3B SCIENTIFIC PHYSICS

Similar documents
3B SCIENTIFIC PHYSICS

Teltron Delection Tube D

J.J. Thomson, Cathode Rays and the Electron

CATHODE-RAY OSCILLOSCOPE (CRO)

THE OPERATION OF A CATHODE RAY TUBE

THE OPERATION OF A CATHODE RAY TUBE

ORLAND SCAN PR PR LIGHTING LTD. Yingbin Road, Dashi Panyu, Guangzhou, China

CHAPTER 4 OSCILLOSCOPES

INSTRUMENT CATHODE-RAY TUBE

OSCILLOSCOPE AND DIGITAL MULTIMETER

120cm (4x36 Watt) incl. Splitter Instruction Manual

Phono Amplifier brinkmann «EDISON» Manual.

NewScope-7A Operating Manual

Orbit TM DIGITAL SHAKERS

ALO 030 MKII. 30 Watt DMX LED scanner. User manual

INSTRUMENT CATHODE-RAY TUBE

CHAPTER 3 OSCILLOSCOPES AND SIGNAL GENERATOR

Thank you for purchasing a qualiton PHONO preamplifier!

01. Stay safe. Privacy information

Tube Rotator. User Guide. Version 1.2

The Cathode Ray Tube

Capstone Experiment Setups & Procedures PHYS 1111L/2211L

Thank you for purchasing a qualiton APR204 preamplifier!

.Power Distribution Center. PD-1. Instruction Manual

USER MANUAL. 28" 4K Ultra HD Monitor L28TN4K

CM-S38901SV TVL IR Long Range camera

User Manual. Adjustable Speed Vortex. Fixed Speed Vortex

MEISHU Phono INTEGRATED AMPLIFIER OWNER S INFORMATION

Model DT-311J. And DT-311J-230V(AC) DIGITAL STROBOSCOPE INSTRUCTION MANUAL

MKH 8060 Directional studio microphone

Operating instructions Retro-reflective sensor. OJ50xx laser / / 2010

Elcometer Circular Ball Type. Drying Time Recorder. Operating Instructions

ELECTRON TUBES 3bscientific.com

Instructions for Use P.154-UP (9/4) P.155-UP (9/8) P.150-UP-12 (9/12) P.150-UP-16 (9/16)

4. Alignment and Adjustments

Using an oscilloscope - The Hameg 203-6

DH551C/DH550C/DL550C Double Sided Display User Manual

TS2.8 Sub OWNER S MANUAL

USER MANUAL. 27 Full HD Widescreen LED Monitor L27ADS

USER MANUAL. 27" 2K QHD LED Monitor L27HAS2K

Led Dynamic DMX Tri Curtain Manual

USER MANUAL. DE-1 Police-light. CAUTION! Keep this device away from rain and moisture! Unplug mains lead before opening the housing!

T5, T8, TC-L. PC T5 PRO lp W V 50/60/0 Hz, HO. Electronic ballasts Linear lamps T5, T8 and compact lamps TC-L

Tutorial Cathode Rays Year 12 Physics - Module 9.3 Motors and Generators

Instrukcja montażu. FLEX LED Neon Instalacja

USER MANUAL. 27 Full HD Widescreen LED Monitor L270E

TRF STEP-DOWN TRANSFORMER USER MANUAL

Service manual Cantano W/T

Tube Roller Shakers. User Guide. Version 1.2

CM-S23349SV. Vari-Focal IR Bullet Camera

X-ray Tube Housing Assembly H1076X H1076Y Print No.HA Release Date:

Product Manual. Designed and Manufactured in the UK by Optikinetics

RIPPLE TANK - projection, with strobe & kit

Vibratory Deck Sieves 15 in. (380 mm)

Outdoor IR Audio Camera

K Service Source. Apple High-Res Monochrome Monitor

USER MANUEL. SNIPE 2 Ref R13

Video Door Entry System Kits 2 Wires Installation

Operation Manual for. SCU1 Signal Conditioning Unit

PERFORMANCE SPECIFICATION SHEET ELECTRON TUBE, CATHODE RAY TYPE 7AGP19

WaterVue TV Installation & User Manual

Hex-color RGBAW+UV LED strip light

MH-X50+ LED spot moving head. user manual

Table of Contents Precautions... 2

6X3W RGB LEDS PROJECTOR FOR PROFESSIONAL TRUSSES USER GUIDE / Version 1

3. Electronics and MMU2 unit assembly

K Service Source. Apple High-Res Monochrome Monitor

CATHODE RAY OSCILLOSCOPE (CRO)

CHECK LINE. Model LS-36-LED. Stationary Stroboscope. Operating Manual BY ELECTROMATIC

Instruction manual. KUZMA 4POINT 14 inch TONEARM Serial Number:

KingWash 7QX 7x40w,Zoom 5-60degree. User manual. Please read the instructions carefully before use TABLE OF CONTENTS

SquareLED - Aura Bar & Matrix Beam Light 100

LED Spot 300W. Please read this user manual before your operation

Operating Instructions Dimmer for V Incandescent Lamps

Fully ly Automaticti. Motorised Satellite t TV System. User s manual REV

Instruction Manual Fixed Speed Vortex Mixer Analog Vortex Mixer Digital Vortex Mixer Pulsing Vortex Mixer

USER MANUAL. 22" Class Slim HD Widescreen Monitor L215DS

This Level 3 amplifier features Audio Note Silver wire and Audio Note signal capacitors. UNPACKING AND INSTALLATION

USER MANUAL Full HD Widescreen LED Monitor L236VA

EN - English Washington Street Melrose, MA Phone Toll Free Revision 4 20/06/17

Instructions for Use P.160-AP-8 (13/8) P.160-CP-8 (13/8) P.160-CP-12 (13/12) P.160-CP-16 (13/16)

Elements of a Television System

LCD Thermometer / Clock S No. 1253

CP1 OAD. Owner s Manual. Stereo Control Preamplifier. Ultrafidelity

4-PROJECTOR BAR WITH 3 X 9W LEDS AND 1 X 1W FLASH LED USER GUIDE

SHOP 150 & 250. CYM continuous colour changer wash luminaire. USER S MANUAL release 1.0

Panel-mounting thermostats, type series EM

Mini LED Pin Spot Light Model: PLS00571

Location and function of controls

Safety Precautions and Maintenance

USER MANUAL Goldmund PH3.8 Phono Preamplifier

Quality produced by means of electron beam

USER MANUAL Full HD Widescreen LED Monitor L215ADS

PEGAS 160 T PULSE HF PEGAS 200 T PULSE HF

INSTRUCTION MANUAL LITE-WRITE LASER SHOW TM

USER MANUAL Full HD Widescreen LED Monitor L215IPS

USER MANUAL. WARNING Read the instructions before using the machine. EN (Original Instruction) / 1704

Q-TV2. User Manual. for Screens

SCREEN WINCH SYSTEM INSTALLATION MANUAL FOR SCREENS FROM 300 cm. UP TO 450 cm. of width

QLOCKTWO CLASSIC. Instructions for use

Transcription:

3B SCIENTIFIC PHYSICS Complete Fine Beam Tube System 1013843 Instruction sheet 10/15 SD/ALF If it is to be expected that safe operation is impossible (e.g., in case of visible damage), the apparatus is to be rendered inoperative immediately and to be safe-guarded from unintentional use. In schools and training institutions, operation of the apparatus is to be responsibly supervised by trained personnel. While the equipment is in operation, voltages may be present at the tube socket which are unsafe to touch. Never operate the device without a tube inserted. Never remove or insert tubes while the equipment is turned on. The instrument may only be connected to the mains via a socket that has an earth connection. Replace a faulty fuse only with one matching the specifications stated at the rear of the housing. Disconnect the equipment from the mains before replacing a fuse. Never short the fuse or the fuse holder. Never cover the air vents in the housing. This is necessary in order to ensure sufficient circula-tion of air required for cooling the internal com-ponents of the equipment. 1. Safety instructions The operating unit for fine-beam tube conforms to the safety requirements for electrical equipment for measurement, control and laboratory use of DIN EN 61010 part 1 and is classified as belonging to protection class I. It is in-tended for operation in dry rooms that are suitable for electrical equipment or installations. Safe operation of the apparatus is guaranteed with correct handling. However, safety is not guaranteed if the apparatus is handled improperly or carelessly. Hot cathode tubes are thin-walled, highly evacuated glass tubes. Treat them carefully as there is a risk of implosion. Do not subject the tube to mechanical stresses. Before switching on the anode voltage wait about 1 minute for the heater temperature to stabilise. When the tube is in operation, the stock of the tube may get hot. Allow the tube to cool before putting away the apparatus. 1

2. Description Operating Unit for Fine-Beam Tube The operating unit for the fine beam tube is to be used with the fine beam tube T (1008505) in order to determine the specific charge of an electron and for investigating the deflection of electron beams in a uniform magnetic field. The Helmholtz coils are permanently attached to the apparatus while the removable fine beam tube is placed on a socket that can be rotated by up to 270. The tube and coil pair are both connected internally to the operating unit without a need for external wiring. All supply voltages for the tube and the current through the Helmholtz coils are adjustable. The anode voltage and coil current are displayed digitally and can be tapped additionally as equivalent voltage values. Fine-Beam Tube T Inside the fine beam tube, a sharply delimited electron beam is generated by a system comprising an indirectly heated oxide cathode, perforated anode and Wehnelt cylinder in a residual helium atmosphere with accurately known gas pressure. Impact ionisation of helium atoms creates a very bright, also sharply delimited trace of the electron path in the tube. If the tube is aligned optimally and an appropriate current flows through the Helmholtz coils, the electrons are deflected into a circular orbit, whose diameter can be easily determined when the electrons strike one of the equidistant measurement marks, causing its end to light up. The operating unit for the fine beam tube is designed for operating the fine beam tube (1009948). 3. Contents a) Operating Unit for Fine-Beam Tube 1 Operating unit 1 Set of power supply cables EU, UK, US 1 Instruction sheet b) Fine-Beam Tube T 1 Fine-beam tube 1 Instruction sheet 4. Technical data a) Operating Unit for Fine-Beam Tube Helmholtz coil pair: Coil diameter: Winding count: 124 Magnetic field: Operating unit: Coil current: Measurement output: Anode voltage: Measurement output: Heating voltage: Wehnelt voltage: Display: approx. 300 mm 0 3.4 mt (0.75 mt/a) 0 4.5 A U OUT I H 1V 1A 15 300 V, 10 ma max. U A UOUT 100 5 7 V DC, 1 A max. 0-50 V 3-digit digital LED display for coil current and anode voltage Precision Display: 1% + 2 digits Measurement outputs: 1% Output connections: 4 mm safety sockets General data: Tube's rotary angle: -10 270 Supply voltage: Power supply cable: Dimensions: Weight: b) Fine-Beam Tube T Gas filling: Gas pressure: Bulb diameter: Orbit diameter: Measurement mark spacing: 100 240 V, 50/60 Hz EU, UK and US approx.310x275x410 mm³ approx.7.5 kg Helium 0.13 hpa 165 mm 20 120 mm 20 mm 5. Basic principles An electron moving with velocity v in a direction perpendicular to a uniform magnetic field B experiences a Lorentz force in a direction perpendicular to both the velocity and the magnetic field F ev B (1) e: elementary charge This gives rise to a centripetal force on the electron in a circular path with radius r, where 2

2 m v F (2) r and m is the mass of an electron. Thus, m v e B (3) r The velocity v depends on the accelerating voltage of the electron gun: e v 2 U (4) m Therefore, the specific charge of an electron is given by: e m 2 U (5) r B 2 If we measure the radius of the circular orbit in each case for different accelerating voltages U and different magnetic fields B, then, according to equation 5, the measured values can be plotted in a graph of r 2 B 2 against 2U as a straight line through the origin with slope e/m. The magnetic field B generated in a pair of Helmholtz coils is proportional to the current IH passing through a single coil. The constant of proportionality k can be determined from the coil radius R = 147.5 mm and the number of turns N = 124 per coil: B k where (6) I H k 5 3 4 2 7 4π 10 Vs Am N R mt 0,756 A Thus, all parameters for the specific charge are known. 6. Operating unit controls 1 Measurement output for accelerating voltage 2 Adjustment knob and display for accelerating voltage 3 Adjustment knob for Wehneltvoltage 4 Adjustment knob for heater voltage 5 Adjustment knob and display for coil current 6 Measurement output for coil current 7 Rotating socket 8 T-model fine beam tube (1008505) 9 Helmholtz coils 10 Carrying handle 11 Mains socket 12 Fuse holder 13 Mains switch 14 Fan 15 Ventilation slits 3

7. Operation 7.1 Installation of fine beam tube Screw on the cap nut by turning it anticlockwise. Check the fine beam tube to ensure that none of its contacts are bent. Insert the tube vertically downward, making sure that the contact pins and the coding pin are correctly aligned (see Fig 1). 7.2 Adjusting the electron beam Set up the fine beam apparatus in a darkened room. Align the tube as illustrated above (with the cathode ray gun perpendicular to the magnetic field of the Helmholtz coils). For instructions on how to rotate the tube, see section 7.3. Set the adjustment knob for the heater voltage to a position in the middle (6 V approx.). Turn the knob for the coil current all the way to the left, i.e. 0 A. Wait about 1 minute for the heater temperature to stabilise. Slowly increase the anode voltage to 300 V (the electron beam is initially horizontal and is visible as a weak, bluish ray). Select the Wehnelt voltage so that a very clear and narrow electron beam is visible. Optimise the focus and brightness of the electron beam by varying the heater voltage. Fig. 1: Insertion of tube Press the tube down with gentle pressure until it sits firmly on the socket. Note: Measure the height of the socket up to the top of the cap nut and compare this with the height of the tube. This will enable you to see whether the tube is sitting correctly in the socket. Tighten the cap nut manually by turning it to the right, making sure that the tube remains vertical. Caution: as long as the knurled screw is not tightened, the tube is not secured and could fall out when being transported. Increase the current IH passing through the Helmholtz coils and check that the electron beam curves upwards. If the beam is deflected downwards, the tube should be rotated by 180. Turn the coil current back up and check whether the electron beam follows a closed circular path. You may need to rotate the tube slightly. Carry out the experiment as described below. 7.3 Rotating the tube The tube is mounted on a socket which can rotate from -10 to 270. In order to rotate the tube, you must loosen the knurled screw, but do not screw it all the way out Do not turn the tube itself, instead rotate the turntable or the cap nut. Tighten up the knurled screw again. Caution: if the knurled screw is screwed out all the way, the tube is not secured and could fall out when being transported. Fig. 2: Inserted tube 7.4 Changing the fuse Turn off the power switch and unplug the mains plug. Pull out the fuse holder using a flat end screwdriver (see Fig. 3). Use the screwdriver as a lever from the side of the mains socket. 4

Replace the fuse and reinsert the holder in its socket. Fig. 3: Changing the fuse 8. Care and maintenance Before cleaning the equipment, disconnect it from its power supply. Use a soft, damp cloth to clean it. 10. Sample experiment Determination of the specific charge of an electron e/m Select the current passing through the coils so that the radius of the circular path is for example 5 cm. Note the set current value. Decrease the anode voltage in steps of 20 V to 200 V. In each case, set the coil current IH so that the radius remains constant. Take down these values. Record other series of measured values for radii of 4 cm and 3 cm. For further evaluation, plot the measured values in a graph of r 2 B 2 against 2U. The slope of the line through the origin corresponds to e/m. 9. Disposal The packaging should be disposed of at local recycling points. Should you need to dispose of the equipment itself, never throw it away in normal domestic waste. Local regulations for the disposal of electrical equipment will apply. 2 U/ V 600 400 200 0 0 10 20 30 40 2 2 2 2 Br / mt cm Fig. 4 Graph of r 2 B 2 against 2U for values as measured (black: r = 5 cm, red: r = 4 cm, green: r = 3 cm) 3B Scientific GmbH Rudorffweg 8 21031 Hamburg Germany www.3bscientific.com Subject to technical amendments Copyright 2015 3B Scientific GmbH