Houston METRO Rail Expansion Program

Similar documents
Mosaic 1.1 Progress Report April, 2010

RELIABILITY REASON FOR A COMMERCIAL INADVERTENT-INTERCHANGE SETTLEMENT STANDARD.

Welcome to the MST Subscriber Handbook!

Versatile EMS and EMI measurements for the automobile sector

AN302 Anconda 3BR 3BA

The Construction Status of CSNS Linac

Andrei Seryi, Toshiaki Tauchi. December 15-18, 2008

Satellite Interference The Causes, Effects and Mitigation. Steve Good Global Director, Customer Solutions Engineering

CASE STUDY. Smart Motorways Project. Temporary CCTV Monitoring Systems for England s Motorway network.

A SMART, SAFE AND SMOOTH FUTURE TELESTE FOR CITY TRANSPORT. Video security and passenger information solution for city transport

COE Group plc. Contents

City of Lafayette. Advanced Transportation Management System (ATMS) Active Traffic Signal Management December 13 th, Agency Case Studies

Risk. Sedco Express DGPS Operations Five Years of Lessons Learned

POSITION DESCRIPTION

Federal Transit Administration s New Starts Process. Circle Line Alternatives Analysis Study

Digital Delivery of IEEE Spectrum & The Institute for IEEE Student and Graduate Student Members

Library. Summary Report

802DN Series A DeviceNet Limit Switch Parameter List

CP316 Screencast mini-project

The LEP Superconducting RF System

HDMI 2.0 Overview. HDMI Licensing, LLC. Q2/2015

1 Feb Grading WB PM Low power Wireless RF Transmitter for Photodiode Temperature Measurements

KPI and SLA regime: August 2015 performance summary Ref Jun 15 Jul 15 Aug 15 Target Description KPI A 100% 100% 99.87% 99% green

report L.M. Fraile, CERN PH/IS Impact of technical issues Running statistics 2006 Planning for 2007

200$ 186$ 189$ 196$ 198$ Jul.$2012$ Jun.$2012$ Dec.$2012$ Aug.$2012$ Jan.$2013$ Sep.$2012$ Oct.$2012$ Mar.$2013$ Feb.$2013$ Nov.$2012$ Apr.

Dimming actuators GDA-4K KNX GDA-8K KNX

John Stankey President and CEO AT&T Operations

BURNLEY GROUP OPERATING PROCEDURES

SCALE & WEIGHT DISPLAYS

OB35 Paper 06 KPI Report

Quality products from a single source

Environmental Impact Statement (EIS)/ Section 106 Public Meeting Level 1 Concept Screening. May 16, 2017

KPI and SLA regime: October 2014 performance summary Reference Outcome Result Target Description KPI A Green 100% 99% green

SP-10. Sports Perimeter (SP) solution - optimized for Broadcast

Finding aid for the Grand Rapids Public Library underground newspapers collection Collection 256

DB-x20 Digital Billboard

Siemens Industry Online Support

M4000 Diagnostic Test System For Power Apparatus Condition Assessment

Presented by: David J. Crain, GeoMetWatch ITSC-18, Meteo France, Toulouse, March 21,

Risk Risk Title Severity (1-10) Probability (0-100%) I FPGA Area II Timing III Input Distortion IV Synchronization 9 60

Aqua Turf International, Inc.

Before the FEDERAL COMMUNICATIONS COMMISSION Washington, D.C

RSSL1:1-KuXER. Outdoor Unit (ODU) Ku Ext Ref LNB Redundancy System with external 10 MHz Reference System. Mux/Tee. Coax cable

CAPITAL METRO TRANSIT ADVERTISING

BE108 Pet-friendly Very Spacious!

LSD Review December 2012 Schedule, Re-Baseline, & Resource Analysis

FY 2012 Website Visits Up 19% over previous year

Before the Federal Communications Commission Washington, D.C

In November, the Federal

Traffic Sign Life Expectancy Investigation LAB943

Coding Productivity & Audit. Laura Dornsife Director, Coding & Revenue Cycle Support

Quality products from a single source

KPI and SLA regime: June 2015 performance summary Ref Apr 15 May 15 Jun 15 Target Description KPI A 100% 100% 100% 99% green

Dimming actuators of the FIX series DM 4-2 T, DM 8-2 T

Guidelines for Wiring, Electronic Timing and Scoring Systems Table of Contents

ADF-2 Production Readiness Review

Marc Segar Director of Technology NEP Australia

Images for life. Nexxis for video integration in the operating room

VERWER TRAINING AND CONSULTANCY LTD Supporting the PROFIBUS Group UK & PROFIBUS International

Breckenridge Peak Seven 3 Bedroom Home

CITY OF ISSAQUAH CABLE COMMISSION

SITOP power supply. Technical data, April SITOP Power Supply. Answers for industry.

Innovative Rotary Encoders Deliver Durability and Precision without Tradeoffs. By: Jeff Smoot, CUI Inc

CEBAF Accelerator Update. Michael Tiefenback CASA Accelerator Physics Experimental Liaison June 14, 2017

Crossing the. Diplex Chasm. to 85 MHz. Author: Todd Gingrass Cable & Media Solutions

Prospects of Digital Broadcasting and Convergence Services. - The Essential and Expanding Role of Broadcasting September 02, 2010

Configuring the Stack ST8961 VS Module when used in conjunction with a Stack ST81xx series display.

Intelsat-29e Interference Mitigation Testing Interference Scenarios and Mitigation Techniques Enabled by the Intelsat Epic NG Class Satellites

Siemens Industry Online Support

H SERIES INDOOR FINE PIXEL PITCH LED DISPLAY. Yaham Optoelectronics Co., Ltd

Unsealed Metaling Trials in the Mackenzie District SCOTT MCKENZIE ROADING MANAGER

Gamma instabus. Technical product information

CADS - Edmonton Zone Volunteer Policy

Tech Support: Customer Service: General Tech Questions: Tech Docs:

Table of Contents. Section E: Inspection and Acceptance

KPI and SLA regime: September 2015 performance summary

Case analysis: An IoT energy monitoring system for a PV connected residence

Digital Systems Based on Principles and Applications of Electrical Engineering/Rizzoni (McGraw Hill

EXECUTIVE SUMMARY. MARKET DYNAMICS CHINA CINEMATIC nd QUARTER

ANKA Status Report. N.Smale, on behalf of all ANKA colleagues, Directors : A.-S. Müller, C Heske, T Baumbach.

Keyboard Controlled Scoreboard

USER MANUAL Model: A5

TE s AGASTAT relays are available in two basic operating types: On-Delay and Off-Delay.

Focus of efforts. ILC 2010, Mar/27/10 A. Seryi, BDS: 2

Progress in Scale-up of 2G HTS Wire at SuperPower Part I

Camera and Communication Systems for hazardous Areas. SAMCON Topical Booklet No. 0001

A.D. Engineering International Pty Ltd - Product Range

ACS(Independent) Choir - Calendar of Events for Post Exams 2017 & 2018 Semester 1

BLOCK OCCUPANCY DETECTOR

Deliverable 2.17 Periodic WP2 Progress Report 3

NC811 UCC Report for January Blue Ridge UCC. Downtown Asheville

MAKE HAZARD ANALYSES BETTER SINGLE-USE DEVICES GAIN PERMANENT PLACE PATH FOR PROCESS SAFETY EMERGES

Troubleshooting EMI in Embedded Designs White Paper

Networks of Things. J. Voas Computer Scientist. National Institute of Standards and Technology

Index Contents: 1000 Series Single Channel Multi Mode Fiber Optic Video Solutions Product Overview Product Configurations Product Specifications

ENGINEERING COMMITTEE Interface Practices Subcommittee AMERICAN NATIONAL STANDARD ANSI/SCTE

800 MHz Band Reconfiguration

MACOMB COUNTY DEPARTMENT OF ROADS TRAFFIC OPERATIONS CENTER

Research on Precise Synchronization System for Triple Modular Redundancy (TMR) Computer

Energy Efficiency with KNX Focus on Lighting Saving Hager

Transcription:

Houston METRO Rail Expansion Program Axle Counter Replacements Presented by: Houston Rapid Transit Jorge L. Estevez, Project Director Capital & Strategic Planning Committee Presentation October 24, 2016

1. Executive Summary 2. Selection of the Frauscher RSR180 Agenda a) Solid Performance i. Site Specific Performance in the Houston Environment a. Test Bed 1 b. Test Bed 2 ii. Worldwide applications with stellar manufacturer support 3. Replacement Schedule a) Cutover Schedule b) Alternative Cutover Schedule c) Alternative Cutover Schedule Pro s and Con s d) Risks and Mitigations 4. Questions or Comments 2

Executive Summary Over the past few years HRT has worked to mitigate the failures experienced with the Siemens ACM 100 axle counter system. In 2015 HRT recommended the implementation of the on-site testing of two different manufacturers products, Frauscher and Thales Axle Counter Systems. A total of 8 Thales devices and 12 Frauscher devices were installed along Capitol Street in the Downtown Corridor (Test Bed # 1). Over a 6 month period between November 2015 and May 2016 the Frauscher RSR 180 Axle Counter System proved to provide excellent performance. A second test bed was then implemented (Test Bed # 2) at the terminus of the North Corridor (Northline) in June of 2016. this location was selected due to the varying train movements and functionality requirements. After initial adjustments we have also experienced excellent performance from the Frauscher devices. Based on the results on both test beds, HRT is recommending to move forward to replace the current system with the Frauscher RSR180 Axle Counter System along all corridors systematically to address Metro, the COH and the traveling publics impacts and concerns. 3

Downtown Test Bed # 1 12 Devices Frauscher Diagnostic System (FDS) was not available for installation on Test Bed 1 No recalibrations have been required No temperature drifts have been experienced 4

Northline Test Bed # 2 16 Devices 38 disturbances in total 8 disturbances caused by Vehicle Electro Magnetic Interference 17 disturbances had operational impacts 7 caused by incorrect operation 10 are unclear due to missing data 13 disturbances did not impact operations 5

Successful Worldwide Implementation Key Projects 6

Frauscher Axle Counter Differentiators Stellar On-Site Support Product Adaptability Low Failure Rate Diagnostic System (FDS) Failure of a single axle counter module does not lead to failures of the configured track section Frauscher Axle Counter Differentiators Remote Reset Capabilities (resets initiated by operations) No temperature drifts No Re-Calibration IP68 Rating More than 100,000 units successfully operating in over 70 countries 7

Frauscher RSR 180 Axle Counter System Outdoor Equipment Indoor Equipment Wheel Sensor RSR 180 Power Supply Board Evaluation Board Communications Board IP68 Rated (IP) International Protection Marking (6) Rated to be dust tight (8) Rated for up to 1 meter of continuous immersion in water 8

Cutover Schedule Activity Name Large Cutover All Corridors Super Bowl Week Downtown Corridors Hobby to Milam Replacements Travis To Hamilton Replacements Harrisburg Overpass Axle Counters Delivered Installations By MEC Commissioning/Systems Integration Testing/ Pre-revenue Ops Testing East Corridor East Corridor Replacements Southeast Corridor Southeast Corridor Replacements North Corridor Melbourne to Rothwell replacements Fannin South Fannin South Installations Start/Finish 30-Jan-17/05-Feb-17 21-Oct-16/24-Oct-16 04-Nov-16/13-Nov-16 08-Nov-16 09-Nov-16/11-Nov-16 11-Nov-16/16-Jan-17 10-Dec-16/18-Dec-16 07-Jan-17/19-Mar-17 01-Apr-17/30-Apr-17 05_May-17/07-May-17 Cutover Schedule key points: The Downtown Corridor section between Hobby Center and Milam was completed successfully this weekend Downtown Corridor, East Corridor and the Harrisburg Overpass are revenue ready prior to Super Bowl LI East Corridor is completed by 12/18/16 Southeast Corridor work is completed by 03/19/2017 North Corridor is completed by 04/30/2017 The communities have multiple weekend shutdown impacts 9

Alternate Cutover Schedule Activity Name Large Cutover All Corridors Super Bowl Week Downtown Corridors Hobby to Milam Replacements Travis To Hamilton Replacements Harrisburg Overpass Axle Counters Delivered Installation By MEC Commissioning/Systems Integration Testing/ Pre-revenue Ops Testing East Corridor East Corridor Replacements Southeast Corridor 4a Chartres to Nagle Replacements 4b Griggs to McKinney Replacements North Corridor Melbourne to Rothwell replacements Fannin South Fannin South Installations Start/Finish 30-Jan-17/05-Feb-17 21-Oct-16/24-Oct-16 04-Nov-16/11-Nov-16 08-Nov-16 09-Nov-16/11-Nov-16 11-Nov-16/16-Jan-17 14-Nov-16/20-Nov-16 09-Dec-16/11-Dec-16 12-Dec-16/23-Dec-16 06-Jan-17/14-Jan-17 11-Feb-17/12-Feb-17 Alternate Cutover Schedule key points: The Downtown Corridor section between Hobby Center and Milam was completed successfully this weekend The Harrisburg Overpass is completed in time to allow for Commissioning, Systems Integration Testing and Pre-Revenue Operations to be completed mid January. East Corridor is completed by 11/20/2016 Southeast Corridor is completed before Christmas 2016 North Corridor is completed in mid January 2017 All System Replacements are completed prior to Super Bowl LI, 5 months ahead of the Cutover Schedule 10

Cutover Alternative Schedule- Pros and Cons Pros Improve on-time performance of service for customers Improve traffic reliability with positive impacts to motorist (i.e. fewer gates down) Replacements of the Southeast Line between Univ. of Houston semesters Completes all corridors before Super Bowl LI, the Houston Livestock Show and Rodeo, and Spring Break Lessons learned will be applied as the replacements progress Cons Short term impacts to daily riders 11

Risks, Mitigation and Coordination requirements for Large Cutovers Risks Pre-Work not completed due to track access and availability Adjustment period for the replaced devices impacting OTP Messaging to the community Public not having access to transportation Service Interruptions during the adjustment period Resources Risk Schedule risk Mitigation Work with Metro Ops for daytime track allocation on Southeast and North Corridors Mass Electric Company (MEC) and Frauscher will be onsite to address issues in real time Work with Metro to provide real time updates Institute Bus Bridges and work with Metro to provide real time updates to the community Work with Metro to provide real time updates HRT, MEC, Frauscher, ISIS and Metro Ops must address issues in real time Large cutovers will impact traffic patterns and must have COH participation to avoid delays * Coordination is required with Metro, MEC and the City of Houston 12

QUESTIONS OR COMMENTS? 13