INSTRUCTION MANUAL [J] [E] [C] [G] [B] [I] [H] [D] [F] [A] 0 INTRODUCTION 1 RECOMMENDATIONS 2 ACCESSORIES INCLUDED

Similar documents
SCREEN WINCH SYSTEM INSTALLATION MANUAL FOR SCREENS UP TO 300 cm. of width

In-Ceiling Electric Motorized Front Projection Screen Evanesce Series. User s Guide

SCREEN WINCH SYSTEM INSTALLATION MANUAL FOR SCREENS FROM 300 cm. UP TO 450 cm. of width

SCREEN WINCH SYSTEM INSTALLATION MANUAL FOR SCREENS UP TO 300 cm. of width

Starling Tab-Tension 2 Series

414 P 1. DESCRIPTION AND TECHNICAL SPECIFICATIONS 2. LAY-OUT OF STANDARD SYSTEM INSTALLATION DIMENSIONS. Fig. 1. Fig. A

Fully ly Automaticti. Motorised Satellite t TV System. User s manual REV

Website: Tel: ADDRESS: 6475 Las Positas Rd. Livermore, CA Item No. E5B/E5S Installation Guide

Electric Motorized Projection Screen PowerMax Tension Series

Instructions for Use P.154-UP (9/4) P.155-UP (9/8) P.150-UP-12 (9/12) P.150-UP-16 (9/16)

Instructions for Use P.160-AP-8 (13/8) P.160-CP-8 (13/8) P.160-CP-12 (13/12) P.160-CP-16 (13/16)

Industrial Monitor Update Kit

Product catalogue 2010

Contents. 1. General Information. 2. Contents. 3. Operating Instruction. 4. Program update. 5. Trouble Shooting. 6. Specifications

Litile34 INSTALLATION MANUAL

Orbit TM DIGITAL SHAKERS

8000 Plus Series Safety Light Curtain Installation Sheet ( CD206A/ CD206B )

USER MANUEL. SNIPE 2 Ref R13

Fully ly Automaticti. Motorised Satellite t TV System. User s manual. ver 3.0.

DLP200M 2 Relay Module for Heating and Cooling Plants

INSTRUCTION AND MAINTENANCE VIDEO MOTORE PROJECTION SCREEN

Installation Guide VL-MV10. Model No.

SQM40/41 Actuators for air and gas dampers

INSTRUCTION & INSTALLATION GUIDE

SINAMICS G130. dv/dt filter plus Voltage Peak Limiter. Operating Instructions 03/2013 SINAMICS

7 Day Digital Programmer 3 Channel Surface Mount

TV Lift System Model CL-65 Installation Instructions

Electric Motorized Projection Screen Spectrum Tab-Tension Series User s Guide

Guide for installers. METTLER TOLEDO MultiRange System solution analog Ex1. Hazardous area. Safe area

Installation and User Guide 458/CTR8 8-Channel Ballast Controller Module

Electric Wall/Ceiling Projection Screen Saker Series User s Guide

Electric Wall/Ceiling Projection Screen Saker Tab-Tension Series User s Guide

USER MANUAL. DE-1 Police-light. CAUTION! Keep this device away from rain and moisture! Unplug mains lead before opening the housing!

Figure 1: Device components

DLP600M 6+1 Relay Module for Heating and Cooling Plants

Identification - electrical services

System Satellites Acoustimass Module. 2.5" (64 mm) full-range driver (per satellite) 5.25" (133 mm) dual voice coil low frequency driver

Galaxias. Flex LED display. User Manual

Important Safety & Warning Precautions

Support Frame STB Technical Instruction Manual

IL591 SECTION D Rev /2011. Tek-SAFE NC150R Area of Rescue Assistance System. Operation, Installation and Service Manual

Reference Manual. Notes 9/16 Series H

FogScreen emotion Projection Screen. User Manual Part 1: Installation Guidelines

Cable installation guidelines

Cambridge International Examinations Cambridge International General Certificate of Secondary Education

Model#: IN-DI2MIRF 2MP Indoor Dome with True Day/Night, IR, Basic WDR, Fixed lens

SAFETY WARNINGS AND GUIDELINES... 3 INTRODUCTION... 4 CUSTOMER SERVICE... 4 PACKAGE CONTENTS... 4 RECOMMENDED TOOLS... 6 CONTROL PANEL OVERVIEW...

LED MODULES READYLINE DL

INSTRUCTIONS FOR USE Pro-Ject RPM 1 Genie

R87B. Box Fan. Comprehensive Lineup of Single, Double, and Triple Axial Fans with Easy One-step Mounting. Ordering Information. Model Number Structure

A449-6S 70 CENTIMETER FM YAGI ANTENNA MHz

(1) (2) (3) Bedienungs- und Montageanleitung. Safety instructions. Structure of the device

USER MANUAL. GOLDMUND LOGOS 1N-2N SPEAKER SYSTEM Active Speaker

USER MANUAL. 27 Full HD Widescreen LED Monitor L270E

Laying of cables and lines in electrical installations and data networks

Operating Manual. Automated Gear. Apollo Design Technology, Inc Fourier Drive Fort Wayne, IN USA

Power Injector 1520 Series

FIST-GCOG2-Dx6. Follow all local safety regulations related to optical fiber plant elements.

OWNER'S MANUAL SIGNAL COMMANDER

ACADEMIC SUCCESS CENTER THE COLLEGE AT BROCKPORT STATE UNIVERSITY OF NEW YORK PROJECT NO

SMART CINEMAHORIZONTAL. User Guide VPSP Projector side. model. Notice SmartCrystal Cinema MUV V1R0

TVAC20000 User manual

Fiberglass - Technical Data

User Manual. 360W LED Moving Zoom KEEP THIS MANUAL FOR FUTURE NEEDS. 36pcs10W 4 in 1 RGBW LEDs

Installation Manual IPT Installation of skillet systems with 125 A track current. MV a-E.

Electric Wall/Ceiling Projection Screen Saker Plus Series User s Guide

19" TiRAX cabinet system. from page 3. 19" NETcell cabinet system from page 31. Open 19" racks from page 43

MASTR II BASE STATION 12/24V POWER SUPPLY 19A149979P1-120 VOLT/60 Hz 19A149979P2-230 VOLT/50 Hz

Roof-mounted Blue e+ cooling unit Integration solution VX25

ISP-W 350 till 1200 ISP-R 350 till 1200 ISP-B 350 till 1200 ISP-Motiv 450 till 950 with receiver RF Edition: 05/16 Nr

WID-DL74 WID-DL74 BLP WID. Designed for. Installation guide for workitdesk interactive table for. BrightLink Pro

sequenza 1000/1250 al manuale di istruzioni instruction manual 1^ edizione, ottobre st edition october 1996

2.0 Wall Mount TV Soundbar Instruction Manual

Metal and Glass TV Stand for TVs up to 65 or 110 lbs. NS-HMG1856

INSTRUCTIONS FOR USE Pro-Ject Essential Basic

NewScope-7A Operating Manual

LED Panel Light. Specialists. in High Efficiency Lighting DLC 4.0

USER MANUAL. 22" Class Slim HD Widescreen Monitor L215DS

Zero-G. Owner s Manual. External Mount INSTALLERS: PLEASE LEAVE THIS MANUAL WITH THE OWNER.

Business Display Solutions - Institutional Television Mirror TV. Installation Guide for 32PM8822 ( BDL3221M) 42PM8822 (BDL4221M)

MS2540 Current Loop Receiver with RS485 Communication

Caution. Hanging the Screen:

Tube Roller Shakers. User Guide. Version 1.2

INSTRUCTION DE SÉCURITÉ SAFETY INSTRUCTION Mandatory as defined in SAPOCO/42 FIRE PREVENTION FOR CABLES, CABLE TRAYS AND CONDUITS

USER MANUAL. WARNING Read the instructions before using the machine. EN (Original Instruction) / 1704

USER MANUAL. 27 Full HD Widescreen LED Monitor L27ADS

ICS Digital Menu. Installation Guide Version 1.1

TENSIONED ELPRO CONCEPT Motorized projection screen for wall or ceiling installations

Led Dynamic DMX Tri Curtain Manual

Cyclo Series. user manual. MartinArchitectural

May result in personal injury or property loss. Indicate the behaviors that must be prohibited

ACCESSORIES MANUAL PART NUMBER: TNP500. Universal Tilt N Plug Interconnect Box USER'S GUIDE

Operating Instructions 07/2007 Edition. SINAMICS G130/G150 Line harmonics filter. sinamics

NC-1000 INSTALLATION MANUAL NC-1000 FIBRE OPTIC CROSS-CONNECTION SYSTEM

USER MANUAL Full HD Widescreen LED Monitor L215ADS

MF-4000 WEIGHT BENCH OWNER S MANUAL

Cellular Signal Booster

Instruction Manual. 2.4G Digital Wireless Four Channel Transmitter System RVS-554W. Reverse With Confidence 1

USER MANUAL Full HD Widescreen LED Monitor L215IPS

LED Spot 300W. Please read this user manual before your operation

Transcription:

0 INTRODUCTION Video Lift is an electro-mechanical device which, once installed in the ceiling, allows vertical movement (ceiling floor ceiling) for loads of up to 19 Kg and with maximum runs of 1 metre for the VL-100E model, or 2 metres for the VL-200E model. This manual has been created to help you install the Video Lift. Please read all the instructions indicated carefully and scrupulously follow all the recommendations. 1 RECOMMENDATIONS Before installation, please read this manual carefully. The device must be assembled by specialist installers or qualified personnel and/or personnel with experience in fastening equipment with transfer movements suspended from ceilings. Video Lift is very easy to install, as the assembly system has been designed by a team of technicians who know the difficulties presented by different ceilings. 2 ACCESSORIES INCLUDED The Video Lift equipment includes the following accessories: BAG 1 - M4 x 50 mm screws. [A] x 4-8.8 x 0.7 mm springs. [B] x 4 - M4 washers [C] x 8 - Bayonet supports [D] x 4 - M4 nuts [E] x 4 - M5 x10 screws [F] x 4 - M4 star washers [G] x 4 - Hallen key [H] x 1 - Projector fastening plates [ I ] x 4 - M4 self-tapping nuts [J] x 4 [B] [I] [J] [E] [C] [G] 1 [F] [A] [D] [H]

BAG 2-1 230 VCA connection cable - 1 UP/DOWN operation connection LOOSE: - 1 End crowning plate - 4 VL closing columns 3 SAFETY MEASURES - All electrical work required on this equipment must be carried out by qualified electronic, electricians or competent personnel in accordance with the electro-technical requirements of each country. - The power circuit requires a bipolar switch with a MINMUM 3 mm separation between contacts. Inflammable materials must not be placed within a 1 metre radius of the device (see instructions manual for the video projector to be installed). - Fasten and protect the power supply, operation, data, etc. cables and tubing. Ensure that they are not near any moving parts or heat sources. - Video Lift must be positioned on the ceiling at a certain distance so that it is not within anyone s reach, fastened to the building, or on a metal support adequate for the resistance and weight of the device, plus the image projector. - Video Lift will not be accessible while in operation. Before accessing the connections inside the device, all of its electricity supply circuits must be disconnected. - The position of the work is horizontal with the multi-boring plate facing downwards. - The devices must be checked once every 90 days. The parts which fasten to the structure, the moving parts, mechanical cables, electrical parts, etc. must be reviewed and greased if required. - Do not install this device anywhere unstable. - Do not change or modify this unit. - Do not use this unit in a bathroom or near inflammable liquids or gases. - Do not connect the unit to any electrical voltage other than that specified. - If you have any queries, please contact the Technical Service or distributor. 4 DESCRIPTION AND OPERATION OF THE COMPONENTS detail 1 connection detail 2 closing columns detail 2

Cross-section of the closing columns at the height required by the projector for subsequent fastening (with glue, silicone, etc.) of the ceiling s end crowning plate. detail 3 3 5 INSTALLATION AND CONNECTION Installation: Remove the ceiling support from the packaging. Position the support chassis in the place you have chosen to install it, then, with a felt-tip pen, pencil, etc., mark the places for the 6 ceiling support holes. Fasten using rawlplugs and/or braces; (we recommend high-quality ones), not smaller than 8/10 mm. Position the ceiling support and screws in the rawlplugs. By screwing perpendicularly, tighten the support firmly on to the ceiling. It is necessary and important that the ceiling support is levelled horizontally (0º). Use a level to ensure the exact reference. On either side of the lift there are 4 hexagonal-head M5 screws (see figure 2). Remove the 4 M5 screws on the ends, loosen the 4 central screws remaining in the lift. Separate them approximately 5 mm from the chassis without removing their nut. Ensure your personal stability. Holding the lift with both hands, position the central screws in the bayonet-shaped grooves. Move the Video Lift on to the ceiling support and leave it on its housing. Replace the 4 end screws to their positions and firmly fasten the body of the Video Lift to the ceiling support. If greater safety is required, fasten a chain or steel cable between the Video Lift and a steel or concrete beam. correct levelling figure 1 brace detail figure 2

Electrical Connection: - Complete all the connections, always without electricity. - Remove the packaging from the power supply cable and the connector for the up/down switch. - Connect the VDE approved power supply cable to 230 VAC electrical current. - To the up/down connector, you must connect three electrical wires (1.5 minimum section) which will connect to an up/down switch (not supplied), or to the electronic operation control (see the manual for your electrical equipment). In any event, the contacts must be voltagefree (see connection diagram). Circuit diagram: The Video Lift structure is finished with a perforated, reinforced plate to support equipment of up to 19 kg. This tray has been designed so that no drilling need be done to fasten the video projector. Result: it can be adapted to any video projector base on the market. To save these largespace perforations, Video Lift provides you with four plates of four 140 x 140 mm bores (accessory I), which will act as washers for the screws to fasten the video projector. 230 VAC ELECTRICAL CONNECTION operation connection for up/down electrical reset button overload indicator connection detail figure 3 IMPORTANT Ensure that the weight of the projector is as centred as possible on the Video Lift tray. Movement will be much more vertical, causing less friction and avoiding any possible operating noises. 2 RAISING 4 SAFETY Video Lift is fitted with two safety systems which are described below: It is protected by breaking the electrical current: A. When the permitted load has been exceeded: the projector + video, data, control, cables etc. + accessories must not exceed 19 kg. B. The motor protection will be activated if the latter becomes blocked with external elements during the Video Lift running process. C. When operating continuously for any time longer than 4 minutes. The motor is protected when a temperature which may damage it is detected. 1 STANDARD 3 LOWERING 2 DO NOT CONNECT TO THE POWER SUPPLY WITHOUT ELECTRICAL CURRENT Switch (not included) 1 3 connection diagram

In cases A and B, activate the reset button again (figure 3). In case C, the motor will become cold and its thermal protection will keep the motor s mechanism in use. In connections to the projector, use flexible cables or extra-flexible cables for better vertical movements of Video Lift. Make a spiral or spring with the cables (video, PC, etc.) the same shape as the projector power supply cable, fastening it with flanges to the bridges (eyes) on the pantograph. Monitor and prevent the cables from rubbing against any moving parts of the Video Lift mechanism. ASSEMBLING THE ACCESSORIES You now know the height of the projector equipment and the space that it occupies. Use the VL closing columns by joining them to the bayonet brackets and check the height required to fasten the multi-bore plate. Cut off the excess multi-window rod. Figure 4 shows how to fasten the bracket to the multi-bore plate in the following order: M screw spring washer M self-tapping screw. The opposite end must be joined to the projector fastening tray using the screws, washers and nuts supplied in the accessories kit. assembly process figure 4 REGULATING THE RUN Once the electrical installation is complete and checked, and the motor wires have been connected, adjust the motor run-end in its mechanical fastening. The Video Lift motor system has a rest regulation (up) position and a work regulation position (down). Video Lift is supplied by the manufacturer with the up rest regulation position at its maximum and the work regulation position at 1 metre and 2 metres, which is the longest possible distance for the VL-100E and VL-200E models, respectively. To change the up or down run-ends of the lift, follow these guidelines. Ensure that the motor stops at the end where the cable, light indicator, etc. is installed and at this end you will see two marks, 1 and 2 (see figure 5). adjustment of rest/work position regulation of up-buffer regulation of down-buffer figure 5 1 2 Connect Video Lift to the electricity supply and leave the operating switch in the DOWN position. 5 PROJECTION With the Hallen key from the accessories kit, turn screw 2 in a down + direction to obtain a greater distance from the projector with regard to the ceiling. If you want to reduce this run, turn screw 2 in a down direction.

HIDE With the Allen key, turn screw 1 in an up direction. To go up, stop the Video Lift-projector beforehand and position the multi-bore plate at the same level as the enclosure ceiling. Turn screw 1 in a + direction to obtain the opposite effect. > < Screw 1 Screw 2 (-) direction (-) direction for raising the Video Lift more (Projector+multi-bore plate) < for lowering the Video Lift less (shorter projector-ceiling distance) (+) direction (+) direction > for raising the Video Lift less for lowering the Video Lift more (projector+multi-bore plate) (greater projector-ceiling distance) quick view chart Important: Remember that in the rest or retraction position, thanks to its springs, Video Lift allows you to adapt the plate (between 3 and 4 cm) to the possible imperfections on the ceiling. Final Tip: Try and fasten light materials (which weigh very little) to the multi-bore plate, such as balsa wood, high-density, expanded polyurethane, plastic, etc., which eliminate weight and adapt easily to the artistic use and final decor of the surroundings. THANK YOU FOR CHOOSING 7 TROUBLESHOOTER - The system does not work. The pilot light is off: 1. Check that there is a 230-V power supply. The pilot light is on: 1. Check the 230-V input voltage. 2. Check the cabling and operating switch and circuit diagram. 3. Check that the overload micro-switch has not jumped; to do this, press the safety button (figure 3, reset button), with the lift operating switch in the projection position. 4. Ensure that the Video Lift equipment has not been in operation for more than 4 minutes. Wait until the motor has cooled down. 6 - The steel cable has come out of its guide channel: 1. Check the HORIZONTAL status of your lift using a level. Check that the video projector is balanced. 2. Check that no foreign object prevents the cable from entering its guide channel. 3. Activate the lift downwards fully, guide the cable in its guide channel from the start and activate the upwards movement. If the cable is bulkier, if there are any stray hairs, if it is folded, rusted, etc., or it is in a bad condition, send it to the technical service.

8 TECHNICAL INFORMATION VL-100 E MODEL VL-100 US MODEL VL-200 E MODEL VL-200 US MODEL Equipment *: width 400 mm. width 400 mm. length 470 mm. length 470 mm. * further details in figure 6 height 110 mm. height 140 mm. With packaging: width 455 mm. width 455 mm. length 480 mm. length 480 mm. height 220 mm. height 220 mm. Net weight: 10.4 kg. 12.2 kg. Gross weight: 16.0 kg. 18.0 kg. Maximum work run: 105 cm. 203 cm. Noise level: Tubing: Maximum permitted consumption: Ambient temperature: Up or down speed: Continuous motor operating time: Maximum load: Regulation of up-run end: Regulation of down-run end: Mechanical protection: Electrical protection: < 50 db. insulation. 5 Amp. (including the consumption by the equipment to be installed) 40ºC maximum. 45 seconds a metre. 4 minutes (with the thermal safety system) 19 Kg. YES YES YES Protection to be installed by the user/installer Power supply: MOD. E 230 V / 50 Hz. MOD. US 115V / 60 Hz. Insulation: 1000 V. Consumption: 105 W / 0.5 Amp. Electrical guarantee: 2 years Mechanical guarantee: 3 year 400 mm 470 mm Video Lift VL 100-1.050 mm VL 200-2.030 mm 330 mm Video Lift VL 100-110 mm VL 200-145 mm equipment measurements 7 figure 6

9 -MAINTENANCE This equipment has been constructed for low-level maintenance: Grease the axles on the pantograph joints every 6 months with a drop of very fluid SAE 20 oil. Check the steel cable every 2 months; ensure that there are no faults or loose hairs or breakages throughout its run. 10 -GUARANTEE Video Lift has established the following guarantees for its devices: For 24 months after the date of billing and for the first customer, we undertake to repair or replace all parts which, in the opinion of the company, are due to faults in the materials used in manufacturing its equipment. Repairs will be carried out at our Technical Support Service. The SOMFY operating motor has a 36-month guarantee of use. Transfer, carriage and haulage costs of the equipment to our workshops and return to the customer are excluded. Not included in the guarantee: damage or faults cause by undue use, incorrect installation, faults attributable to carriage or incorrect packaging when the equipment is being returned. Video Lift is not responsible for direct or indirect eventual damage caused to people or things due to damage or faults with its equipment, and does not accept any liability or responsibility, whatever it may be. 11 HC635 FRAMEWORK KIT OPTIONAL ACCESSORIES Four aluminium profiles, brackets, screws, etc. to construct a framework to replace technical ceiling guides (Armstrong or similar) on wood, plaster, etc. ceilings, with a professional finish such as the CINEMA MIRROR support. It also settles the Video Lift closing system finish in its installations. INTERIOR DIMENSIONS: EXTERIOR DIMENSION: 597 x 597 mm. 640 x 640 mm. Total or partial reproduction or dissemination of this manual is prohibited without written authorisation by the owner of the trademark. Technical characteristics may vary without prior notice; always to ensure technical and structural improvements. 8