VENDOR MANUAL VERSION 2.0. SECTION 8 Quality Assurance Requirements

Similar documents
VENDOR MANUAL VERSION 3.0. SECTION 5 On Product Marketing Requirements & Suppliers

VENDOR MANUAL VERSION 2.0. SECTION 6 Technical Design Sample & Fit Requirements

InfiniBand Trade Association Integrators List Policy

Table of Contents. Section E: Inspection and Acceptance

Special Specification 6293 Adaptive Traffic Signal Control System

TC Mbps - 622Mbps FIBER OPTIC MODE CONVERTER/REPEATER (Rev A0.1) User's Manual

TC3005(LED/ELED/LASER) User's Manual

SECTION 686 VIDEO DECODER DESCRIPTION

Electronic M.O.P Card. Instruction Manual Model D

Colour Explosion Proof Video Camera USER MANUAL VID-C

ADVANCED TELEVISION SYSTEMS COMMITTEE, INC. CERTIFICATION MARK POLICY

New York State Board of Elections Voting Machine Replacement Project Task List Revised

STANDARD FOR MULTI-DWELLING UNIT (MDU) OPTICAL FIBER CABLE. Publication S First Edition - June 2012

avenue Submit Forms CONTENTS I. Statement of Purpose Explanation of Effective Color Evaluation Color Standards Lab Dip Process

BILOXI PUBLIC SCHOOL DISTRICT. Biloxi Junior High School

Installation Guide OvalSox TM Cable

TANZANIA COMMUNICATIONS REGULATORY AUTHORITY

PORON Microcellular Urethanes Product Availability

VENDOR MANUAL VERSION 2.0. SECTION 7 Testing, Labeling & Product Compliance

ELIGIBLE INTERMITTENT RESOURCES PROTOCOL

Chapter 7 Production Sample Process (Apparel)

SECTION TESTING OF COPPER CABLES

HONEYWELL VIDEO SYSTEMS HIGH-RESOLUTION COLOR DOME CAMERA

DA8-T DA8-T MANUAL

TERMS & CONDITIONS FOR SUBMISSION OF FILMS THROUGH WITHOUTABOX.COM

SECTION 5900 TRAFFIC SIGNALS CITY OF LEE S SUMMIT, MISSOURI DESIGN CRITERIA

The University of Texas at Austin September 30, 2011

Rural Development Department Old secretariat, Patna. Sub: - Invitation for Quotations for Printing & Supply of Booklets and Pamphlets To

P.S.C. No. 2- Telephone. FRONTIER TELEPHONE OF ROCHESTER, INC. Section 7 Original Page No. 1

GLI-12 V1.1 GLI 12 V2.0

SIRIUS HOME ANTENNA USER GUIDE & WARRANTY

OPERATION AND MAINTENANCE MANUAL

Capital Works process for Medium Works contracts

SHOW-TIME REALD 3D MASTERS SPECS & CREATIVE DELIVERY INFORMATION

CASS COUNTY, MICHIGAN CASSOPOLIS, MI REQUEST FOR PROPOSAL SPECIFICATIONS

CASS COUNTY, MICHIGAN CASSOPOLIS, MI REQUEST FOR PROPOSAL SPECIFICATIONS

TRF STEP-DOWN TRANSFORMER USER MANUAL

Logo Usage Guide TUV AUSTRIA TURK. Guide for document designs Rev. 04 / GUI-001a Rev.4 /

VERIZON MARYLAND INC.

Gluten-Free Certification Program (GFCP) Trademark Usage Guide

Design and Manufacture of Video Pipeline Inspection Systems A Full Service Company

LIBRARY BINDING GENERAL CONDITIONS AND SPECIFICATIONS

Appendix II Decisions on Recommendations Matrix for First Consultation Round

A. Section Includes: Division 1 applies to this section. Provide GPS wireless clock system, complete.

9I273 01/10/2012 COU-03/0 AUTOMATIC CHANGEOVER UNIT TO BACK-UP AMPLIFIER

RECOGNITION OF PRIOR LEARNING CANDIDATE APPLICATION FORM UEE30811 CERTIFICATE III IN ELECTROTECHNOLOGY - ELECTRICIAN

GUIDELINES FOR THE PREPARATION AND SUBMISSION OF YOUR THESIS OR DISSERTATION


MBS ARC (Textbook) Manual

Building Your DLP Strategy & Process. Whitepaper

APPENDIX J Richmond High School Performing Arts Theater Usage Policy (December 2018)

User Guide. Centrex Recording Interface

2. SUPERPATH Mbps Digital Service 2.1. General

Reservation, Facility Usage and Facilitation

Australian and New Zealand Energy Performance and Marking Requirements for External Power Supplies

Brisbane Eisteddfod Inc. General Policies

LOW-BUDGET INDEPENDENT FEATURE FILM ASSISTANCE PROGRAM GUIDELINES FOR

In-Wall Control Mount for ipod Touch

INSTALLATION INSTRUCTIONS FOR. MODEL 2230LED

Class B digital device part 15 of the FCC rules

REQUEST FOR PROPOSALS: FOR AN INTEGRATED IN-CAR AND BODY-WORN VIDEO MANAGEMENT SYSTEM

SHORT TERM THEATRE RENTAL RENTAL PACKET (For Tenant & Non-Tenant Use)

INSTALLATION INSTRUCTIONS FOR

OFI Optical Fiber Identifier User s Guide

Model CO4020 Quad 4-Input Logic Unit Operating and Service Manual

TRANSPLANTATION PROCEEDINGS

BROADCAST RECEIVER. Installation Guide (BR-100-MOT, BRP-100-MOT) Document Version 1.0. BR-100-MOT, BRP-100-MOT Installation Guide

Toronto Hydro - Electric System

(5) Warm-up and Tuning. Immediately following the instruction period and prior to the sight-reading performance the sight-reading music will be

ORDER FORM FOR SPECIALTY SERVICES OF MOVIE FILM RECOVERY AND SCANNING OF WARPED, SHRUNK OR DAMAGED FILM (Film in poor condition)

Owner's Manual LIGHTING CONTROL CONSOLE TEATRONICS LIGHTING CONTROLS, INC. PROCON II Los Osos Valley Rd., Ste. G Los Osos, CA 93402

NAVSEA STANDARD ITEM. 1.1 Title: Fiber Optic Component; remove, relocate, repair, and install

BUFORD COMMUNITY CENTER, TOWN PARK & THEATRE THEATRE AND STAGE RENTAL AGREEMENT

Furnish and Deliver New Light Emitting Diode (LED) Fluorescent Light Tubes

American National Standard for Electric Lamps Double-Capped Fluorescent Lamps Dimensional and Electrical Characteristics

SECTION FIBER OPTIC STATION CABLES

Coastal Carolina University RE-BID WILLIAMS BRICE RENOVATION AND REPAIR October 19, 2018 Construction Documents

VFA Participation Agreement 2018 (Year 5)

AWT150C/AWT150CS/ AWT151C CCD Camera

User Manual. Model 1372A and 1374A HDMI Switchers. 1T-SX-632 Model 1372A 2X1 Switcher. v1.3 2x1 SWITCHER. v1.3 INPUT ENHANCE POWER

AES-404 Digital Audio Switcher/DA/Digital to Analog Converter

46 th ANNUAL MINNESOTA RENAISSANCE FESTIVAL Craft Application Information

TC3301. User's Manual

AU OPTRONICS CORPORATION. Specification for Approval. INCOMING INSPECTION STANDARD FOR A201SN02 TFT-LCD MODULES (A- Grade)

APPENDIX E DeAnza High School Performing Arts Theater Usage Policy (July 2018)

DESIGN!!GUIDELINES!!!!!

Primex Wireless, Inc. July, Wells Street Lake Geneva, WI

Reconfiguration Along the U.S.-Mexico Border Meeting in NPSPAC Region 3: Arizona May 16, 2013

ALTERNATIVE BROADCAST INSPECTION PROGRAM

VGAD-12 ORDERCODE

Request for Proposals Fiber Optic Network Backbone Upgrades

HIGH COURT OF BOMBAY AT GOA

SERVICE BULLETIN MANDATORY SB EFFECTIVITY SERIAL NUMBERS G36 (Bonanza) E-4076 thru E-4079, E-4084

TERMS & CONDITIONS FOR SUBMISSION OF FILMS THROUGH WITHOUTABOX.COM

Recommended Guidelines for Developing Standard Operating Procedures

Guide to the Inspection of Printed Products

The YWCA RAGS Guild Presents. Wearable Art Sale and Show. Juried Marketplace and Gallery Competition. March 10-13, Mercedes-Benz of Tacoma

Call for your discount codes.

SPECIAL SPECIFICATION 8311 LED Countdown Pedestrian Signal Module

Manual No: Revision: D. IQ Box. Software Upgrade Instructions

Transcription:

VENDOR MANUAL 2017-2018 VERSION 2.0 SECTION 8 Quality Assurance Requirements Updated as of October 7, 2017

TABLE OF CONTENTS Contents Quality Assurance Program 1 Reporting and Quality Approval Process 2 Factory In-Line Inspections & AQL Requirements 3 Finished Garment Inspection 4 DM Global Inspection Protocol 9 Sewing Needle and Metal Contamination Control System 11 DM Internal Inspection 12 Total Pages in This Section 13

DM Quality Assurance Program Overview Quality is developed throughout the entire Destination Maternity sourcing and manufacturing process. Patternmaking and Pre-Production is conducted as a partnership between the Vendor, Factory and Destination Maternity Teams responsible. In-line and Finished Garment Inspection is the responsibility of the factory, with appropriate oversight by Vendor Management. The DM Quality Assurance Program is mandatory and must be implemented as set forth in this section. Development Sample The development process is necessary to identify how product will look aesthetically, how fabric and trimmings will work within a style and to develop appropriate and successful 1 st sample fit parameters. Fit Sample Pattern corrections, spec development, fabric, trim and design aesthetic verification in addition to an emphasis on proper garment construction, will achieve the requested fit and finish. Accurate pattern, sample and sewing ensures fit samples can be approved for Pre-Production sample stage. Pre-Production Sample Final pattern corrections, spec, fabric, trim and design aesthetic verification in addition to confirmation of proper garment construction, labeling, branding and packaging (when applicable), ensures the entire purchase order will meet DM fit, quality and branding requirements in production. In-Line Quality Inspection In process quality inspection ensures that every production garment is constructed identically to the approved Pre-Production sample. In-Line inspection should catch any mistakes in spec, stitching, seams, pressing, labeling selection, labeling placement and fabric quality as early as possible. Finished Garment Inspection Confirms proper garment construction, focuses on garment appearance, finished measurements, and ensures that the purchase order is finished properly and that all packaging (labels, hangtags, tickets, poly bags, cartons, packing etc.) are applied correctly. Page 1

Reporting and Quality Approval Procedure The Destination Maternity approach to quality assurance includes the following reporting and quality approval procedures as well as Factory quality control procedures: Receipt of the DM purchase order initiates the pre-production process for each style. The preproduction process should yield an approved pre-production sample, a set of specifications (specs) and finalized PLM (DeSL System) Tech Pack detailing expected Fit, Fabric, Trims, Components required and Fit, Design, and Care approval. Upon reaching Fit Approval Stage and before Cutting Stage of the initial purchase order, the factory must submit a Pre-Production sample for approval. The Factory must make an additional Pre- Production Keep Sample to reference as a benchmark for production. The Factory will submit the Pre-Production sample in the appropriate DM sample size (Follow Sample Size Chart in Section 6 of this manual) for each initial purchase order of the Master PO. For styles with re-orders shipping past the initial purchase order ship date the Factory must submit a NEW Pre-production sample for every additional PO shipping after the Initial PO ship date. This requirement may be amended for Vendors with consistent exemplary quality performance. In these cases adjusted Pre-Pro Submittal requirements will be communicated biannually through the DM Sourcing Team. Pre-Production Sample approval will be communicated as one of the following scenarios: APPROVED AS SUBMTITED, APPROVED WITH CORRECTIONS REJECTED In Cases where a Pre-Production Sample is APPROVED WITH CORRECTIONS or REJECTED. Corrective action will be shared in the DM PLM tech pack (DeSL System) and a 2 nd Pre-Production Sample will be required for approval. Once DM approves the Pre Pro Sample, the Factory will be allowed to proceed into production. The Factory must have on hand their own Pre-Production Keep Sample reflective of the DM approval, for the Factory to reference for production. Upon reaching 10-15% completion of the purchase order, the Factory must review a size set (random sampling) of the purchase order. Purchase order garments should be reviewed against the Factory s DM Pre-Production Keep Sample to ensure consistency and that the quality system is working. The Factory must document results and the results should be available to DM immediately upon request. The Final Garment Inspection 2.5 AQL Report & Measurement Sheet must be completed for all purchase orders and automatically included with payment submission documentation checklist outlined in Section 9 Logistics (Page 12). Failure to provide will result in non-payment of purchase order. To ensure compliance, purchase orders will be audited routinely by DM dependent on Factory document compliance and quality performance. Page 2

Factory In-Line Inspection In-Line inspection is a critical aspect of a good quality program. Problems discovered early in production (10-15% complete) allow for early correction and prevention of costly final audit failures. Destination Maternity requires that each factory have a robust In-Line Inspection system in place. This system includes checking all components prior to sewing and in addition, inspecting the work on the line during the assembly of the garment. In-Line inspection is ongoing and continuous. In-Line inspection requires sampling pieces from the bundles daily against DM construction and measurement standards as they apply. *Upon request, Vendor/Factory may request assistance with setting up an In-Line Inspection Program through the Destination Maternity Certified Testing Lab: For more information contact our Intertek Program Mangers: 1. Poorva Raut: poorva.raut@intertek.com 2. Archana Archana: fnu.archana@intertek.com Page 3

Finished Garment Inspection Finished product inspection should occur on two levels: First Level Inspection Individuals responsible for final thread trimming and final inspection should be trained to understand all quality requirements including, SEAMS AND PRESSING. They should fully inspect every product completed in production (100%). When their inspection finds a garment that is defective, they should mark the problem, tag the garment and send it back to the floor for repair. No defective garments should be shipped to Destination Maternity. Second Level Inspection Finished product quality inspectors should conduct statistical inspection audits to determine if each purchase order meets all quality standards. These inspections should include selecting statistical quantities for measurement, construction, finish and packaging inspection. These inspection audits must be documented in the Final Garment Inspection 2.5 AQL Report prior to shipment. Any failure of a final inspection will require a 100% Re-Inspection of the entire purchase order. All defective units must be removed from the purchase order prior to shipment. NOTE: Final quality audit failure should be considered catastrophic. 100% Re-Inspection of every garment that such a failure mandates will result in missed shipping deadlines. An audit failure also indicates that the In-Line inspection process is deficient, and should be evaluated immediately. Destination Maternity reserves the right to conduct independent quality audits as deemed necessary. These audits will be conducted in partnership with the Factory, DM Certified Laboratory (Intertek) and DM Sourcing Team. Intertek Inspection Reports will be provided to Destination Maternity and the Factory upon completion. These independent quality audits require review and disposition for shipping from DM. DM Sourcing will inform Vendor/Factory if an independent audit is required prior to shipment. Page 4

Finished Garment Inspection Final Inspection The purpose of the Final Inspection Audit for Visual, Construction and Packing is to verify that the product meets Destination Maternity Standards as it relates to: Technical Specification Package (DM Tech Pack) Final Approved Pre-Production Sample Visual Appearance Packaging Requirements The quality inspectors should be referring to their DM Pre-Production Keep Sample as a benchmark, and to appropriate reference documents for DM expectations and guidelines including but not limited to Internal Factory documents, DM Tech Pack, DM Vendor Manual etc. Inspectors should refer to the defect classification list for visual and construction defects rating by zone outlined in this section. Any major defect found must be corrected. The final quality inspection must be conducted for Visual Quality, Fit Measurements, and for Packaging (Labeling, Ticketing, Hangtags, Cartons, Etc.) per procedures outlined below. Acceptable Quality Level (AQL) AQL standard refers to the maximum number of defective units that could be considered acceptable during the random sampling of an inspection. The defects that are found during inspection should be classified into 2 Levels for DM: Critical Major NOTE: Minor Defects are not permitted, all defects are considered Major. Inspection Standard adopted is ANSI/ASQC Z.1.4 Single Sampling Plan for Normal Inspection: General Inspection Level II. The following AQL standard should be applied by the Factory unless otherwise instructed by Destination Maternity. DESTINATION MATERNITY CRITICAL NON-CONFORITY (Defective) NO CRITICAL DEFECT IS ACCEPTED MAJOR NON-CONFORMITY (Defective) AQL 2.5 Page 5

Finished Garment Inspection Sampling Table for Visual Quality Audit TABLE A ALL PRODUCTS CRITICAL Defects MAJOR Defects (2.5 AQL) PO Shipment Size (per color) Sample Size (per color) Accept Reject Accept Reject 0 to 280 32 0 1 2 3 281to 500 50 0 1 3 4 501 to 1,200 80 0 1 5 6 1,201 to 3,200 125 0 1 7 8 3,201 to 10,000 200 0 1 10 11 10,001 to 35,000 315 0 1 14 15 35,001 and up 500 0 1 21 22 NOTE: All Defects Considered Major Defects. Minor Defects Are Not Permitted. Inspection Procedure At the time of audit, obtain the number of units packed data from Factory Management. A minimum of 80% of the purchase order garment must be ready (packed/pre heat-sealed based on the PO quantity), in order to conduct the final quality audit. Select a random sampling quantity of garments proportionally by size and color to be inspected based on purchase order size quantities: follow TABLE A (quantity per color). It is essential that the selection to garments is done randomly by the auditor. Failure to utilize a random process may skew inspection results and could allow product to be shipped that does not meet Destination Maternity quality requirements. Ensure that the packaging materials meet specified standards. Inspect the product for defects related to visual, construction and packaging. Defects detected is reviewed against the amount allowed (Accept) in TABLE A. The appropriate Accept or Reject determination is noted on the Final Garment Inspection 2.5 AQL Report. Page 6

Finished Garment Inspection Complete the Final Garment Inspection 2.5 AQL Report form for Visual, Construction and Packaging. Use the report form to indicate the outcome of the finished product audit. Discuss the results with Factory Management. Factory Management is required to sign off on recommended correction action. If the audit fails, the purchase order must be 100% inspected by the quality inspector (all garments). Any defective garments found must be corrected (If possible) and re-packed by the Factory for follow up Finished Product Inspection. Garments which cannot be corrected must be discarded. If the purchase order defects detected will result in a shipping delay, Factory must notify the DM Sourcing Team, appropriate Product Development Manager, immediately. Sampling Table for MEASUREMENT Quality Audit TABLE B MAJOR Defects (all defects) Sample Size ACCEPT REJECT 80 5 6 Inspection Procedure As per Table B example above, select 80 units per color, from the random sampling (by size) used for the Visual, Construction, and Packaging audit. Measure 80 garments of each color as per the DM critical points of measurement (POM) highlighted on the graded spec sheet (DM tech Pack). Record all measurements on the Final Garment Inspection 2.5 AQL Measurement Sheet as variance from the measurement point regardless of tolerance. See example below: Bust Spec is 17 (+/- 1/2 tolerance) Sample Measures 17 ½ Factory will record +1/2 CIRCLE any measurement variance that is outside of the tolerance. NOTE: a garment with more than one major measurement defect is to be counted as one MAJOR defective garment. Page 7

Finished Garment Inspection Identification of Accept/Reject Criteria For Visual, Construction and Measurement If a garment has one or more major visual or measurement Defects, the garment is to be counted as 1(one) MAJOR defective garment. Count the total number of major defective garments and refer to TABLE A to determine Accept/Reject disposition for the purchase order. If any garment is found to have one or more CRITICAL defects, the purchase order is FAILED. If shade variations are outside of Destination Maternity s acceptable shade range, the DM Sourcing Team must be informed immediately for a disposition on how to proceed and garments must be provided for review/approval. If the shading is within DM acceptable shade range, DM will advise how to mark, pack, and ship the purchase order. Carton shade marks should be checked during the shipment audit. During the finished production inspection, packaging and labeling should be checked closely to assure compliance to DM standards including proper Country of Origin, DM branding, Care and Fiber content markings. Pre-Pack assortments should be audited where applicable. If the number of visual defects (TABLE A) and/or measurement defects (TABLE B) are EQUAL to or LESS than the ACCEPT number in either chart, the audit PASSES. The defective garments found are to be extracted for repair or discarded. Factory will submit the Final Garment Inspection 2.5 AQL Report & Measurement Sheet with payment submission documentation outlined in Section 9 Logistics (Page 12). If the number of visual defects (TABLE A) and/or measurement defects (TABLE B) are EQUAL to or MORE than the REJECT number in either chart, the audit FAILS. If the garments cannot be repaired in time to meet the shipment date, DM Sourcing Team, appropriate Product Development Manager, must be notified immediately to determine disposition of the shipment. NOTE: if the audit FAILS, the factory must re-inspect 100% of the purchase order. All defective garments are to be removed from the purchase order, repaired, or discarded. After 100% inspection Factory will re-audit the purchase order using the same procedure for inspection and approval as a NEW audit, including packaging. Page 8

DM Global Inspection Protocol Classification of Defects The classification of defects is not all-inclusive but represents the majority of defects commonly found in apparel. All Quality Auditors are required to use this defect list as a guide to help identify: Types of defects Rating as to Critical or Major Critical Defect Is a defect that can harm our customer or anyone in our customer s immediate and close proximity. Example of Critical Defect: Straight Pin or other metal contamination sewn into garment and if found requires that every garment in the purchase order be re-inspected. If any critical defect is found any time during the auditing process, the garment is to be rejected and the Factory is required to ensure via 100% re-inspection of purchase order, that all critical defects have been removed before shipping to Destination Maternity. Major Defect Is any defect that will adversely affect the function of the garment over its expected life cycle. Is any defect that will cause the customer to not purchase or to return the garment. Defect Zones In some cases, a major defect can be considered as minor based on the location or zone of the defect in a garment. For DM Inspection purposes, and the fair evaluation of our garments, DM apparel is divided up into 2 zones (A & B). Quality Auditors must follow the DM zoning guidelines detailed in our Inspection Protocol and mark defects accordingly when preparing audit report. See below zone example: Zone Sketch Example Woven Top Page 9

DM Global Inspection Protocol In order to achieve quality inspection consistency between Destination Maternity Factory s, certified Testing Labs and our Distribution Center Quality Team the attached Inspection Protocol must be adhered to. This protocol is part of Destination Maternity s Certified Lab Protocol. In the event that a 3 rd party Inspection by DM Certified Lab is required at the Factory or in the DM Distribution Center all Quality Auditors methods will be aligned. The DM Inspection Protocol encompasses the following: SOP Highlights & Inspection details Style/Color Check Outer Packaging Check Data Measurement Check (Garment Specs) Function check (Accessories/Trim etc.) Defects Garment Construction Garment Appearance Garment Finishing Zone Sketches Unit Packing To access the DM Inspection Document & Forms: Global Inspection Protocol Final Garment Inspection 2.5 AQL Report Final Garment Inspection 2.5 AQL Measurement Sheet *These documents are accessible from the Forms Download Link, on the Vendor Manual Dashboard, SECTION 8 FORMS. Page 10

Sewing Needle and Metal Contamination Control System Every Factory producing Destination Maternity garments must have a Needle and Metal contamination Control System that meets or exceeds the Destination Maternity procedures outlined in this section. All DM Factories must be equipped with a needle detector. The goal is to prevent used, broken needle or other metal contamination embedded within a garment from being sold to DM customers causing bodily harm. The DM System is outlined in the DM Needle and Metal Contamination Control System document containing the following sections: Needle Replacement Control Procedures Broken Needle Control Procedures Metal Contamination Control Procedures Needle Detection Procedures Needle Detector Maintenance Forms Failure to comply with this system or failure to administer to it completely will result in termination of the purchase order for Destination Maternity. The costs and losses in any claim or litigation arising out of or resulting from injury caused by needle parts found in a DM garment will be passed entirely to the Vendor and/or Factory involved. To access the DM Needle and Metal Contamination Control System Document & Forms: Needle and Metal Contamination Control System Broken Needle Control Log Needle Detection Control Log Needle Detection Control Log *These document are accessible from the Forms Download Link, on the Vendor Manual Dashboard, SECTION 8 FORMS. Page 11

DM Internal Inspection All incoming shipments undergo a random inspection. From the electronic packing list, the computer selects a cross section of cartons representing all SKU s for audit. These Cartons are inspected for: 2.5 AQL audit for Visual and Measurement defects Zero defect inspection for adherence to packing requirements Audit failure of the purchase order will trigger a 100% inspection of the entire purchase order. Quality Assurance charges will be billed to the Vendor/Factory to cover the costs related to inspection. These expenses are outlined in the DM Non-Compliance Matrix located in Section 1 & 2 of the Vendor Onboarding and Certification document. Audit failures will be notified to Factory/Vendor Management by the Destination Maternity Quality Department. The Email notification will include digital photos of the defective garments and audit details. DM Quality Team will provide defective garments to the Factory/Vendor Management as needed. DM Internal Review Review of audit failures is handled in partnership between the DM Quality and Sourcing Teams with oversight from SR. VP Sourcing in order to ensure appropriate disposition of purchase order. DM will not hold defective merchandise for any reason. Disposition after internal review may trigger the need for REPAIRS or REWORKS and Destination Maternity reserves the right to repair or rework the purchase order with a local outsource to prevent loss of sales and to mitigate damages. Quality expenses will be estimated according to the DM Non-Compliance Matrix and advised to the Vendor/Factory Management and a course of action communicated. In some cases a repair or rework may require a return to vendor (RTV), depending on the nature of the defects. Rejected Product If Destination Maternity rejects non-conforming product, the purchase order may be returned to the vendor and all quality assurance expenses associated with the delivery of the product will be recovered from the Vendor and/or Factory. If the purchase order can be sold at a reduced price, DM will offer the Factory/Vendor Management a price reflective of a discount. If the Factory/Vendor Management does not agree to the discount offered, the purchase order will be returned with the Vendor and/or Factory responsible for absorbing all DM Quality expenses associated with moving the product. Destination Maternity may choose to remove all trademarked material and bill the vendor for the expense. If returned to the vendor without removal of trademarked material the Factory must follow the destroy policy detailed in the DM Resale Conditions located in Section 1 Vendor Onboarding and Certification document. Page 12

DM Internal Inspection Once it is determined that the purchase order will be returned, Factory/Vendor Management will be allowed 5 business days to advise a RA# (Return Authorization). If the RA# is not advised within 5 business days, DM reserves the right to arrange for the return at the Vendor and/or Factory s expense. Once an RA# is provided, the Vendor and/or Factory is allowed 5 business days to arrange for purchase order to be picked up. After the 5 th business day, DM reserves the right to arrange for return at the Vendor and/or Factory s expense. RTV (Return to Vendor) Process Final count of the purchase order garments is emailed to the Factory/Vendor Management. The Vendor and/or Factory will reply with RTV or RA#. In cases of a forced RTV (Factory/Vendor Management are not in agreement with the return of goods) DM will provide the RTV or RA# for internal recordkeeping purposes. Once the RTV or RA# has been issued, the defective purchase order is taken out of DM Inventory using the RTV Code. The purchase order goods are moved to DM loading dock and then returned to the Factory. Quality Team Contact Information NAME CONTACT INFORMATION Repair/Re-Work/RTV: qualityassurance@destinationmaternity.com Quality/DC/Corporate Non-Compliance Charges: chargebacks@destinationmaternity.com Page 13