FORENSIC CASEBOOK. By Bob Huddleston, Eastman Chemical Co. One of the most common. reasons for marriage failure

Similar documents
SECTION MEDIUM VOLTAGE CABLE INSTALLATION. 1. Section Underground Ducts and Manholes.

REFURBISHMENT OF SECONDARY SYSTEMS IN HIGH VOLTAGE SUBSTATIONS LESSONS LEARNED IN VENEZUELA

HSE Learning from Fatal Coating Plant Accident

SITE All work shall be performed at Center Park Substation (1895 Kernan Blvd, Jacksonville, Fl ). DATE: 04/03/2018

HEALTH AND SAFETY MANUAL

IndyGo Facility Upgrades Project 35671EE

Report on Comments June 2013 NFPA 70

Installation Manual Original Instructions - IW4001

Meeting the Challenge of a Difficult Job Speciality Contractor ACE Awards

TRANSCENSION 6-CHANNEL DMX DIMMER PACK (order code: BOTE40) USER MANUAL

OneFit Cable test and temporary earthing truck instruction manual

2002, Cisco Systems, Inc. All rights reserved.

POTCSC - Integrated Small Target Detection Radar and Acoustic Deterrence System RFP Questions and Answers

CITY OF LOS ANGELES CIVIL SERVICE COMMISSION CLASS SPECIFICATION POSTED JUNE VIDEO TECHNICIAN, 6145

Methods of Inspection to Determine the Presence of Potential Arc Flash Incidents

Engineering Instruction

HARMONIZATION OF SYNOPTIC BLOCK DIAGRAMS ON THE CONTROL PANELS OF MV SWITCHGEAR AND CONTROLGEAR

Continuous Currents. When inspectors see a photovoltaic (PV) power system. through Curious Cables. by John Wiles

Operating Instructions 07/2007 Edition. SINAMICS G130/G150 Line harmonics filter. sinamics

Product Manual MNX10015 / REV C MODEL SB142, SB242. Dual Output Series Switch Boxes

SINAMICS G130 / G150. Line harmonics filter. Operating Instructions 05/2010 SINAMICS

Mediacom Upgrade/Splicing Procedures (based on original document from Corporate dated 4/16/98)

Incorrect Temperature Measurements: The Importance of Transmissivity and IR Viewing Windows

AMERICAN NATIONAL STANDARD

COOPER POWER SERIES. 600 A 15/25 kv class DT625 T-body installation and cable preparation instructions. Deadbreak Apparatus Connectors MN650017EN

Cambria County Association for the Blind and Handicapped 175 Industrial Park Road Ebensburg, PA Prepared for: Prepared by:

INSTALLATION INSTRUCTIONS MODEL VSBX-236 LED 3 X 8 INDOOR SCOREBOARD

ICS Digital Menu. Installation Guide Version 1.1

SECTION Q -- EQUIPMENT REMOVAL AND CABLE MINING

Operating Manual (Edition 04/2004) sinamics. Line Reactors SINAMICS G130

SceneStyle2 User Guide

Student Services & Classroom Addition

TV Lift System Model CL-65 Installation Instructions

INSTALLATION INSTRUCTIONS FOR

System Troubleshooting for

ELECTRICAL SAFETY INSPECTION REPORT. MTM Garments Ltd.

Implementation of a High-Speed Distribution Network Reconfiguration Scheme by Greg Hataway, Ted Warren, and Chris Stephens.

Preventing Fieldbus Physical Layer Problems

Identification - electrical services

SINAMICS G130. dv/dt filter plus Voltage Peak Limiter. Operating Instructions 03/2013 SINAMICS

IEEE-SA SCC-18 Report by Representatives to NFPA NEC CMP-6 January 6-8, 2010 on Actions Taken on Proposals by CMP-6 for NEC 2011 ROC Prepared by

RoHS. Atma-Sphere Music Preamplifier. model P-2 OWNER'S MANUAL. Please study this document carefully before using equipment

Specification. NGTS Issue 1 October 1993

/ PAT01 USER MANUAL

High Voltage Cable Splicing Training

Photovoltaic Module Installation Manual (IEC)

This SOP is applicable to all WMATA personnel working on the Rail System, contractors performing the work and WMATA contractor escorts.

FIBER OPTIC CABLE PULLING

Be sure to check the camera is properly functioning, is properly positioned and securely mounted, every time you operate your vehicle.

Programming Guide and User Manual INS # Model # CKM. ControlKeeper M

Transfer Switch. OTECA (Spec A) OTECB (Spec A) OTECC (Spec A) OTECD (Spec A) Amperes. English Original Instructions (Issue 5)

Installation Manual SaVi Note Underwater LED Light

Target Interface / Construction Compliance Inspection Checklist

INSTALLATION INSTRUCTIONS FOR. MODEL 2230LED

Tucker Theatre Policies and Procedures MTSU Department of Theatre 205 Boutwell Dramatic Arts Murfreesboro, TN 37132

TRANSMISSION ENGINEERING STANDARD TES-P , Rev. 0 TABLE OF CONTENTS 1.0 SCOPE 2.0 CABLES SPLICES

March 4 th, Addendum No. 1. Brooklyn College Systems Integrator Broadcast Television Equipment Project No: BY019/

ELECTRICAL SAFETY INSPECTION REPORT

SECTION 5900 TRAFFIC SIGNALS CITY OF LEE S SUMMIT, MISSOURI DESIGN CRITERIA

Photovoltaic Module Installation Manual (IEC)

MICROMASTER Encoder Module

Tube Rotator. User Guide. Version 1.2

Utility Amplifier GA6A Model

TRIPLETT. PairMaster. Lan Cable Test Set. Instruction Manual

MODELS USIX-024 AND USIX-120 INSTRUCTION SHEET FOR FEDERAL SIGNAL UNISTAT STATUS INDICATOR MODEL USIX

ELECTRICAL SAFETY FOLLOW UP INSPECTION REPORT (8th) Factory Name Address Factory ID

Sample Test Project. District / Zonal Skill Competitions. Skill- Electrical Installation. Category: Construction and Building Technology

SECTION 7 -- CROSS-CONNECT SYSTEMS

Broadcast Operations

VITALink Taped Splice Straight Through Crimp

S Regulators. Supplement 1. Contents. Control Replacement Assembly Installation Instructions Supplement

Installation Guide VL-MV10. Model No.

Fieldbus Testing with Online Physical Layer Diagnostics

Longwood University Department of Communication Studies Communication Studies Facilities and Equipment. Policies & Procedures

PC-250. SMD Taped Parts Counter Operator s Manual. ISO 9001:2008 Certified. V-TEK, Incorporated 751 Summit Avenue Mankato, MN USA

User Manual CC DC 24 V 5A. Universal Control Unit UC-1-E. General Information SET. Universal Control Unit UC-1 Of Central Lubrication PAUSE CONTACT

Model 1421 Distribution Amplifier

INSTRUCTION DE SÉCURITÉ SAFETY INSTRUCTION Mandatory as defined in SAPOCO/42 FIRE PREVENTION FOR CABLES, CABLE TRAYS AND CONDUITS

Failure Report. elbow near termination on bend. live-front

AUTOMATIC VIDEO LOSS A/B SWITCH

Aerial Cable Installation Best Practices

Tube Roller Shakers. User Guide. Version 1.2

220KV EHV NETWORK AT RELIANCE JAMNAGAR REFINERY COMPLEX


Condition Monitoring Program of HV Cable Systems

Model 1476-C SuperQuad HR

National Wire and Cable and National Cable Molding Headquarters Los Angeles California

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

CG-1 CAMERA-GUARD INSTRUCTION BOOK IB647501

Interface Practices Subcommittee AMERICAN NATIONAL STANDARD ANSI/SCTE

The Chan-L-Wire Pro Series Lighting Distribution

Alberta Electric System Operator

OWNERS MANUAL. Revision /01/ Lightronics Inc. 509 Central Drive Virginia Beach, VA Tel

DS1 Cross-Aisle Panel

SyncGen. User s Manual

BROADCAST RECEIVER. Installation Guide (BR-100-MOT, BRP-100-MOT) Document Version 1.0. BR-100-MOT, BRP-100-MOT Installation Guide

Wired Troubleshooting Manual

Design and Manufacture of Video Pipeline Inspection Systems A Full Service Company

RFIs AND RESPONSES; ANSWERS ARE IN RED.

Instructions for Use P.154-UP (9/4) P.155-UP (9/8) P.150-UP-12 (9/12) P.150-UP-16 (9/16)

Transcription:

The Case of the Energized Cable Cutting Incident How miscommunication leads to an electrical helper slicing through live 13.8kV cable and miraculously walking away to tell about it By Bob Huddleston, Eastman Chemical Co. One of the most common reasons for marriage failure today is the breakdown of basic communications. The same holds true for construction and maintenance workers. Words spoken on the job with a specific intent can often be misconstrued to mean something entirely different a situation that can ultimately be a recipe for disaster. That was definitely the case at a major chemical manufacturing facility when an unqualified electrical helper working for an outside electrical contracting firm was asked to perform a task he didn t fully understand. The job at hand on that fateful day was to remove some temporary mediumvoltage (MV) cabling and rigid conduit that extended from the old MV load break switch (which was being used as a splice box) to a new load break switch and to install a new junction box. The crew performing the installation, who was hired by the manufacturing facility as an electrical contractor, had been working on this job for several weeks, replacing the aging electrical distribution equipment. This involved replacing the old substation located in Building 12B (Photo 1) with a new one in Building 12C (Photo 2 on page 10). The scene. The distribution system was configured so that power flowed from an MV breaker (located in another building) to old load break switch [36-3] (which was basically gutted and used Photo 1. Building 12B (location of old substation). Note stairway at south end of building. for a splice box) in old substation Bldg 12B. Temporary MV cable was installed to power a new load break switch [36-4] in Bldg 12C (green cable), as shown in Fig. 1 on page 10. Company electricians (in-house employees who worked for the chemical plant) placed this circuit under lock and tag (LOTO) the morning of the incident. Contractor employees were removing the temporary cabling and conduit between old load break switch [36-3] and new load break switch [36-4] to install a new junction box below the substations in order to provide a permanent feed for the left half of the new substation in Bldg 12C. Similarly, power flowed from a different MV breaker (also in another building) to the other old load break switch [46-3] (which was also just used as a splice point), and then temporary cable was run to new load break switch [46-4] (red cable). This circuit was energized, and the new double-ended substation in Bldg 12C was configured such that the tie breaker was closed, allowing the entire line-up to be powered by this circuit. The contractor crew acquired a safe work permit and hot work permit from the company s area maintenance coordinator first thing that morning. They also conducted a safety task 8 EC&M December 2013 www.ecmweb.com 312ecm FORENSICS.indd 8 11/12/2014 2:13:32 PM

FORENSIC CASEBOOK They also peeled the red tape X off of the back of the new load break switch that had been isolated in the new substation. (This X is used to alert people that this part of the substation is energized. Because this load break switch had been de-energized and placed under LOTO, the X was removed.) Company electricians then removed the back panels of the locked-out new load break switch [36-4], and unbolted the cable terminations after verifying that the circuit parts were de-energized using voltage test equipment. At this point, they told the electrical contractor the circuit had been de-energized/locked out, and left the area. Contractor personnel placed their locks on the lock box for the circuit. Photo 2. Building 12C (location of new substation). Note stairway at north end of building. assessment (STA). In fact, the contractor used the STA as a means of pre-job safety assessment a method that was typically very effective in identifying hazards and either eliminating or mitigating them. However, on this particular morning, the STA did not include any specific information about cutting or removing cables. Instead, it concentrated on installation of the junction box (Photo 3 on page 12). While waiting for the job setup to be completed, a member of the contractor crew (who we will refer to as the contractor electrical helper ) left the building to help move cable reels to another building. Company electricians completed the isolation of the load break switch by racking out and performing LOTO on the MV breaker in another building. The accident. Contractor employees began cutting the conduits and cabling below the de-energized old load break switch [36-3] in Bldg 12B. The contractor lead electrician asked the electrical helper to get his ratchet cable cutters, go to the far load break, and cut the 4/0 cables. (He was being asked to cut the MV terminators off of the cables in the back of the locked-out load break switch [36-4] so that they would pull out of the conduit easily.) The contractor crew, including the lead electrician, began wiping lubricant off of the cables in anticipation of pulling them out of the conduit. Fig. 1. Layout of buildings, showing where the cut was made and where it was supposed to be made. 10 EC&M December 2013 www.ecmweb.com 312ecm FORENSICS.indd 10 11/12/2014 2:14:00 PM

FORENSIC CASEBOOK Have you seen the newest E-newsletter in the EC&M family? Photo 3. New junction box located below the buildings. Illumination Insider tracks the research, development, design, installation and operation of all types of lighting and control products. This twice-a-month e-newsletter reaches approximately 75,000* professionals working in the industrial, commercial, retail, residential, institutional, health care, government, and utility market sectors. *Publisher s own data Subscribe Today See all if our EC&M E-newsletters at ecmweb.com The helper promptly went up the south stairway of Bldg 12B and entered the old substation room (Fig. 2 on page 14). He passed by de-energized load break switch [36-3] (which had the wires hanging out and the back taken off), noticed the door leaning up against the back wall, and continued to far load break switch [46-3] in, which was energized. He noticed that this switch was locked and tagged in the off position. He also saw the red tape X on this load break switch (Photo 4 on page 14) but made the incorrect assumption that this device was de-energized. The helper took a battery-powered drill and removed the bolts from the back cover from the energized load break switch and placed the cover to the side. When he began to cut the cable in the back of the load break switch, he heard a loud pop and saw a flash. Realizing something was very wrong, he went to the south stairway to tell the contractor s lead electrician that there might be a problem. A problem it was, indeed. Company operations personnel quickly showed up asking what had happened, considering that a significant portion of the chemical manufacturing facility had lost power when this fault occurred. Despite the disruption and downtime that followed, the miraculous thing was that the helper walked away from the incident without a scratch. Investigation and analysis. One positive result of this near-miss was that the ground fault detection and relaying system on the MV power circuit breaker was tested and proved to work as designed. The protection system detected the phase-to-ground fault, which resulted from the cable cutters slicing through the copper shield on the 13.8kV cable and penetrating the inner conductor. The circuit breaker opened quickly, removing power from the fault and preventing a large arc flash event. The investigation uncovered some rather unsettling facts that ultimately contributed to this safety near-miss. Although he was considered to be a good worker and generally did his 12 EC&M December 2013 www.ecmweb.com ILLUMINATION INSIDER_DECIssueHsAd.indd 1 312ecm FORENSICS.indd 12 12/12/2013 2:40:14 PM 11/12/2014 2:14:29 PM

best to perform tasks correctly, the helper was not a qualified electrical worker as defined by NFPA 70E ( one who has skills and knowledge relating to the construction and operation of the electrical equipment and installations and has received safety training to recognize and avoid the hazards involved ). During the investigation, the helper s answers to some basic questions about the new substation installation clearly demonstrated he did not fully understand the technical aspects of this job. The electrical contracting firm s employees had worked at the chemical manufacturing site for many years, so they clearly understood both site policies and their own contracting firm s requirements for participating in the LOTO /hand-over of the de-energized circuits, yet they did not do so on this job. The company electricians performed the circuit lock-out, but there was no verification by the contractor employees and virtually no discussion about how the lock-out had been performed. They just took the electrician s word for it that everything had been isolated, locked out, and de-energized. The pre-job safety review performed by the contracting crew the morning of the incident was not executed properly. The STA focused on the big job rather than specific issues and safety hazards of the task at hand, which was to remove the old cables and conduit, install the junction box and new conduit, and then install the new cabling. Clearly, the instructions given by the electrical contractor s lead electrician to the helper were inadequate. Go to the far load break, and cut the 4/0 cables, he was told. During the investigation, it became apparent that the lead electrician intended for the helper to go up the north stairway adjacent to Bldg 12C, enter the new substation room, go to the far load break switch [36-4] in that room (which was de-energized and under LOTO), and cut the terminators off of the shielded cable. The helper, however, went up the south stairway next to Bldg Photo 4. Red taped X on rear of energized load break switch 46-3. Fig. 2. Layout of buildings, showing intended path (right side) for contractor electrical helper, and actual path (left side). 14 EC&M December 2013 www.ecmweb.com 312ecm FORENSICS.indd 14 11/12/2014 2:14:50 PM

12B, entered the old substation room, and went to the far load break switch in that room [46-3] (which was energized) to make the cut (Fig. 2). In essence, the helper did exactly what he was told to do! In retrospect, it was also determined that the lead electrician did not fully understand what tasks he should assign to the helper without direct supervision. The pair had worked together in the same crew for many months, which may have lulled the lead electrician into a sense of complacency concerning the helper s understanding of instructions. There was a lock and tag on the front of load break switch [46-3] left over from the removal of the old substation equipment where the cut was made (Photo 5). In actuality, this load break switch was only being used as a splice box. Thus, the lock and tag were meaningless. However, when the helper saw the lock and tag, it further convinced him that it was okay to remove the back from this load break switch a decision that substantiates the fact that he should not have been considered a qualified electrical worker. At this company site, there were high expectations concerning the wearing of arc-rated clothing whenever an arc flash hazard exists. However, no one had given adequate consideration to the concern of cutting into existing cables especially shielded MV cables that were installed in the field. Because of the difficulty of testing shielded cables to determine whether they are energized or not, the assumption of energized until proven otherwise should always prevail, and adequate arc-rated PPE should be worn until the first cut is made. The taped red X system also proved woefully inadequate as a method to inform workers of energized parts. A better system one that is NFPA 70Ecompliant should have been used. Lessons learned. There were many action items that resulted from the incident investigation, all of which made improvements to the company s electrical safety program: The company group responsible for contractor management was asked to ensure that outside contractors both define and understand the qualifications for Photo 5. Cable cutters embedded in 13.8kV cable. performing electrical work and that those doing so were adequately trained and fully competent. The role of helpers also needed to be clarified. The site s Safe Practices Manual, which contains the electrical safety program, was re-worded to require that all parties working on the job be involved in the absence of voltage check after LOTO is performed. The company contractor management group was asked to stress to all site contractors the proper use of the pre-job safety assessment, which must be detailed enough and specific to the tasks to be performed that day. All those who are involved in the work must participate in this assessment. The company crew responsible for electrical distribution was assigned the task of implementing new minimum PPE requirements for making cuts on cables that have been previously energized. Finally, the company electrical crew responsible for working on distribution equipment developed an NFPA 70Ecompliant hazard identification process to replace the red tape X system. This new process was rolled out to all parties involved, including outside contractors. At the end of this case, all parties involved learned that improper communications is an ongoing issue that is not easily resolved. The miscommunication and incorrect interpretation that started the dangerous chain of events and led to a near-miss in this case is a lesson for all of us. Only by stressing safety above all else and at all times can we hope to keep employees safe. Huddleston is a licensed professional engineer in Tennessee and an electrical safety engineer at Eastman Chemical Co., Kingsport, Tenn. He can be reached at rhud@eastman.com. 16 EC&M December 2013 www.ecmweb.com 312ecm FORENSICS.indd 16 11/12/2014 2:15:10 PM