Michigan State University Construction Standards EXTERIOR FIBER OPTIC CABLE SYSTEM PAGE

Similar documents
Public Works Division Lighting District Fiber Optic Specifications April 2009

SPECIAL SPECIFICATION 8540 Telecommunication Cable

SPECIAL SPECIFICATION 6559 Telecommunication Cable

Section Communications Optical Fiber Backbone Cabling

SPECIFICATION. Optical Fiber Cable

Special Specification 6242 Special Fiber Optic Cable

SPECIAL SPECIFICATION 6191 Fiber Optic Cable

SPECIAL SPECIFICATION 2284 Fiber Optic Cable (Self-Supporting)

1. The contractor shall ensure that: c) Contractor or sub-contractor has at least 5 years experience

1993 Specifications CSJ SPECIAL SPECIFICATION ITEM Fiber Optic Cable System

Cable Installation Tips

Cable Installation Tips

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR FIBER OPTICS. ITS:CLC 1 of 11 APPR:MDW:JVG: FHWA:APPR:

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 804 FIBER OPTIC CABLE AND COMPONENTS. July 19, 2013

NC-1000 INSTALLATION MANUAL NC-1000 FIBRE OPTIC CROSS-CONNECTION SYSTEM

Panduit Recommended Best Case Practice Split Fibre

SECTION FIBER OPTIC STATION CABLES

California Polytechnic State University ITS Telecommunications PART 1 GENERAL SECTION AUDIO VISUAL STATION CABLES 1.

HCS - HES Cabling Systems

Telecommunciations Infrastructure Project September 20, A. Broadband radio frequency active and passive components

HES HACILAR ELEKTRİK SANAYİ VE TİC.A.Ş.

STRUCTURED CABLE SYSTEM (SCS)

SECTION MEDIUM VOLTAGE CABLE INSTALLATION. 1. Section Underground Ducts and Manholes.

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 804 FIBER OPTIC CABLE AND COMPONENTS. January 20, 2017

Optical Distribution Box 300 Installation Guide. Version : R0.0

SECTION TESTING, IDENTIFICATION AND ADMINISTRATION

NAVSEA STANDARD ITEM. 1.1 Title: Fiber Optic Component; remove, relocate, repair, and install

FIBER OPTIC CABLE PULLING

SPECIAL SPECIFICATION 1438 Fiber Optic Cable (Single mode and Multimode)

SECTION COMMUNICATIONS HORIZONTAL CABLING

SSA Fibre-Optic Extender 160 Fibre Installation Guidelines Version 1.2

MT-RJ SECURE Product Expansion Now 10 Variants of the MT-RJ SECURE Products

FREEDM Loose Tube Interlocking Armored Cables

Triax TechInfo. Installing and pulling Fibre Optic cables

Telecommunication Infrastructure Project September 20, 2002

CABLING STANDARDS FOR

DESIGN!!GUIDELINES!!!!!

REQUEST FOR QUOTE: TELECOMMUNICATIONS CABLING Library/Classroom Building, Beltline Campus

TECHNICAL SPECIFICATION

ADDENDUM #3. SPECIAL NOTE: Addendum #3 information shall supersede the information contained in the Contract Documents

COMMON WORK RESULTS FOR INTEGRATED AUTOMATION DESIGN AND CONSTRUCTION STANDARD

3M Fiber Optic Wall Mount Enclosure 8430 Series

SECTION 683 VIDEO OPTICAL TRANSCEIVER WITH BI-DIRECTIONAL DATA CHANNEL DESCRIPTION

SECTION COMMUNICATIONS HORIZONTAL CABLING

SPECIAL SPECIFICATION 1987 Single Mode Fiber Optic Video Transmission Equipment

SECTION TELECOMMUNICATIONS FIBER OPTIC DISTRIBUTION

BILOXI PUBLIC SCHOOL DISTRICT. Biloxi Junior High School

Fiber Optics Redefined

CHAPTER 14 WIRING SIGNALS AND LIGHTING FIELD GUIDE Wiring Requirements WIRING

Installation of Optical Fiber

A. All communications equipment rooms shall be installed in a neat and workmanlike manner.

HI-DEX PRODUCT SET DATASHEET

Ø 1000 * 588 mm 50 kg

Delaware County Community College Project # Marple Campus Renovation - Phase % Construction Documents November 23, 2011

Coastal Carolina University RE-BID WILLIAMS BRICE RENOVATION AND REPAIR October 19, 2018 Construction Documents

UNIFIED FACILITIES GUIDE SPECIFICATIONS

IP-LINX. Installation Guide

1995 Metric CSJ SPECIAL SPECIFICATION ITEM 6031 SINGLE MODE FIBER OPTIC VIDEO TRANSMISSION EQUIPMENT

GF-KSW-48 Series of Fiber Optic Distribution Box. Instruction Manual

Clearview. Classic Cassettes. Installation Manual. Clearview Classic (HD) High Density. Part #: Rev: A Updated:

Minimum qualifications for the Telecommunications Engineer are: A. Texas Licensed Profession Engineer (PE)

ACADEMIC SUCCESS CENTER THE COLLEGE AT BROCKPORT STATE UNIVERSITY OF NEW YORK PROJECT NO

Connectix Cabling Systems

Pre-bid Supplement #01 Communications Specifications and Additional Scope Project Bid: CM Date: 05/26/2017

UNIFIED FACILITIES GUIDE SPECIFICATIONS

Number of Fiber 12 Core 24 Core 48 Core. Part Number

Detailed Specifications & Technical Data

INSTALLATION INSTRUCTIONS

SJOF-BS604B. Fiber Optic Splice Closure User Manual Rev.1

SECTION 7 -- CROSS-CONNECT SYSTEMS

SECTION O FIBER OPTICS

Specification for Loose Tube Fiber Optic Cable (Non-Metallic, Dry Block, Figure-8) (G.652.D)

24-Fiber LANLINXS (Model # ) 48-Fiber LANLINXS (Model # ) User Manual

Micro duct Cable with HDPE Sheath for Installation by Blowing

Request for Quote E- Rate Eligible Services Scope of Work Network Infrastructure and Structured Cabling

Mining and Petrochemical Fiber Optic Cables

3M Distribution Box (DDB)

SPECIAL SPECIFICATION 1291 Fiber Optic Video Data Transmission Equipment

Optical Fibre Cable Technical Specification. Duct Cable GYFTY-24,48,72,144,216B1.3

Target Interface / Construction Compliance Inspection Checklist

3M Fiber Optic Splice Closure 2178-XL & 2178-XL/FR

APPENDIX A Verify All Part Numbers (Partial List of Approved Products)

SPECIFICATION 96F SM LOOSE TUBE, DRY CORE MINI CABLE

Data Network Wiring Standard. Part 1: General Section Includes Publications and Standards

DOME OPTIC SPLICE CLOSURE

SECTION 5900 TRAFFIC SIGNALS CITY OF LEE S SUMMIT, MISSOURI DESIGN CRITERIA

IP-LINX Fiber :: X-XXXX

GUWN. Central Loose Tube Cables Universal Indoor/Outdoor, Steel Wire Armor (SWA) A/I-DQ(ZN)HBH Full Rodent Protection. Ordering Information

NO MORE LOOSE ENDS PRE-TERMINATED FIBER CABLE: FAST. TESTED. READY TO GO (BBOX) BLACKBOX.COM/PRETERMFIBER

SPECIAL SPECIFICATION :1 Video (De) Mux with Data Channel

Mediacom Upgrade/Splicing Procedures (based on original document from Corporate dated 4/16/98)

TE CONNECTIVITY <cable type> <fiber type> MM/YY SO<shop order number> XXXXX FEET

Click & Go. LWL-NE4-Katalog. Click & Go Modular Solutions. Subject to technical changes! 1

PHYSICAL FACILITIES Consultant s Handbook Specifications Division 27 Communication 0553 Identification for Communications Systems

RetractaNet XS. Extractable Solutions for OSP. October 2012

SPECIAL SPECIFICATION 6911 Fiber Optic Video Data Transmission Equipment

Small System Packages. Strand Dimming Systems

Preparing a home for TransACT fibre-to-the-premise (FTTP) services

3M Fiber Optic Splice Closure 2178-XSB/XSB-FR & 2178-XLB/XLB-FR 3M Cable Addition Kit 2181-XB/XB-FR

SPECIFICATION 192F SM LOOSE TUBE, DRY CORE MINI CABLE

Transcription:

PAGE 271800-1 SECTION 271800 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section. 1.2 SUMMARY A. This Section includes the following: 1. This Section specifies the fiber optic cabling system for cable installed between buildings and structures. 2. Provide all labor, materials, and equipment as necessary to complete all work as indicated on the drawings, and as specified herein. 3. The Contractor shall furnish and install a complete fiber optic cabling system with all necessary components for a complete system as described in the specification and shown on the drawings. B. Related Sections include the following: 1. Applicable sections of Division 26 - Electrical 1.3 SYSTEM DESCRIPTION A. Installation of new fiber optic communication cable including all terminations for a complete system. 1.4 SUBMITTALS A. Shop Drawings: 1. Fiber optic cables 2. Equipment racks, enclosures, patch panels, and all related components 1.5 QUALITY ASSURANCE A. The fiber optic cables shall be installed under the supervision of an installer having a minimum of five years experience in fiber optic cable installation under this type of application.

PAGE 271800-2 B. All fiber optic connections and terminations shall be made by a fiber optic technician with a minimum of two years experience in similar installations. C. The contractor assumes responsibility for ensuring the electrical and mechanical integrity of the combination of components used in the system. Any components which are not engineered suitably for the devices to which they are attached shall be subject to exchange before or after installation at the Contractor's expense. All components shall be operated within the manufacturer's specifications without modification. D. The Contractor shall test each fiber to be used in the system using an OTDR. The test shall be performed at the installation site with cables on reels. An authorized Owner representative shall be present during the entire testing phase. The test data shall be submitted to the Project Representative prior to cable installation. E. On-reel tests shall consist of OTDR traces for each multi-mode fiber at 850 and 1300 nm. Photographic or hardcopy traces shall be submitted to the Owner for approval. F. After installation, Proof-of-Performance tests shall be performed and documented as described in Section 160800. Use the following paragraph when new cable is installed adjacent to existing broadband cable and/or installed in existing broadband outlet boxes. G. In some cases the new cable will be installed in the vicinity of the existing broadband cable. The broadband cable system is fully functional with no abnormalities. At the conclusion of the project, the Owner will test the broadband system and if any problems are identified the Owner will repair the system at the Contractors expense PART 2 - PRODUCTS 2.1 FIBER OPTIC CABLES A. Siecor part number: 072XW4-AK780A20. B. Altos type loose tube cable. C. Single PE jacket, six loose tubes. D. 24 Multi-mode 62.5/125 um fibers, 3.5/1.00 db/km (maximum attenuation) and 200/600 mhzkm (minimum bandwidth at 850/1300 nm). E. 48 Single-mode 8.3/125 um fibers, 0.40/0.30 db/km (maximum attenuation at 1310/1550 nm). F. Fiber placement: SMF 12, 12, 12, 12 ; MMF 12, 12. G. Loose tube colors: SMF Blue, Orange, Brown, Green ; MMF Slate, White.

PAGE 271800-3 H. Fiber Colors: Blue, Orange, Green, Brown, Slate, White, Red, Black, Yellow, Violet, Pink, Aqua. 2.2 SPLICES A. All splices shall be fusion type. B. The maximum loss of any splice shall be 0.20 db. C. All splices shall be contained in splice trays. Splice trays shall be Siecor M67-045. D. Fiber Splice Centers shall be Siecor FSC-05D with all necessary manufacturer recommended components for a complete and secure installation. 2.3 FIBER OPTIC PIGTAILS AND CONNECTORS A. Pigtails shall be defined as a length of fiber with a connector on only one end. Pigtails shall be: 1. Siecor Fiber Optic Cable Assembly, part number 6100-01R3131-006M (single- mode) 2. Siecor Fiber Optic Cable Assembly, part number 5000-01K3141-006M (multi- mode) B. Jumpers shall be defined as a length of fiber without connectors. Jumpers shall be: 1. Siecor Fiber Optic Interconnect Cable, part number 001R31-31131-00 (single- mode) 2. Siecor Fiber Optic Interconnect Cable, part number 001K31-31141-00 (multi- mode) C. Pigtails shall be factory assembled production units. D. The maximum loss of any pigtail's connector shall be 0.30 db. E. The optical return loss for each single mode pigtail's connector shall be greater than or equal to 55 db. 2.4 EQUIPMENT A. Fiber Optic Racks and Cabinets 1. Equipment rack shall be: a. BUD Open Relay Rack, type RR-1369MG, with 77"x19" panel space. 2. Equipment cabinets shall be: a. Everest, 19" vertical cabinet, model 4-771930, royal blue 3. Equipment cabinet shelves shall be: a. Everest, model SF1930-D

PAGE 271800-4 B. Connector Panels 1. Connectors shall terminate in a connector panel. Connector panels shall be Siecor CPC-D24 with all necessary manufacturer recommended components for a complete and secure installation. 2. Connector panels shall accommodate up to 24 adapters. Adapters shall be labeled and documented accordingly. 3. Connector panel adapters shall be: Siecor TER-067. C. Connector Centers 1. Connector Center shall contain 48 adapters. Adapters shall be labeled and documented accordingly. 2. Connector Center adapters shall be: Siecor FCC-048-15. D. Hose Racks 1. Hose racks shall be installed to hang large coils of fiber optic cable on. Hose racks shall be: a. Spencer Turbine Co. (800) 232-4321, model RKV-90000, for loops of cable 200' or less; model RKV-90003, for loops of cable over 200'; or approved equal. E. Cable Loop Enclosures 1. New 14 gauge galvanized steel, 48"x48" (minimum), enclosures shall be constructed and secured to wall to cover new fiber optic cable loops where indicated on drawings. The fiber optic cable's innerduct shall extend into the new enclosure. 2.5 INNERDUCT A. Innerduct in conduit 1. Innerduct shall have a 1", lubricated, spiraled interior, ribbed exterior, and a pull string. Four different color innerducts shall be installed in one 4" conduit along the entire fiber optic cable route. The four different colors shall be black, red, green, and white. 2. The innerduct shall be: a. Arnco, model SR-511-100-Y0 (colors from above), lubricated, with 1250# polyester pull tape; or approved equal. B. Innerduct in Steam Tunnel 1. Cables in steam tunnels shall be installed in corrugated polyethylene innerduct. 2. The innerduct shall be:

PAGE 271800-5 C. Innerduct plugs a. Arnco, model COR-500-125; or approved equal. 1. Innerduct plugs shall be solid compression plugs. Plugs shall be: a. Jackmoon U.S.A. (818) 854-1670, expansion blank duct plugs with rope tie. D. Split innerduct 1. The split innerduct shall be: a. Arnco, model ARC-540-01-1-5/8 polyethylene corrugated split duct; or approved equal. E. Transition couplers 1. New transition couplers shall be: a. Aeroquip, (800) 445-2192, transition couplers for converting from 3-channel FoDuct to single innerduct. PART 3 - EXECUTION 3.1 GENERAL A. Cables located inside buildings shall be run through new innerduct and installed in conduit or cable tray to the designated fiber optic room or loop location. B. After all fibers have been terminated in equipment cabinets or racks, a 30' service loop of extra cable shall be provided in the cable tray. C. Each loose tube of 12 fibers each shall be looped in the splice center. Minimum length of loose tube between the point of fiber entry into the splice center (where jacket is stripped away) and the splice tray entry point shall be 4 meters. D. All fiber must be looped in the splice trays between the point of fiber entry and the splice. Sufficient spare fiber must be provided to permit replacement of the splice at a future date. E. Install one new splice center for each 72 fiber cable entering the fiber optic cabinet. Each new splice center shall only contain splice trays containing fibers from the same 72 fiber cable; excluding jumpers and pigtails from a different fiber cable. F. Each new fiber end shall be fusion spliced to either a pigtail or a jumper. Pigtails shall be used for linking to the connector panel, and jumpers shall be used for bridging between splice trays; as shown on drawings. END OF SECTION 271800