SECTION TESTING OF COPPER CABLES

Similar documents
The University of Texas at Austin September 30, 2011

STRUCTURED CABLE SYSTEM (SCS)

California Polytechnic State University ITS Telecommunications PART 1 GENERAL SECTION AUDIO VISUAL STATION CABLES 1.

DESIGN!!GUIDELINES!!!!!

SECTION COMMUNICATIONS HORIZONTAL CABLING

Category 6A UTP cables shall be tested and proved to conform to TIA-568-C.2 standards.

SECTION TESTING, IDENTIFICATION AND ADMINISTRATION

Cable Certification. General Testing Criteria (Applies to all cable certification testing) Attachment E Cable Certification

Coastal Carolina University RE-BID WILLIAMS BRICE RENOVATION AND REPAIR October 19, 2018 Construction Documents

SECTION FIBER OPTIC STATION CABLES

BILOXI PUBLIC SCHOOL DISTRICT. Biloxi Junior High School

SECTION COMMUNICATIONS HORIZONTAL CABLING

What really changes with Category 6

Volition TM RJ45 K5e Jacks

NEMA Standards Publication WC Performance Standard for Twisted Pair Premise Voice and Data Communications Cables

NEMA Standards Publication WC Performance Standard for Twisted Pair Premise Voice and Data Communications Cables

Telecommunication Infrastructure Project September 20, 2002

RCIT Cable Certification Testing Revised 10/2017

TEST REPORT NO.: CRT-001b RENDERED TO:

PREMIUM 5e F/UTP PRODUCTS

Category 5e F/UTP Euroclass D ca Cables

REQUEST FOR QUOTE: TELECOMMUNICATIONS CABLING Library/Classroom Building, Beltline Campus

Pre-bid Supplement #01 Communications Specifications and Additional Scope Project Bid: CM Date: 05/26/2017

technicalreport MegaLine Connect100 Class E A links over 100 metres in length Data communication technology 09/2018 Classic structure 2-connector link

SPECIAL SPECIFICATION :1 Video (De) Mux with Data Channel

Copper Cabling Troubleshooting Handbook

Telecommunciations Infrastructure Project September 20, A. Broadband radio frequency active and passive components

SECTION MEDIUM VOLTAGE CABLE INSTALLATION. 1. Section Underground Ducts and Manholes.

HONEYWELL VIDEO SYSTEMS HIGH-RESOLUTION COLOR DOME CAMERA

Minimum qualifications for the Telecommunications Engineer are: A. Texas Licensed Profession Engineer (PE)

SPECIAL SPECIFICATION 8540 Telecommunication Cable

10Gb/s Copper Physical Infrastructure Next Generation Category 6A Cabling System

CABLING STANDARDS FOR

2002, Cisco Systems, Inc. All rights reserved.

CATEGORY 6A CABLING SOLUTIONS

GIGALAN AUGMENTED CABLE CAT6A F/UTP 23AWGX4P LSZH

SPECIAL SPECIFICATION 6559 Telecommunication Cable

MIDDLESEX COUNTY COLLEGE WIRE AND CABLE NETWORK REQUIREMENTS BH, CB, CH, ED, MH, LH, Camera Project

SECTION INTERCOMMUNICATIONS AND PROGRAM SYSTEMS

Everything you always wanted to know about HDBaseT*

DSP-4000 Series. CableAnalyzer. Users Manual

LCS2 Cat. 6 RJ 45 Patch panels and units

User Manual. HDTV Cat 5 Extender Video and Audio Over One Cat 5 Cable Model SCP-11 and SCP-11D

Belden IBDN System 10GX Enabling Technologies

SECTION 686 VIDEO DECODER DESCRIPTION

UNIVERSITY of NORTH DAKOTA LOW VOLTAGE COMMUNICATIONS STANDARDS FOR CABLING, PATHWAYS, AND SPACE

TRIPLETT. PairMaster. Lan Cable Test Set. Instruction Manual

Request for Purchase DESIGN AND INSTALLATION OF STRUCTURED COMMUNICATIONS CABLE SYSTEMS

Excel recommends Fluke Networks, this section is written around the use of this range of test equipment.

About Nexans 3. About Berk-Tek 4. LANmark-1000 Cat 6 UTP 5. LANmark-1000 Category 6 Plenum 6. LANmark-1000 Category 6 Riser 11

GenSPEED Category 5e Cables 3

HDMI Extender over UTP Cable

LCS 2 RJ 45 Cat. 6A HD panels and units

SECTION 5900 TRAFFIC SIGNALS CITY OF LEE S SUMMIT, MISSOURI DESIGN CRITERIA

Platinum Tools Inc. All rights reserved. 5/12 Voice, Data, Video + Length GENERAL SPECIFICATIONS WARNINGS

Detailed Specifications & Technical Data

TEST REPORT NO.: CRT-081 RENDERED TO: Hubbell Premise Wiring 14 Lord s Hill Road Stonington, CT

Request for Proposal (RFP)

Part Number: 7965ENH Category 6 Nonbonded-Pair ScTP Cable

Division 27 COMMUNICATION/DATA, PATHWAYS, AND WIRING

P.S.C. No. 2- Telephone. FRONTIER TELEPHONE OF ROCHESTER, INC. Section 7 Original Page No. 1

About Nexans 3. About Berk-Tek 4. Hyper Plus 5e Cat 5e UTP 5. HyperPlus 5e Plenum 6. Hyper Plus 5e Riser 10. HyperPlus 5e Patch 14

SOLICITATION ADDENDUM NO. 1 ITB THE FOLLOWING CHANGES TO THE ABOVE CITED SOLICITATION ARE ANNOUNCED.

WJHW, Inc. 6 April 2016 Texas Tech University Issue for CD Set Sports Performance Complex Lubbock, Texas

A guide to Woolworths Limited additional requirements. for the testing of twisted pair and fibre installation.

Section COMMUNICATION EQUIPMENT ROOM FITTINGS. Section Communications Cable Management and Ladder Rack

3M Supported Applications Map 100,000 (2005) Single-mode. Fiber. Multimode. Fiber. Copper

Table of Contents. Open Matrix System (OMS) 1-2

UNM IT/Telecommunications Guide Specification Labeling 11/07/

Robert Burén. Product Manager. Nexans Cabling Solutions. 10G Solutions

10G 6A F/UTP SYSTEM PRODUCTS 10G 6A F/UTP

CATEGORY 6A CABLING SOLUTIONS

GIGALAN CAT.6 U/UTP 23AWGx4P - LSZH (EXP)

Table of Contents. Section E: Inspection and Acceptance

Quick Installation Guide

Part Number: 7940A Cat 6 DataTuff, (4 pr) 23 AW G Solid BC, PO/PVC, EtherNet/IP, CMR, CMX-Outdoor

ACOM General Cable General Cable Canada

How to accelerate your cabling system approvals

Tender Report for Supply and installation of LAN in *Biomedical Imaging and Bioinformatics Lab*

A. As defined in Section Telecommunications General Requirements

SECTION COMMUNICATIONS HORIZONTAL CABLING

STRUCTURED CABLING SYSTEMS (SCS)

National Wire and Cable and National Cable Molding Headquarters Los Angeles California

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 804 FIBER OPTIC CABLE AND COMPONENTS. January 20, 2017

INSTALLATION INSTRUCTIONS MODEL VSBX-236 LED 3 X 8 INDOOR SCOREBOARD

Mediacom Upgrade/Splicing Procedures (based on original document from Corporate dated 4/16/98)

INSTALLATION INSTRUCTIONS FOR

INSTALLATION INSTRUCTIONS FOR. MODEL 2230LED

384A Adapter Installation Instructions

SMART CLASSix 24/48 UTP Patch Panels -

Msquare Innotech Solutions Pvt. Ltd. Complete integration of business solution. About Us: Mission:

VGA Extender LR EXT-VGA-141LR. User s Manual

VGA & RS-232 & Audio CAT5 Extender with RGB Delay Control Quick Installation Guide

Multi LAN 350 MI 2016 User Manual Version 2.2, Code No

Owner's Manual LIGHTING CONTROL CONSOLE TEATRONICS LIGHTING CONTROLS, INC. PROCON II Los Osos Valley Rd., Ste. G Los Osos, CA 93402

Sapling Synchronous Communication Clock System Section Master Guide Specification Page 1 October 2013

Colour Explosion Proof Video Camera USER MANUAL VID-C

Technical Specifications Florida Gulf Coast University

VGA & Audio over CAT5 Distribution Series

TELSYS Cable Mapping System

Transcription:

SECTION 27 08 13 TESTING OF COPPER CABLES PART 1 GENERAL 1.01 DESCRIPTION A. The work covered by this section of the Specifications includes all labor necessary to perform and complete such construction, all materials and equipment incorporated or to be incorporated in such construction and all services, facilities, tools and equipment necessary or used to perform and complete such construction. The work of this section shall include, but is not limited to, the following: 1.02 QUALITY ASSURANCE 1. Cable testing for copper cables. 2. Providing test results in accordance within these specifications. A. Refer to Section 27 00 00 for general details. 1.03 CODES, STANDARDS AND GUIDELINES A. Except as modified by governing codes and by the Contract Documents, comply with the applicable provisions and recommendations in Section 27 00 00. 1.04 SUBMITTALS A. Refer to Section 27 00 00 for general details. B. Shop Drawings: 1. None Required C. Submit Manufacturer s Cut Sheets for the following: 1. Any products not specifically listed in the PRODUCTS section shall require a submittal of the manufacturer s cut sheets. D. List of test equipment to be used with the last calibration date and list of technicians certified for use. E. A sample of test data shall be provided to the campus representative prior to testing. F. Contractor s personnel performing testing shall have received factory training and have current certification. G. Submit the proposed schedule for testing at least 2 weeks prior to the start of testing. H. Campus Representatives can elect to observe testing and may request previously performed tests to be repeated for comparative analysis. 1 of 8

1.05 IDENTIFICATION A. Test results shall match final permanent cable, faceplate, and wall field numbering system. B. Test results shall match campus numbering system standards. C. Refer to Section 27 05 53 for general details. 1.06 DEFINITIONS A. N/A 1.07 WARRANTY A. Refer to Section 27 00 00 for general details. 2 of 8

PART 2 PRODUCTS 2.01 CATEGORY 3 UTP CABLE TESTER A. Testing for all cables 25 pair or larger are to use a tester that tests 25 pair at a time. B. The field tester must meet the requirements of ANSI/TIA/EIA-568. C. Make and model at Contractor s discretion. 2.02 CATEGORY 6A UTP CABLE TESTER A. The field tester must be a Level IV or greater. B. The field tester must meet the requirements of ANSI/TIA/EIA-568-C.2 C. Tester must be able to export test results to Microsoft Excel. D. Make and model at Contractor s discretion. 2.03 MULTIMETER A. Make and model at Contractor s discretion. 3 of 8

PART 3 EXECUTION 3.01 GENERAL A. The Contractor shall test, as described below, all metallic cables installed under these specifications. B. Visually inspect all cables, cable reels, and shipping cartons to detect cable damage incurred during shipping and transport. Return visibly damaged items to the manufacturer. C. Where post-manufacturer test data has been provided by the manufacturer on the reel or shipping carton: submit copies to the campus representative prior to installing cables. D. Test fully completed systems only. Piecemeal testing is not acceptable. E. Testing shall not be performed until after all hardware is installed and attached, and all labeling and identification has been completed. F. Any cable that does not pass all required testing shall be removed, replaced, and retested. G. Remove and replace any defective cables from pathways system. Do not abandon cables in place. H. For 100 pair or smaller replace entire cable if a pair or conductor fails a required test. For larger pair count cables, replace if more than 2% of pairs fail a required test. I. The campus telecommunications representative reserves the right to observe all portions of the testing process. J. The campus telecommunications representative further reserves the right to conduct Proof of performance testing, using Contractor equipment and labor, a random re-test of up to ten percent (10%) of the cable plant to confirm documented test results. K. Perform all tests as required by the manufacturer in support of the structured cabling system warranty. L. Perform all tests as prescribed by the manufacturer of the testing equipment, including the use of reference cords where required. 3.02 QUANTITIES A. N/A 3.03 INSTALLATION A. N/A 3.01 GROUNDING & BONDING 3.02 TESTING A. All grounding and bonding is to be complete before any system testing is to begin. A. All test results are to be defined as acceptable / unacceptable by the requirements of ANSI/TIA/EIA-568 C.2. B. Copper Cables General Requirements 4 of 8

1. After terminating and splicing the cables. Test all cable pairs for: a. Continuity to the remote end. b. Shorts between any 2 or more conductors or ground c. Transposed pairs d. Reversed Pairs e. Split Pairs f. Crossed Pairs g. Wire map h. Length i. Shield Continuity (If Shielded) j. Continuity to Grounding (If Shielded) 2. Using a multimeter, test continuity to ground (TGB or TMGB) for a maximum resistance of 1Ω, see section 27-05-26 for additional detail. C. Indoor Riser or OSP Copper Cable 1. After terminating and splicing the cables. Test all cable pairs for: a. DC Loop Resistance for any 2 conductors in the cable. D. Category 6A Copper Station Cables: 1. Contractor is to perform a three connector permanent link test. 2. After terminating both ends of all 4-pair cables, but before any cross-connects are installed, test these cables for the following: a. Return Loss b. Insertion Loss c. NEXT (near-end crosstalk) d. PSNEXT (power sum near-end crosstalk) e. FEXT (far end crosstalk) f. ACR-F (attenuation to crosstalk ratio) g. PSACR-F (power sum attenuation to crosstalk ratio) h. TCL (transverse conversion loss) 5 of 8

i. ELTCTL (equal level transverse conversation transfer loss) j. Propagation delay k. Coupling attenuation l. Propagation delay skew m. PSANEXT (power sum alien near-end crosstalk loss) n. Average PSANEXT (average power sum alien near-end crosstalk loss) o. PSAFEXT (power sum alien far-end crosstalk loss) p. PSAACRF (power sum alien attenuation to crosstalk ratio far-end) 3.03 ACCEPTANCE A. All test results for Cat 3 cable are to be documented and submitted in Microsoft Excel or.csv format to the campus telecommunications representative within five (5) working days of test completion. B. All test results for Cat 6A cable are to be documented and submitted in Microsoft Excel to the campus telecommunications representative within five (5) working days of test completion. C. Test result shall be recorded per cable and identical copies placed on three removable media devices (CD, DVD, or Flash drive) for delivery to the campus project manager and campus telecommunications representative. D. Each test report shall contain the following general information: 1. Date of Preparation 2. Date of Test 3. Project Name 4. Contractor s Name 5. Make, Model and Serial Number of test equipment used 6. Date of Last Calibration 7. Names of Test Crew E. In addition to the results of the specific tests specified, reports shall also include: 1. Building (backbone cabling to/from) 2. Room (Telecommunication room) 3. Room (Jack location) 4. Cable Number 6 of 8

5. Cable Type 6. Pair or Conductor Count 7. Individual Pair or Conductor Numbers 8. Results of Each Test for Each Pair or Conductor 9. Total Number of Serviceable Pairs or Conductors in Cable 10. Ground Resistance Measurements 11. Loop Resistance 12. Total Length 13. NVP (Nominal Value of Propagation) F. Once the testing has been completed and the campus telecommunications representative is satisfied that all work is in accordance with the Contract Documents, the representative will notify the Contractor and/or campus project manager in writing or via email. 3.04 RECORD (ASBUILT) DRAWINGS A. Refer to Section 27 00 00 for general details. END OF SECTION 7 of 8

DOCUMENT VERSION CONTROL REVISION DATE AUTHOR REASON 1 08/07/2012 C. WHITEHOUSE INITIAL DOCUMENT CREATION 2 03/07/2013 CJW & CLC PRIMARY REVIEW COMPLETE 3 04/26/2018 CLC & MAS SECONDARY REVIEW COMPLETE 8 of 8