Glast beam test at CERN

Similar documents
A new Scintillating Fibre Tracker for LHCb experiment

TORCH a large-area detector for high resolution time-of-flight

SciFi A Large Scintillating Fibre Tracker for LHCb

Report from the 2015 AHCAL beam test at the SPS. Katja Krüger CALICE Collaboration Meeting MPP Munich 10 September 2015

arxiv:hep-ex/ v1 27 Nov 2003

Report from the Mini-peer Review of the Tracker GTRC6 Problem, Root Cause, Tests & planned GTRC7 Resolution.

Commissioning and Performance of the ATLAS Transition Radiation Tracker with High Energy Collisions at LHC

The CALICE test beam programme

Sensors for the CMS High Granularity Calorimeter

The hybrid photon detectors for the LHCb-RICH counters

Time Resolution Improvement of an Electromagnetic Calorimeter Based on Lead Tungstate Crystals

THE TIMING COUNTER OF THE MEG EXPERIMENT: DESIGN AND COMMISSIONING (OR HOW TO BUILD YOUR OWN HIGH TIMING RESOLUTION DETECTOR )

Particle Test Peer Review

arxiv: v1 [physics.ins-det] 1 Nov 2015

Status of the CUORE Electronics and the LHCb RICH Upgrade photodetector chain

Using Geant4 in the BaBar Simulation. CHEP03 25 March 2003 Dennis Wright (SLAC) on behalf of the BaBar computing group

BABAR IFR TDC Board (ITB): requirements and system description

li, o p a f th ed lv o v ti, N sca reb g s In tio, F, Z stitu e tests o e O v o d a eters sin u i P r th e d est sezio tefa ectro lity stem l su

RTPC 12 Simulation. Jixie Zhang Aug 2014

Study of the performances of the ALICE muon spectrometer

DAQ Systems in Hall A

HAPD and Electronics Updates

Commissioning of the ATLAS Transition Radiation Tracker (TRT)

An extreme high resolution Timing Counter for the MEG Upgrade

The Elettra Storage Ring and Top-Up Operation

Compact Muon Solenoid Detector (CMS) & The Token Bit Manager (TBM) Alex Armstrong & Wyatt Behn Mentor: Dr. Andrew Ivanov

1. General principles for injection of beam into the LHC

1 Digital BPM Systems for Hadron Accelerators

THE ATLAS Inner Detector [2] is designed for precision

Concept and operation of the high resolution gaseous micro-pixel detector Gossip

... A COMPUTER SYSTEM FOR MULTIPARAMETER PULSE HEIGHT ANALYSIS AND CONTROL*

Drift Tubes as Muon Detectors for ILC

Test beam data analysis for the CMS CASTOR calorimeter at the LHC

Tracking Detector R&D at Cornell University and Purdue University

LHCb and its electronics. J. Christiansen On behalf of the LHCb collaboration

The trigger for the New Electromagnetic Calorimeter NewCal

Spatial Response of Photon Detectors used in the Focusing DIRC prototype

The ATLAS Pixel Detector

Upgrading LHC Luminosity

The Silicon Pixel Detector (SPD) for the ALICE Experiment

Status of BESSY II and berlinpro. Wolfgang Anders. Helmholtz-Zentrum Berlin for Materials and Energy (HZB) 20th ESLS-RF Meeting

An Overview of Beam Diagnostic and Control Systems for AREAL Linac

Present Status and Future Upgrade of KEKB Injector Linac

Beam Loss Detection for MPS at FRIB

LHC Beam Instrumentation Further Discussion

Status of the Timing Detector Plastic+SiPM Readout Option

A fast and precise COME & KISS* QDC and TDC for diamond detectors and further applications

Development of an Abort Gap Monitor for High-Energy Proton Rings *

PoS(PhotoDet 2012)018

Monolithic Thin Pixel Upgrade Testing Update. Gary S. Varner, Marlon Barbero and Fang Fang UH Belle Meeting, April 16 th 2004

TitleLarge strip RPCs for the LEPS2 TOF. Author(s) Chu, M.-L.; Chang, W.-C.; Chen, J.- Equipment (2014), 766:

Synchronization of the CMS Cathode Strip Chambers

Proposal by the Ohio State University High Energy Physics to join the BABAR Collaboration

Status of GEM-based Digital Hadron Calorimetry

with Low Cost and Low Material Budget

Local Trigger Electronics for the CMS Drift Tubes Muon Detector

Evaluation of ALICE electromagnetic calorimeter jet event trigger performance for LHC-Run2 by simulation

The Large TPC Prototype: Infrastructure/ Status/ Plans

Study of Timing and Efficiency Properties of Multi-Anode Photomultipliers

The CMS Detector Status and Prospects

CMS Note Mailing address: CMS CERN, CH-1211 GENEVA 23, Switzerland

Current status of XFEL/SPring-8 project and SCSS test accelerator

Performance of the MCP-PMT for the Belle II TOP counter

HIGH-INTENSITY PROTON BEAMS AT CERN AND THE SPL STUDY

LHCb and its electronics.

ATLAS Pixel Subsystem and Simulation

The Alice Silicon Pixel Detector (SPD) Peter Chochula for the Alice Pixel Collaboration

OPERATIONAL EXPERIENCE AT J-PARC

Performance and aging of OPERA bakelite RPCs. A. Bertolin, R. Brugnera, F. Dal Corso, S. Dusini, A. Garfagnini, L. Stanco

A flexible FPGA based QDC and TDC for the HADES and the CBM calorimeters TWEPP 2016, Karlsruhe HADES CBM

Note on the preliminary organisation for the design, fabrication and test of a prototype double-sided ladder equipped with MAPS

Hall-B Beamline Commissioning Plan for CLAS12

The TORCH PMT: A close packing, multi-anode, long life MCP-PMT for Cherenkov applications

12GeV CEBAF Commissioning

INCA ENERGY EDS TRAINING. System Block Diagram. INCA Energy Software. Xiang Yang EM SMU. Navigators. Point & ID Navigator.

Libera Hadron: demonstration at SPS (CERN)

Status of CMS and preparations for first physics

PRESENT STATUS OF J-PARC

SLAC Cosmic Ray Telescope Facility

GLAST Large Area Telescope:

Week 0: PPS Certification and Processing. Mon Feb 11 Tue Feb 12 Wed Feb 13 Thu Feb 14 Fri Feb 15 Sat Feb 16 Sun Feb 17

Focusing DIRC R&D. J. Va vra, SLAC

Paul Rubinov Fermilab Front End Electronics. May 2006 Perugia, Italy

Commissioning and Initial Performance of the Belle II itop PID Subdetector

Realization and Test of the Engineering Prototype of the CALICE Tile Hadron Calorimeter

CGEM-IT project update

R&D of Scintillating Fibers for Intermediate Tracking and Bunch Id

Trigger synchronization and phase coherent in high speed multi-channels data acquisition system

CERN-RRB April 2005 Status of the LHCb Experiment Report to April 2005 RRB By the LHCb Collaboration

FMS Update: Spin PWG. Stephen Trentalange April

Short Introduction to the use of the H6 beam

TRT Software Activities

Instrumentation and analysis progress for g2p experiment

Copper Tube 5.25 mm ID. PEEK Fiber 0.25 mm OD. Copper Rod 4.75 mm OD

GLAST Large Area Telescope:

Update on DAQ for 12 GeV Hall C

First evaluation of the prototype 19-modules camera for the Large Size Telescope of the CTA

US CMS Endcap Muon. Regional CSC Trigger System WBS 3.1.1

Atlas Pixel Replacement/Upgrade. Measurements on 3D sensors

Digital Delay / Pulse Generator DG535 Digital delay and pulse generator (4-channel)

Transcription:

Glast beam test at CERN Glast Collaboration Meeting 2005 R. Bellazzini 1

LAT beam test at CERN Main goals LAT-TD-02152, see Steve slides Required beam types and related measurements 1. tagged-photon beam 50MeV- ~GeV (PSF, 2-track recon, inter-tower dead space.) 2. Electron beam 1-~100 GeV (CAL calibrations, high energy leak corrections in CAL,.) 3. Hadron beam ~GeV Desired approximate beam time 3 weeks for each beam type (including setup) Calibration unit configuration 2 TKR towers, 3 CAL modules R. Bellazzini 2

Beams availability at CERN Experimental areas 1. Tagged γ beam available from CERN-PS, T7, T9 and T11 East Hall experimental areas 2. High energy electron beam available from CERN-SPS, H4 and H6 (if E ~100GeV) North Hall experimental areas Current general beam schedule 1. CERN-PS physics runs: 5/15 11/3 2006 (3950 hrs) 2. CERN-SPS physics runs: 6/15 11/3 2006 (2950 hrs) Guidelines for beam requests Glast is a recognized experiment (RE7) and beam requests are welcome A call for beam requests from the SPS coordinator will circulate in September Requests for beam time larger than 1 week can: be split into more runs of 1 week each and be submitted to the SPS coordinator with a single request following his call; the standard form should be filled and a support/documentation proposal (max 4 pages) should be provided to the SPS coordinator. This way was suggested by the SPS coordinator be directly submitted to the SPS Committee and its chairman at least 3 weeks before the committee meetings (next meetings 9/27, 11/15); SPSC will discuss and eventually approve the request at the Research Board Meeting (12/1) R. Bellazzini 3

Experimental areas for tagged γ beam T9/T11 Maximum electron energy 15GeV (T9), 3.5GeV (T11) Photon energy range : ~50MeV-~GeV low energy threshold dependent on the position of the experimental apparatus in the hall; lower γ energy require positioning the apparatus far from the magnet to allow harder electrons (smaller deviations after the magnet) to be tagged before intercepting the apparatus Beam dimensions: ~cm both in X (bending plane) and Y Rates: SPS has a cycle of ~15s with 1 to 3 spills of 400ms flattop. AGILE collected 5M γ events in the 2004 run (~1 week of data taking) Beam line equipment: cherenkov counters for particle ID, general equipment (gas, vacuum, N 2 ) available on request, control room away from the area (connection to DAQ via ethernet) Beam purity: mixture of e -, p, π, with e - fraction rapidly decreasing with energy (<50% at 3GeV see following slides) R. Bellazzini 4

AGILE experience at T9 AGILE γ-tagging station at T9 M. Prest offered the AGILE setup and their experience (beam settings) to support a GLAST beam test. They had the best experience in T9 (better beam, better line equipment), although almost a week was lost due to a beam tuning problem that was moving the beam spot away from the apparatus and which the AGILE team finally solved in conjunction with the beam line responsibles. The following slides are taken from the T9 AGILE runs R. Bellazzini 5

The AGILE γ-tagging station at T9 0.96T Tagging station performance: S1, S2, S3: scintillators for trigger (S1&S2&S3 for γ acquisition) BCi: AGILE silicon detectors (~1/16 of a GLAST tray layer); used for e - beams detection e - deflection is measured with 5mrad resolution momentum resolution is 2.5% p/p + 2% from beam Comments: AGILE is willing to provide the station, and an integration with the GLAT CAL was already performed in 2003 integration with current TKR+CAL DAQ system is to be understood the TKR team could provide a similar setup using spare trays: integration of the DAQ would be simpler but we would have to build the system from scratch R. Bellazzini 6

T9 beam dimensions from M.Prest, AGILE 2003 run R. Bellazzini 7

T9 beam purity The rest is mainly π, so at 1GeV the beam is ~7%p, 73%e, 20%π from M.Prest, AGILE 2003/2004 runs R. Bellazzini 8