Circuit Reliability Review

Similar documents
Circuit Reliability Review

British Columbia Utilities Commission (BCUC) British Columbia Hydro and Power Authority (BC Hydro)

Implementation of a High-Speed Distribution Network Reconfiguration Scheme by Greg Hataway, Ted Warren, and Chris Stephens.

APPLICATION OF POWER SWITCHING FOR ALTERNATIVE LAND CABLE PROTECTION BETWEEN CABLE LANDING STATION AND BEACH MAN HOLE IN SUBMARINE NETWORKS

A SMART, SAFE AND SMOOTH FUTURE TELESTE FOR CITY TRANSPORT. Video security and passenger information solution for city transport

Implementation of LED Roadway Lighting

Real Time Monitoring for SMART Grid Initiatives Synchronized Measurement & Analysis in Real Time SMART program by

Images for life. Nexxis for video integration in the operating room

SUMMARY REPORT. Consultation Summary Report. January 2016

Set-Top Box Incentive Programs: The Slippery Frog or A Subliminal Fog?

Justifying the Proactive Replacement of Cable

CASE STUDY. Smart Motorways Project. Temporary CCTV Monitoring Systems for England s Motorway network.

BUSINESS SYSTEMS MONITORING

SERVICE DESCRIPTION VIDENS SD-WAN SERVICE MANAGEMENT

Power Quality - 5. Interruptions. Content. Course. Ljubljana, Slovenia 2013/14. Prof. dr. Igor Papič

Bridging Legacy Systems & the Internet of Things. Matt Newton Director of Technical Marketing OPTO 22

INTERNET OF THINGS WINNING FORMULA. Rami Avidan Managing Director, Tele2 IoT

WIRING INSTRUCTIONS Crop Link Lite/Pro 4-20mA INPUTS and SCALED VOLTAGE INPUTS

Don t let Potential Customers pass you by!

Based on our maintenance efforts, during the second quarter of 2018, Comcast s plant was 99.9% reliable.

GfK Audience Measurements & Insights FREQUENTLY ASKED QUESTIONS TV AUDIENCE MEASUREMENT IN THE KINGDOM OF SAUDI ARABIA

ATV-HD Project Executive Summary & Project Overview

Professional LED sports lighting in an adaptable system

BEFORE THE FEDERAL COMMUNICATIONS COMMISSION Washington, D.C

Processor time 9 Used memory 9. Lost video frames 11 Storage buffer 11 Received rate 11

IoT trends in the Americas and considerations on the importance of National IoT plans

Off Site Maintenance Goes Mobile Electronic Cellular Time Switch

Assessing I-Grid Web-Based Monitoring for Power Quality and Reliability Benchmarking

KCRT. Prepared by: Sue Hartman, Director. Assisted by: Cecily McMahan

ANALYSIS OF FAILURE IN POWER CABLES FOR PREVENTING POWER OUTAGE IN ALEXANDRIA ELECTRICITY DISTRIBUTION COMPANY IN EGYPT

PINE RIDGE ELEMENTARY

The BIGGEST. The 2 nd Saudi International Exhibition & Conference for Internet of Things February 2019

Cable Rate Regulation Provisions

Damaged, unsecured, and broken poles

CATV Leakage Detection Flyovers with Pinpointing Capability

AREMA 2015 ANNUAL CONFERENCE. NYSDOT / Amtrak. Hudson Line Improvement Program. David W. Emerich, PE CHA. Minneapolis, MN October 4-7, 2015

Flip-Flops. Because of this the state of the latch may keep changing in circuits with feedback as long as the clock pulse remains active.

Mitigation of Cascading Outages and Prevention of Blackouts:System-Wide Corrective Control

New York MX700 Room. PWD-NY5-MX700-P60 List Price: $11, SLA Price: $1,100.00/year (Other options available See Appendix B)

PoE: Adding Power to (IoT)

CALIFORNIA GERMANY TRAVEL TRADE BAROMETER

WIRING INSTRUCTIONS CROP-LINK Drip Installation

Presented by: David J. Crain, GeoMetWatch ITSC-18, Meteo France, Toulouse, March 21,

OpenOne Outage Management System

Evaluation Tools. Journal Impact Factor. Journal Ranking. Citations. H-index. Library Service Section Elyachar Central Library.

IOT. Internet of Transformation. Whitepaper.

Q&A with our Customer Services Director, Matt Rudling

SolarEdge Instruction - California Electric Rule 21

Fieldbus Testing with Online Physical Layer Diagnostics

Photovoltaic Module Installation Manual (IEC)

Sample Test Project. District / Zonal Skill Competitions. Skill- Electrical Installation. Category: Construction and Building Technology

India s perspective on IoT in smart cities program

Reliability Guideline: Generating Unit Operations During Complete Loss of Communications

Welcome to Electrical and Electronic Engineering UCD. Electronic/Computer Engineering (ECE)

Barnas International Pvt Ltd Converting an Analog CCTV System to IP-Surveillance

User's Manual. Rev 1.0

Grid Interactive Advanced Features Self-Supply Mode

Spectrum for the Internet of Things

City of Lafayette. Advanced Transportation Management System (ATMS) Active Traffic Signal Management December 13 th, Agency Case Studies

Choosing the Right Machine Vision Applications

UCR 2008, Change 3, Section 5.3.7, Video Distribution System Requirements

Cambridge National Engineering. Mark Scheme for June Unit R113: Electronic principles

North American Broadcasters Association (NABA)

IoT in Port of the Future

Smart Communities Using GIS

Solar System. 21st Century Junior Library: Titles & Pricing ISBN. CALL: FAX: ONLINE:

December 16, 1999 PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION

Meeting the Challenge of a Difficult Job Speciality Contractor ACE Awards

Success Providing Excellent Service in a Changing World of Digital Information Resources: Collection Services at McGill

TRF STEP-DOWN TRANSFORMER USER MANUAL

instruction manual model 315 video sync separator s/n

never recognized 7,307,391)

Sustainable Energy without the hot air

AMPHENOL RF ENABLES THE INTERNET OF THINGS

CPD LED Course Notes. LED Technology, Lifetime, Efficiency and Comparison

Photovoltaic Module Installation Manual (IEC)

Building for the Future, Taking Care of Today

Set-Top-Box Pilot and Market Assessment

European Weather Centre upgrades AV for collaboration and clarity

Undergrounding HV and EHV Window of Opportunity Opens

AN INTRODUCTION TO BIBLIOMETRICS

Aqua Turf International, Inc.

Bringing an all-in-one solution to IoT prototype developers

ELIGIBLE INTERMITTENT RESOURCES PROTOCOL

Guatemala Capital Area Digital Telephone Network Improvement and Expansion Project

2009 Fare Collection Workshop VISA + TAP. Jane Matsumoto. LACMTA, Deputy Executive Officer/Program Manager TAP. Matt Newsome

M4000 Diagnostic Test System For Power Apparatus Condition Assessment

Re-defining the utility-scale inverter

IEEE-SA SCC-18 Report by Representatives to NFPA NEC CMP-6 January 6-8, 2010 on Actions Taken on Proposals by CMP-6 for NEC 2011 ROC Prepared by

National Grid Residential Demand Response Demonstration Project Update. MA EEAC October 2016

Summary Project Specification Consultation Report

Review of the Comcast. Fort Collins Cable System. Technical Characteristics

Installation and Operation Manual

Reduction of operating costs

Analog to Digital conversion of HD video. The HD-Now provides a simple method of upgrading ROVs for live HD. Keep existing infrastructure intact.

MEASURING EMERGING SCIENTIFIC IMPACT AND CURRENT RESEARCH TRENDS: A COMPARISON OF ALTMETRIC AND HOT PAPERS INDICATORS

AN ECONOMIC MODEL FOR THE EVALUATION OF DIFFERENT TECHNOLOGICAL SCENARIOS IN THE RAIL SECTOR

G1-M1 (Protection Relay)

CHIEF BROADCAST ENGINEER

BIG DATA IN RESEARCH IMPACT AMINE TRIKI CUSTOMER EDUCATION SPECIALIST DECEMBER 2017

Transcription:

Circuit Reliability Review Rancho Santa Margarita January 2018

Building a Smarter Grid for Southern California Southern California Edison is developing an electric grid to support California s transition to a clean and sustainable future that meets the needs and expectations of our customers. We are investing more than $13 billion in the power distribution grid over three years (2017-19). Our main investment goal is to increase power reliability through significant upgrades. The investments include: Upgrading cables, poles, switches and transformers Updating the grid so it can accommodate new technologies, such as smart inverters that will allow for the twoway flow of solar energy Adapting the power system to accommodate future California policy related to energy storage, electric transportation and renewable energy Providing enhanced automation and monitoring devices to allow us to better respond to changes on the grid Our investments in local communities will help ensure that customers receive safe, reliable, and affordable electricity now and in the future. Learn more at edison.com/innovation 2

Understanding Your Reliability Report As your electric utility, we want you to always have power when you need it. To get there, we constantly track and monitor electric outages across our service territory, and we measure our system reliability from this data. The two metrics we rely on are common in the electric utility industry: the System Average Interruption Duration Index (SAIDI) and the System Average Interruption Frequency Index (SAIFI). Both are described in more detail on the next page. Replacing and upgrading our infrastructure will help SCE maintain or improve SAIDI and SAIFI measurements. This report provides historical reliability data for the circuits that serve your jurisdiction and our proposed infrastructure upgrades for the current year. To view other reliability reports, visit sce.com>outage Center>Maintaining Reliable Service 3

Reliability Metrics MOMENTARY OUTAGES: OUTAGES LASTING 5 MINUTES OR LESS SUSTAINED OUTAGES: OUTAGES LASTING LONGER THAN 5 MINUTES MAIFI: o The number of times the average customer is interrupted by Momentary outages each year. SAIFI: o The number of times the average customer is interrupted by Sustained outages each year. SAIDI: o The cumulative amount of time the average customer is interrupted by Sustained outages each year. 4

Cities in the SADDLEBACK District CityList1 ALISO VIEJO COTO DE CAZA IRVINE LAGUNA BEACH LAGUNA HILLS LAGUNA NIGUEL LAGUNA WOODS LAKE FOREST LAS FLORES MISSION VIEJO RANCHO SANTA MARGARITA 5

* Exclusions are days which utilities are allowed to remove from their metrics because the outages on those days were caused by a severe acts of nature. **In the columns showing Rank, lower numbers indicate poorer performance. 6

Overview of Rancho Santa Margarita CircuitList1 There are 17 circuits that serve Rancho Santa Margarita 1 Circuit Type Customers Circuit Type Customers Circuit Type Customers Circuit Type Customers AUDUBON(12KV) 1,779 - - - CAZA(12KV) 455 - - - CLEVELAND(12KV) 1,816 - - - COOLER(12KV) 1,575 - - - EMPRESA(12KV) 1,308 - - - FIZZ(12KV) 1,676 - - - FOGCUTTER(12KV) 2,321 - - - GRASSHOPPER(12KV) 1,738 - - - MELINDA(12KV) 1,393 - - - MODJESKA(12KV) 1,775 - - - OLYMPIAD(12KV) 1,003 - - - PAJARO(12KV) 1,900 - - - RANCH(12KV) 1,549 - - - RUSTIC(12KV) 3,096 - - - SCOTCH(12KV) 2,617 - - - SHOOTER(12KV) 1,251 - - - WHISKEY(12KV) 1,528 - - - Grand Total 28,780 7

Reliability History of Circuits Serving Rancho Santa Margarita (No Exclusions) BarChart 2014 2015 2016 2017 SAIDI (average minutes of sustained interruptions) 160.0 140.0 120.0 100.0 80.0 60.0 40.0 20.0 84.5 112.1 114.8 32.1 76.8 134.5 139.7 69.2 Rancho Santa Margarita 0.0 SAIFI (average frequency of sustained interruptions) 1.4 1.2 1.0 0.8 0.6 0.4 0.2 0.0 0.6 1.0 0.4 0.9 0.5 1.1 0.4 1.2 SCE SYSTEMWIDE ** Exclusions are days which utilities are allowed to MAIFI (average frequency of momentary interruptions) 2.0 1.5 1.0 0.5 0.0 0.3 1.4 1.4 0.1 0.1 1.6 1.1 1.8 remove from their metrics because the outages on those days were caused by acts of nature. **Data is as of 02/20/2018, data can be slightly different due to outage data validation process 8

Causes of Repair Outages in Rancho Santa Margarita 2017 SAIDIChart Weather /Fire /Earthquake 0.9% Contributions to SAIDI by Outage Cause Vegetation /Animal 0.0% 3rd Party 1.4% Other 3.7% Equipment Failure e.g., in-service failure of transformer, switch, or conductors Vegetation/Animal e.g., tree branch, rodent, or bird causing a short circuit between conductors Other e.g., patrolled but no cause found Operations e.g., urgent maintenance w/o 3-day notice 3 rd Party e.g., balloon, car hit pole, dig-in Operation 10.9% Equipment Failure 83.1% 3rd Party Equipment Failure Operation Other Vegetation /Animal Weather /Fire /Earthquake SAIDI = the cumulative amount of time the average customer is interrupted by sustained outages each year. 9

Causes of Repair Outages in Rancho Santa Margarita 2017 SAIFIChart Other 0.4% Vegetation /Animal 0.0% 3rd Party 3.5% Contributions to SAIFI by Outage Cause Weather /Fire /Earthquake 7.8% Equipment Failure e.g., in-service failure of transformer, switch, or conductors Vegetation/Animal e.g., tree branch, rodent, or bird causing a short circuit between conductors Other e.g., patrolled but no cause found Operations e.g., urgent maintenance w/o 3-day notice 3 rd Party e.g., balloon, car hit pole, dig-in Operation 12.8% Equipment Failure 75.5% 3rd Party Equipment Failure Operation Other Vegetation /Animal Weather /Fire /Earthquake SAIFI = the number of times the average customer is interrupted by sustained outages each year 10

11

12

Back-up Slides Reliability Histories of Circuits Serving Rancho Santa Margarita Updated through Dec 2017

Average Reliability of 17 Circuits Serving Rancho Santa Margarita CitySummary 2014 2015 2016 1st Qtr 2017 2nd Qtr 2017 3rd Qtr 2017 4th Qtr 2017 2017 SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI 17 Circuits Serving Rancho Santa Margarita -- Total Customers: 28,780 84.5 0.6 0.3 32.1 0.4 0.1 76.8 0.5 0.1 31.7 0.1 0.1 6.9 0.1 0.0 12.5 0.1 1.0 18.1 0.1 0.0 69.2 0.4 1.1 3rd Party 3% 5% 57% 1% 3% 33% 5% 10% 52% - - - 1% 0% - 7% 11% 0% - - - 1% 3% 0% Equipment Failure 75% 66% 10% 71% 78% - 90% 77% 10% 73% 67% 51% 95% 95% - 86% 60% 0% 95% 93% 100% 83% 75% 6% Operation 17% 26% 19% 24% 19% - 5% 13% - 19% 32% 44% 4% 5% - 2% 4% - 5% 7% - 11% 13% 5% Other 1% 0% 3% 1% 0% 2% - - 38% 8% 1% 5% 1% 0% 100% 0% 0% 1% 0% 0% - 4% 0% 3% Vegetation/Animal 0% 0% 12% 3% 0% 65% - - Weather/Fire/Earthquake 3% 1% - 5% 25% 98% - - - 1% 8% 86% SCE SYSTEMWIDE 112.1 1.0 1.4 114.8 0.9 1.4 134.5 1.1 1.6 42.6 0.3 0.5 23.6 0.2 0.4 29.2 0.2 0.4 44.3 0.4 0.5 139.7 1.2 1.8 Notes: No outages are excluded from the metrics. Outage Causes: Other: e.g., patrolled but no cause could be found Operations: e.g., urgent maintenance w/o 3-day notice to customers 3 rd Party: e.g., balloons, car hit pole, dig-in Vegetation/Animal: e.g., tree branch, rodent, or bird causing short circuit across conductors SAIDI (minutes) = the cumulative amount of time the average customer is interrupted by sustained (longer than 5 minutes) outages. SAIFI (interruptions) = the number of times the average customer is interrupted by sustained outages. MAIFI (interruptions) = the number of times the average customer is interrupted by momentary " (lasting 5 minutes or less) outages. 14

Reliability Histories for Individual Circuits Serving Rancho Santa Margarita - 1 of 5 2014 2015 2016 1st Qtr 2017 2nd Qtr 2017 3rd Qtr 2017 4th Qtr 2017 2017 SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI AUDUBON(12KV) - Customers: 1,779 0.0 0.0-10.1 0.0 1.0 - CircuitHistory - - 1.0-1.0 3rd Party - - - 1 - Equipment Failure Operation 100% 100% - - Vegetation/Animal - - - 100% 100% 100% - - Weather/Fire/Earthquake - 100% - 100% CAZA(12KV) - Customers: 455 - - - 26.0 0.0 1.0-7.1 0.0 1.0 - - - 7.1 0.0 1.0 3rd Party Equipment Failure Operation - - - 100% 100% 100% 100% - Vegetation/Animal - - - 100% 100% 100% - - Weather/Fire/Earthquake - 100% - 100% CLEVELAND(12KV) - Customers: 1,816 1.4 0.0 - - - 1.0 205.2 1.0-205.2 1.0 1.0 3rd Party Equipment Failure - - 100% 100% - 100% 100% - Operation 100% 100% - - Vegetation/Animal Weather/Fire/Earthquake - 100% - 100% COOLER(12KV) - Customers: 1,575 - - - 95.3 1.2-13.9 0.1-104.9 0.5 0.9 102.2 1.0-3.6 0.5 0.5 - - - 210.6 2.1 1.4 3rd Party Equipment Failure - - - 89% 94% - 91% 86% 100% 100% - - - 49% 48% - Operation - - - 11% 6% - 9% 14% - 100% 100% 100% - 50% 26% 67% Vegetation/Animal Weather/Fire/Earthquake - - - 100% 100% 100% - - - 2% 26% 33% 15

Reliability Histories for Individual Circuits Serving Rancho Santa Margarita - 2 of 5 CircuitHistory 2 2014 2015 2016 1st Qtr 2017 2nd Qtr 2017 3rd Qtr 2017 4th Qtr 2017 SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI 2017 EMPRESA(12KV) - Customers: 1,308 510.9 1.0 295.0 1.1 1.4 1.0-1.0 3rd Party - - 2% 11% 80% - - - Equipment Failure 100% 99% 98% 89% 20% - - - Operation 0% 1% - - Vegetation/Animal Weather/Fire/Earthquake - 100% - 100% FIZZ(12KV) - Customers: 1,676 14.2 0.5 1.0 75.6 1.5-0.1 0.0-1.0-1.0 3rd Party 77% 4% 100% - Equipment Failure - - - 82% 69% - 100% 100% Operation 23% 96% - 18% 31% - - - Vegetation/Animal Weather/Fire/Earthquake - 100% - 100% FOGCUTTER(12KV) - Customers: 2,321 161.0 1.1-61.9 1.0-12.1 0.1-1.0 5.0 0.1-5.0 0.1 1.0 3rd Party Equipment Failure 66% 96% - 100% 100% - 49% 26% - - 100% 100% - 100% 100% - Operation 34% 4% 51% 74% Vegetation/Animal Weather/Fire/Earthquake - 100% - 100% GRASSHOPPER(12KV) - Customers: 1,738 31.4 0.2 0.0 66.0 0.5-218.0 1.2-6.4 0.1-0.5 0.0-164.5 1.3 1.0 27.3 0.1-198.7 1.5 1.0 3rd Party Equipment Failure 87% 26% - 30% 16% - 96% 92% - - - 98% 93% - 100% 100% - 95% 86% - Operation 13% 74% 100% 70% 84% - 4% 8% - 100% 100% - 100% 100% - 2% 7% 5% 14% - Vegetation/Animal Weather/Fire/Earthquake - 100% - 100% 16

Reliability Histories for Individual Circuits Serving Rancho Santa Margarita - 3 of 5 CircuitHistory 3 2014 2015 2016 1st Qtr 2017 2nd Qtr 2017 3rd Qtr 2017 4th Qtr 2017 2017 SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI MELINDA(12KV) - Customers: 1,393 - - - 61.9 1.0-55.0 0.1 - - - 18.3 0.1 1.0 41.3 0.2 0.1 59.6 0.3 1.1 3rd Party Equipment Failure - - - 100% 100% - 91% 54% - - - 100% 100% 3% 56% 44% 100% 70% 55% 10% Operation - - 9% 46% - - 44% 56% - 30% 45% - Vegetation/Animal Weather/Fire/Earthquake - 97% - 90% MODJESKA(12KV) - Customers: 1,775 123.1 0.3 0.9 10.9 0.1-170.4 1.2-330.9 1.0 1.0-1.0 - - - 330.9 1.0 2.0 3rd Party Equipment Failure 68% 70% - 100% 100% - 95% 92% - 100% 100% 100% - 100% 100% 50% Operation 32% 30% 100% - - - 5% 8% - 0% 0% - - 0% 0% - Other - - 1% - Vegetation/Animal Weather/Fire/Earthquake - 100% - 50% OLYMPIAD(12KV) - Customers: 1,003 158.4 1.0 1.6 27.9 0.1-4.7 0.0 1.0 1.0 9.0 0.1-9.0 0.1 1.0 3rd Party Equipment Failure 100% 98% 38% - - - 100% 100% - - 100% 100% - 100% 100% - Operation 0% 2% - 100% 100% - - - Other 100% - - - Vegetation/Animal - - 62% - Weather/Fire/Earthquake - 100% - 100% PAJARO(12KV) - Customers: 1,900 77.6 0.1-29.0 0.1-0.3 0.0 3.6 0.0 - - - 1.0 - - - 3.6 0.0 1.0 3rd Party Equipment Failure 100% 94% - 100% 100% - - - Operation 0% 6% 100% 100% 100% 100% - - - 100% 100% - Vegetation/Animal Weather/Fire/Earthquake - 100% - 100% 17

Reliability Histories for Individual Circuits Serving Rancho Santa Margarita - 4 of 5 CircuitHistory 4 2014 2015 2016 1st Qtr 2017 2nd Qtr 2017 3rd Qtr 2017 4th Qtr 2017 2017 SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI RANCH(12KV) - Customers: 1,549 12.7 0.1 192.8 1.0 17.3 0.1 - - - 1.0 - - - 17.3 0.1 1.0 3rd Party Equipment Failure 100% 100% 100% 100% 100% 100% - - - 100% 100% - Operation Vegetation/Animal Weather/Fire/Earthquake - 100% - 100% RUSTIC(12KV) - Customers: 3,096 95.5 0.4 1.2 5.2 0.1 0.4 92.4 1.0 0.2 48.5 0.1 0.1 1.0 0.0 0.1 12.5 0.1 1.1 0.5 0.0-62.6 0.3 1.3 3rd Party 15% 55% 87% 60% 91% 94% 6% 2% 52% - - - 68% 56% - 66% 95% 1% - - - 14% 46% 1% Equipment Failure 40% 9% 6% 0% 0% - 94% 98% - 52% 93% 1% 0% 41% 46% - Operation 8% 12% - 7% 4% - - - Other 10% 5% 7% 32% 5% 6% - - 48% 48% 7% 100% 32% 44% 100% 0% 0% 11% 100% 100% - 38% 5% 23% Vegetation/Animal 3% 4% - - Weather/Fire/Earthquake 24% 15% - 32% 5% 88% - - - 6% 2% 76% SCOTCH(12KV) - Customers: 2,617 120.1 2.1-16.6 0.1-37.7 0.1-1.0-1.0 3rd Party 3% 2% - - Equipment Failure 45% 50% 84% 68% Operation 52% 47% - 100% 100% - 16% 32% Vegetation/Animal Weather/Fire/Earthquake - 100% - 100% SHOOTER(12KV) - Customers: 1,251 80.0 1.0 252.5 3.0-1.0-1.0 3rd Party - - 26% 33% Equipment Failure 100% 100% 63% 34% Operation - - 11% 33% Vegetation/Animal Weather/Fire/Earthquake - 100% - 100% 18

Reliability Histories for Individual Circuits Serving Rancho Santa Margarita - 5 of 5 CircuitHistory 5 2014 2015 2016 1st Qtr 2017 2nd Qtr 2017 3rd Qtr 2017 4th Qtr 2017 2017 SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI WHISKEY(12KV) - Customers: 1,528 31.9 1.0-73.3 1.0-8.8 0.1-1.0 13.4 0.0-13.4 0.0 1.0 3rd Party Equipment Failure 97% 99% - 84% 98% - 70% 25% - - 100% 100% - 100% 100% - Operation 3% 1% - 16% 2% - 30% 75% Vegetation/Animal Weather/Fire/Earthquake - 100% - 100% 19