is modeled using a universal bridge model with IGBTs connected to the IG rotor windings. The RSC controls the active power delivered by the DFIG, by determining a torque reference (following a Power-Speed curve). This torque reference is used along with a flux estimate to determine the reference rotor current I dr. The RSC model (in the original model controlled to not deliver any reactive power) has been modified so to support the grid voltage with reactive power injection. The reference for the reactive power is determined through a PI controller by measuring the grid voltage and comparing it with a reference. Crowbar The SimPowerSystems DFIG model does not include a crowbar protection. This has therefore been added, with some simplifications. The crowbar is made up of a symmetric three phase y-connected resistance. It is connected to the rotor through a controllable breaker. This is not the real case (in reality, the crowbar may be made up of one resistance fed through a switched rectifier bridge), but it may be sufficient for us to assess the overall impact of a crowbar protection on the LVRT. The breaker is normally open, but it is closed short-circuiting the rotor through the resistance if either the rotor current or the DC-link capacitor voltage become too high. At the same time the switching of the RSC is stopped. The value of the crowbar resistance is chosen according to [2] as 20 times the rotor resistance. The choice of the crowbar resistance is important because, as we will see, it detemines how much reactive power the DFIG will draw while the crowbar is inserted. The crowbar can be disconnected and the RSC reinserted either after a fix time or when the rotor current and DC-link voltage return well within their normal operating range. Network Model The used network model is shown below. The wind farm is connected to a 25 kv network, via a 25/0.575 kv transformer. The transformer is rated 12 MVA and its impedance is equal to 5%. A

resistive load is connected at the wind farm. A high pass capacitor filter is connected at the DFIG wind farm for absorbing high current harmonics, generated by the switching in the converters. The DFIG wind farm is then connected to the 120 kv network through a 30 km 25 kv line and a 120/25 kv transformer. The positive sequence parameters data for the 25 kv line are reported in Table 2. We are not interested in its zero sequence data, since we do not simulate earth-faults. Three-phase faults are simulated at t=500 ms and disconnected at t = 650 ms. The location of the fault is shown in Figure 1, bus B25. R L 0.115 Ω/km 0.001 H/km C 11.3 nf/km Table 2. 25 kv line parameters data. The line is 30 km long. Figure 1. Network model schematic 3. Results from DFIG LVRT Simulations The simulation of the LVRT of a DFIG wind farm has been performed using the described crowbar protection. The results are shown below. Before the fault, the DFIG windfarm was in steady state feeding 50% of its rated power and almost no reactive power. When the fault occurs, the crowbar protection is triggered, protecting the RSC which stops switching. The rotor current in the crowbar and the rotor windings decays and the DC-link voltage ( the 5 th, unnamed variable in Figure 3) increases slightly while the crowbar is connected. Notice that the crowbar disconnects and the RSC starts switching while the fault is still active, at about 70 ms after the fault. This is important since it allows the DFIG to feed reactive power (about 0.3 pu) into the network, increasing the voltage. This of course may have a positive effect for the voltage stability of the system. The rotor current in the DFIG windings (Iabc_rot_IG) decreases, while the RSC current (I_rot) is zero when the crowbar is active. The RSC voltage is then the voltage over the crowbar. The DC-link capacitor voltage (the 5 th, unnamed variable in Figure 3) does not increase much just after the fault. However, its increase is very high (2 pu) when the fault is disconnected at 650 ms, even though the crowbar is correctly reinserted to limit the RSC current. This increase, as can be seen, is due to the fact that the DFIG absorbs active power just after the fault is disconnected. This clearly indicates the need for a chopper to be connected across the DC-link capacitor to limit its voltage. Finally notice that when the fault is disconnected, the DFIG absorbs reactive power, thus decreasing the voltage in the network. This is due to the fact that, being the crowbar still connected for a long time (because of the high DC-link voltage), the DFIG is actually a FSIG accelerating and thus drawing lot of

reactive power. This bad behavior of the DFIG would be attenuated (and probably) eliminated if a chopper was used, since then the crowbar would disconnect in shorter time (when the DC-link capacitor voltage would decrease within acceptable limits) allowing the RSC to re-take control of the reactive power. The crowbar protection however seems to perform well in protecting the RSC. It also seems that the use of a chopper would allow the considered DFIG to ride through the three-phase fault. Fig. 2. DFIG LVRT at a three-phase fault.

Fig. 3. DFIG LVRT at a three-phase fault. 4. Results from FSIG LVRT Simulations The behavior of a FSIG during a fault has also been analyzed. The IG has same pu data as the DFIG generator, but the wind farm is now rated 3 MW. It has been connected at the same location of the DFIG. Results from a three-phase short circuit are shown below. A capacitor bank rated 20% of the IG rated power is connected at its terminals, and the reactive power shown below is inclusive of the capacitor contribution. Before the fault, the IG and capacitor actually deliver reactive power to the grid. This may not be realistic, but should not change the meaning of the analysis during the fault. It is observed that the IG feeds through all the fault duration a current higher than 2 pu. Also after the fault disconnection, the current remains higher than 1 pu for a while because of the large amount of reactive power absorbed by the accelerating IG. At a certain time after the short-circuit, the overcurrent protection of the generator may disconnect it from the network. The stator current decays faster in the DFIG case because of the extra rotor resistance of the crowbar. Moreover, these high currents in turn cause a voltage drop in the network at about 0.8 pu after the fault disconnection before the voltage is re-established. In a worst case scenario, for ex if the pre-fault mechanical power would be higher (causing higher overspeeding), the reactive power demand after the fault may cause a voltage collapse phenomenon, with stator currents even higher than the ones shown in this simulation. This is a main reason why FSIG without proper reactive power aid (e.g. a statcom)

are generally not able to ride through severe faults. It is worth noting here, that also the DFIG is actually a squirrel cage IG after fault disconnection because of the rotor circuit being short circuited through the crowbar. However, it is just the high resistance in the crowbar which limits the amount of reactive power needed by the DFIG, only about 0.5 pu. versus 2 pu for the FSIG. The voltage drop in Figure 2 during the period the crowbar is inserted is comparable to the post-fault voltage drop in the FSIG case: however, it should be noted that the DFIG is rated 3 times the power of the FSIG, and this obviously causes higher voltage drops over the same line. Fig. 4. FSIG LVRT at a three-phase fault. 5. Conclusions The crowbar protection allows fault ride through capability for the DFIG wind turbine, if the DC-link capacitor voltage is contained within acceptable limits. This calls for the need of using a chopper across the DC-link. The chopper function would be to dissipate the excess active power causing the DC-link capacitor voltage increase. The crowbar protection avoids high rotor currents to flow through the RSC. However, when the crowbar is active, the DFIG is actually a squirrel cage IG, loosing its capability of controlling the reactive power. If the crowbar resistance is chosen properly (in [2] it is suggested 20 times the rotor resistance), it will limit the amount of reactive power drawn by the DFIG when the

crowbar is active. The FSIG has no means to control the reactive power, unless it is not provided with a dedicated reactive power supply unit, e.g. a statcom. This fact makes it difficult for the FSIG to ride through severe faults, since this will result in an acceleration of the FSIG. When accelerated, the FSIG draws large amount of reactive power and a voltage collapse may be the consequence. Even if the voltage does not decrease (for ex. because the network is strong), it may still be necessary to disconnect the FSIG for overcurrent, as in the case simulated in this report. References [1] MATLAB SimPowerSystems User's Guide, Version 4.6 (R2008a), http://www.mathworks.com/access/helpdesk/help/toolbox/physmod/powersys/ [2] Akhmatov V., Induction Generators for Wind Power, Multi-Science Publishing Company, Ltd., 2005.